You are on page 1of 79

Dolkha District

SN Materials Unit
Rate

A CIVIL
1 OPC Cement MT
2 PPC Cement MT
4 White cement with pigment Kg
5 Brick(machine made ) nos
6 Btick bats cu.m.
7 Sand(river) cu.m.
8 Aggregate less than 6mm machine broken cu.m.
9 Aggregate (10-20)mm machine broken cu.m.
10 Aggregate (20-40)mm machine broken cu.m.
11 stone/boulder cu.m.
12 Gravel cu.m.
13 stone dust cu.m.
14 TMT Bars
b (4.75-7)mm dia MT
c (8-16)mm dia MT
d 20mm dia MT
e 25mm dia MT
f 28-32mm dia MT
g Binding wire kg
Tubular black pipes kg
15 CGI sheets
a 24 guage CGI sheet heavy bundle
b 24 guage CGI sheet light bundle
c 24 guage CGI sheet medium bundle
d 24 guage CGI colour sheet Heavy bundle
e 24 guage CGI colour sheet light bundle
f 24 guage CGI colour sheet medium bundle
16 J hook
17 Bitumen washer
18 Nut bolts kg
19 13 mm rjasthani marble sq.m.
20 16 mm rjasthani marble sq.m.
21 Granite 12mm sq.m.
22 Granite 16mm sq.m.
23 Granite 18mm sq.m.
24 Ordinary Floor and wall tiles sq.m.
25 White cement kg
26 Floor Trap nos
30 Hexagonal Concrete interlocking Blocks (single colour)
a thickness 80mm sq.m.
b thickness 60mm sq.m.
c thickness 50mm sq.m.
31 Concrete interlocking Blocks (colour)
a thickness 25mm sq.m.
b thickness 40mm sq.m.
c thickness 60mm sq.m.
d thickness 80mm sq.m.
e thickness 100mm sq.m.
32 Gypsum Borad(thai) false ceiling sq.m.
33 Wood (Local ) cu.m.
34 Wood (soft) cu.m.
35 Wood (Agrakh ) cu.m.
36 Non-Skid Vitrified Ceramic floor Tile Sq.m
37 Ceramic glazed wall tile Sq.m
39 AcroSilk emulsion paint Sq.m
40 wall primer (aster) lit
41 Silk emulsion paint(emulsion paint/ distemper) lit
42 Enamel paint lit
43 Aluminium Single panal sliding doors Sq.m
44 Aluminium casement window Sq.m
45 Wall Putty normal Kg
46 Wall Putty water proof Kg
48 50 mm MS props kg
49 19 mm WP ply sqm
50 Nails kg
51 Manhole cover nos
a 600mm dia CI heavy duty cover complete set set

B SANITARY
1 HDPE pipe
100mm dia rm
150mm dia rm
200 mm dia rm
250 mm dia rm
300 mm dia rm
400 mm dia rm
500 mm dia rm
600 mm dia rm
800 mm dia rm
1000 mm dia rm
2 75mm dia pvc pipe -6kg/cm^2 rm
3 110mm dia pvc pipe -6kg/cm^2 rm
4 160mm dia pvc pipe -6kg/cm^2 rm
5 50mm MS tubular pipe
6 Nut bolt kg
7 water lit
8 Bitumen 80/100 kg
10 kerosene lit
11 NP3 Hume Pipe -460dia
12 580 mm Porcelain clay white glaze Orissa Pan (Hindware,
Parryware, Classica, cera or equivalent.) set
13 10.0 ltr.porcelain clay low level flushing cistern complete
accessories (Internal PVC fittings) set
14 White glazed porcelin clay regular commode with p trap set
15 32mmx60mm size flushing CP pipe
16 40x50cm Porcelain clay white glaze Corner Wash basin set
(Hindware, Parryware, Classica, cera or equivalent )
17 bracket no
18 32 mm PVC bottle trap
20 15 mm fancy type CP pillar cock
21 1.5x45cm (½"x18") PVC pipe connector
22 1000Ltr. PVC water tank with Inlet, outlet, over flow, cleanout
hole etc. no
23 60x45x25Cm (24"x18"x10") White glaze sink with bracket
(Hindware, Parryware, Classica, cera or equivalent )
25 ½" Ø Sink cock no
26 Shower arm no
27 wall mixer no
28 Shower rose ordinary no
29 C PTowel rod no
30 Chrome plate toilet paper holder no
31 C.P Soap dish no
32 20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 rm
33 25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 rm
34 32 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 rm
35 40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 rm
36 20 mm PP-R Pipe,(PN-10,SDR 11) rm
37 25 mm PP-R Pipe,(PN-10,SDR 11) rm
38 32 mm PP-R Pipe,(PN-10,SDR 11) rm
39 40 mm PP-R Pipe,(PN-10,SDR 11) rm
40 50 mm PP-R Pipe,(PN-10,SDR 11) rm
41 CP Soap Tray(Glass shelf) no
42 CP 15 mm Bib cock no
Pvc bottle trap no
43 Floor trap no
44 Looking mirror(0.2925=450mm*600mm) sqm
45 CPVC ball valve
a 20mm no
b 30mm no
c 32mm no
d 40mm no
e 50mm no
46 19 mm thick Granite sq.m.
47 Oxalic acid kg
48 Maeen polish kg
49 Turpentine ( Nariol oil ) liter
50 Weather coat paint liter
51 Filler putty kg
51 Red oxide metal primer liter
51 Steel railings rm
51 Ms section Mt
Kathmandu Trnasportation
District rate rates Final rates in Dolkha

16,500.00 128.64 16,628.64 ktm


14,500.00 128.64 14,628.64 ktm
36.75 128.64 165.39 ktm
16.20 6.53 22.73 ktm
2,500.00 6.53 2,506.53 ktm
3,108.44 3,099.87 6,208.31 ktm
2,861.18 5,145.78 8,006.96 ktm
3,108.44 5,145.78 8,254.22 ktm
3,320.38 5,145.78 8,466.16 ktm
88,308.02 4,594.45 92,902.46 ktm
2,021.90 5,145.78 7,167.68 ktm
1,449.66 4,594.45 6,044.11 ktm

86,000.00 2,572.89 88,572.89 ktm


85,000.00 2,572.89 87,572.89 ktm
85,000.00 2,572.89 87,572.89 ktm
85,000.00 2,572.89 87,572.89 ktm
85,000.00 2,572.89 87,572.89 ktm
92.00 2.57 94.57 ktm
81.00 2.57 83.57 ktm

