GOVERNMENT OF MANIPUR

PUBLIC WORKS DEPARTMENT

State:- Manipur Branch:- P.W.D.


Division:- Imphal East Division.

Name of work:- Impvt. of Lai Hiden bridge to Konpal Komkham leikai Bridge via Commando complex
Fund :-
Major Head :-
Sub-Major Head :-
Minor Head :-
Sub-Head :-
Detailed Head :-
Object :-
Estimate framed by the Executive Engineer, Imphal East Division, PWD, Manipur of the probable
cost of Rs.56,00,000/-

REPORT
HISTORY:- This detail estimate amounting to Rs.56,00,000/- ( Fifty six lakh) only/- which is inclusive of
12% GST,1% Labour cess 3% Contingency charges & 11.75% Agency Charge has been framed to meet
the probable cost of the above mentioned work & for obtaining AA & ES of the competent authority.

There are large numbers of pot holes, ruts all along the road which is quite inconvenient to the
operation of the vehicular traffic. As the road is an important road connecting many important private and
Governmental institutions, religious places so pavement of the existing road is quite necessary in the
interest of the public to provide a good riding surface. Hence, the estimate is being prepared for early
sanction of AA & ES of the competent authority.

Design & Scope:- The estimate provides the provision of50mm thick Bituminous macadam overtopped
by 25mm thick Semi dense graded bituminous macadam.

Cost :- Rs.56,00,000/-
Rate :- Analysed rate based on MSR '17
Method :- By contract
Land :- Available
Time :- 6 (six) months
T&P :- Road Roller wll be necessary.
W/C Estt :- Will be met from 3% contingency charge.