You are on page 1of 4

ASSEMBLY LOCATION LEVEL

CBM-9000 2-3/A-A1 +12.160


CBM-9000 2-3/A3-B +12.160
CBM-9000 2-3/B-C3 +12.160
CBM-9000
CBM-9000
2-3/C1-C
3-4/A-A1
+12.160
+12.160 IDEAL HOME
CBM-9000 3-4/A3-B +12.160
CBM-9000
CBM-9000
3-4/B-C3
3-4/C1-C
+12.160
+12.160
FOR STEEL FABRICATION
CBM-9000 4-5/A-A1 +12.160
CBM-9000 4-5/A3-B +12.160
REFERENCE DRAWINGS:-
CBM-9000 4-5/B-C3 +12.160
Trade Drawing Description Drawing Number
CBM-9000 4-5/C1-C +12.160
CBM-9000 5-6/A-A1 +12.160
CBM-9000 5-6/A3-B +12.160
CBM-9000 5-6/B-C3 +12.160
CBM-9000 5-6/C1-C +12.160
REFERENCE DOCUMENTS:-
CBM-9000 6-7/A-A1 +12.160
Trade Type Document No.
CBM-9000 6-7/A3-B +12.160
CBM-9000 6-7/B-C3 +12.160
CBM-9000 6-7/C1-C +12.160
CBM-9000 7-8/A-A1 +12.160 Abbreviations/ Symbols:

CBM-9000 7-8/A3-B +12.160 TOC = TOP OF CONCRETE


CBM-9000 7-8/B-C3 +12.160 NTS = NOT TO SCALE

CBM-9000 7-8/C1-C +12.160 TOS = TOP TO STEEL


= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.
CBM-9000 8-9/A-A1 +12.160
CBM-9000 8-9/A3-B +12.160 NOTES :
CBM-9000 8-9/B-C3 +12.160
CBM-9000 8-9/C1-C +12.160
CBM-9000 9-10/A-A1 +12.160
CBM-9000 9-10/A3-B +12.160
CBM-9000 9-10/B-C3 +12.160
CBM-9000 9-10/C1-C +12.160
CBM-9000 10-11/A-A1 +12.160
CBM-9000 10-11/A3-B +12.160
CBM-9000 10-11/B-C3 +12.160
CBM-9000 10-11/C1-C +12.160
CBM-9000 11-12/A-A1 +12.160
CBM-9000 11-12/A3-B +12.160
CBM-9000 11-12/B-C3 +12.160
CBM-9000 11-12/C1-C +12.160

5990
ENGINEER ACTION:
(A ) Proceed
(B ) Proceed with comments
70 200 10 540 10 4330 10 540 10 200 70
(C ) Do not proceed, Revise & Resubmit
2* D 22 2* D 22 (D ) Rejected
GAGE = 150 GAGE = 150
15

15

15

15
(E ) Information only

50 50
93

93
B9-2 B9-1
70

70
HI350-8-15*350-10*350 B9-10 B9-6 B9-9 HI350-8-15*350-10*350 CLIENT:
350

350
323

323
325

325
PHI350-725-8-10*350-15*350 HI725-6-15*350-10*350 PHI350-725-8-10*350-15*350 3*D22
70

70
3*D22
S9-4 BS
S9-4 BS GAMBIA GROUNDNUT CORPORATION - GAMBIA
92

92
S9-3 BS S9-3 BS
700

700
STRUCTURAL CONSULTANT :
10

10
2*D26 2*D26
GAGE = 200 GAGE = 200
PROF. DR.
NOUR EL - DIN M. ABD ALLAH
10

10
CONTRACTOR:
10

10

Drawing Title:-
70 230 500 4390 500 230 70
REHABILITION OF THE MAIN DEPOT IN GAMBIA
GENERAL NOTES:
t2

tp = MIN. (t1,t2)

1- ALL FILLET WELD SIZE EQUAL TO :.


ts=tp for tp< or = 6mm
ts=tp-2 for tp>6mm U.N.O t1 ts

CRANE BEAM
MATERIAL LIST FOR ASSEMBLY MK'D CBM-9000 40 No. Required
Mark Profile Material No. Length Weight
CBM-9000
B9-6 HI725-6-15*350-10*35 ST-52 1 4390 446.3
DATE SCALE
B9-9 PHI350-725-8-10*350- ST-52 1 500 53.8

B9-10 PHI350-725-8-10*350- ST-52 1 500 53.8


19.04.2020 N.T.S
B9-1 HI350-8-15*350-10*35 ST-52 1 300 26.7 IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
01 MODIFY STIFFENERS LOCATION 11.06.2020 MMN HAMED HAMED
40XCBM-9000
Tekla structures

B9-2 HI350-8-15*350-10*35 ST-52 1 300 26.7 DRAWING PROJECT PHASE


Rev. DESCRIBTION OF REVISION DATE PREP. CHECK APP.
ST-52 700 9.4 TYPE MARK NO.
S9-3 PL10*171 4
01
00 ISSUED FOR FABRICATION 19.04.2020 MMN HAMED HAMED ST-52 323 4.3 IH19-14 GA 08
Rev. DESCRIBTION OF REVISION DATE PREP. CHECK APP.
S9-4 PL10*171 4 AD
Total 662.2
ASSEMBLY LOCATION LEVEL
CBM-9001 1-2/A-A1 +12.760
CBM-9001 1-2/A3-B +12.760
CBM-9001 1-2/B-C3 +12.760
CBM-9001 1-2/C1-C +12.760
IDEAL HOME
FOR STEEL FABRICATION
REFERENCE DRAWINGS:-
5545 Trade Drawing Description Drawing Number

15 300 15 25

REFERENCE DOCUMENTS:-
Trade Type Document No.

Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE

HI330-8-15*200
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :

600
B9-16
70 200 10 540 10 3730 10 540 10 200 150 75

2* D 22
GAGE = 150
15

15

15

15
2* D 22 2* D 22
50
92

GAGE = 150 GAGE = 150 ENGINEER ACTION:


(A ) Proceed
B9-2 B9-3 (B ) Proceed with comments
70

HI350-8-15*350-10*350 B9-10 B9-7 B9-11 HI350-8-15*350-10*350 (C ) Do not proceed, Revise & Resubmit
350

350
323

323
325

325
PHI350-725-8-10*350-15*350 HI725-6-15*350-10*350 PHI350-725-8-10*350-15*350 (D ) Rejected
70

S9-4 BS S9-4 BS (E ) Information only


93

S9-3 BS S9-3 BS
700

700
10

10
2*D26 2*D26 2*D26
GAGE = 200 GAGE = 200 CLIENT:
GAGE = 200

GAMBIA GROUNDNUT CORPORATION - GAMBIA


10

10
STRUCTURAL CONSULTANT :

PROF. DR.
NOUR EL - DIN M. ABD ALLAH
10

10

CONTRACTOR:
70 230 500 3790 500 230 150 75

Drawing Title:-

GENERAL NOTES:
t2

tp = MIN. (t1,t2) REHABILITION OF THE MAIN DEPOT IN GAMBIA


1- ALL FILLET WELD SIZE EQUAL TO :.
ts=tp for tp< or = 6mm
ts=tp-2 for tp>6mm U.N.O t1 ts

MATERIAL LIST FOR ASSEMBLY MK'D CBM-9001 4 No. Required


Length Weight
CRANE BEAM
Mark Profile Material No.
B9-7 HI725-6-15*350-10*35 ST-52 1 3790 385.3 CBM-9001
B9-10 PHI350-725-8-10*350- ST-52 1 500 53.8
DATE SCALE
B9-11 PHI350-725-8-10*350- ST-52 1 500 53.8

B9-3 HI350-8-15*350-10*35 ST-52 1 455 40.5


19.04.2020 N.T.S
B9-16 HI330-8-15*200 ST-52 1 600 39.6 IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
01 MODIFY STIFFENERS LOCATION 11.06.2020 MMN HAMED HAMED
4XCBM-9001
Tekla structures

B9-2 HI350-8-15*350-10*35 ST-52 1 300 26.7 DRAWING PROJECT PHASE


Rev. DESCRIBTION OF REVISION DATE PREP. CHECK APP.
ST-52 700 9.4 TYPE MARK NO.
S9-3 PL10*171 4
01
00 ISSUED FOR FABRICATION 19.04.2020 MMN HAMED HAMED ST-52 323 4.3 IH19-14 GA 08
Rev. DESCRIBTION OF REVISION DATE PREP. CHECK APP.
S9-4 PL10*171 4 AD
Total 654.6
ASSEMBLY LOCATION LEVEL
CBM-9002 12-13/A-A1 +12.760

IDEAL HOME
FOR STEEL FABRICATION
REFERENCE DRAWINGS:-
Trade Drawing Description Drawing Number

5545 REFERENCE DOCUMENTS:-


Trade Type Document No.

25 15 300 15
Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :
HI330-8-15*200
B9-16
600

75 150 200 10 540 10 3730 10 540 10 200 70


ENGINEER ACTION:
2* D 22 (A ) Proceed
GAGE = 150
15

15

15

15
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
2* D 22
2* D 22 50 (D ) Rejected

92
GAGE = 150
GAGE = 150 (E ) Information only

B9-4 B9-1

70
HI350-8-15*350-10*350 B9-13 B9-8 B9-12 HI350-8-15*350-10*350
350

350
323

323
325

325
PHI350-725-8-10*350-15*350 HI725-6-15*350-10*350 PHI350-725-8-10*350-15*350

70
S9-4 BS S9-4 BS
CLIENT:

93
S9-3 BS
S9-3 BS GAMBIA GROUNDNUT CORPORATION - GAMBIA
700

700
10

10
2*D26 2*D26 2*D26
GAGE = 200 GAGE = 200 GAGE = 200

STRUCTURAL CONSULTANT :
10

10
PROF. DR.
NOUR EL - DIN M. ABD ALLAH
CONTRACTOR:
10

10

75 150 230 500 3790 500 230 70

Drawing Title:-

GENERAL NOTES:
t2

tp = MIN. (t1,t2) REHABILITION OF THE MAIN DEPOT IN GAMBIA


1- ALL FILLET WELD SIZE EQUAL TO :.
ts=tp for tp< or = 6mm
ts=tp-2 for tp>6mm U.N.O t1 ts

