ERECTION STANDARD

STANDARD FIELD INSPECTION REPORT

The standard field inspection report will be used to register the different checks (measurements,
observations ...) which are required in the control reports dispatched with each Erection Quality
Control Plan.
Additional or equivalent sheets can be used by contractors but on condition that contractor's reports
are agreed by ALSTOM Power representative.

List of standard Field Inspection Reports

- Storage
. storage maintenance FT 611-39
. storage non conformance report FT 611-40

- Acceptance of Civil Works


. handling over of civil structures FT 611-41
. equipment foundation FT 611-42

- Mechanical equipment erection


. rotating machine alignment FT 611-43
. standard for specific equipment FT 611-46

- Piping erection
. piping networks FT 611-44
. piping supports FT 611-45

- Welding :
For all standard data record sheets regarding welding inspection : refer to the Welding
Enginnering Manual (C 5) = EG 501.

- System erection certificate FT611.96

GGG/00/M/MCE---/EG/020 C FT 611-39
FIELD INSPECTION REPORT
--------------------------------------------- REPORT N° : ________________
STORAGE MAINTENANCE
Power
Steam Power Plant
Power Plant

PROJECT : ____________________________________ UNIT : _________________________

EQUIPMENT : _____________________________ PACKING LIST : ____________________________

ON SITE DELIVERY DATE : _/_/_

STORAGE CONDITIONS COMMENTS

AREA REQUESTED / ACTUAL

FORECAST STORAGE DURATION

WAREHOUSE N°

SHELTER N°

ENCLOSURE N°

YARD N°

STORAGE INSTRUCTIONS

PERIODICAL INSPECTIONS FREQUENCY

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

GGG/00/M/MCE---/EG/020 C FT 611-39
STORAGE NON CONFORMANCE REPORT REPORT N° : _________________
---------------------------------------------
Power
Steam Power Plant
Power Plant

PROJECT : ____________________________________ EQUIPMENT : ______________________________

CASE N° : _____________________________ ON SITE DELIVERY DATE : _/_/_

STORAGE CLASS : REQUESTED / ACTUAL

CASE STORAGE CONDITIONS

A : The crate is not located as per the storage instruction


B : The crate lays on the ground or on insufficient shimming

C : The crate content has not been suitably rearran

D : The crate is not or insufficiently weather protected

E : The delicate coating is not protected against the sun

F : There is water accumulation in the tarpaulin

G : The damage crate is not suitably weather protected

H : The tarpaulin used is completly useless (poor conditions, rolled)

I : No tarpaulin

COMMENTS :

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

GGG/00/M/MCE---/EG/020 C FT 611-40
FIELD INSPECTION REPORT REPORT N° : ________________
---------------------------------------------
Power HANDLING OVER OF CIVIL STRUCTURES
Steam Power Plant
Power Plant

PROJECT : ____________________________________ UNIT : ________________________________

EQUIPMENT : ____________________________ REFERENCE DOCUMENT : __________________


AREA : __________________________________

INSPECTIONS CONFORMITY NCR COMMENTS



YES NO
WORKS QUALITY :

CONCRETE FINISH ACCEPTABLE

ANCHORAGE RECESSES CLEAN

ANCHORAGE BOLTS UNDAMMAGED

ERECTION AREA CLEAN

LAYOUT AND GEOMETRY :

AS BUILT SURVEY ATTACHED

AXIS MARKED ON STRUCTURES

LEVEL DATUM AVAILABLE

COMMENTS :

ALL ITEMS MANDED OVER, APPROVED BY UNDERSIGNED

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

GGG/00/M/MCE---/EG/020 C FT 611-41
FIELD INSPECTION REPORT REPORT N° : ________________
---------------------------------------------
Power EQUIPMENT FOUNDATION
Steam Power Plant
Power Plant

PROJECT : ______________________________________ UNIT : ______________________________

EQUIPMENT : ___________________________ REFERENCE DOCUMENT : ___________________


WORK UNIT : ___________________________

INSPECTIONS CONFORMITY NCR COMMENTS



YES NO
FOUNDATION LEVEL :