11,336.00 11,336.00 Ktm


9,404.00 9,404.00 Ktm
10,398.00 10,398.00 Ktm
12,381.00 12,381.00 Ktm
10,929.00 10,929.00 Ktm
11,938.00 11,938.00 Ktm
-
-
165.00 2.57 167.57 23.94
1,808.34 90.69 1,899.03 Ktm
2,023.69 111.62 2,135.31 Ktm
1,743.75 83.37 1,827.13 Ktm
3,788.90 111.14 3,900.04 Ktm
4,251.75 125.02 4,376.77 Ktm
581.25 2.88 584.13 Ktm
30.75 128.64 159.39 Ktm
294.00 294.00 Ktm
-
2,716.95 2,716.95 ktm
1,815.40 1,815.40 ktm
1,698.09 1,698.09 ktm
-
430.56 430.56
-
-
-
-
893.40 893.40 ktm
41,328.15 1,799.22 43,127.38
33,910.28 1,799.22 35,709.50
1,799.22 1,799.22
1,614.59 1,614.59 ktm
1,937.50 1,937.50 ktm
258.33 258.33 ktm
172.00 172.00 ktm
522.00 522.00 ktm
509.00 509.00 ktm
8,606.00 8,606.00 ktm
7,493.00 7,493.00 ktm
35.00 35.00 Ktm
60.00 60.00 Ktm
81.00 81.00
139.00 32.27 171.27
112.00 2.57 114.57 ktm
-
9,792.00 9,792.00 ktm
-

-
-
500.00 500.00 Ktm
1,000.00 1,000.00 Ktm
1,500.00 1,500.00 Ktm
1,900.00 1,900.00 Ktm
3,160.00 3,160.00 Ktm
4,070.00 4,070.00 Ktm
4,860.00 4,860.00 Ktm
8,370.00 8,370.00 Ktm
13,875.00 13,875.00 Ktm
20,900.00 20,900.00 Ktm
-
474.00 474.00
1,080.00 1,080.00
-
165.00 165.00 ktm
0.26 0.26 ktm
78.10 78.10
97.00 97.00 ktm
-

2,741.00 2,741.00 ktm

3,559.00 3,559.00 ktm


1,587.00 1,587.00 ktm
-

1,095.00 1,095.00 ktm


135.00 135.00 ktm
432.00 432.00 ktm
-
130.00 130.00 ktm

10,300.00 10,300.00 ktm

-
1,309.00 1,309.00 ktm
976.00 976.00 ktm
5,435.00 5,435.00 ktm
567.00 567.00 ktm
1,663.00 1,663.00 ktm
929.00 929.00 ktm
1,042.00 1,042.00 ktm
160.00 160.00 ktm
210.00 210.00 ktm
261.00 261.00 ktm
366.00 366.00 ktm
51.33 51.33 ktm
78.76 78.76 ktm
124.78 124.78 ktm
197.35 197.35 ktm
306.19 306.19 ktm
680.00 680.00 ktm
1,361.00 1,361.00 ktm
432.00 432.00 ktm
294.00 294.00
1,416.80 1,416.80
-
458.00 458.00 ktm
588.00 588.00 ktm
1,371.00 1,371.00 ktm
1,643.00 1,643.00 ktm
2,117.00 2,117.00 ktm
4,251.75 132.01 4,383.76 ktm
118.00 2.57 120.57 ktm
345.00 2.57 347.57 ktm
208.00 208.00 ktm
503.00 503.00 ktm
36.00 2.57 38.57 ktm
276.00 276.00 ktm
1,200.00 1,200.00 ktm
94,000.00 2,572.89 96,572.89 ktm
Transporataion( By person) Transporataion( By truck)(ton/km)
(kg/Km) upto 50km in black Green road

1.14 23.92
1.14

1.14

861.11
Transporataion( By truck)( ton/km) Transporataion( By truck)
upto 50km in blacke topped road (ton/km) more than 50km

46.80 18.51
24.00
TRANSPORTATION COST for Charikot
Transportation Cost
Material
@ton /km
Units Unit per Ton
black topped road
Road
Bricks Nos 394.0000 18.51
Stone Cum 0.5600 18.51
Gravel Cum 0.5000 18.51
Sand Cum 0.8300 18.51
Cement bag 20.0000 18.51
Iron Bar MT 1.0000 18.51
Wood Cum 1.4300 18.51
Other (s) Kg 1000.0000 18.51
Binding wires Kg 1000.0000 18.51
Tubular black pipes Kg 1000.0000 18.51
CGI sheets bundle 0.1300 18.51
J hook 18.51
Bitumen washer 18.51
Nut bolts kg 1000.0000 18.51
13 mm rjasthani marble sq.m. 28.3700 18.51
16 mm rjasthani marble sq.m. 23.0500 18.51
Granite 12mm sq.m. 30.8600 18.51
Granite 16mm sq.m. 23.1500 18.51
Granite 18mm sq.m. 20.5800 18.51
Ordinary Floor and wall tiles sq.m. 892.8600 18.51
White cement kg 20.0000 18.51
Floor Trap nos 18.51
Hexagonal Concrete interlocking Blocks (single colour) 18.51
Gypsum Borad(thai) false ceiling sq.m. 18.51
Wood (Local ) cu.m. 1.4300 18.51
Wood (soft) cu.m. 1.4300 18.51
Wood (Agrakh ) cu.m. 1.4300 18.51
Non-Skid Vitrified Ceramic floor Tile Sq.m 18.51
Ceramic glazed wall tile Sq.m 18.51
AcroSilk emulsion paint Sq.m 18.51
wall primer (aster) lit 18.51
Silk emulsion paint(emulsion paint/ distemper) lit 18.51
Enamel paint lit 18.51
Aluminium Single panal sliding doors Sq.m 18.51
Aluminium casement window Sq.m 18.51
Wall Putty normal Kg 1000.0000 18.51
Wall Putty water proof Kg 1000.0000 18.51
50 mm MS props kg 1000.0000 18.51
19 mm WP ply sqm 79.7400 18.51
Nails kg 1000.0000 18.51
Manhole cover nos 18.51
600mm dia CI heavy duty cover complete set set 18.51
18.51
SANITARY 18.51

