No Jam Pekerjaan

1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1


Brusing lt Atrium 2-3,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 3
Brusing lt jeruk depan teras gudang MDS
Cleaning gulma area zona 3
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen dpn R Panel/Trafo
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 3
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Pemasangan karpet pameran di atrium 1
s/d Cleaning area kantin zona 3
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan Time zone s/d escalator barat lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Kamis,02 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
s/d Brusing lantai depan BNI
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 2
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 1
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan hypermart s/d coridor escalator timur lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Jumat,03 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Brusing lantai jeruk depan KFC
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 3
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping mushola
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 3
Spoting trap tangga exit samping mushola
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai jeruk depan pintu kaca lobby depan
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Sabtu,04 Februari 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
s/d Dusting pipa plafond area Zona 2
Brusing lt jeruk depan hoka-hoka bento
Dusting lampu amater area Zona 1
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt papin blok depan mushola
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 2
Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai Textum & lorong menuju MO lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.

Rutinitas & Non Rutinitas


Minggu,05 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt lobby barat & lobby belakang hypermart lt dasar.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Brusing lantai jeruk depan gudang MDS
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 1
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Detail cleaning Ruang Panel Lt 1 Barat & Timur.
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 1
Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan hypermart s/d depan Time zone lt 1 -
Serta lt dasar Atrium 1.
Cleaning alat-alat bantu spt mop,sapu,duspent dll.

Rutinitas & Non Rutinitas


Senin,06 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Brusing lantai jeruk depan KFC
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipi plafon depan mushola
Cleaning Gulma area zona 2
Cleaning pintu exit depan office FDU
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 1
Spoting trap tangga exit samping mushola
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai jeruk depan pintu kaca lobby depan
Cleaning alat-alat bantu spt mop,sapu,duspent dll.

Rutinitas & Non Rutinitas


Selasa,07 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,-
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Brusing lt jeruk depan teras gudang MDS
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen dpn R Panel/Trafo
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 2
Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1
10 20.30 22.00 General cleaning toilet all area.
s/d Washing standyng astray & tempat sampah.
Brusing lantai depan Time zone s/d escalator barat lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.

