Professional Documents
Culture Documents
6.00
B3 B3
1 S1 SLOOF 20/40 420,70 B3 = BALOK WF 250.125.6.9
8.16
B4 B4
B4 = BALOK WF 350.175.7.11
K2 B4 K1
2 S2 SLOOF 20/30 109,80 48 49
14 C1 = BAJA CANAL C 200
38 B3 C2 = BAJA CANAL C 150
13.29
.60
6.00
B3
3 K1 H BEAM 300.300.10.15 14 B4 B4
K2 B4
8.20
K2 13
4 K2 H BEAM 250.250.9.14 32 47
B3
46
5.99
B3 B3
K2 K2
5 K3 KOLOM BETON 15/30 18 8.00 51 50
15
B4 B4
NO. PERUBAHAN / REVISION TGL PARAF
30.99
K2 B4 K2
6.00
11
8.00
5.10
44 S1 45
B3
6.00
B3
K2 K2
8.00 11.34 48 49
14
B4
K2 K2
6.00
9
8.00
7.00
43 BK+S1 42
1.35
6.00
K2 K2
4.78 47 46
13 BK+S1
S1
3.00
K2 K2
6.00
6.70 40 41 8
PEMILIK / OWNER
K1 K2 K2
11
T T
A DP A DP
16 RE
NC
AN
RE
NC
AN
10 44 45 1.65
K1
RENCANA DPT
S1 1.80 8.36
6.00
LIVE MUSIK 11
S1 PROYEK / PROJECT
PLAY GROUND PEMBANGUNAN
12.6
-2.16
K1
1 09
K2 K2
9 RESTO DAN CAFE MACARIUS
76.89
S1
1
+S 43 42
BK
2.40 J K L M JL.RAYA CIREBON-KUNINGAN PATAPAN KEC. BEBER KAB. CIREBON
6.00
K1 MANAGEMEN KONSTRUKSI
K2 K3 12 RENCANA DPT
20
BK+S1
K1 BK KP
6.00
BK+S1
7.42 55 ARSITEK PERENCANA
13
K3 1 K3 S1 K1
K3 +S
13 K2 BK 07 K2 S1 K2
S2 S2 K2 S1 7
4.78
3.03
K3 25 K2 39 38
S2 18
BK+S1
BK+S1
S2 S2 S2 S1 S1K1 54
K1
S2
S1 K2 KONSULTAN ARSITEKTUR
1.25
6.00
K2 5 14 06
12
KP S2 KP 21 S1 KP 3.45 6.70
S2 K3 K2 FP2 S1 KP
11 S1 K2
3.87
K3 17 K3 K1 K2
5
1.80
K3 24 23 36 37
S1 15 KP
0.74
BK+S1 PENANGGUNG JAWAB ARSITEKTUR
1.85 3.89
K3 S1 K2 KP
2.13
BK+S1
K3 K2 B4 K2
10 + S1 K1 53
KP BK+S1 K2 15
BK 51 50
04 4 B3
1.70
34
9 K3 K2 BK+S2 K2 KP S2 KONSULTAN STRUKTUR
6.00
6.00
K3 B3 B3
K2 16 35 K3 3
5.92
22 BK+S2 33 32 B4 B4
K3 K3
2.03 8 2.01 4.95
13.2
5.08
5.45
5.45
S2 S2 K2 B2 K1 14
1.68
48 49
8 S1 S1 B3
PRANATA
PT. METAKOM
0.37
2 KONSULTAN M & E
1
6.00
K3 K3 B3
7 K2 K1 K1 30 S2 31
4.32
01 02 03 B4 B4
10.36
4.32
K2 B2 K2
47
13
46
10.42
6 B3 NAMA GAMBAR / DRAWING TITLE
5.82
PEKERJAAN STRUKTUR
5.99
B3 B3
B4 DENAH PONDASI BK, SLOOF DAN KOLOM LT. 1
K2 B2 K2
1.97
4 11
5.10
44 45
B3 SKALA / SCALE REVISI / REVISION PERUNTUKAN / ISSUED FOR
6.00
B3 . 1 : 400 . .
0.92 1.97
B4 TANGGAL / DATE 26 AGUSTUS 2022
1.98 7.40 7.41 4.91 7.03 3.81 5.81 6.60 4.35 2.36 K2 B2 K2
9 DIGAMBAR / DRAWN By HAMDANI,ST
7.00
43 42 .
B3
54.56 B3 DIPERIKSA / CHECKED By .
6.00
B4B3
B4 DISETUJUI / APPROVED By .
B2
3.00
K2 K2 JML LEMBAR / KODE GAMBAR / NO. GAMBAR /
40 41 8 TOTAL SHEET DRAWING CODE DRAWING NO.
A B C D E F G H I J K L M
B2
DENAH PONDASI BK-SLOOF DAN KOLOM LT.1
STR-002