Project Great Eastern Tower

Trane Selection Water Flow


Tag No model Rate (m3/h)
MEZZANINE
WCP-M-1 WCV250FE 13.60
WCP-M-2 WCV350FE 20.40
7Th Floor
WCP-7F-1 WCV500FE 31.00
WCP-7F-2 WCV450FE 27.30
8Th Floor
WCP-8F-1 WCV500FE 31.00
WCP-8F-2 WCV450FE 27.30
9Th Floor
WCP-9F-1 WCV500FE 31.00
WCP-9F-2 WCV450FE 27.30
10Th Floor
WCP-10F-1 WCV500FE 31.00
WCP-10F-2 WCV450FE 27.30
11Th Floor
WCP-11F-1 WCV500FE 31.00
WCP-11F-2 WCV450FE 27.30
12Th Floor
WCP-12F-1 WCV500FE 31.00
WCP-12F-2 WCV450FE 27.30
13Th Floor
WCP-13F-1 WCV500FE 31.00
WCP-13F-2 WCV450FE 27.30
13ATh Floor
WCP-13AF-1 WCV500FE 31.00
WCP-13AF-2 WCV450FE 27.30
15Th Floor
WCP-15F-1 WCV500FE 31.00
WCP-15F-2 WCV450FE 27.30
16Th Floor
WCP-16F-1 WCV500FE 31.00
WCP-16F-2 WCV450FE 27.30
17Th Floor
WCP-17F-1 WCV500FE 31.00
WCP-17F-2 WCV450FE 27.30
18Th Floor
WCP-18F-1 WCV700FE 42.80
WCP-18F-2 WCV650FE 39.80
Roof Floor
WCP-RF-1 (PAU) WCV400FE 23.70
WCP-RF-2 (PAU) WCV400FE 23.70

Ground Floor
FCU-G-1 WTKA24/MCCA242B 1.36
6th Floor
FCU-6F-1 WCV350FE 20.40
FCU-6F-2 WCV350FE 20.40
Total (m3/h) 847.46
Convert gal(us)/min 3731.254515