HDPE pipe rm 18.51

75mm dia pvc pipe -6kg/cm^2 rm 18.51

110mm dia pvc pipe -6kg/cm^2 rm 18.51

160mm dia pvc pipe -6kg/cm^2 rm 18.51

50mm MS tubular pipe rm 18.51

Nut bolt kg 1000.0000 18.51

water lit 18.51

Bitumen 80/100 kg 18.51

kerosene lit 18.51

NP3 Hume Pipe -460dia 18.51

580 mm Porcelain clay white glaze Orissa Pan (Hindware,


18.51
Parryware, Classica, cera or equivalent.) set
10.0 ltr.porcelain clay low level flushing cistern complete set 18.51
accessories (Internal PVC fittings)
White glazed porcelin clay regular commode with p trap set 18.51

32mmx60mm size flushing CP pipe 18.51

40x50cm Porcelain clay white glaze Corner Wash basin set


18.51
(Hindware, Parryware, Classica, cera or equivalent )
bracket no 18.51

32 mm PVC bottle trap 18.51

15 mm fancy type CP pillar cock 18.51

18.51
1.5x45cm (½"x18") PVC pipe connector
1000Ltr. PVC water tank with Inlet, outlet, over flow, cleanout no 18.51
hole etc.
60x45x25Cm (24"x18"x10") White glaze sink with bracket
18.51
(Hindware, Parryware, Classica, cera or equivalent )
½" Ø Sink cock no 18.51

Shower arm no 18.51

wall mixer no 18.51

Shower rose ordinary no 18.51

C PTowel rod no 18.51

Chrome plate toilet paper holder no 18.51

C.P Soap dish no 18.51

20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 rm 18.51

25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 rm 18.51

32 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 rm 18.51

40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 rm 18.51

20 mm PP-R Pipe,(PN-10,SDR 11) rm 18.51

25 mm PP-R Pipe,(PN-10,SDR 11) rm 18.51

32 mm PP-R Pipe,(PN-10,SDR 11) rm 18.51

40 mm PP-R Pipe,(PN-10,SDR 11) rm 18.51

50 mm PP-R Pipe,(PN-10,SDR 11) rm 18.51


CP Soap Tray(Glass shelf) no 18.51

CP 15 mm Bib cock no 18.51

Pvc bottle trap no 18.51

Floor trap no 18.51

Looking mirror(0.2925=450mm*600mm) sqm 18.51

CPVC ball valve no 18.51

19 mm thick Granite sq.m. 19.4900 18.51

Oxalic acid kg 1000.0000 18.51

Maeen polish kg 1000.0000 18.51

Turpentine ( Nariol oil ) liter 18.51

Weather coat paint liter 18.51

Filler putty kg 1000.0000 18.51

Red oxide metal primer liter 18.51

Steel railings rm 18.51

Ms section Mt 1.0000 18.51


Distance (Km)
Cost of
Transportation
per ton per unit cost
black topped road Remarks
Road
139 2572.89 6.53
139 2572.89 4594.45
139 2572.89 5145.78
139 2572.89 3099.87
139 2572.89 128.64
139 2572.89 2572.89
139 2572.89 1799.22
139 2572.89 2.57
139 2572.89 2.57
139 2572.89 2.57 7.85gm/cm3 0.00785
139 2572.89 19791.46 7850
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 2.57
139 2572.89 90.69
139 2572.89 111.62
139 2572.89 83.37
139 2572.89 111.14
139 2572.89 125.02
139 2572.89 2.88
139 2572.89 128.64
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 1799.22
139 2572.89 1799.22
139 2572.89 1799.22
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 2.57
139 2572.89 2.57
139 2572.89 2.57
139 2572.89 32.27
139 2572.89 2.57
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!
139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 2.57

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!


139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 132.01

139 2572.89 2.57

139 2572.89 2.57

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 2.57

139 2572.89 #DIV/0!

139 2572.89 #DIV/0!

139 2572.89 2572.89


0.0013225
378071.83365

280000
SN Manpower Unit Rates without VAT (NRs)
1 Skilled per day 990.00
2 Unskilled per day 750.00
3 Carpenter/Painter/Black smith per day 955.00
4 Plumber per day 880.00
5 Semi plumber (Helper) per day 750.00
Layout & setting out including site clearence
Analysis for 1 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md
Unskilled Md 0.04 750.00
Sub Total A
B Materials

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

E/W in clay and silty soil


Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md
Unskilled Md 0.80 750.00
Sub Total A
B Materials

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

12-30cm diameter tree cutting Norms Ref no: 1-1(Ka)


Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled
Unskilled Md 0.13 750.00
Sub Total A
B Materials
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

137cm diameter tree cutting


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled
Unskilled Md 4.00 750.00
Sub Total A
B Materials

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Backfilling by ordinary soil for 10 m haulage Norms Ref no: 2.25 (ka)
Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md
Unskilled Md 0.50 750.00
Sub Total A
B Materials

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Flat brick soling including sand filling Norms Ref no: 11(15) ka
Analysis for 10 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.50 990.00
Unskilled Md 1.00 750.00
Sub Total A
B Materials
Brick no 420 22.73
Sand cum 0.71 6208.31

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

M10 grade concrete, (1:3:6) with 30m lead Norms Ref no: 7(2)Ga
Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.00 990.00
Unskilled Md 4.00 750.00
Sub Total A
B Materials
OPC Cement MT 0.22 16628.64
Sand cum 0.47 6208.31
Aggregate cum 0.89 8,466.16

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

M20 (1:1.5:3) grade Concrete with WPC with 30m lead Norms Ref no: 7(4)Kha
Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.80 990.00
Unskilled Md 7.00 750.00
Sub Total A
B Materials
OPC Cement MT 0.4 16628.64
Sand cum 0.425 6208.31
Aggregate cum 0.86 8,466.16
Admixture @0.5% by wt. of cement kg 2 320.00
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Steel reinforcement TMT bar


Analysis for 1 MT
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 12.00 990.00
Unskilled Md 12.00 750.00
Sub Total A
B Materials
TMT bar MT 1.05 87572.89
binding wire kg 10 94.57

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

First class machine made brick masonry works in (1:4) cement ratio

Analysis for 1 cum


S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.50 990.00
Unskilled Md 2.40 750.00
Sub Total A
B Materials
Brick nos 560 22.73
PPC cement MT 0.07 14628.64
Sand Cum 0.3 6,208.31

Sub Total B
C Equipment
T&P @ 3% of labour cost 98.55

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Half brick masonry work in 1:4 cement sand mortar in partition walls

Analysis for 1 cum


S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.50 990.00
Unskilled Md 2.40 750.00
Sub Total A
B Materials
Brick nos 560 22.73
PPC cement MT 0.1 14628.64
Sand Cum 0.28 6,208.31