Rutinitas & Non Rutinitas


Rabu,08 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
s/d Brusing lantai depan BNI
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 3
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 1
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan hypermart s/d coridor escalator timur lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Kamis,09 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt lobby belakang hypermart,lt lobby barat
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Brusing lantai jeruk depan KFC
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 2
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 3
Spoting trap tangga exit samping mushola
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai jeruk depan pintu kaca lobby depan
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Jum'at,10 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,-
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Brusing lt jeruk depan teras gudang MDS
Cleaning gulma area zona 3
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen dpn R Panel/Trafo
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 2
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Pemasangan karpet pameran di atrium 1
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan Time zone s/d escalator barat lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Sabtu,11 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby barat,-
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
s/d Claning trap tangga darurat arah time zone
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 3
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt Semen depan enginering
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 2
s/d Spoting sudut-sudut lantai lorong area textum
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai exit lt 1 samping MDS
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Minggu,12 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
s/d Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Brusing lantai jeruk depan KFC
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
s/d Dusting pipa plafond area Zona 2
Cleaning gulma area zona 1
Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
s/d Brusing lt congcret/semen samping ruang Visual
Dusting standyng astray all area
6 14.30 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 3
s/d Spoting trap tangga exit samping mushola
8 18.00 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
s/d Washing standyng astray & tempat sampah.
Brusing lantai jeruk depan pintu kaca lobby depan
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
11 22.00 06.30 Brusing lt Atrium 2-3,lt lobby barat,-
lantai Atrium 1,lt lobby belakang hypermart.
Rutinitas & Non Rutinitas
Senin,13 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
s/d Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
s/d Brusing lt jeruk depan teras gudang MDS
Cleaning gulma area zona 2
Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
s/d Cleaning area Roof Top
Dusting standyng astray all area
6 14.30 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 2
s/d Spoting trap tangga darurat area luar MO
8 18.00 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Cleaning kap lampu area lobby depan
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
s/d Washing standyng astray & tempat sampah.
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Selasa,14 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lantai Atrium 2-3 di lt 1
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Cleaning & Bufing lantai depan BNI
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
s/d Cleaning gulma area zona 2
Dusting standyng astray all area
6 14.30 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning area Roof Top
s/d Spoting trap tangga darurat samping enginering
8 18.00 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt 1
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
s/d Washing standyng astray & tempat sampah.
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Rabu,15 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lantai lobby belakang & Atrium 1
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Brusing lantai jeruk depan dunkin donut
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning area Roof Top
Spoting trap tangga exit samping mushola
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt 1
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
s/d Washing standyng astray & tempat sampah.
Brusing lantai jeruk depan pintu kaca lobby depan
s/d Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Kamis,16 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt lobby barat & lobby belakang hypermart lt dasar.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
s/d Dusting pipa plafond area Zona 2
Brusing lt jeruk depan teras gudang MDS
Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
s/d Brusing lt congcret/semen dpn R Panel/Trafo
Dusting standyng astray all area
6 14.30 18.00 Maintanance indoor – outdoor (termasuk toilet)
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
s/d Washing standyng astray & tempat sampah.
Brusing lantai depan Time zone s/d escalator barat lt 1
s/d Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Jum'at,17 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3 area lt 1
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
s/d Cleaning gulma area zona 3
Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 1
Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
s/d Washing standyng astray & tempat sampah.
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
s/d
Rutinitas & Non Rutinitas
Sabtu,18 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby bara
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
s/d Cleaning gulma area zona 1
Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
s/d Dusting standyng astray all area
6 14.30 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 1
s/d Spoting dinding luar toilet lt dasar barat.
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar
s/d Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
s/d Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Minggu,19 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
s/d Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
s/d Brusing lt jeruk depan teras gudang MDS
Cleaning gulma area zona 1
Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
s/d Brusing lt congcret/semen dpn R Panel/Trafo
Dusting standyng astray all area
6 14.30 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 3
s/d Spoting trap tangga darurat area luar MO
8 18.00 20.30 Maintanance indoor – outdoor (termasuk toilet)
s/d Cleaning area kantin zona 2
9 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
s/d Cleaning alat-alat bantu spt mop,sapu,duspent dll.
10 22.00 06.30 Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat,-
lantai Atrium 1.
Rutinitas & Non Rutinitas
Senin,20 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
s/d Brusing lantai depan BNI
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning area Roof Top
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 1
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan hypermart s/d coridor escalator timur lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Selasa,21 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby bara
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Brusing lantai jeruk depan KFC
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning area Roof Top
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 1
Spoting trap tangga exit samping mushola
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai jeruk depan pintu kaca lobby depan
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Rabu,22 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Brusing lt jeruk depan teras gudang MDS
Cleaning area Roof Top
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen dpn R Panel/Trafo
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 3
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Pemasangan karpet pameran di atrium 1
s/d Cleaning area kantin zona 3
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan Time zone s/d escalator barat lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Kamis,23 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby bara
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Spoting dinding luar toilet lt 1
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning area Roof Top
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Cleaning trap tangga darurat arah time zone
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning Gulma area zona 2
Spoting trap tangga darurat area depan enginering
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan hypermart s/d coridor escalator timur lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Jumat,24 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby bara
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
Brusing lantai jeruk depan KFC
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 1
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Spoting dinding pilar zona 2
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning area Roof Top
Spoting trap tangga exit samping mushola
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai jeruk depan pintu kaca lobby depan
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Sabtu,25 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Brusing lt jeruk depan teras gudang MDS
Cleaning gulma area zona 3
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Spoting dinding pilar zona 2
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 3
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Pemasangan karpet pameran di atrium 1
s/d Cleaning area kantin zona 3
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan Time zone s/d escalator barat lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Minggu,26 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
s/d Brusing lantai depan BNI
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 3
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 1
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
11 22.00 06.30 Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat,-
lantai Atrium 1.
Rutinitas & Non Rutinitas
Senin,27 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
s/d Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet)
Cleaning gulma area zona 2
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 3
s/d Spoting trap tangga exit samping mushola
8 18.00 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar
s/d Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
s/d Brusing lantai jeruk depan pintu kaca lobby depan
s/d Cleaning alat-alat bantu spt mop,sapu,duspent dll.

