You are on page 1of 1

ITEMS ACTUEL NOMINAL

SG-4016 6284 6283


SG-4016 6284 6283

REFERENCE DRAWINGS:-
Trade Drawing Description Drawing Number

REFERENCE DOCUMENTS:-
Trade Type Document No.

Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :

INSPECTION MEASURMENT

ENGINEER ACTION:
(A ) Proceed
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
SG-4016 1*D14 1*D14
UPN120 (D ) Rejected
(E ) Information only
25 30

25 30
55

55
1*D14
35 5320 80 848
35
0

5435
5355

6283
CLIENT:

GAMBIA GROUNDNUT CORPORATION - GAMBIA

UPN120 x 6283 STRUCTURAL CONSULTANT :

PROF. DR.
35

5435
5355

6283
35 5320 80 848
NOUR EL - DIN M. ABD ALLAH
0

SG-4016
UPN120
CONTRACTOR:
120

Drawing Title:-

REHABILITION OF THE MAIN DEPOT IN GAMBIA

GIRT
SG-4016
DATE SCALE
GENERAL NOTES:
t2

tp = MIN. (t1,t2)
17.02.2020 N.T.S
1- ALL FILLET WELD SIZE EQUAL TO :.
ts=tp for tp< or = 6mm
ts=tp-2 for tp>6mm U.N.O t1 ts
IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
2XSG-4016
Tekla structures

MATERIAL LIST FOR ASSEMBLY MK'D SG-4016 2 No. Required DRAWING PROJECT PHASE
Length TYPE MARK NO.
Mark Profile No. 00
00 INSPECTION 17/02/2020 I.S S.A.INTER O.M 6283 IH19-14 GA ALL
Rev. DESCRIBTION OF JOB DATE PREP. CHECK APP.
SG-4016 UPN120 1 AD
Total

You might also like