Sub Total B
C Equipment
T&P @ 3% of labour cost 98.55

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

20mm thick (1:4) cement sand plaster Norms Ref no: 12.4 Kha
Analysis for 100 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 14.00 990.00
Unskilled Md 19.00 750.00
Sub Total A
B Materials
PPC Cement MT 0.81 14628.64
Sand cum 2.2 6208.31

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate
12.5mm thick (1:4)cement sand plaster Norms Ref no: 12.1 Ga
Analysis for 100 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 12.00 990.00
Unskilled Md 16.00 750.00
Sub Total A
B Materials
PPC Cement MT 0.538 14628.64
Sand cum 1.46 6208.31

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

3mm thick cement punning in (1:1) cement sand ratio Norms Ref no: 11.20
Analysis for 10 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.00 990.00
Unskilled Md 1.00 750.00
Sub Total A
B Materials
PPC Cement MT 0.0532 14628.64

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Form works
Analysis for 100 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 17.20 990.00
Unskilled Md 25.70 750.00
Sub Total A
B Materials
wood local Cum 0.232 43127.38
50 mm MS props kg 750 81.00
19 mm WP ply sqm 16.6 171.27
Nails kg 25 114.57
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

110mm. OD Pipe (ID 100mm)


Analysis for 1 rmt
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.17 990.00
Unskilled Md 0.20 750.00
Sub Total A
B Materials
110mm. OD pipe 6 kg/cm2 MT 1 474.00
PVC fittings @ @20% of pipe cost 94.80
Jointing materials, nails, hooks, clamps etc. LS 237.00

Sub Total B
C Equipment
T&P @ 3% of labour cost 9.55

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Structural work for roof truss using MS tubular pipes


Analysis for 78.28 kg
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 3.70 990.00
Unskilled Md 4.80 750.00
Sub Total A
B Materials
50mm MS tubular pipe (MD) Kg 78.5 81.00
Nut bolt Nos. 54 165.00
Primer paint L.S. 500.00

Sub Total B
C Equipment
T&P @ 3% of labour cost 217.89

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

24 gauge thick CGI sheet for roofing work


Analysis for 10 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.10 990.00
Unskilled Md 1.25 750.00
Sub Total A
B Materials
24 gauge CGI sheet Sqm 12 9404.00
J hook Nos. 25 25.00
bitument washer Nos. 55 55.00
Nut bolt Nos. 30 23.94
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

RR Stone Masonry work in 1:4 cement sand mortar Norms Ref no: 6-3-2
Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 2.00 990.00
Unskilled Md 5.40 750.00
Sub Total A
B Materials
Block stone Cum 1.1 2198.22
PPC cement Mt 0.159 14628.64
Sand Cum 0.45 6,208.31

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Reinstatement of brick Paving - flat brick soling Norms Ref no:11- 15.ka
Analysis for 10 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.50 990.00
Unskilled Md 1.00 750.00
Sub Total A
B Materials
Brick no 420 22.73
Sand Cum 0.71 6208.31

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Provide and laying 460mm dia NP3 Hume pipe Norms Ref no: 15.23.Kha
Analysis for 32 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 6.00 990.00
Unskilled Md 22.00 750.00
Sub Total A
B Materials
NP3 Hume Pipe -460 Rm 32 3100.00
OPC cement MT 0.83 16628.64
Sand Cum 0.13 6,208.31
Jute kg 0.19 10.00
Bitumen LS 500.00
Sub Total B
C Equipment
Bitumen Distributer hr 0.11
Roller 8-10 ton hr 0.11
Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

38 mm (1½" ) thk. Cement Sand Screeding Flooring (1:2:4) with (per 10 sq.m.)
Analysis for 10 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.25 990.00
Unskilled Md 2.00 750.00
Sub Total A
B Materials
PPC Cement MT 0.11 14628.64
Sand cu.m. 0.15 6208.31
12 mm Aggregates cu.m. 0.3 8,254.22
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Providing & fixing in position Glazed Ceramic Tile on wall using tile
adhesive and grout (per 10 sq.m.)
Analysis for 10 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.25 990.00
Unskilled Md 2.00 750.00
Sub Total A
B Materials
Cement mt. 0.056 14628.64
Sand cu.m. 0.152 6208.31
White cement kg. 3.228 165.39
Ceramic Glazed Tile sq.m. 11 1,937.50
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

1000 Ltr. PVC WATER TANK with Inlet, outlet, over flow, cleanout hole etc.
Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 3.00 990.00
Unskilled Md 4.00 750.00
Sub Total A
B Materials
1000Ltr. PVC water tank nos 1 10300.00

Tanki nipples with wash out plug etc. Ls 187.86

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Non-Skid Vitrified Ceramic Tile


Analysis for 1 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 13.00 990.00
Unskilled Md 4.50 750.00
Sub Total A
B Materials
Non-Skid Vitrified Ceramic Tile sq.m. 11 1614.59
Cement mt. 0.056 14628.64
Sand cu.m. 0.152 6,208.31
White cement with pigment kg. 3.228 165.39
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Two or more coats of washable distemper paint with approved primer


Analysis for 100 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 12.00 990.00
Unskilled Md 8.00 750.00
Sub Total A
B Materials
Aster liter 8.1 172.00
Distemper liter 16 522.00
Electrical, scaffolding, sand papers,
918.00
etc. LS

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

16 mm thick Granite flooring over 20 mm (average) thick base with


joint finished flush Base with cement mortar 1:2
Analysis for 10 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 2.00 990.00
Unskilled Md 8.00 750.00
Sub Total A
B Materials
Cement mt 0.13 16628.64
Sand cu.m. 0.183 6208.31
16 mm thick Granite sq.m. 11 3,900.04
Oxalic acid kg 0.37 120.57
Maeen polish kg 0.118 347.57
Turpentine ( Nariol oil ) liter 0.538 208.00
Carborendom stone LS 150.00
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Two or more coats of exterior weather coat paint


Analysis for 100 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 12.00 990.00
Unskilled Md 8.00 750.00
Sub Total A
B Materials
Primer lit. 8.1 172.00
Weather coat paint lit. 16 503.00
Filler putty kg 3 38.57

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Cement sand skirting with Punning(5")


Analysis for 10 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.00 990.00
Unskilled Md 1.00 750.00
Sub Total A
B Materials
PPC Cement MT 0.0532 14628.64

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Gypsum Board False Ceiling (per 103.79 sq.m.)


