SUMMARY OF UNIT PRICE

Client: MINISTERIO DA ADMINISTRAÇÃO ESTATAL


Project: MUNICÍPIO DE MANATUTO
Location: MANATUTO, TIMOR-LESTE

ITEM WORK DESCRIPTION UNIT

1 Project sign board ls


2 Cleaning of construction site, including removal of debris ls
3 Clearing and stripping, minimum 250mm depth, including removal
of debris ls
4 Excavation in soil of any type m3
5 Backfill with material from excavation or from borrow site m3
6 Transport of surplus soil m3
7
Double concrete block wall 400x200x200mm + 400x200x150mm m²
8 Single concrete block wall 400x200x200mm m²
9 Single concrete block wall 400x200x150mm m²
10 Single concrete block wall 400x200x100mm m²
12
Plasterboard partition wall, including galvanized profiles structure m2
13 Paint scheme, consisting of one coat of primer and 3 coats of
aqueous paint m2
14 Insulation system, with 60mm thick extruded polystyrene and
35mm mineral wool m²
15 Bituminous waterproofing membrane m²
16 Prefabricated insulating extruded polystyrene plates, 60mm
thickness m²
17 Precast concrete roof drains (gargoyles) un
18 Water proofing coating "Sika" or similar m²
19 Floor screeding m²
20 Thermal slabs m²
22 Reinforced concrete m³
23 Precast RC slabs m²
24 Pre fabricated concrete curbs lm
25 Acoustic absorbers lm
26 Zinc plate flashing 350mm large lm
27 Zinc plate flashing 950mm large lm
28 Gutter lm
29 Expansion joints lm
30 Rendering to receive stone/tiles m²
31 Rendering to receive painting m²
32 Porcelain tiles 30x30cm, in walls m²
33 Marbel stone, with 30mm thickness m²
34 Cherry veneer panel, with 30mm thickness m²
35 Porcelain tiles 30x60cm, in floors m²
36 Porcelain tiles 30x60cm, in stairs m²
37 Porcelain tiles 30x30cm, in floors m²
38 Vinyl flooring "FORBO - Eternal Contrast" or similar m²
39 Vinyl flooring "FORBO - Eternal Palette" or similar m²
45 Porcelain tile footer 30x7cm lm
ITEM WORK DESCRIPTION UNIT

46 Vinyl footer "FORBO - Eternal Contrast" or similar lm


47 Vinyl footer "FORBO - Eternal Palette" or similar lm
51 Cherry veneer wood footer lm
52 Projected plaster "MU-100 Plester Premium" or similar m²
53
Ceilings, with perfurated gypsum board 13mm thick, including
mineral wool insulation 40mm, and structure in galvanized profiles m²
54 Ceilings, with gypsum board 13mm thick, including mineral wool
insulation 40mm, and structure in galvanized profiles m²
55 Gypsum Cornice lm
56 Limestone, with 30mm thickness m²
57 Compact toilet "TOTO - CW630PJ" or similar un
58 Suspended toilet "TOTO - CW620J" or similar un
59 Urinal "TOTO - U104" or similar un
60 Hunged porcelain wash basin "TOTO - LW538RCB" or similar un
61 Wash basin CREATIVE LIVING un
62 Acrylic shower tray, 0,80x0,80m un
63 Faucet for wash basin "TOTO - TX126LE" or similar un
64 Single lever mixer faucet for wash basin "TOTO - T205QN" or
similar un
65 Angled taps for toilet tanks "TOTO - TX403SBW" or similar un
66 Single lever mixer of shower base with flexible hose 1,75m,
including shower and rotatable support "TOTO - TX474SV" or
similar un
67 Chromed shutoff valves un
68 Lean concrete C12/15 m3
69 Reinforced concrete C16/20 m3
70 Reinforced concrete C20/25 m3
71 CPVC pipes, Ø 25mm m
72 CPVC pipes, Ø 32mm m
73 CPVC pipes, Ø 40mm m
74 CPVC pipes, Ø 50mm m
75 CPVC pipes, Ø 22mm m
76 CPVC pipes, Ø 28mm m
77 Esferical valves, Ø 3/4" un
78 Gate valves, Ø 3/4" un
79 Gate valves, Ø 1" un
80 Gate valves, Ø 1 1/4" un
81 Gate valves, Ø 1 1/2" un
82 Pressure valves, Ø 3/4" un
83 Esferical compact weldable VS valves, Ø 25mm un
84 Galvanized Cast Iron, K9 class, PN10 pipe, Ø 65 mm, painted in
red m
85 PVC pipe, DN40 m
86 PVC pipe, DN50 m
87 PVC pipe, DN75 m
88 PVC pipe, DN100 m
89 PVC JEI pipe, DN100 m
90 PVC JEI pipe, DN150 m
91 Concrete inspection box, size 60x60cm, including concrete lid un
92 Concrete inspection box, size 80x80cm, including concrete lid un
93 Hard copper pipe for LPG, Ø 15mm m
94
Quick shut-off valve, Ø 1/2" x terminal Ø 11,80mm (for hose 3/8") un
ITEM WORK DESCRIPTION UNIT