s/d
Rutinitas & Non Rutinitas

No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Brusing lt jeruk depan teras gudang MDS
Cleaning gulma area zona 3
s/d Cleaning LIFT
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor
s/d Maintanance indoor – outdoor (termasuk toilet)
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen dpn R Panel/Trafo
s/d Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 18.00 Cleaning Gulma area zona 3
s/d Spoting trap tangga darurat area luar MO
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 20.30 Pemasangan karpet pameran di atrium 1
s/d Cleaning area kantin zona 2
10 20.30 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan Time zone s/d escalator barat lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.
Rutinitas & Non Rutinitas
Rabu,29 february 2012
No Jam Pekerjaan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum.
Sweping area outdorr Zona 1,2,3
Glass cleaning kaca-kaca lobby
Detail cleaning area office MO
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby
Glass cleaning kaca-kaca luar toko lt dasar – lt 1
Dusting standyng astray all area
Dusting stainless railing – glass claning kaca railing lt 1
Dusting wall acsesoris lt dasar – lt 1
Cleaning all area exit dari lt dasar s/d lt 1
Cleaning area Toilet lt dasar – lt 1
Pengangkatan lemak area kantin
Cleaning area mushola
Cleaning escalator Timur-Barat
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet)
Dusting pipa plafond area Zona 2
Cleaning gulma area zona 3
Cleaning LIFT
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor
Maintanance indoor – outdoor (termasuk toilet)
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1
Brusing lt congcret/semen samping ruang Visual
Dusting standyng astray all area
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet)
7 15.00 s/d 18.00 Cleaning area Roof Top
Spoting dinding tangga darurat area depan office FDU
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet)
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area.
Washing standyng astray & tempat sampah.
Brusing lantai depan hypermart s/d coridor escalator timur lt 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll.

Cikarang,01-03-2012
Dibuat oleh

( HARIS RIYANTO)
FDU
Keterangan

Selesai

Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai

Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai

Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai

Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
lt lobby barat
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai

Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai

Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai

Selesai
Keterangan
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai

Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
lt lobby barat,-
Selesai
Keterangan
Selesai
lt lobby barat
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
lt lobby barat
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
lt lobby barat
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
lt lobby barat
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
lt lobby barat,-
Selesai
Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
lt lobby barat
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
lt lobby barat
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai

Mengetahui

( )
Bouilding Service
Rutinitas & Non Rutinitas
Kamis 01maret 2012
No Jam Pekerjaan Keterangan

1 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai


Brusing lt lobby belakang & lobby depan area dalam Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Sweping,moping & bufing lt teras lobby barat & BNI Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 1 Lanjut
Dusting list2 kaca luar hypermart lobby belakang Selesai
General cleaning ruang mesin enginering depan pencucian-
mobil area zona 2 Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 3 Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Pemasangan karpet pameran di atrium 1 Selesai
s/d Cleaning area kantin zona 3 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Pembersihan ruangan belakang posko Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jum'at 02 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai lobby belakang lantai dasar Selesai
Brusing lantai lantai lobby barat & lobby depan area dalam Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
s/d sweping,moping & bufing lt teras BNI Selesai
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 1 Lanjut
spoting pilar-pilar dinding lt dasar Lanjut
s/d Cleaning area lift Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar Lanjut
Cleaning area roof top Lanjut
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Sweping pasir area depan mushola Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Dusting list2 kaca luar hypermart lobby belakang Selesai
s/d Cleaning area kantin zona 2 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d coridor escalator timur lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu 03 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping mushola Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu 04 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
s/d Dusting pipa plafond area Zona 2 Lanjut
Pembersihan sarang laba2 area mushola Selesai
Dusting lampu amater area Zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt papin blok depan mushola Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 2 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22.00 s/d 06.30 Brusing all lantai dasar Selesai
Brusing lantai jeruk depan kfc Selesai
Brusing lantai textum Selesai

Rutinitas & Non Rutinitas


Senin 05 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan gudang MDS Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Detail cleaning Ruang Panel Lt 1 Barat & Timur. Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d depan Time zone lt 1 -
Serta lt dasar Atrium 1. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Selasa 06 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipi plafon depan mushola Lanjut
Cleaning Gulma area zona 2 Lanjut
Cleaning pintu exit depan office FDU Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu 07 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,-
,lt lobby depan. Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 2 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
s/d Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Kamis 08 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum. Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
s/d Brusing lantai depan BNI Selesai
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 3 Lanjut
s/d Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 1 Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
s/d Cleaning area kantin zona 2 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d coridor escalator timur lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jum'at 09 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 2 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu 10 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning gulma area zona 3 Lanjut
s/d Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 2 Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Pemasangan karpet pameran di atrium 1 Selesai
s/d Cleaning area kantin zona 2 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu 11 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai lobby belakang Selesai
Brusing lantai jeruk depan resepsionis lobby depan Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Claning trap tangga darurat arah time zone Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Pembersihan sarang laba2 area zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Pembersihan saluran air luar zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 2 Lanjut
Spoting sudut-sudut lantai lorong area textum Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22.00 s/d 06.30 Brusing lobby belakang s/d coridor lobby barat Selesai
Brusing lt textum & lt hypermart lantai 1 Selesai

