COST ESTIMATE FOR RE-CONDITIONING AND RENOVATION OF CATTLE SHED LOCATED NEAR ROSE VALLEY
Rate Per Unit
Quantit Quantity As Per Length Width in Height y in S.No Item of Work Nos AJK CSR 1st Amount in RS. in Feet Feet in feet Cubic Semi Annual Feet 2019-20 Superstructure in 8" thick hollow block masonary Cement sand mortar 1 : 6 Long 1 wall 2.00 100.00 0.67 10.00 1333.33 193.00 257,333.3
Lawrencepur sand 1:6 on walls and columns in basement, plinth and ground floor 3 including making edges, corners and 2.00 100.00 - 10.00 2000.00 22.75 45,500.0 curing.
3/8 inch (9.5mm) thick cement plaster using
Lawrencepur sand 1:6 on walls and columns in basement, plinth and ground floor 4 including making edges, corners and 2.00 42.00 - 10.00 840.00 22.75 19,110.0 curing.
Providing and laying 1:2:4 cement concrete
floor using using Margalla crushed aggrgate 1/2" (19mm) and down gauge in 5 ground floor laid in panels including - 100.00 42.00 - 4200.00 98.20 412,440.0 formwork, consolidation,
According to the test report it seems that 3” Dia pipe sample is complying with BS-13871985 standards but 6” Dia pipe sample cannot fulfill the minimum criteria of following two parameters as per BS-13871