We respectfully submit the TOTAL COST OF PROJECT: Construction of Septic Vault, for your existing building in the
amount of Two Hundred sixty-four thousand and two hundred twenty-seven pesos only (Php 264,227.30).
BREAKDOWN AS FOLLOWS:
SCOPE OF WORKS
1. MASONRY WORKS -----------------------------------------------------------------------Php 115,200.00
a. CHB laying
b. Floor concreting
c. Excavation
___________________________________________________________________________
Labor & Materials Php 181,644.00
3. OTHERS
a. 10% Mobilization / Demobilization-----------------------------------Php 18,644.00
b. 20% Contractor’s Profit--------------------------------------------------Php 39,961.60
c. 10% Acceleration Cost---------------------------------------------------Php 23,977.70
If this proposed undertaking merits your consideration, please sign the conform below which will give us the
________________________________ ______________________________
Date:
_______________________________
Date:
PAYMENT THRU
GCASH: 09192030280
OR
BANK DETAILS:
LANDBANK SAVINGS ACCOUNT NO. 2966163707
_______________________________ _____________________________________