95 H1XG-R 4x185 cable m


96 H1XG-R 3x35+2G16 cable m
97 H1XG-R 3x25+2G16 cable m
98 H1XG-R 5G16 cable m
99 H1XG-R 5G10 cable m
100 H1XG-R 5G6 cable m
101 PEAD pipe, Ø 125mm m
102 H1XG-U 3G1,5, including VDØ20mm pipe, fixed with clamps m
103 H1XG-U 2x1,5 cable m
104 ERE Ø20mm pipes m
105 VD pipe, Ø 20mm m
106 ERM Ø 20mm pipes m
107 PEAD pipe, Ø 63mm m
108 PEAD pipe, Ø 40mm m
109 ERM/Isogris-F pipe, Ø 25mm m
UNIT PRICE

374.60
2,145.30

10,251.30
21.67
15.00
12.50

58.05
32.36
25.61
17.51

56.65

9.75

29.87
51.50

31.10
125.00
85.00
31.00
96.26
511.97
80.00
42.50
124.50
37.50
112.50
39.60
34.60
20.36
23.45
40.79
155.30
205.00
45.60
52.29
39.34
61.81
61.81
11.00
UNIT PRICE
61.81
61.81
78.60
40.26

59.21

54.27
27.53
147.90
596.70
676.70
300.85
325.00
449.47
366.70
190.43

80.43
50.43

342.23
27.93
85.36
429.45
549.45
19.20
20.40
24.00
27.60
37.20
38.40
52.80
85.20
94.80
150.00
170.40
189.12
61.20

190.00
40.40
43.80
54.00
67.60
123.30
175.30
304.12
391.37
47.00

49.00
UNIT PRICE
82.11
16.76
16.76
12.84
10.62
7.35
21.55
15.65
3.82
16.08
11.32
11.32
16.38
15.91
11.40
BREAKDOWN OF PRICES AND UNIT RATES

Client: MINISTERIO DA ADMINISTRAÇÃO ESTATAL


Project: MUNICÍPIO DE MANATUTO

Location: MANATUTO, TIMOR-LESTE


Work item: Project sign board Unit: Output:

ls 14 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Cleaning of construction site, including removal of debris Unit: Output:

ls 0.2 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: Clearing and stripping, minimum 250mm depth, including removal of Unit: Output:
debris
ls 0.25 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Excavation in soil of any type Unit: Output:

m3 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Backfill with material from excavation or from borrow site Unit: Output:

m3 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Transport of surplus soil Unit: Output:

m3 90 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Double concrete block wall 400x200x200mm + 400x200x150mm Unit: Output:

m² 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Single concrete block wall 400x200x200mm Unit: Output:

m² 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Single concrete block wall 400x200x150mm Unit: Output:

m² 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Single concrete block wall 400x200x100mm Unit: Output:

m² 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Reinforced concrete wall, 150mm thickness Unit: Output:

m² 130 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Plasterboard partition wall, including galvanized profiles structure Unit: Output:

m2 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Paint scheme, consisting of one coat of primer and 3 coats of aqueous Unit: Output:
paint
m2 85 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
BREAKDOWN OF PRICES AND UNIT RATES
D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00
0.00