Analysis for 103.79 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 40.00 990.00
Unskilled Md 70.00 750.00
Sub Total A
B Materials
Gypsum Board sq.m. 109 893.40
Ceiling Sections rm. 242 90.00
Perimeter Channel rm. 42 55.00
Intermediate Channel rm. 91.5 90.00
Strap Hanger nos. 11 75.00
Connection Clips nos. 190 12.00
6 mm dia. Nuts & bolts nos. 22 5.00
Soffit Cleats nos. 75 6.50
Joint Filler kg. 24 50.00
Joint Finisher kg. 35 71.00
Joint Tape roll 1.5 280.00
12 mm dia. 40 mm long with 6mm
15.00
dia. Bolt dash fastener nos. 75
Sub Total B
C Equipment
@5% of labour cost 4,605.00

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Dry Brick work


Analysis for 10 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.00 990.00
Unskilled Md 3.25 750.00
Sub Total A
B Materials
Brick nos 750 22.73
Sand cu.m. 0.71 6,208.31

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Painting work
Analysis for 1 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.12 990.00
Unskilled Md 0.08 750.00
Sub Total A
B Materials
Primer lit 0.081 172.00
Enamel lit 0.16 522.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

RR Stone Masonry work in 1:4 cement sand mortar


Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 2.00 990.00
Unskilled Md 5.40 750.00
Sub Total A
B Materials
Block stone Cum 1.1 2198.22
PPC cement Mt 0.159 14,628.64
Sand Cum 0.45 6,208.31
Sub Total B
C Equipment
@3% of labour cost 180.90

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Providing and installation of interlocking blocks


Analysis for 10 sqm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.00 990.00
Unskilled Md 10.00 750.00
Sub Total A
B Materials
Interlocking block sqm 11 2716.95
Stone dust cum 1.26 1,165.25

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Providing and laying plastic bottles packed bags


Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md
Unskilled Md
Sub Total A
B Materials
Smashed plastic bottles cum 50 5.00
bags nos 4 10.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Providing, laying, spreading, watering, levelling and compaction of


natural sand gravel subbase grading
Analysis for 1 cum
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.01 990.00
Unskilled Md 1.05 750.00
Sub Total A
B Materials
Sub base agg cum 1.28 8006.96
Diesel litre 0.66 97.00

Sub Total B
C Equipment
Road roller hr 0.03 1,200.00

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Supplying and erecting traffic sign in place including 50mm dia.


Steel tube, 2mm. thick steel plate, cement concrete, painting,
writing and supporting steel angle nut and bolit etc. complete.
Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.03 990.00
Unskilled Md 0.09 750.00
Sub Total A
B Materials
Enamel Paint lit 0.1 509.00
M10/40 PCC cum 0.03 13,071.49
Steel plate sqm 0.25 278.20
formwork sqm 0.36 1,297.00
Steel tube m 2.5 508.00
Sub Total B
C Equipment
Road roller hr 0.03 1,200.00

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

40-80 mm Natural Gravel for Filter


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md
Unskilled Md 5.75 750.00
Sub Total A
B Materials
40-80 mm Gravel cu.m 1 7167.68

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

1m GI Sheets Gutter Installation of Size (200x90)mm


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.05 990.00
Unskilled Md 0.05 750.00
Sub Total A
B Materials
GI Sheets for Gutter rm 1 410.00

Sub Total B
C Equipment
@3% of labour cost 2.61

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate
Norms Ref no: 1-3

Amount (Rs.)

-
30.00
30.00

-
-
-
-
-

-
-
-
30.00
4.50
34.50
35.00

Norms Ref no: 2.2

Amount (Rs.)

-
600.00
600.00

-
-
-
-
-

-
-
-
600.00
90.00
690.00
690.00

Norms Ref no: 1-1(Ka)

Amount (Rs.)

-
97.50
97.50
-
-
-
-

-
-
-
97.50
14.63
112.13
112.00

Amount (Rs.)

-
3,000.00
3,000.00

-
-
-
-

-
-
-
3,000.00
450.00
3,450.00
3,450.00

Norms Ref no: 2.25 (ka)

Amount (Rs.)

-
375.00
375.00

-
-
-
-
-

-
-
-
375.00
56.25
431.25
431.00

Norms Ref no: 11(15) ka

Amount (Rs.)

495.00
750.00
1,245.00

9,546.67
4,407.90
-
-
13,954.57

-
-
-
15,199.57
2,279.94
17,479.51
1,748.00

Norms Ref no: 7(2)Ga

Amount (Rs.)

990.00
3,000.00
3,990.00

3,658.30
2,917.91
7,534.88
-
14,111.09

-
-
-
18,101.09
2,715.16
20,816.25
20,816.00

Norms Ref no: 7(4)Kha

Amount (Rs.)

792.00
5,250.00
6,042.00

6,651.46
2,638.53
7,280.90
640.00
17,210.89

-
-
-
23,252.89
3,487.93
26,740.82
26,741.00

Norms Ref no: 7-5

Amount (Rs.)

11,880.00
9,000.00
20,880.00

91,951.53
945.73
-
-
92,897.26

-
-
-
113,777.26
17,066.59
130,843.85
130,844.00

Norms Ref no: 5(1)


Kha 3, 5(2)Ka

Amount (Rs.)

1,485.00
1,800.00
3,285.00

12,728.90
1,024.01
1,862.49
-
15,615.40
98.55
-
98.55
18,998.95
2,849.84
21,848.79
21,849.00

Norms Ref no: 5.1


Kha 2, 5 (2) Ka ,

Amount (Rs.)

1,485.00
1,800.00
3,285.00

12,728.90
1,462.86
1,738.33
-
15,930.09

98.55
-
98.55
19,313.64
2,897.05
22,210.69
22,211.00

Norms Ref no: 12.4 Kha

Amount (Rs.)

13,860.00
14,250.00
28,110.00

11,849.20
13,658.28
-
-
25,507.48

-
-
-
53,617.48
8,042.62
61,660.11
617.00
Norms Ref no: 12.1 Ga

Amount (Rs.)

11,880.00
12,000.00
23,880.00

7,870.21
9,064.13
-
-
16,934.34

-
-
-
40,814.34
6,122.15
46,936.49
469.00

Norms Ref no: 11.20

Amount (Rs.)

990.00
750.00
1,740.00

778.24
-
-
-
778.24

-
-
-
2,518.24
377.74
2,895.98
290.00

Norms Ref no:8-4ka

Amount (Rs.)

