You are on page 1of 1

KETERANGAN / REMARKS

KETERANGAN 3.45 6.70 S1 = SLOOF 20 / 40 CM


S2 = SLOOF 20 / 30 CM
PANJANG JUMLAH K1 = KOLOM H BEAM 300.300.10.15
NO. TYPE URAIAN 12.50 18.83 6.70
( M' ) ( bh ) K2 B4 K2
15
K2 = KOLOM H BEAM 250.250.9.14
51 50 B1 = BALOK WF 300.150.6,5.9
B3
18 B2 = BALOK WF 400.200.8.15

6.00
B3 B3
1 S1 SLOOF 20/40 420,70 B3 = BALOK WF 250.125.6.9

8.16
B4 B4
B4 = BALOK WF 350.175.7.11
K2 B4 K1
2 S2 SLOOF 20/30 109,80 48 49
14 C1 = BAJA CANAL C 200
38 B3 C2 = BAJA CANAL C 150

13.29
.60

6.00
B3
3 K1 H BEAM 300.300.10.15 14 B4 B4
K2 B4

8.20
K2 13
4 K2 H BEAM 250.250.9.14 32 47
B3
46

5.99
B3 B3
K2 K2
5 K3 KOLOM BETON 15/30 18 8.00 51 50
15
B4 B4
NO. PERUBAHAN / REVISION TGL PARAF

30.99
K2 B4 K2

6.00
11
8.00

5.10
44 S1 45
B3

6.00
B3
K2 K2
8.00 11.34 48 49
14
B4
K2 K2

6.00
9
8.00

7.00
43 BK+S1 42

1.35

6.00
K2 K2
4.78 47 46
13 BK+S1

S1

3.00
K2 K2

6.00
6.70 40 41 8
PEMILIK / OWNER
K1 K2 K2
11
T T
A DP A DP

16 RE
NC
AN
RE
NC
AN

10 44 45 1.65
K1

RENCANA DPT
S1 1.80 8.36

6.00
LIVE MUSIK 11
S1 PROYEK / PROJECT
PLAY GROUND PEMBANGUNAN
12.6

-2.16
K1
1 09
K2 K2
9 RESTO DAN CAFE MACARIUS

76.89
S1
1

+S 43 42
BK
2.40 J K L M JL.RAYA CIREBON-KUNINGAN PATAPAN KEC. BEBER KAB. CIREBON

6.00
K1 MANAGEMEN KONSTRUKSI
K2 K3 12 RENCANA DPT

K1 DENAH PONDASI BK-SLOOF DAN KOLOM LT.1


19 S1
K2 K2
14 S1 08 8 EL. -3.75 SKALA 1 : 400
1 40 BK+S1 41
K2 +S
BK +S1 K2
5.85

20

BK+S1
K1 BK KP

6.00
BK+S1
7.42 55 ARSITEK PERENCANA
13
K3 1 K3 S1 K1
K3 +S
13 K2 BK 07 K2 S1 K2
S2 S2 K2 S1 7
4.78

3.03

K3 25 K2 39 38
S2 18

BK+S1

BK+S1
S2 S2 S2 S1 S1K1 54
K1
S2

S1 K2 KONSULTAN ARSITEKTUR
1.25

6.00
K2 5 14 06
12
KP S2 KP 21 S1 KP 3.45 6.70
S2 K3 K2 FP2 S1 KP
11 S1 K2
3.87

K3 17 K3 K1 K2
5
1.80
K3 24 23 36 37
S1 15 KP

0.74
BK+S1 PENANGGUNG JAWAB ARSITEKTUR

1.85 3.89
K3 S1 K2 KP
2.13

BK+S1
K3 K2 B4 K2
10 + S1 K1 53
KP BK+S1 K2 15
BK 51 50
04 4 B3

1.70
34
9 K3 K2 BK+S2 K2 KP S2 KONSULTAN STRUKTUR

6.00

6.00
K3 B3 B3
K2 16 35 K3 3
5.92

22 BK+S2 33 32 B4 B4
K3 K3
2.03 8 2.01 4.95
13.2

5.08
5.45

5.45
S2 S2 K2 B2 K1 14
1.68

48 49
8 S1 S1 B3

PRANATA
PT. METAKOM

0.37
2 KONSULTAN M & E
1

6.00
K3 K3 B3
7 K2 K1 K1 30 S2 31
4.32

01 02 03 B4 B4

10.36
4.32
K2 B2 K2
47
13
46

10.42
6 B3 NAMA GAMBAR / DRAWING TITLE
5.82

PEKERJAAN STRUKTUR

5.99
B3 B3
B4 DENAH PONDASI BK, SLOOF DAN KOLOM LT. 1
K2 B2 K2
1.97

4 11

5.10
44 45
B3 SKALA / SCALE REVISI / REVISION PERUNTUKAN / ISSUED FOR

6.00
B3 . 1 : 400 . .
0.92 1.97
B4 TANGGAL / DATE 26 AGUSTUS 2022
1.98 7.40 7.41 4.91 7.03 3.81 5.81 6.60 4.35 2.36 K2 B2 K2
9 DIGAMBAR / DRAWN By HAMDANI,ST

7.00
43 42 .
B3
54.56 B3 DIPERIKSA / CHECKED By .

6.00
B4B3
B4 DISETUJUI / APPROVED By .
B2

3.00
K2 K2 JML LEMBAR / KODE GAMBAR / NO. GAMBAR /
40 41 8 TOTAL SHEET DRAWING CODE DRAWING NO.
A B C D E F G H I J K L M
B2
DENAH PONDASI BK-SLOOF DAN KOLOM LT.1
STR-002

DENAH BALOK DAN KOLOM HAK CIPTA \ COPYRIGHT


THIS DRAWING IS THE PROPERTY OF CV.KEMILAU SURYA KONSTRUKSI, AND WE RESERVE THE COPYRIGHT
EL. ±0.00 SKALA 1 : 400 EL. ±0.00 SKALA 1 : 400 TO ALL OUR DESIGNS WHICH CANNOT BE REPRODUCED ( WHETHER PART/WHOLE OR MODIFIED)
WITHOUT FIRST OBTAINING OUR WRITTEN CONSENT CONTRAVENTION WILL BE PROSECUTED.
THIS DRAWING IS SUBJECTED TO MODIFICATION OF ITS DESIGN AND MEASUREMENT FROM TIME
TO TIME TO SUIT CONSTRUCTION PURPOSES

You might also like