Work item: Insulation system, with 60mm thick extruded polystyrene and 35mm Unit: Output:
mineral wool
m² 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Bituminous waterproofing membrane Unit: Output:

m² 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: Prefabricated insulating extruded polystyrene plates, 60mm thickness Unit: Output:

m² 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Precast concrete roof drains (gargoyles) Unit: Output:

un 8 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Water proofing coating "Sika" or similar Unit: Output:

m² 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Floor screeding Unit: Output:

m² 25 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Thermal slabs Unit: Output:

m² 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Sandwich isothermal panel 80mm Unit: Output:

m² 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Reinforced concrete Unit: Output:

m³ 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Precast RC slabs Unit: Output:

m² 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Pre fabricated concrete curbs Unit: Output:

lm 75 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Acoustic absorbers Unit: Output:

lm 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Zinc plate flashing 350mm large Unit: Output:

lm 70 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: Zinc plate flashing 950mm large Unit: Output:

lm 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Gutter Unit: Output:

lm 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Expansion joints Unit: Output:

lm 5 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Rendering to receive stone/tiles Unit: Output:

m² 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Rendering to receive painting Unit: Output:

m² 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Porcelain tiles 30x30cm, in walls Unit: Output:

m² 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Marbel stone, with 30mm thickness Unit: Output:

m² 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Cherry veneer panel, with 30mm thickness Unit: Output:

m² 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Porcelain tiles 30x60cm, in floors Unit: Output:

m² 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Porcelain tiles 30x60cm, in stairs Unit: Output:

m² 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Porcelain tiles 30x30cm, in floors Unit: Output:

m² 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Vinyl flooring "FORBO - Eternal Contrast" or similar Unit: Output:

m² 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: Vinyl flooring "FORBO - Eternal Palette" or similar Unit: Output:

m² 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Vinyl flooring "FORBO - Eternal Sand" or similar Unit: Output:

m² 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Vinyl flooring "FORBO - Eternal Stone" or similar Unit: Output:

m² 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Vinyl flooring "FORBO - Eternal Wood" or similar Unit: Output:

m² 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Vinyl flooring "FORBO - Flotex" or similar Unit: Output:

m² 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Marble stone 133x67,5x3cm, with softened finish Unit: Output:

m² 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Porcelain tile footer 30x7cm Unit: Output:

lm 35 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Vinyl footer "FORBO - Eternal Contrast" or similar Unit: Output:

lm 60 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Vinyl footer "FORBO - Eternal Palette" or similar Unit: Output:

lm 60 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Vinyl footer "FORBO - Eternal Sand" or similar Unit: Output:

lm 60 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Vinyl footer "FORBO - Eternal Stone" or similar Unit: Output:

lm 60 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Vinyl footer "FORBO - Eternal Wood" or similar Unit: Output:

lm 60 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: Cherry veneer wood footer Unit: Output:

lm 60 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Projected plaster "MU-100 Plester Premium" or similar Unit: Output:

m² 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Ceilings, with perfurated gypsum board 13mm thick, including mineral Unit: Output:
wool insulation 40mm, and structure in galvanized profiles
m² 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Ceilings, with gypsum board 13mm thick, including mineral wool Unit: Output:
insulation 40mm, and structure in galvanized profiles
m² 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Gypsum Cornice Unit: Output:

lm 100 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Limestone, with 30mm thickness Unit: Output:

m² 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Compact toilet "TOTO - CW630PJ" or similar Unit: Output:

un 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Suspended toilet "TOTO - CW620J" or similar Unit: Output:

un 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Urinal "TOTO - U104" or similar Unit: Output:

un 20 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Hunged porcelain wash basin "TOTO - LW538RCB" or similar Unit: Output:

un 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Wash basin CREATIVE LIVING Unit: Output:

un 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Acrylic shower tray, 0,80x0,80m Unit: Output:

un 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: Faucet for wash basin "TOTO - TX126LE" or similar Unit: Output:

un 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: Single lever mixer faucet for wash basin "TOTO - T205QN" or similar Unit: Output:

un 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Angled taps for toilet tanks "TOTO - TX403SBW" or similar Unit: Output:

un 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Single lever mixer of shower base with flexible hose 1,75m, including Unit: Output:
shower and rotatable support "TOTO - TX474SV" or similar
un 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Chromed shutoff valves Unit: Output:

un 40 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Lean concrete C12/15 Unit: Output:

m3 15 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Reinforced concrete C16/20 Unit: Output:

m3 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Reinforced concrete C20/25 Unit: Output:

m3 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: CPVC pipes, Ø 25mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
BREAKDOWN OF PRICES AND UNIT RATES
D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00
0.00