EMBEDDED PIECES

AXES AND LEVELS LOCATION

MATERIALIZATION

GEOMETRICAL CONFORMITY:

SHAPE

DIMENSIONS

ANCHORING POINTS

ACCESS AVAILABILITY FOR


ERECTION

SURROUNDING CONDITIONS

COMMENTS :

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

GGG/00/M/MCE---/EG/020 C FT 611-42
FIELD INSPECTION REPORT REPORT N° : ________________
---------------------------------------------
Power ROTATING MACHINE ALIGNEMENT
Steam Power Plant
Power Plant

PROJECT : ____________________________________ UNIT : _________________________

EQUIPMENT : ___________________________ REFERENCE DOCUMENT : _____________________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

GGG/00/M/MCE---/EG/020 C FT 611-43
FIELD INSPECTION REPORT REPORT N° : _____________________
---------------------------------------------
Power PIPING NETWORK
Steam Power Plant
Power Plant

PROJECT : ______________________________________ UNIT : ______________________________________

PIPE LINE N°: _______________________________ REFERENCE DOCUMENT : _______________________

INSPECTIONS CONFORMITY NCR COMMENTS



YES NO
PIPEWORK :

INSTALLATION

BRANCHES CONNECTIONS

PUMP/TANK/APPARATUS
CONNECTIONS

SAMPLING POINTS CONNECTIONS

SLOPE

VALVES

ERECTION

POSITION

ACCESSIBILITY

FLOW DIRECTION

FITTINGS :

TEMPERATURE WELL

ORIFICE PLATES, NOZZLES…

GASKETS, BOLTS

COMMENTS :

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

GGG/00/M/MCE---/EG/020 C FT 611-44
FIELD INSPECTION REPORT REPORT N° : _______________________
---------------------------------------------
Power PIPING SUPPORT
Steam Power Plant
Power Plant

PROJECT : _______________________________________________ UNIT : _______________________________

PIPE LINE N° : ______________________________________ REFERENCE DOCUMENT : __________________

INSPECTIONS CONFORMITY NCR SUPPORT COMMENTS


N° REFERENCE
YES NO

ERECTION

POSITIONNING

SPRING BOXES UNLOCKED

FINAL SETTING UP

COMMENTS :

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

GGG/00/M/MCE---/EG/020 C FT 611-45
FIELD INSPECTION REPORT REPORT N° : ________________
---------------------------------------------
Power
Steam Power Plant
Power Plant

PROJECT : ______________________________________ UNIT : ______________________________

EQUIPMENT : ___________________________ REFERENCE DOCUMENT : ___________________

INSPECTIONS CONFORMITY NCR COMMENTS



YES NO

COMMENTS :

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

Date/Name/Visa : _____________ Date/Name/Visa : ______________Date/Name/Visa : _____________

GGG/00/M/MCE---/EG/020 C FT 611-46
UNIT : Folio /
SYSTEM ERECTION SYSTEM : S.E.C. N° :
CERTIFICATE
Power
Steam Power Plant
Power Plant

DESIGNATION OF EQUIPMENT CONCERNED : (ELECTRICAL/MECHANICAL/INSTRUMENTATION)

This is to certify that an inspection of the system has been carried out
on……………………………………………………. ……………………………………………………..and that the
preliminary tests without fluid/voltage can be strated.

During the inspection the following main outstanding items related to start-up were noticed.
TO BE
ITEM N° MAIN OUTSTANDING ITEMS CLEARED CLEARED BY
BY
Nam/vis. date

ITEMS TO BE CLEARED BEFORE PUTTING UNDER FLUID/VOLTAGE :

START-UP START-UP
ACCEPTED BY ERECTION SUPERVISORS CWE ENGINEER LEAD ENGINEER

COMPAGNY

NAME

DATE

SIGNATURE

GGG/00/M/MCE---/EG/020 C FT 611-96