Rutinitas & Non Rutinitas


Senin 12 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Selasa 13 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning gulma area zona 2 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Cleaning area Roof Top Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 2 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Cleaning kap lampu area lobby depan Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu 14 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai Atrium 2-3 di lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Cleaning & Bufing lantai depan BNI Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Cleaning gulma area zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Spoting trap tangga darurat samping enginering Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt 1 Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Kamis 15 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai lobby belakang & Atrium 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan dunkin donut Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt 1 Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jum,at
Kamis,16
16 Mfebruary 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt lobby barat & lobby belakang hypermart lt dasar.
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 18.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu 17 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3 area lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu 18 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting dinding luar toilet lt dasar barat. Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22.00 s/d 06.30 Brusing lobby belakang s/d coridor lobby barat Selesai
Brusing lt textum & lt hypermart lantai 1 Selesai

Rutinitas & Non Rutinitas


Senin 19 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
s/d Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
s/d Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
s/d Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 20.30 Maintanance indoor – outdoor (termasuk toilet) Lanjut
s/d Cleaning area kantin zona 2 Selesai
9 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
s/d Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
10 22.00 06.30 Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat,-
lantai Atrium 1. Selesai
Rutinitas & Non Rutinitas
Selasa 20 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai

Sweping area outdorr Zona 1,2,3 Lanjut


Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
s/d Brusing lantai depan BNI Selesai
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
s/d Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 1 Lanjut
s/d Spoting trap tangga darurat depan loading Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
s/d Cleaning area kantin zona 2 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d coridor escalator timur lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu 21 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan resepsionis lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Kamis 22 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum. Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning area Roof Top Lanjut
s/d Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 3 Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Pemasangan karpet panggung area textum Selesai
s/d Cleaning area kantin zona 3 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jum'at 23 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Spoting dinding luar toilet lt 1 Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Cleaning trap tangga darurat arah time zone Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
cleaning area roof top Lanjut
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting dinding lt dasar barat arah mushola Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d coridor escalator timur lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu 24 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting dinding pilar zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan KFC Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu 25 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
spoting sudut2 lantai depan gudang MDS Selesai
Cleaning gulma area zona 3 Lanjut
s/d Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting dinding pilar zona 2 Lanjut
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 3 Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Pemasangan walet area time zone Selesai
s/d Cleaning area kantin zona 3 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22.00 06.30 Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat,-
lantai Atrium 1. Selesai

Rutinitas & Non Rutinitas


Senin 26 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum. Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
s/d Brusing lantai depan BNI Selesai
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 3 Lanjut
s/d Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 1 Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
s/d Cleaning area kantin zona 2 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22.00 06.30 Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat,-
lantai Atrium 1. Selesai

Rutinitas & Non Rutinitas


Selasa 27 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
s/d Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 2 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 1 Lanjut
s/d Spoting trap tangga exit samping mushola Selesai
8 18.00 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
s/d Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
s/d Brusing lantai jeruk depan pintu kaca lobby depan Selesai
s/d Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

s/d

Rutinitas & Non Rutinitas


Rabu 28 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum. Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Pelepasan karpet & cleaning depan travelator hypermart Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning gulma area zona 3 Lanjut
s/d Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 General cleaning R panel samping MDS/Enginering Selesai
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Pembersihan sarang laba2 area lobby depan Selesai
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Pemasangan karpet pameran di atrium 1 Selesai
s/d Cleaning area kantin zona 2 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pizza hut Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Kamis 29 Maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai jeruk area lobby depan Selesai
Persiapan buat acara di lantai dasar toko giordano Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
spoting dinding pilar depan office fdu selesai
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
general cleaning ruang panel hypermart Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Spoting dinding tangga darurat area depan office FDU Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting sudut lt dasar lobby belakang hypermart Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d coridor escalator timur lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jum"at 30 maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai jeruk area lobby depan Selesai
Persiapan buat acara di lantai dasar toko giordano Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
spoting dinding pilar depan office fdu selesai
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Cleaning tangga darurat textum Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Spoting dinding tangga darurat area depan office FDU Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pelepasan tenda area parkir motor ( imam & sopiansyah ) Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk area lobby depan sebelah kiri lanjut shift 1
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu 31 maret 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai jeruk area lobby depan Selesai
Brusing lantai lobby belakang Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
spoting dinding pilar depan office fdu selesai
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting sudut lt dasar lobby belakang hypermart Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Clkarang,01 April 2012 Mengetahui