17,028.00
19,275.00
36,303.00
10,005.55
60,750.00
2,843.02
2,864.32
76,462.89

-
-
-
112,765.89
16,914.88
129,680.77
1,297.00

Amount (Rs.)

168.30
150.00
318.30

474.00
94.80
237.00
-
805.80

9.55
-
9.55
1,133.65
170.05
1,303.70
1,304.00

Amount (Rs.)

3,663.00
3,600.00
7,263.00

6,358.50
8,910.00
500.00
-
15,768.50

217.89
-
217.89
23,249.39
3,487.41
26,736.80
342.00

Norms Ref no:9-1

Amount (Rs.)

1,089.00
937.50
2,026.50

112,848.00
625.00
3,025.00
718.17
117,216.17

-
-
-
119,242.67
17,886.40
137,129.07
13,713.00

Norms Ref no: 6-3-2

Amount (Rs.)

1,980.00
4,050.00
6,030.00

2,418.04
2,325.95
2,793.74
-
7,537.74

-
-
-
13,567.74
2,035.16
15,602.90
15,603.00

Norms Ref no:11- 15.ka

Amount (Rs.)
495.00
750.00
1,245.00

9,546.67
4,407.90
-
-
13,954.57

-
-
-
15,199.57
2,279.94
17,479.51
1,748.00

Norms Ref no: 15.23.Kha

Amount (Rs.)

5,940.00
16,500.00
22,440.00

99,200.00
13,801.77
807.08
1.90
500.00
114,310.76

0.11
0.11
0.22
136,750.98
20,512.65
157,263.62
4,914.00

) with (per 10 sq.m.)

Amount (Rs.)

1,237.50
1,500.00
2,737.50

1,609.15
931.25
2,476.27
-
5,016.66

-
-
-
7,754.16
1,163.12
8,917.29
892.00

Amount (Rs.)

1,237.50
1,500.00
2,737.50

819.20
943.66
533.89
21,312.55
23,609.31

-
-
-
26,346.81
3,952.02
30,298.83
3,030.00

eanout hole etc.

Amount (Rs.)

2,970.00
3,000.00
5,970.00

10,300.00
187.86
-
-
10,487.86

-
-
-
16,457.86
2,468.68
18,926.54
18,927.00

Amount (Rs.)

12,870.00
3,375.00
16,245.00

17,760.46
819.20
943.66
533.89
20,057.22

-
-
-
36,302.22
5,445.33
41,747.55
41,748.00

ved primer

Amount (Rs.)

11,880.00
6,000.00
17,880.00

1,393.20
8,352.00
918.00
-
10,663.20

-
-
-
28,543.20
4,281.48
32,824.68
328.00
Amount (Rs.)

1,980.00
6,000.00
7,980.00

2,161.72
1,136.12
42,900.42
44.61
41.01
111.90
150.00
46,545.79

-
-
-
54,525.79
8,178.87
62,704.66
6,270.00

Amount (Rs.)

11,880.00
6,000.00
17,880.00

1,393.20
8,048.00
115.72
-
-
9,556.92

-
-
-
27,436.92
4,115.54
31,552.46
316.00

Amount (Rs.)

990.00
750.00
1,740.00

778.24
-
-
778.24

-
-
-
2,518.24
377.74
2,895.98
290.00

Amount (Rs.)

39,600.00
52,500.00
92,100.00

97,381.14
21,780.00
2,310.00
8,235.00
825.00
2,280.00
110.00
487.50
1,200.00
2,485.00
420.00
1,125.00
138,638.64

4,605.00
-
4,605.00
235,343.64
35,301.55
270,645.19
2,608.00

Amount (Rs.)

990.00
2,437.50
3,427.50
17,047.63
4,407.90
-
21,455.53

-
-
-
24,883.03
3,732.45
28,615.49
2,862.00

Amount (Rs.)

118.80
60.00
178.80

13.93
83.52
-
97.45

-
-
-
276.25
41.44
317.69
318.00

Amount (Rs.)

1,980.00
4,050.00
6,030.00

2,418.04
2,325.95
2,793.74
7,537.74

180.90
-
180.90
13,748.64
2,062.30
15,810.93
15,811.00

Amount (Rs.)

990.00
7,500.00
8,490.00

29,886.45
1,468.22
-
31,354.67

-
-
-
39,844.67
5,976.70
45,821.37
4,582.00

Amount (Rs.)

-
-
-

250.00
40.00
-
290.00

-
-
-
290.00
43.50
333.50
334.00

Amount (Rs.)

4.95
787.50
792.45

10,248.91
64.02
-
10,312.93

36.00
-
36.00
11,141.38
1,671.21
12,812.59
12,813.00

Amount (Rs.)

32.67
66.00
98.67

50.90
392.14
69.55
466.92
1,270.00
2,249.51

36.00
-
36.00
2,384.18
357.63
2,741.81
2,742.00

Amount (Rs.)

-
4,312.50
4,312.50

7,167.68
-
-
7,167.68
-
-
-
11,480.18
1,722.03
13,202.21
13,202.00

Amount (Rs.)

49.50
37.50
87.00

410.00
-
-
410.00

2.61
-
2.61
499.61
74.94
574.55
575.00
580 mm size Orissa pan with low level cistern complete set
(Hindware, Parryware, Classica, cera or equivalent
Analysis for 1 set
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 3.00 990.00
Unskilled Md 3.00 750.00
Sub Total A
B Materials
Porcelain clay white glaze Orissa Pan nos 1 2,741.00
10.0 ltr.porcelain clay flushing cistern nos 1 3,559.00
32mmx60mm size flushing CP pipe

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CORNER WASH BASIN COMPLETE SET 40X50 CM (Hindware,


Parryware, Classica, cera or equivalent ) with 32mm cp waste
coupling with CP chain and rubber plug etc.
Analysis for 1 set
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 2.00 990.00
Unskilled Md 2.00 750.00
Sub Total A
B Materials
Porcelain clay white glaze Corner Wash basin nos 1 1095.00
Bracket nos 1 135.00
32 mm PVC bottle trap nos 1 432.00
1.5x45cm (½"x18") PVC pipe connector nos 1 130.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

