G500-Ion Majestic @ Genting

Optimization of Rock Socket Length (for VO)

Site 1

Pile Eff. Max. Structural Adopted Adopted Pile Optimization of Rock Socket Actual Geotechnical
Pile Diameter Given Column Conc Grade, fcu
Pile Ref Diameter Capacity Column Loading Pile Working Efficiency Length (m) Capacity (kN)
(mm) Loading (kN) (N/mm2)
(mm) (kN) for Design (kN) Load (kN) Grade I&II Grade II&III Grade I&II Grade II&III
CP62-CP3600B 3600 3900 85000 77790 81679.5 81700.00 0.95 G40 2.0 3.7 82396.0 81784
CP67-CP3600A 3600 3900 96200 83280 87444 87500.00 0.95 G40 2.5 4.4 88063.0 88216
CP58-CP2800 2800 3100 61500 50090 52594.5 52600.00 0.95 G40 1.7 3.1 53053.0 52834
CP64-CP3000A 3000 3300 70600 65525 68801.25 68900.00 0.95 G40 2.8 4.5 69616.0 69201.0
CP45-CP2800 2800 3100 61500 56350 59167.5 59200.00 0.95 G40 2.4 4.0 59359.0 59408
*Note:
1) Not applicable for pile CP68,CP61,CP66,CP59-60,CP65,CP50,CP49,CP48,CP51 & CP46 due to pile efficiency is almost or more than 95%.
2) CP57,CP52-56,CP63 & CP47 pile size no change from tender. Therefore optimization of rock socket is not required.

Site 2

Pile Eff. Max. Structural Adopted Adopted Pile Optimization of Rock Socket Actual Geotechnical
Pile Diameter Given Column Conc Grade, fcu
Pile Ref Diameter Capacity Column Loading Pile Working Efficiency Length (m) Capacity (kN)
(mm) Loading (kN) (N/mm2)
(mm) (kN) for Design (kN) Load (kN) Grade I&II Grade II&III Grade I&II Grade II&III
CP44-CP3000A 3000 3300 70600 64300 67515 67600 0.95 G40 2.6 4.3 67698.0 67646
CP39-CP3000B 3000 3300 65000 60500 63525 63600 0.95 G40 2.2 3.8 63862.0 63759
CP37-CP3000B 3000 3300 65000 60380 63399 63400 0.95 G40 2.2 3.8 63862.0 63759
CP36-CP3000B 3000 3300 65000 60380 63399 63400 0.95 G40 2.2 3.8 63862.0 63759
CP35-CP3000B 3000 3300 65000 60450 63472.5 63500 0.95 G40 2.2 3.8 63862.0 63759
*Note:
1) Not applicable for pile CP43,CP38 & CP40 due to pile efficiency is almost or more than 95%.
2) CP41-42 pile size no change from tender. Therefore optimization of rock socket is not required.

Site 3

Pile Eff. Max. Structural Adopted Adopted Pile Optimization of Rock Socket Actual Geotechnical
Pile Diameter Given Column Conc Grade, fcu
Pile Ref Diameter Capacity Column Loading Pile Working Efficiency Length (m) Capacity (kN)
(mm) Loading (kN) (N/mm2)
(mm) (kN) for Design (kN) Load (kN) Grade I&II Grade II&III Grade I&II Grade II&III
*CP28-CP3000A 3000 3300 70600 64910 68155.5 68200 0.95 G40 2.7 4.4 68657.0 68424 *refer table for additional rock socket
CP31-CP3000A 3000 3300 70600 64700 67935 68000 0.95 G40 2.7 4.4 68657.0 68424
CP25-CP3000B 3000 3300 65000 60730 63766.5 63800 0.95 G40 2.2 3.9 63862.0 64536.0
CP22-CP2800 2800 3100 61500 48830 51271.5 51300 0.95 G40 1.6 2.9 52152.0 51373
CP12-CP3000A 3000 3300 70600 64930 68176.5 68200 0.95 G40 2.7 4.4 68657.0 68424
*Note:
1) Not applicable for pile CP34,CP29,CP16-20,CP21,CP15,CP10,CP13,14,24,26,CP9,CP2a-4a,CP8,CP7,CP6, & CP1 due to completed pile
2) Not applicable for pile CP32,CP23,CP27 & CP30 due to pile efficiency is almost or more than 95%.
3) CP11-CP33 pile size no change from tender. Therefore optimization of rock socket is not required.