Professional Documents
Culture Documents
CC Water PDF
CC Water PDF
To
------------------------ Municipality.
Sir,
Dated:
Address:
----------------------------Municipality
------------------------------------------------------------------------------------------------------------------------------
-------------------------------
------------------------------------------------------------------------------------------------------------------------------
-------------------------------
Rs. P. Rs. P.
G.I.Pipe M
G.I.Bend Each
G.I.Coupling
G.I.Reducers
G.I.Elbow
G.I.Union
Union Washer
1.Nails
Surfaces box(c1)6x6x4
Stop cock
Non-Return Valve
G.I.Cover ferrule
G.I.Tee/G.I.Nipple
MISCELLANEOUS Each
Water Meter
Checknut
Testing charges
Sq.m.
Truo to axis
Walls 0’9’
"1 – 6"
LS
DEPARTMENTAL CHARGES
Including WBM
TOTAL Rs
MUNICIPALITY
No ………………….Date………..
……………..Municipality ………………Municipality
FORM B
To,
Date
The Commissioner,
……………….Municipality.
Sir,
I beg to give you notice that I Intend to effect (1) a new water supply house service connection
or (2) Transferring metering extensions, alternations and repairs to the existing connection in
house No. In Street
Ward and in accordance with the Under Section 306 (7) (b) by-law framed I forward herewith
Estimate in duplicate I have the work to be done and its cost Engaged of the said work
Rs…………….licensed plumber For carrying out I request that permission be accorded for
executing the said work.
Signature of the Owner
Address
COMPLETION CERTIFICATE
1. Work commenced on …
2. Work completed on …
3. Deviation if any …
5. Amount to be refunded if any on actuals … Certified that the work has been completed as
an estimates and land approved (with deviations as stated above) and hence balance of
Rs…………….. (in words).................... may be recovered from the party, refunded to the party
Ar completion report.
Overseer/Junior
Engineer……………………………………………………………………………..Municipal
Engineer ……………………………………………………………………………………………….
Amount of Rs..................... in Words…………………………………………………………
Recovered in Challan No...................................... Dated
…………………………………………Refunded in refund Voucher
No.................................................... Dated ………………..Entered in sewage connection
Register Aege ……………….Item No..............................
RECORDED
--------------------------------------------Municipality
Under Ground Drainage Estimate Form for Providing New House Service Connection /.
Alternation Repairs Name of Applicant: No:
Nos.
Rate
PART A
PART B
From syphone point to water closet and drain in lot point inside the house (Materials supplied
by the party)
S W G Pipes 4" or 6" size
S W G ‘Y’ or T junction pipes 4 or 6
Stone ware gully pipes 4 or 8
Indian water closet with ‘P’ traps
Foot rests
Absestos cement pipe 4" sie for providing as vent
A C Wire Gowl
C I Manhole covers 13"X18" or 4"X24"
SWG Bonds 4’ OR 8"
C 1 ‘I’ or ‘Y’ Pipes 4 or 6
C 1 ‘I’ or ‘Y’ Pipes 4" or 6"
PART C
TOTAL
ESTIMATE NO
PART – D
--------------------------------------------------------------------------------------
SKETCH
--------------------------------------------------------------------------------------
Inspected, The estimate may be approved and a sum of Rs. -----------(in words)---------------------
------------------- may be permitted to be remitted to the party in Municipal Treasury as per this
Estimate.
SANCTIONED
---------------------------------------------Municipality
FORM – C
From Dated
To
-------------------------Municipality,
Sir,
I wish to give notice that I intend to effect (1) a new drainage house service or (2) extensions,
alternation and repairs to the existing connection in House No.--------- in --------------------------
Street Ward and in accordance with the Bye-laws framed under section 306 (7) (b) of the Tamil
Nadu District Municipalities Act 1920 as amended I forward here with an estimate and plans
induplicate of the work to be done I have engage Thiru ---------------------------------------------------
a licensed plumber works for carrying out the said work.,
I request that permission may be accorded for executing the said work.
Address ----------------------------------------------------------------------------------
Address ------------------------------------------------------------------------------------
COMPLETION CERTIFICATE
Work commenced on
Deviation if any…
Certified that the work has been completed as per estimates and plans approved (with
definitions as stated above) and hence Balance of Rs. ---------------(in words -------------------------
-----------------------------may be recovered from the party/reunded to the party as per completion
report.
RECORDED