Dibuat oleh

( HARIS RIYANTO) ( )
FDU Bouilding Service
``
Rutinitas & Non Rutinitas
Minggu 01 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt lobby belakang & lobby depan area dalam Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
Sweping,moping & bufing lt teras lobby barat & BNI Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai

3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


Cleaning gulma area zona 1 Lanjut
Dusting list2 kaca luar hypermart lobby belakang Selesai
General cleaning ruang mesin enginering depan pencucian-
mobil area zona 2 Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
Cleaning area kantin zona 3 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Pembersihan ruangan belakang posko Selesai
11 22.00 s/d 06.30 Brushing area indoor lantai dasar s/d lantai 1 sudah ter-
masuk area textum Selesai

Rutinitas & Non Rutinitas


Senin,02 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai jeruk lobby depan Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 1 Lanjut
spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area lift Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar Lanjut
Cleaning area roof top Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Sweping pasir area sekitar Sting Lanjut
Vacuming karpet mushola MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting kaca lobby barat bekas lakban Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Selasa,03 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai Hypermart lantai1 timur Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan gudang MDS Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping mushola Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu,04 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai dalam ATM Barat & Lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Pembersihan sarang laba2 area zona 2 Selesai
Spoting dinding luar air mancur zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt papin blok depan mushola Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Kamis,05 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
Brusing area lt dasar lobby belakang Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Detail cleaning Ruang Panel Lt 1 Barat & Timur. Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Pengambilan sampah area taman zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting plin lantai 1 area timur Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Jumat,06 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing depan posko s/d lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai

3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


Dusting pipi plafon depan mushola Lanjut
Cleaning Gulma area zona 1 Lanjut
Cleaning pintu exit depan office FDU Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu,07 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing coridor lt dasar barat & lobby belakang Selesai
Sweping area outdorr Zona 1,2,3 Selesai
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
GC ruang genset samping enginering Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 2 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu,08 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai jeruk area lobby depan Selesai
Brusing lantai depan BNI Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai

3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


Dusting list kaca area lobby belakang luar dalam Lanjut
Cleaning exit samping mushola Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
11 22.00 s/d 06.30 Brushing area indoor lantai dasar s/d lantai 1 sudah ter-
masuk area textum Selesai

Rutinitas & Non Rutinitas


Senin,09 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Pembersihan nomad lobby depan Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
GC toilet belakang office security Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Pemindahan kanstin area parkir Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Cleaning loading depan office security Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Dusting difuser ac area meja CS Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Selasa,10 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai dasar barat,timur & lobby belakang Selesai
Brusing lantai jeruk depan pizza hot Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Spoting pilar area coridor depan gudang MDS Selesai
Cleaning pipa zona 2 depan mushola Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Pelepasan tenda area parkir motor lama Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan banner Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan Time zone Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu,11 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt coridor area lantai 1 barat & timur Selesai
Brusing lantai dasar lobby belakang Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Claning trap tangga darurat arah time zone Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Pelepasan tenda area parkir motor lama Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Pembersihan gutter samping Sting Lanjut
Spoting sudut-sudut lantai lorong area textum Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai dasar depan hoka2 bento Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Kamis,12 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
Brusing lantai coridor area lt dasar barat & timur Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Spoting pintu exit luar dalam lt dasar timur samping Matahari Selesai
Sweping pasir area luar Sting Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Spoting pintu exit luar dalam dekat area kantin zona 2 Selesai
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu KFC Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jumat,13 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting difuser AC area lantai 1 Lanjut
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Spoting dinding luar bawah trap tangga time zone Selesai
Cleaning Ruang Genset samping Enginering Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut

5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut


Cleaning area Roof Top Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Sweping pasir area luar Sting Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Cleaning kap lampu area lobby depan Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu,14 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai atrium 2 & 3 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Cleaning & Bufing lantai depan BNI serta ATM Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting lampu area zona 1 Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Spoting trap tangga darurat samping enginering Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting dinding exit textum Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu,15 April 2012
No Jam Pekerjaan Keterangan
1 22.00 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai lobby belakang & Atrium 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan dunkin donut Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 spoting dinding area lobby belakang dekat travelator Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting dinding exit time zone Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan kfc Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22.00 s/d 06.30 Brushing area indoor lantai dasar s/d lantai 1 sudah ter-
masuk area textum Selesai
Rutinitas & Non Rutinitas
Senin,16 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai jeruk lobby depan Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning list kaca area luar lobby belakang Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Claning area exit samping mushola dari lt 1 - lt dasar Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 18.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning area roof top Lanjut
7 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
8 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
Cleaning area kantin zona 2 Selesai
9 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan gudang MDS Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Selasa,17 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brushing lantai lobby belakang Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai belakang pot lt dasar & 1 Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area roof top Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu,18 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning LIFT Lanjut
Pengangkutan puing dari kodak lt 1 ke depan enginering Lanjut
Cleaning area roof top
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Pengangkutan puing dari kodak lt 1 ke depan enginering Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Pengangkutan puing dari kodak lt 1 ke depan enginering Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pengangkutan puing dari kodak lt 1 ke depan enginering Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Pengangkutan puing dari kodak lt 1 ke depan enginering Lanjut

Rutinitas & Non Rutinitas


Kamis,19 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
General cleaning dinding tempat wudlu mushola Selesai
Clening gudang kosong area lorong textum dkt MO. Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Pembersihan sarang laba2 area lt dasar barat Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Spoting dinding area loading depan office outchorcing. Lanjut
Pembersihan Ruang Genset Selesai
8 18.00 s/d 20.30 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning area kantin zona 2 Selesai
9 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Pengambilan standing astray yg rusak dari lt dasar 3 buah & -
dari lantai 1 3 buah Selesai

Rutinitas & Non Rutinitas


Jumat,20 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum. Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
s/d Brusing lantai depan BNI Selesai
3 10.00 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
s/d Cleaning LIFT Selesai
4 12.00 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
s/d Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
s/d Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 18.00 Cleaning Gulma area zona 1 Lanjut
s/d Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
s/d Cleaning area kantin zona 2 Selesai
10 20.30 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d coridor escalator timur lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu,21 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
s/d Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan resepsionis lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu,22 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby barat
,lt lobby depan,area lt Textum. Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet panggung area textum Selesai
Cleaning area kantin zona 3 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22.00 s/d 06.30 Brushing area indoor lantai dasar s/d lantai 1 sudah ter-
masuk area textum Selesai

Rutinitas & Non Rutinitas


Senin,23 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Spoting dinding luar toilet lt dasar timur Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Cleaning trap tangga darurat area textum Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
cleaning area roof top Lanjut
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting dinding tempat wudlu mushola Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan gudang MDS Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Selasa,24 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt dasar barat,timur & lobby belakang Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gudang belakang posko Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Pembersihan sulo2 yang sudah tidak kepakai Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Cleaning area exit depan gudang fiesta Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai concret depan gudang fiesta Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu,25 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt 1 barat & timur Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
spoting dinding belakang posko Selesai
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting dinding pilar zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Perapian area tempat penyimpanan walet di lt 1 Selesai
Cleaning area kantin zona 3 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Kamis,26 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt dasar barat,timur serta lobby belakang Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai

3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


Dusting pipa plafond area Zona 2 Lanjut
Pembersihan lantai area loading depan office security Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Dusting difuser ac lantai 1 barat Selesai
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar lobby depan Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jumat,27 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning Ruang P3K Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Dusting lampu armater area zona 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca pizza hut Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu,28 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai dasar lobby belakang Selesai
Brusing lantai 1 area time zone Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Pengangkatan walet ke depan textum Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning samping mushola untuk lantainya Selesai
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 General cleaning R panel samping MDS/Enginering Selesai
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Pembersihan sarang laba2 area lobby depan Selesai
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pizza hut Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu,29 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai jeruk area lobby depan Selesai
Persiapan buat acara di lantai dasar toko giordano Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
spoting dinding pilar depan office fdu selesai
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
general cleaning ruang panel hypermart Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Spoting dinding tangga darurat area depan office FDU Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting sudut lt dasar lobby belakang hypermart Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
11 22.00 s/d 06.30 Brusing lantai dasar barat,timur serta lobby belakang Selesai
Brusing lantai 1 barat,timur serta textum Selesai