KITCHEN SINK COMPLETE SET 60x45x25Cm ( 24"x18"x10") size


LARGE (Hindware, Parryware, Classica, cera or equivalent ) with
bottle trap including 1½" waste coupling with c p chain and rubber
plug etc.
Analysis for 1 set
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 3.00 990.00
Unskilled Md 1.00 750.00
Sub Total A
B Materials
White glaze sink with bracket nos 1 1587.00
Pvc bottle trap set 1 432.00
½" Ø Sink cock nos 1 1309.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

Supplying and fixing overhead shower


Analysis for 1 set
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.33 990.00
Unskilled Md
Sub Total A
B Materials
shower rod nos 1 976.00
wall mixer nos 1 5435.00
Shower rose (5.0 to 10.00 cm) nos 1 567.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

C P towel rod 1.5x45cm (½"x 18")


Analysis for 1 set
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.22 990.00
Unskilled Md
Sub Total A
B Materials
C PTowel rod nos 1 1663.00
Screws etc. LS 15.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CHROME PLATE TOILET PAPER HOLDER


Analysis for 1 set
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.11 990.00
Unskilled Md
Sub Total A
B Materials
Chrome plate toilet paper holder nos 1 929.00
Zink oxide screw etc. LS 10.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CHROME PLATE SOAP DISH.


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.11 990.00
Unskilled Md
Sub Total A
B Materials
C.P Soap dish nos 1 1042.00
Zink oxide screw etc. LS 10.00

Sub Total B
C Equipment
Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

5mm thick Looking Mirror Size 450x600mm


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.33 990.00
Unskilled Md
Sub Total A
B Materials
looking mirror nos 1 1416.80
Screws LS 100.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CP Soap Tray (Below Mirror)


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.05 990.00
Unskilled Md
Sub Total A
B Materials
CP Soap Tray(Glass shelf) nos 1 680
Zink oxide screw etc LS 50.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate
C P Bib Cock
Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.1 990.00
Unskilled Md
Sub Total A
B Materials
CP 15 mm Bib cock nos 1 1,361.00
Screws etc LS 10.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC Pipe SDR 13.5, 20mm (3/4") CTS


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.01 990.00
Unskilled Md 0.01 750.00
Sub Total A
B Materials
20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rm 1 160.00
Cpvc fittings LS 120.00
Jointing materials (flow guard adesive soln) LS 30.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC Pipe SDR 13.5, 25mm (1") CTS


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.011 990.00
Unskilled Md 0.019 750.00
Sub Total A
B Materials
25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rm 1 210.00
Cpvc fittings LS 120.00
Jointing materials (flow guard adesive soln) LS 30.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC Pipe SDR 13.5, 32mm (1 1/4") CTS


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.011 990.00
Unskilled Md 0.019 750.00
Sub Total A
B Materials
32 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rm 1 261.00
Cpvc fittings LS 120.00
Jointing materials (flow guard adesive soln) LS 50.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC Pipe SDR 13.5, 40mm (1 1/2") CTS


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.011 990.00
Unskilled Md 0.019 750.00
Sub Total A
B Materials
40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 Rm 1 366.00
Cpvc fittings LS 150.00
Jointing materials (flow guard adesive soln) LS 50.00
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PPR Pipe( Poly propylene Random Co-polymer ) , 20 mm


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.01 990.00
Unskilled Md 0.01 750.00
Sub Total A
B Materials
20 mm PP-R Pipe,(PN-10,SDR 11) Rm 1 51.33
PPR fittings LS 30.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PPR Pipe( Poly propylene Random Co-polymer ) , 25 mm


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.01 990.00
Unskilled Md 0.01 750.00
Sub Total A
B Materials
25 mm PP-R Pipe,(PN-10,SDR 11) Rm 1 78.76
PPR fittings LS 30.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PPR Pipe( Poly propylene Random Co-polymer ) , 32 mm


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.01 990.00
Unskilled Md 0.01 750.00
Sub Total A
B Materials
32 mm PP-R Pipe,(PN-10,SDR 11) Rm 1 124.78
PPR fittings LS 36.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PPR Pipe( Poly propylene Random Co-polymer ) , 40 mm


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.01 990.00
Unskilled Md 0.01 750.00
Sub Total A
B Materials
40 mm PP-R Pipe,(PN-10,SDR 11) Rm 1 197.35
PPR fittings LS 60.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PPR Pipe( Poly propylene Random Co-polymer ) , 50 mm


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.01 990.00
Unskilled Md 0.01 750.00
Sub Total A
B Materials
50 mm PP-R Pipe,(PN-10,SDR 11) Rm 1 306.19
PPR fittings LS 60.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PVC pipes 160mm. OD Pipe (ID 150mm)


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.20 990.00
Unskilled Md 0.25 750.00
Sub Total A
B Materials
160mm. OD pipe 6 kg/cm2 Rm 1 1,080.00
PVC fittings @ LS 432
Jointing materials, nails, hooks, clamps etc. LS 540

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PVC pipes 110mm. OD Pipe (ID 100mm)


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.17 990.00
Unskilled Md 0.20 750.00
Sub Total A
B Materials
110mm. OD pipe 6 kg/cm2 Rm 1 474.00
PVC fittings @ LS 190
Jointing materials, nails, hooks, clamps etc. LS 237.00
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PVC pipes 75mm. OD Pipe (ID 100mm)


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.11 990.00
Unskilled Md 0.11 750.00
Sub Total A
B Materials
75mm. OD pipe 6 kg/cm2 Rm 1 474.00
PVC fittings @ LS 190
Jointing materials, nails, hooks, clamps etc. LS 237.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

PVC pipes 50mm. OD Pipe (ID 100mm)


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.06 990.00
Unskilled Md 0.10 750.00
Sub Total A
B Materials
50mm. OD pipe 6 kg/cm2 Rm 1 474.00
PVC fittings @ LS 190
Jointing materials, nails, hooks, clamps etc. LS 237.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

110 mm. dia. PVC multi floor trap unit 1 no.