0.00
Work item: CPVC pipes, Ø 32mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: CPVC pipes, Ø 40mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: CPVC pipes, Ø 50mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: CPVC pipes, Ø 22mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: CPVC pipes, Ø 28mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Esferical valves, Ø 3/4" Unit: Output:

un 200 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Gate valves, Ø 3/4" Unit: Output:

un 200 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Gate valves, Ø 1" Unit: Output:

un 200 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Gate valves, Ø 1 1/4" Unit: Output:

un 200 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Gate valves, Ø 1 1/2" Unit: Output:

un 200 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Pressure valves, Ø 3/4" Unit: Output:

un 200 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Esferical compact weldable VS valves, Ø 25mm Unit: Output:

un 200 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Galvanized Cast Iron, K9 class, PN10 pipe, Ø 65 mm, painted in red Unit: Output:

m 55 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: PVC pipe, DN40 Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: PVC pipe, DN50 Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: PVC pipe, DN75 Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: PVC pipe, DN100 Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: PVC JEI pipe, DN100 Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: PVC JEI pipe, DN150 Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Concrete inspection box, size 60x60cm, including concrete lid Unit: Output:

un 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
BREAKDOWN OF PRICES AND UNIT RATES
D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00
0.00

0.00
Work item: Concrete inspection box, size 80x80cm, including concrete lid Unit: Output:

un 10 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: Hard copper pipe for LPG, Ø 15mm Unit: Output:

m 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
BREAKDOWN OF PRICES AND UNIT RATES
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: Quick shut-off valve, Ø 1/2" x terminal Ø 11,80mm (for hose 3/8") Unit: Output:

un 75 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: H1XG-R 4x185 cable Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: H1XG-R 3x35+2G16 cable Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: H1XG-R 3x25+2G16 cable Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: H1XG-R 5G16 cable Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: H1XG-R 5G10 cable Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

Work item: H1XG-R 5G6 cable Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

Work item: PEAD pipe, Ø 125mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: H1XG-U 3G1,5, including VDØ20mm pipe, fixed with clamps Unit: Output:

m 30 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: H1XG-U 2x1,5 cable Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: ERE Ø20mm pipes Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: VD pipe, Ø 20mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: ERM Ø 20mm pipes Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: PEAD pipe, Ø 63mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
BREAKDOWN OF PRICES AND UNIT RATES

0.00
Work item: PEAD pipe, Ø 40mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00

0.00
Work item: ERM/Isogris-F pipe, Ø 25mm Unit: Output:

m 50 / day

TOTAL
CODE DESCRIPTION UN QUANT. PRICE TOTAL PRICE
LABOR

0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0.000
0 0.0000 0 0.00 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00
0 0.0000 0 0.00 0.000 0.00 0.00

D SUM OF LABOUR, MATERIAL AND EQUIPMENT COST 0.00


0.00
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
LABOR WAGES

Client: MINISTERIO DA ADMINISTRAÇÃO ESTATAL


Project: MUNICÍPIO DE MANATUTO
Location: MANATUTO, TIMOR-LESTE

RATE
REF. POSITION UNIT
US$

L-1 Foreman Day 15.00


L-1.1 Foreman - Team Lider Day 12.00
L-2 Unskilled Labor Day 6.00
L-3 Skilled Labor Day 10.00
REMARKS
MATERIAL COST

