Professional Documents
Culture Documents
ABSTRACT OF COST
Name of work :- Construction of retaining wall at the periphery of macha leima wang leirak
Sl.
Sub-head/Items of work Quantity Rate Unit Amount Remarks
No.
1 Earthwork in excavation in
foundation trenches or drains
including ding dressing of sides
and ramming of bottoms lift upto A/R
1.5m meters including dressing based on
of sides and ramming of bottom 34.8 140.1 m3 4875
MSR,
lift upto 1.5 m including getting 2017
out the excavated soil as
directed within lead of 50 meters
(a) Hard / Dense soil.
2 Filling available excavated earth
(excluding rock) in trenches ,
plinth side of foundation etx in A/R
layers not exceeding 20 cm in based on
depth , consolidating each 11.6 ₹ 111.50 m 3
1293
MSR,
deposited layers by ramming 2017
and watering lead upto 50
meters lift upto 1.5 metres
3 Providing and laying cement
concrete in foundation and plinth
excluding the cost of centering A/R
and shuttering 1:4:8 (1 cement : based on
4 coarse sand : 8 graded stone MSR,
aggregate 40 mm nominal size) 5.22 Rs. 6,191.28 m3 Rs. 32,318.00 2017
4 Providing and laying cement
concrete in foundation and plinth
excluding the cost of centering A/R
and shuttering 1:3:6 (1 cement : m3
based on
3 coarse sand : 6 graded stone MSR,
aggregate 20 mm nominal size) 52.05 Rs. 6,859.09 Rs. 3,57,016.00 2017
5 Providing form works i/c
centering and shuttering so as to
give a rough finish, strutting and
propping etc. height of propping
and centering below supporting
floor to ceiling not exceeding 4 m
and removal of the same for in- A/R
situ reinforced concrete and based on
plain concrete work in MSR,
(a) Foundation, footings, bases 143.32 Rs. 463.10 m2 Rs. 66,371.00 2017
of columns etc. and mass Rs. 4,61,873.00