MAU03-17/143/2019-PLG-D0TCP

GOVERNMENT OF ANDHRA PRADESH


TOWN AND COUNTRY PLANNING DEPARTMENT
OFFICE OF
DIRECTOR OF TOWN & COUNTRY
PLANNING, GOVT. OF A.P., Guntur.

Circular Memo No.17 /143/2019/Plg Dated.17-10-2019

Sub: - 0/o DT&CP, AP, Guntur - Delegation of powers in 7 New UDAs (BUDA,
SUDA, EUDA, OUDA, AUDA, CUDA, PKM-UDA) - Implementation of
APDPMS in 7 New UDAs - Certain instructions - Issued - Reg.

Ref: - 1. G.O.Ms.No.215 MA Dt.19.7.2019 of MA&UD Dept.


2. This office Circular Memo No.17 /143/2019/Plg, Dated:24.07.20.19
***
Please see the reference cited, wherein the Government have issued instructions
authorizing the Director of Town and Country Planning to issue Development Permission
as per prevailing rules in newly constituted (7) UDAs viz. Annamayya Urban Development
Authority (AUDA), Bobbili Urban Development Authority (BUDA), Chittoor Urban
Development Authority (CUDA), Eluru Urban Development Authority (EUDA), Ongole
Urban Development Authority (OUDA), Palamaneru-Kuppam-Madanapalli Urban
Development Authority (PKM- UDA) and Srikakulam Urban Development Authority
(SUDA). The same has been communicated to all the concerned officials vide reference 2nd
cited for implementation. Further, the Building and layout approval was made online for
the said newly constituted (7) UDAs. But, it is observed that there is some confusion in
implementation regarding post verification etc.

Therefore, the following clarification issued for better functioning and service delivery.

1. Any Licensed Technical Person who was enrolled in ULB within respective UDA may
raise RTS for login creation for the said UDA to upload the proposal for development
permission within the respective UDA until a procedure for enrolment of LTPs within
UDAs is prescribed.

2. The post approval verification shall be carried out as follows.

s. Category of Permission type Authority for post approval verification


No Local body
1 Gram a. Building permission • As per the delegations issued in
Panchayats upto 300 sqmts site area G.O.Ms.No.443 MA&UD Dept., Dated:
Falling in 18-12-2017 Gram Panchayats can grant
UDA permission duly following AP Building
Rules 2017 issued in G.O.Ms.No.119
' MA&UD Dated :28-03-2017 and as
amended
b. Building perrrussron • Online Permission under
above 300 sqmts and upto APDPMS.
500 sqmt site area • Post Verification shall be done by
concerned DTCPO

,.
File No.MAUOJ-17/143/2019-PLG-DOTCP

c. Building permission • Online Permission under


above 500 sqmts site area APDPMS. 'I
• Post Verification shall be done by
concerned DTCPO and shall be submitted
to Director of Town and Country Planning
for concluding post verification
d. Layout upto 2.50 Acs • Online Permission under APDPMS
• Post Verification shall be done by
concerned DTCPO
e. Layouts above 2.50 • Online Permission under APDPMS
Acs and upto 5.00 Acs Site • Post Verification shall be done by
concerned RDDTP
f. Layouts Above 5.00 • Online Permission under APDPMS
Acs • Post Verification shall be done by
concerned DTCPO and shall be submitted .
to Director of Town and Country Planning
for concluding post verification
2 Municipaliti a. Building permission • Online Permission under APDPMS
es and Nagar upto 300 sqmts site area • Post Verification shall be done by
Panchayats concerned U LB.
'I
falling in b. Building permission • Online Permission under APDPMS
UDA above 300 sqmts and upto • Post Verification shall be done by
1000 sqmt site area concerned ULB and shall be submitted to
RDDTP for concluding post verification
c. Building permission • Online Permission under APDPMS
above 1000 sqmts site area • Post Verification shall be done by
concerned ULB and shall be submitted to
Director of Town and Country Planning
for concluding post verification
d. Layout approval • Online Permission under APDPMS
irrespective of extent
• Post Verification shall be done by
concerned ULB and shall be
submitted to Director of Town and
Country Planning for concluding
post verification

3 Municipal a. Building permission • Online Permission under APDPMS


.,
Corporations upto 1000 sqmts site area • Post Verification shall be done by
falling in concerned ULB
1--------------+------------------i
UDA b. i3uilding perrrussron • Online Permission under APDPMS
above 1000 sqmts site area • Post Verification shall be done by
concerned ULB and shall be submitted to
Director of Town and Country Planning
for concluding post verification
c. Layout approval • Online Permission under APDPMS
irrespective of extent • Post Verification shall be done by
File No.MAUOJ-17/143/2019-PLG-DOTCP

concerned ULB and shall be submitted to


Director of Town and Country Planning
for concluding post verification

3. Where ever relaxation of rules and TOR availment is involved, such file shall be
invariably circulated to the Director of Town and Country Planning irrespective of
extent and height of the building.
4. Any grievances related to the software issues and other issues, the LTPs can raise the
issue under RTS and concerned DTCPO shall verify and submit to Director of Town and
Country Planning with specific remarks with rule position within 3days without fail.

5. Post verification shall be done without causing any delay.

The Instructions come into force with immediate effect.

Director of Town and


Country Planning
To
The RDDTPs and DTCPOs.
All the officers in Head Office.
All the Commissioners of ULBs falling in the newly constituted (7) UDAs
All Panchayat secretaries falling in the newly constituted (7) UDAs
All the Town Planning Staff of ULBs falling in the newly constituted (7) UDAs.
Copy to website (APDPMS & DT&CP)
Copy to M/s Softtech Engineers Ltd.

Signature