Rutinitas & Non Rutinitas


Senin,30 April 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai jeruk area lobby depan Selesai
Pengangkatan walet dari textum Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
spoting dinding pilar depan office fdu selesai
Pembersihan sarang laba2 area lobby depan Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Cleaning tangga darurat textum Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning area Roof Top Lanjut
Cleaning tangga darurat depan enginering Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Brusing lantai congcret samping Ruang Visual Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Cikarang,04 Mei 2012 Mengetahui


Dibuat oleh

( HARIS RIYANTO) ( )
FDU Bouilding Service
)
ding Service
Rutinitas & Non Rutinitas
Kamis,31 Mei 2012
No Jam Pekerjaan Keterangan
1 06.30 s/d 08.00 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Cleaning lantai sekitar panggung atrium 1 Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
GC area toilet lt dasar timur P/W Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Pemasangan barikade sekitar panggung Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 General cleaning R panel samping MDS/Enginering Selesai
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14.30 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Pembersihan sarang laba2 area lobby depan Selesai
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk area lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22.00 s/d 22.3 Cleaning lantai sekitar panggung atrium 1 lanjut shift 1

Cikarang,04 Juni 2012 Mengetahui


Dibuat oleh

( HARIS RIYANTO) ( )
FDU Bouilding Service
Rutinitas & Non Rutinitas
Jumat, 01 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt lobby belakang & lobby depan area dalam Selesai
GC kolam air mancur Lanjut
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
GC kolam air mancur Selesai
Pembersihan Gulma area parkir depan Lanjut
Progress sarang laba2 area parkir belakang Lanjut
Pemb, area Roof top Lanjut
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning ruangan belakang posko Lanjut
Dusting list2 kaca luar hypermart lobby belakang Selesai
Dusting dak2 parapet bawah relling Selesai
Pelepasan banner area roof top Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning exit area textum Selesai
Cleaning exit depan office fiesta Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Sweeping daun2 kering area parking belakang Lanjut
Pembersihan Gulma area parkir depan Lanjut
Pembersihan sarang laba2 area parkir mobil belakang Lanjut
Pembersihan rumput2 liar parkir depan zona 1
7 15.00 s/d 18.00 Sweeping sampah2 lepas Lanjut
GC kolam air mancur Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 pembersihan sarang laba2 area lanyai dasar Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Pembersihan ruangan belakang posko Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Pembersihan Dispuser AC dan AC Grill Lanjut
Rutinitas & Non Rutinitas
Sabtu, 02 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai 1 barat & timur Selesai
Brusing lantai lantai lobby barat & lobby depan area dalam Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing manual lantai congcret hijau exit textum Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 1 Lanjut
spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area lift Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar Lanjut
Cleaning area roof top Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Pembersihan roof top Lanjut
Sweeping daun2 kering area parkir belakang Lanjut
Pembersihan gulma / rimput2 liar Lanjut
Sweeping debu2 area loading Lanjut
Pemberihan rumput liar area counter sting Lanjut
7 15.00 s/d 18.00 Persiapan karpet buat matahari Selesai
Spoting trap tangga luar area textum Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Dusting railing tangga exit depan office fiesta Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai congcret depan office fiesta Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Minggu, 03 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai dasar barat & timur Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Pembersihan sarang laba2 area zona 2 Lanjut
Cleaning gulma area depan loading hypermart Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar barat Selesai
Brusing lt congcret/semen samping mushola Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Pembersihan sarang laba2 area parkir mobil belakang Lanjut
Pembersihan fifa flumbing Lanjut
Pembersihan rumput liar samping matahari Lanjut
Pembersihan area roof top Lanjut

