Method Statement

REPAIR OF DEFECTIVE CONCRETE, ROCK POCKETS OR HONEYCOMBS


For Repair Areas That Are Approximately 6” (150 mm) in Diameter or Less
2016-06

Honeycombs, rock pockets, spalls and other concrete defects occur in a variety of sizes, shapes and situations which
makes it impossible to create a brief work procedure that cover all variables. The following information gives general
directions and procedures for repair of standard, small or medium-large sized deficiencies. These procedures should
not supersede ACI, ICRI or other recognized authorities’ recommendations. The steps outlined here can be modified
and adapted to fit most scenarios and provide long term, well bonded concrete repairs.

6” (150 mm) Diameter or Less STEP 7 – Apply a scrub coat of the selected repair mortar
to the inside surface of the patch area and, while it is still
STEP 1 – Chip out defective, poorly consolidated or de- wet or “green”, fill the entire area to the surface with the
laminated concrete until sound concrete is encountered. same mortar. Note that Patch’n Plug is a very rapid set-
ting material so it must be applied immediately after the
STEP 2 – If corroded reinforcing steel (rebar) is encoun-
scrub coat.
tered the defective rebar should be fully exposed by
chipping and removing any concrete cover until corro- STEP 8 – If the void is deeper than 2” (50 mm) it should
sion free rebar is reached. Remove all corrosion from be filled in layers (lifts) of not more than 2” (50 mm). For
the exposed rebar and chip all the way around it such mechanical bond of the next layer, provide profile by
that mortar can be placed on all sides of the rebar. If due scoring the surface of the installed mortar with the tip of
to corrosion the cross section of the rebar is noticeably the trowel. In situations where the repair area requires
reduced advice from a structural engineer on rebar re- multiple lifts reinforcing such as wire mesh mechanically
placement is recommended. attached to the substrate should be considered.

STEP 3 – If there are active water leaks in the excavated STEP 9 – Apply a coat of Xypex Concentrate slurry at
area create a void of approximately 1” diameter (25 mm) 1.5 lb./sq. yd. (0.8 kg/m2) over the repair area extending
by about 1” (25 mm) deep at each leak point. to 6” (150 mm) beyond the edge of the patch.

STEP 4 – Delineate the chipped area to as close to a STEP 10 – Cure the repair area by keeping moist by fog
simple square shape as is practical by saw cutting to min- spraying periodically with water for two to three days.
imum 3/8” (10 mm) deep or as specified; 3/4” (19 mm) is Open to water contact per Xypex Coatings guidelines.
preferred. If cutting to this depth will damage the rebar
then reduce the depth of the cut such that the reinforcing Note: When early exposure to water is required eliminate
steel is not impacted. Remove the concrete within the Step 9 and Step 10.
designated repair area to create a straight sided, exca-
vated area.
Fill in one or two lifts
STEP 5 – Remove all loose materials in the excavated
area using a 3,500 - 5,000 psi (250 - 350 bar) pressure
wash and saturate the area with water. Allow the con-
crete to absorb the water until it is in a “saturated, surface
dry” condition.

STEP 6 – Stop any active leaking by filling the 1” (25 mm)


6”
diameter by 1” (25 mm) deep voids at the leak points with (150 mm) 1” (25 mm)
Actively
Xypex Patch’n Plug. or less
leaking
crack
1” (25 mm)

Chip and fill to


Scrub coat stop water flow
Fill in one or two lifts

Method Statement

REPAIR OF DEFECTIVE CONCRETE, ROCK POCKETS OR HONEYCOMBS


For Repair Areas That Are Larger than Approximately 6” (150 mm) in Diameter

6”
(150 1” (25 mm)
mm)6 – Stop any active leaking
Larger Than 6” (150 mm) Diameter STEP by filling the 1” (25 mm)
Actively
or less
diameter by 1” (25 mm) deep voids at the leak points with
leaking
STEP 1 – Chip out defective, poorly consolidated or de- Xypex Patch’n Plug. crack
laminated concrete until sound concrete is encountered. 1” (25 mm)
STEP 7 – Apply a scrub coat of Megamix II mortar to the
STEP 2 – If corroded reinforcing steel (rebar) is encoun- inside surface of the patch area and, while it is still wet or
tered the defective rebar should be fully exposed by “green”, fill the entire area to the surface with Megamix II.
chipping and removing any concrete cover until corro-
sion free rebar is reached. Remove all corrosion from the STEP 8 – If the void is deeper than 2” (50 mm) on a verti-
exposed rebar and chip around the rebar such that cal or horizontal surface or 1½” (37 mm) on an overhead
mortar can be placed on all sides of it. If due to corro- surface the void should be filled in layers (lifts) of not
sion the cross section of the rebar is noticeably reduced more that the stated thicknesses. For Chip and fill to
mechanical bond
Scrub coat stop water flow
advice from a structural engineer on rebar replacement is of the next layer, provide profile by scoring the surface
recommended. of the installed mortar with the tip of the trowel. In situ-
ations where the repair area requires multiple lifts rein-
STEP 3 – If there are active water leaks in the excavated forcing such as wire mesh mechanically attached to the
area create a void of approximately 1” (25 mm) diameter substrate should be considered.
by about 1” (25 mm) deep at each leak point.
STEP 9 – Apply a coat of Xypex Concentrate slurry at 1.5
STEP 4 – Delineate the chipped area to as close to a lb./sq. yd. (0.8 kg/m2) over the repair area and to 6” (150
simple square shape as is practical by saw cutting to mm) beyond the edge of the patch.
minimum 3/8” (10 mm) deep or as specified; 3/4” (19
mm) is preferred. If cutting to this depth will damage the STEP 10 – Cure by misting with water to keep moist or by
rebar then reduce the depth of the cut until rebar is not covering with a wet curing blanket for two to three days.
impacted. Remove the concrete within the designated Open to water contact per Xypex Coatings guidelines.
repair area to the saw cut to create a straight sided ex-
cavated area. Note: When early exposure to water is required eliminate
Step 9 and Step 10.
STEP 5 – Remove all loose materials in the excavated
area using a 3,500 - 5,000 psi (250 - 350 bar) pressure
wash and saturate the area with water. Allow the con-
crete to absorb the water until it is in a “saturated, surface Fill in one or two lifts
dry” condition. Scrub coat

1” (25 mm)

1” (25 mm)
Larger
than 6” Actively
(150 mm) leaking
crack

Chip and fill to


stop water flow