Client: MINISTERIO DA ADMINISTRAÇÃO ESTATAL


Project: MUNICÍPIO DE MANATUTO
Location: MANATUTO, TIMOR-LESTE

RATE
REF. MATERIAL DESCRIPTION UNIT
US$

M-1 Cement Bags 6.00


M-1.2 Coulored Cement kg 1.27
M-2 Sand cum 12.00
M-3.1.3 Aggregate 15-30mm cum 25.00
M-5.1.1 Block 400x200x100mm un 0.65
M-5.1.2 Block 400x200x150mm un 1.15
M-5.1.3 Block 400x200x200mm un 1.55
M-7.2 Steel bars AS400 kg 1.40
M-7.4 Steel bars AS500 kg 1.80
M-8.1.4 Plywood 9mm sqm 4.17
M-8.1.5 Plywood 12mm sqm 7.64
M-8.2.1 Gypsum Board 13mm sqm 18.75
M-8.2.2 Perfurated Gypsum Board 13mm sqm 23.45
M-8.2.3 Gypsum Nail kg 2.20
M-8.3.1.2 Timber for proping/shoring ml 0.50
M-8.3.1.5 Timber plank, class 3 cum 290.00
M-8.3.1.6 50x70 mm timber, class 2 cum 350.00
M-8.3.1.7 50x70 mm timber, class 3 cum 290.00
M-8.4 Plasterboard 9mm sqm 14.50
M-10.3.1 Steel wire - burned kg 1.80
M-10.3.2 Nails kg 2.50
M-12.3.1 Steel wire - burned kg 1.80
M-12.3.2 Nails kg 2.50
M-12.3.4 Self tapping screw un 0.20
M-12.3.5 Self drilling screw un 0.25
M-12.3.6 Screw for wood un 0.20
M-12.5 Waterproofing membrane Danosa
Glasdan 40 / GP sqm 43.92
M-12.6 Waterproof "Sika" kg 96.51
M-13.2 Extruded polystyrene 60mm thickness sqm 14.75
M-13.3 Mineral wool 35mm thickness sqm 6.60
M-13.4 Extruded polystyrene plates "Dow
Roofmate" 60mm sqm 25.95
M-13.5 Thermal slabs sqm 49.85
M-13.6 PVC supports un 1.50
M-13.7 Sandwich panel 80mm sqm 161.58
M-13.8 Precast RC slabs sqm 26.07
M-13.9 Supports CDM 5x5x5cm un 0.43
M-13.10 Mineral wool 40mm thickness sqm 7.50
M-14.3.2 Topspan & Roof Batten 40 BMT
0.75mm/Roof Batten lm 3.25
M-14.7 "C" channel profiles 75x33x0.75 lm 3.30
M-15.2 Porcelain tile 30x30cm sqm 23.25
M-15.3 Porcelain tile 30x60cm sqm 29.45
M-15.4
Vinyl flooring "FORBO - Eternal Contrast" sqm 52.60
M-15.5 Vinyl flooring "FORBO - Eternal Palette" sqm 52.60
M-15.6 Vinyl flooring "FORBO - Eternal Sand" sqm 52.60
M-15.7 Vinyl flooring "FORBO - Eternal Stone" sqm 52.60
M-15.8 Vinyl flooring "FORBO - Eternal Wood" sqm 52.60
M-15.9 Vinyl flooring "FORBO - Flotex" sqm 76.46
M-15.14 Polished marble stone 133x67,5x3cm sqm 241.84
M-15.15 Marble stone 3cm thickness sqm 130.94
M-15.16 Limestone 3cm thickness sqm 123.89
M-15.17 Cherry veneer panel 3cm thickness sqm 178.27
M-16.2 Porcelain tile footer 30x7cm lm 7.75
M-16.3 Cherry veneer wood footer lm 68.86
M-16.4 Vinyl footer "FORBO - Eternal Contrast" lm 49.49
M-16.5 Vinyl footer "FORBO - Eternal Palette" lm 49.49
M-16.6 Vinyl footer "FORBO - Eternal Sand" lm 49.49
M-16.7 Vinyl footer "FORBO - Eternal Stone" lm 49.49
M-16.8 Vinyl footer "FORBO - Eternal Wood" lm 49.49
M-17.2 Acrylic Paint, JOTUN liters 11.69
M-17.3 Paint primer liters 2.25
M-17.4 Primary paint, JOTUN liters 12.11
M-17.5 Paint thiner liters 4.95
M-17.6 Paint brush un 1.95
M-17.7 Gloss Paint liters 4.65
M-18.2 Precast gargoyle un 101.95
M-19.1.6 PEAD pipe - diam. 40mm lm 12.66
M-19.1.7 PEAD pipe - diam. 63mm lm 13.09
M-19.1.8 PEAD pipe - diam. 125mm lm 17.79
M-19.5 Water cum 3.00
M-19.6.1 Hard copper pipe - diam 15mm lm 39.73
M-20.1.2 PVC pipe - diam 40mm lm 34.72
M-20.1.3 PVC pipe - diam 50mm lm 37.81
