ERECTION STANDARD
The standard field inspection report will be used to register the different checks (measurements,
observations ...) which are required in the control reports dispatched with each Erection Quality
Control Plan.
Additional or equivalent sheets can be used by contractors but on condition that contractor's reports
are agreed by ALSTOM Power representative.
- Storage
. storage maintenance FT 611-39
. storage non conformance report FT 611-40
- Piping erection
. piping networks FT 611-44
. piping supports FT 611-45
- Welding :
For all standard data record sheets regarding welding inspection : refer to the Welding
Enginnering Manual (C 5) = EG 501.
GGG/00/M/MCE---/EG/020 C FT 611-39
FIELD INSPECTION REPORT
--------------------------------------------- REPORT N° : ________________
STORAGE MAINTENANCE
Power
Steam Power Plant
Power Plant
WAREHOUSE N°
SHELTER N°
ENCLOSURE N°
YARD N°
STORAGE INSTRUCTIONS
GGG/00/M/MCE---/EG/020 C FT 611-39
STORAGE NON CONFORMANCE REPORT REPORT N° : _________________
---------------------------------------------
Power
Steam Power Plant
Power Plant
I : No tarpaulin
COMMENTS :
GGG/00/M/MCE---/EG/020 C FT 611-40
FIELD INSPECTION REPORT REPORT N° : ________________
---------------------------------------------
Power HANDLING OVER OF CIVIL STRUCTURES
Steam Power Plant
Power Plant
COMMENTS :
GGG/00/M/MCE---/EG/020 C FT 611-41
FIELD INSPECTION REPORT REPORT N° : ________________
---------------------------------------------
Power EQUIPMENT FOUNDATION
Steam Power Plant
Power Plant
EMBEDDED PIECES
MATERIALIZATION
GEOMETRICAL CONFORMITY:
SHAPE
DIMENSIONS
ANCHORING POINTS
SURROUNDING CONDITIONS
COMMENTS :
GGG/00/M/MCE---/EG/020 C FT 611-42
FIELD INSPECTION REPORT REPORT N° : ________________
---------------------------------------------
Power ROTATING MACHINE ALIGNEMENT
Steam Power Plant
Power Plant
GGG/00/M/MCE---/EG/020 C FT 611-43
FIELD INSPECTION REPORT REPORT N° : _____________________
---------------------------------------------
Power PIPING NETWORK
Steam Power Plant
Power Plant
INSTALLATION
BRANCHES CONNECTIONS
PUMP/TANK/APPARATUS
CONNECTIONS
SLOPE
VALVES
ERECTION
POSITION
ACCESSIBILITY
FLOW DIRECTION
FITTINGS :
TEMPERATURE WELL
GASKETS, BOLTS
COMMENTS :
GGG/00/M/MCE---/EG/020 C FT 611-44
FIELD INSPECTION REPORT REPORT N° : _______________________
---------------------------------------------
Power PIPING SUPPORT
Steam Power Plant
Power Plant
ERECTION
POSITIONNING
FINAL SETTING UP
COMMENTS :
GGG/00/M/MCE---/EG/020 C FT 611-45
FIELD INSPECTION REPORT REPORT N° : ________________
---------------------------------------------
Power
Steam Power Plant
Power Plant
COMMENTS :
GGG/00/M/MCE---/EG/020 C FT 611-46
UNIT : Folio /
SYSTEM ERECTION SYSTEM : S.E.C. N° :
CERTIFICATE
Power
Steam Power Plant
Power Plant
This is to certify that an inspection of the system has been carried out
on……………………………………………………. ……………………………………………………..and that the
preliminary tests without fluid/voltage can be strated.
During the inspection the following main outstanding items related to start-up were noticed.
TO BE
ITEM N° MAIN OUTSTANDING ITEMS CLEARED CLEARED BY
BY
Nam/vis. date
START-UP START-UP
ACCEPTED BY ERECTION SUPERVISORS CWE ENGINEER LEAD ENGINEER
COMPAGNY
NAME
DATE
SIGNATURE
GGG/00/M/MCE---/EG/020 C FT 611-96
GGG/00/M/MCE---/EG/020 C FT 611-96