You are on page 1of 1

ITEMS ACTUEL NOMINAL

SG-4023 5695 5696


SG-4023 5695 5696
SG-4023 5969 5696
SG-4023 5696 5696
SG-4023 5697 5696
SG-4023 5969 5696
SG-4023 5697 5696
SG-4023 5695 5696
SG-4023 5695 5696
SG-4023 5696 5696
REFERENCE DRAWINGS:-
SG-4023 5697 5696
Trade Drawing Description Drawing Number
SG-4023 5695 5696

REFERENCE DOCUMENTS:-
Trade Type Document No.

Abbreviations/ Symbols:

TOC = TOP OF CONCRETE


NTS = NOT TO SCALE
TOS = TOP TO STEEL
= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.

NOTES :

INSPECTION MEASURMENT

ENGINEER ACTION:
(A ) Proceed
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
(D ) Rejected
(E ) Information only

UPN120 x 5696
CLIENT:

5696
5621

5671
754

814

754 60 4807 50 25 GAMBIA GROUNDNUT CORPORATION - GAMBIA


0

SG-4023
UPN120
35

35
STRUCTURAL CONSULTANT :

4*D14 PROF. DR.


120

50

50
4*D14
NOUR EL - DIN M. ABD ALLAH
35

35
CONTRACTOR:

Drawing Title:-

REHABILITION OF THE MAIN DEPOT IN GAMBIA

GIRT
SG-4023
DATE SCALE
GENERAL NOTES:
t2

tp = MIN. (t1,t2)
16.02.2020 N.T.S
1- ALL FILLET WELD SIZE EQUAL TO :.
ts=tp for tp< or = 6mm
ts=tp-2 for tp>6mm U.N.O t1 ts
IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
12XSG-4023
Tekla structures

MATERIAL LIST FOR ASSEMBLY MK'D SG-4023 12 No. Required DRAWING PROJECT PHASE
Length TYPE MARK NO.
Mark Profile No. 00
00 INSPECTION 16/02/2020 I.S S.A.INTER O.M 5696 IH19-14 GA ALL
Rev. DESCRIBTION OF JOB DATE PREP. CHECK APP.
SG-4023 UPN120 1 AD
Total

You might also like