Analysis for 1 rm
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.06 990.00
Unskilled Md 0.10 750.00
Sub Total A
B Materials
Floor trap nos 1 294.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC 20 mm Ball Valve


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.11 990.00
Unskilled Md
Sub Total A
B Materials
CPVC 20 mm Ball Valve nos 1 458

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC 30 mm Ball Valve


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.22 990.00
Unskilled Md
Sub Total A
B Materials
CPVC 30 mm Ball Valve nos 1 588.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC 32 mm Ball Valve


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.22 990.00
Unskilled Md
Sub Total A
B Materials
CPVC 32 mm Ball Valve nos 1 1,371.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC 40 mm Ball Valve


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.33 990.00
Unskilled Md
Sub Total A
B Materials
CPVC 40 mm Ball Valve nos 1 1,643.00
Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

CPVC 50 mm Ball Valve


Analysis for 1 nos
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 0.50 990.00
Unskilled Md
Sub Total A
B Materials
CPVC 50 mm Ball Valve nos 1 2,117.00

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

300 mm dia. HDPE Pipe


Analysis for 1 m
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 1.50 990.00
Unskilled Md 1.00 750.00
Sub Total A
B Materials
300 mm dia. HDPE Pipe m 1 3,160.00

Sub Total B
C Equipment
Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate

450 mm RCC Hume pipe NP-3


Analysis for 32 m
S.No. Particulars Unit Quantity Rate
A Labours
Skilled Md 6.00 990.00
Unskilled Md 22.00 750.00
Sub Total A
B Materials
450 mm RCC Hume pipe NP-3 rm 1 4,365.00
Cement Mt 0.03 14500
Sand cu.m 0.13 6,208.31

Sub Total B
C Equipment

Sub Total C
Total (A+B+C) :
Add 15% Contractor's OHP
Grand Total
Unit item rate
Amount (Rs.)

2,970.00
2,250.00
5,220.00

2,741.00
3,559.00

6,300.00

-
-
-
11,520.00
1,728.00
13,248.00
13,248.00

Amount (Rs.)

1,980.00
1,500.00
3,480.00

1,095.00
135.00
432.00
130.00

1,792.00

-
-
-
5,272.00
790.80
6,062.80
6,063.00
Amount (Rs.)

2,970.00
750.00
3,720.00

1,587.00
432.00
1,309.00
-
-
3,328.00

-
-
-
7,048.00
1,057.20
8,105.20
8,105.00

Amount (Rs.)

326.70
-
326.70

976.00
5,435.00
567.00
-
-
6,978.00

-
-
-
7,304.70
1,095.71
8,400.41
8,400.00

Amount (Rs.)

219.78
-
219.78
1,663.00
15.00
-
-
-
1,678.00

-
-
-
1,897.78
284.67
2,182.45
2,182.00

Amount (Rs.)

108.90
-
108.90

929.00
10.00
-
-
-
939.00

-
-
-
1,047.90
157.19
1,205.09
1,205.00

Amount (Rs.)

108.90
-
108.90

1,042.00
10.00
-
-
-
1,052.00
-
-
-
1,160.90
174.14
1,335.04
1,335.00

Amount (Rs.)

326.70
-
326.70

1,416.80
100.00
-
-
-
1,516.80

-
-
-
1,843.50
276.53
2,120.03
2,120.00

Amount (Rs.)

49.50
-
49.50

680.00
50.00
-
-
-
730.00

-
-
-
779.50
116.93
896.43
896.00
Amount (Rs.)

99.00
-
99.00

1,361.00
10.00
-
-
-
1,371.00

-
-
-
1,470.00
220.50
1,690.50
1,691.00

Amount (Rs.)

9.90
7.50
17.40

160.00
120.00
30.00
-
-
310.00

-
-
-
327.40
49.11
376.51
377.00

Amount (Rs.)

10.89
14.25
25.14

210.00
120.00
30.00
-
-
360.00

-
-
-
385.14
57.77
442.91
443.00

Amount (Rs.)

10.89
14.25
25.14

261.00
120.00
50.00
-
-
431.00

-
-
-
456.14
68.42
524.56
525.00

Amount (Rs.)

10.89
14.25
25.14

366.00
150.00
50.00
-
-
566.00

-
-
-
591.14
88.67
679.81
680.00

Amount (Rs.)

9.90
7.50
17.40

51.33
30.00
-
-
-
81.33

-
-
-
98.73
14.81
113.54
114.00

Amount (Rs.)

9.90
7.50
17.40

78.76
30.00
-
-
-
108.76

-
-
-
126.16
18.92
145.08
145.00

Amount (Rs.)

9.90
7.50
17.40

124.78
36.00
-
-
-
160.78

-
-
-
178.18
26.73
204.91
205.00

Amount (Rs.)

9.90
7.50
17.40

197.35
60.00
-
-
-
257.35

-
-
-
274.75
41.21
315.96
316.00

Amount (Rs.)
9.90
7.50
17.40

306.19
60.00
-
-
-
366.19

-
-
-
383.59
57.54
441.13
441.00

Amount (Rs.)

198.00
187.50
385.50

1,080.00
432.00
540.00
-
-
2,052.00

-
-
-
2,437.50
365.63
2,803.13
2,803.00

Amount (Rs.)

168.30
150.00
318.30

474.00
189.60
237.00
-
-
900.60

-
-
-
1,218.90
182.84
1,401.74
1,402.00

Amount (Rs.)

108.90
82.50
191.40

474.00 District rate not found so kept the rate of 110mm


189.60
237.00
-
-
900.60

-
-
-
1,092.00
163.80
1,255.80
1,256.00

Amount (Rs.)

59.40
75.00
134.40

474.00 District rate not found so kept the rate of 110mm


189.60
237.00
-
-
900.60

-
-
-
1,035.00
155.25
1,190.25
1,190.00

Amount (Rs.)

59.40
75.00
134.40

294.00
-
-
-
-
294.00

-
-
-
428.40
64.26
492.66
493.00

Amount (Rs.)

108.90
-
108.90

458.00
-
-
-
-
458.00

-
-
-
566.90
85.04
651.94
652.00
Amount (Rs.)

217.80
-
217.80

588.00
-
-
-
-
588.00

-
-
-
805.80
120.87
926.67
927.00

Amount (Rs.)

217.80
-
217.80

1,371.00
-
-
-
-
1,371.00

-
-
-
1,588.80
238.32
1,827.12
1,827.00

Amount (Rs.)

326.70
-
326.70

1,643.00
-
-
-
-
1,643.00

-
-
-
1,969.70
295.46
2,265.16
2,265.00

Amount (Rs.)

495.00
-
495.00

2,117.00
-
-
-
-
2,117.00

-
-
-
2,612.00
391.80
3,003.80
3,004.00

Amount (Rs.)

1,485.00
750.00
2,235.00

3,160.00
-
-
-
-
3,160.00

-
-
-
5,395.00
809.25
6,204.25
6,204.00

Amount (Rs.)

5,940.00
16,500.00
22,440.00

4,365.00
435.00
807.08
-
-
5,607.08

-
-
-
28,047.08
4,207.06
32,254.14
1,008.00