MATERIAL LIST FOR ASSEMBLY MK'D CBM-9002 1 No. Required


Length Weight
CRANE BEAM
Mark Profile Material No.
B9-8 HI725-6-15*350-10*35 ST-52 1 3790 385.3 CBM-9002
B9-12 PHI350-725-8-10*350- ST-52 1 500 53.8
DATE SCALE
B9-13 PHI350-725-8-10*350- ST-52 1 500 53.8

B9-4 HI350-8-15*350-10*35 ST-52 1 455 40.5


19.04.2020 N.T.S
B9-16 HI330-8-15*200 ST-52 1 600 39.6 IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
01 MODIFY STIFFENERS LOCATION 11.06.2020 MMN HAMED HAMED
1XCBM-9002
Tekla structures

B9-1 HI350-8-15*350-10*35 ST-52 1 300 26.7 DRAWING PROJECT PHASE


Rev. DESCRIBTION OF REVISION DATE PREP. CHECK APP.
ST-52 700 9.4 TYPE MARK NO.
S9-3 PL10*171 4
01
00 ISSUED FOR FABRICATION 19.04.2020 MMN HAMED HAMED ST-52 322 4.3 IH19-14 GA 08
Rev. DESCRIBTION OF REVISION DATE PREP. CHECK APP.
S9-4 PL10*171 4 AD
Total 654.6
ASSEMBLY LOCATION LEVEL
CBM-9003 12-13/A3-B +12.760
CBM-9003 12-13/B-C3 +12.760
CBM-9003 12-13/C1-C +12.760

IDEAL HOME
FOR STEEL FABRICATION
REFERENCE DRAWINGS:-
Trade Drawing Description Drawing Number

5545 REFERENCE DOCUMENTS:-


Trade Type Document No.

25 15 300 15
Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :
HI330-8-15*200
B9-16
600

75 150 200 10 540 10 3730 10 540 10 200 70


ENGINEER ACTION:
2* D 22 (A ) Proceed
GAGE = 150
15

15

15

15
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
2* D 22 2* D 22
GAGE = 150 50 (D ) Rejected

92
GAGE = 150
(E ) Information only

B9-5 B9-1

70
HI350-8-15*350-10*350 B9-14 B9-8 B9-12 HI350-8-15*350-10*350
350

350
323

323
325

325
PHI350-725-8-10*350-15*350 HI725-6-15*350-10*350 PHI350-725-8-10*350-15*350

70
S9-4 BS S9-4 BS
CLIENT:

93
S9-3 BS
S9-3 BS GAMBIA GROUNDNUT CORPORATION - GAMBIA
700

700
10

10
2*D26 2*D26 2*D26
GAGE = 200 GAGE = 200 GAGE = 200

STRUCTURAL CONSULTANT :
10

10
PROF. DR.
NOUR EL - DIN M. ABD ALLAH
CONTRACTOR:
10

10

75 150 230 500 3790 500 230 70

Drawing Title:-

GENERAL NOTES:
t2

tp = MIN. (t1,t2) REHABILITION OF THE MAIN DEPOT IN GAMBIA


1- ALL FILLET WELD SIZE EQUAL TO :.
ts=tp for tp< or = 6mm
ts=tp-2 for tp>6mm U.N.O t1 ts

MATERIAL LIST FOR ASSEMBLY MK'D CBM-9003 3 No. Required


Length Weight
CRANE BEAM
Mark Profile Material No.
B9-8 HI725-6-15*350-10*35 ST-52 1 3790 385.3 CBM-9003
B9-12 PHI350-725-8-10*350- ST-52 1 500 53.8
DATE SCALE
B9-14 PHI350-725-8-10*350- ST-52 1 500 53.8

B9-5 HI350-8-15*350-10*35 ST-52 1 455 40.5


19.04.2020 N.T.S
B9-16 HI330-8-15*200 ST-52 1 600 39.6 IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
01 MODIFY STIFFENERS LOCATION 11.06.2020 MMN HAMED HAMED
3XCBM-9003
Tekla structures

B9-1 HI350-8-15*350-10*35 ST-52 1 300 26.7 DRAWING PROJECT PHASE


Rev. DESCRIBTION OF REVISION DATE PREP. CHECK APP.
ST-52 700 9.4 TYPE MARK NO.
S9-3 PL10*171 4
01
00 ISSUED FOR FABRICATION 19.04.2020 MMN HAMED HAMED ST-52 322 4.3 IH19-14 GA 08
Rev. DESCRIBTION OF REVISION DATE PREP. CHECK APP.
S9-4 PL10*171 4 AD
Total 654.6

You might also like