M-20.1.5 PVC pipe - diam 75mm lm 47.08
M-20.1.8 PVC pipe - diam 100mm lm 59.45
M-20.5.1 PVC JEI pipe - diam 100mm lm 110.08
M-20.5.2 PVC JEI pipe - diam 150mm lm 157.35
M-20.6 Pipe glue tube 1.15
M-21.3.9 Galv. Iron PN10 pipe, class K9 - diam
65mm lm 169.58
M-21.5.1 H1XG-R 4x185 cable lm 77.06
M-21.5.2 H1XG-R 3x35+2G16 cable lm 14.83
M-21.5.3 H1XG-R 3x25+2G16 cable lm 14.83
M-21.5.4 H1XG-R 5G16 cable lm 11.09
M-21.5.5 H1XG-R 5G10 cable lm 8.98
M-21.5.6 H1XG-R 5G6 cable lm 5.86
M-21.5.7 H1XG-U 3G1,5 cable lm 2.91
M-21.5.8 H1XG-U 2x1,5 cable lm 2.50
M-21.5.9 ERE pipe - diam 20mm lm 13.95
M-21.5.10 VD pipe - diam 20mm lm 9.42
M-21.5.11 ERM pipe - diam 20mm lm 9.42
M-21.5.12 ERM/Isogris-F pipe - diam 25mm lm 9.50
M-22 Project sign-board un 368.74
M-23 Wall stud 0.45x70mm, 3m length un 6.00
M-24 Wall track 0.45x70mm, 3m length un 5.50
M-25 Hang down fischer un 0.20
M-26 Plaster jointing compound kg 12.00
M-27 Joint tape, 9m roll un 2.70
M-28 Concrete curb 150x300x500mm un 19.64
M-29 Acoustic absorbers ISSO "T" lm 109.14
M-30 Laquered zinc nr.14 sheet 119.05
M-31 Roofing screw with rubber gasket un 1.16
M-32 Gutter for rain water lm 34.35
M-33 Elastomeric joint sealer lm 13.26
M-34 Plastering Additive liters 19.95
M-34.1 MU-100 Plester Premium kg 3.25
M-35 Vinyl glue, weld & polish kg 2.50
M-36 Fibrecement joint compound kg 12.00
M-37.1 Compact toilet "TOTO - CW630PJ" un 575.00
M-37.2 Suspended toilet "TOTO - CW620J" un 655.00
M-37.3 Urinal "TOTO - U104" un 290.00
M-37.4 Counter lavatory "TOTO - LW538RCB" un 310.53
M-37.5 Wash basin CREATIVE LIVING un 435.00
M-37.6 Shower tray, 0,80x0,80m "DREAMLINE -
DLT-1032320" un 345.00
M-37.7 Faucet "TOTO - TX126LE" un 185.00
M-37.8 Faucet "TOTO - T205QN" un 75.00
M-37.9 Angled taps "TOTO - TX403SBW" un 45.00
M-37.10 Single lever mixer with flexible hose
1,75m, shower and rotatable support
"TOTO - TX474SV" un 335.00
M-37.11 Chromed shutoff valves un 22.50
M-38.1 CPVC Pipe, diam 25mm lm 15.65
M-38.2 CPVC Pipe, diam 32mm lm 16.75
M-38.3 CPVC Pipe, diam 40mm lm 20.02
M-38.4 CPVC Pipe, diam 50mm lm 23.29
M-38.5 CPVC Pipe, diam 22mm lm 32.02
M-38.6 CPVC Pipe, diam 28mm lm 33.11
M-39.1 Esferical valves, Ø 3/4" un 51.57
M-39.2 Gate valves, Ø 3/4" un 83.97
M-39.3 Gate valves, Ø 1" un 93.57
M-39.4 Gate valves, Ø 1 1/4" un 148.77
M-39.5 Gate valves, Ø 1 1/2" un 169.17
M-39.6 Pressure valves, Ø 3/4" un 187.89
M-39.7 Esferical VS valves, Ø 25mm un 59.97
M-40.1 Quick shut-off valve - diam 1/2'' un 32.96
M-40.2 Hose terminal - diam 11.80mm un 12.75
M-41 Pipe clip un 0.25
M-42 Cable clip box 0.60
REMARKS
EQUIPMENT COST

Client: MINISTERIO DA ADMINISTRAÇÃO ESTATAL


Project: MUNICÍPIO DE MANATUTO
Location: MANATUTO, TIMOR-LESTE

RATE
REF. EQUIPMENT DESCRIPTION UNIT
US$

E-2.1 Cement mixer 250 liter hour 15.00


E-6 Concrete vibrator hour 5.00
E-9.1 Grinder 110mm hour 1.75
E-33 Safety equipment ls
E-48 Dump Truck 3.5 ton hour 27.00
E-74 Loader hour 100.00
E-75 Excavator hour 100.00
E-76 Bulldozer hour 120.00
E-96 Diesel liter 0.75
E-97 Lubrificant oil liter 4.00
E-98.1 Transit Mixer - 5,0 cum hour 90.00
E-99 Blow torch hour 2.75
REMARKS

3% of Labor wages