7 15.00 s/d 18.00 Sweeping,moping exit Lanjut


Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22,00 s/d 07,00 Pencucian area lantai 1 dan lantai hitam area hypermart Selesai
Pencucian area lantai dasar dan lt depan lobby utama Selesai
Pencucian lantai hitam area atrium belakang Selesai
Rutinitas & Non Rutinitas
Senin, 04 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Pembersihan sarang laba2 area mushola Selesai
Dusting lampu amater area Zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt papin blok depan mushola Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 2 Lanjut
Spoting trap tangga darurat area luar MO Selesai
Pem area roof top Lanjut
Pembersihan gulma zona 1 Lanjut
Sweeping daun2 kering zona 1 Lanjut
7 15.00 s/d 18.00 Stanby area lt,dasar,1,halaman Lanjut
Polishing hand relling lt.1 Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
Cleaning area kantin zona 2
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Selasa, 05 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan gudang MDS Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Detail cleaning Ruang Panel Lt 1 Barat & Timur. Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Pembersihan roof top Lanjut
Sweeping daun2 kering area parkir belakang Lanjut
Pembersihan sarang laba area parkir mobil Lanjut
Pembersihan gulma Lanjut
Pembersihat got area parkir belakang Selesai
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d depan Time zone lt 1 - Selesai
Serta lt dasar Atrium 1. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Rabu, 06 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafon zona 2 depan mushola Lanjut
Cleaning pintu exit depan office FDU Selesai

4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai


Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting dinding tembok tangga darurat time zone Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning sampah got dekat loading matahari Lanjut
Spoting trap tangga exit depan office fiesta Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting plin lantai area luar lorong posko lt dasar Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Rutinitas & Non Rutinitas
kamis, 07 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.00 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Spoting manual lt jeruk depan pizza hut Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Cleaning ruang P3K & ruangan belakang posko Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 2 Lanjut
Spoting trap tangga darurat area luar textum Selesai
8 18.00 s/d 20.30 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d Spoting trap tangga darurat area luar MO Selesai
9 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Jumat, 08 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai area atrium 3 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai depan BNI Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai depan hypermart s/d coridor escalator timur lt Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Sabtu, 09 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt lobby belakang hypermart,lt lobby barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Dusting lampu armater area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pintu kaca lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Minggu, 10 Maret 2013
No Jam Pekerjaan Keterangan
1 07.30 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt jeruk depan meja CS lobby depan Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless & glass claning kaca railing lt 1 barat Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Pembersihan sarang laba2 area zona 2 Lanjut
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT ( luar & dalam ) Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Pembersihan area roof top hypermart Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 2 Lanjut
Spoting trap tangga darurat area luar ( exit time zone ) Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Cleaning area exit samping solaria lt dasar barat Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan kfc lobby depan Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22,00 s/d 07,00 Pencucian area lantai 1 dan lantai hitam area hypermart Selesai
Pencucian area lantai dasar dan lt depan lobby utama Selesai
Pencucian lantai hitam area atrium belakang Selesai

Rutinitas & Non Rutinitas


Senin, 11 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai lobby belakang Selesai
Brusing lantai jeruk depan resepsionis lobby depan Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Claning trap tangga darurat arah time zone Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Pembersihan sarang laba2 area zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Pembersihan saluran air luar zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 2 Lanjut
Spoting sudut-sudut lantai lorong area textum Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai

Rutinitas & Non Rutinitas


Selasa, 12 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Dusting lampu armater area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut2 lantai bawah escalator barat lt dasar Selesai
Cleaning pipa-pipa area parkir mobil zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Pem area roof top Lanjut
Pembersihan gulma zona 1 Lanjut
Sweeping daun2 kering zona 1 Lanjut

7 15.00 s/d 18.00 Cleaning ruang genset depan pencucian mobil lama Selesai
Spoting trap tangga exit samping mushola Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pizza hut Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu, 13 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Dusting lampu armater area zona 1 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut2 lantai bawah escalator timur lt dasar Selesai
Dusting standyng astray all area Lanjut
6 14,00 s/d 15.00 Cleaning pipa2 parkir mobil area zona 2 Lanjut
Spoting trap tangga darurat exit depan office fiesta Selesai
7 15.00 s/d 18.00 Stanby area Flotingan Lanjut
Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Cleaning kap lampu area lobby depan Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai

Rutinitas & Non Rutinitas


kamis, 14 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai Atrium 2 lt 1 barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Cleaning pilar depan BNI Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Spoting plin lantai area lantai 1 timur Selesai
Cleaning gulma area zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning area Roof Top Lanjut
Pembersihan lorong samping mushola Selesai
Pembersihan rumput liar area zona1 Lanjut

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt 1 Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jumat, 15 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai lobby belakang & Atrium 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan dunkin donut Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning area Roof Top Lanjut
Spoting dinding tempat wudlu mushola Selesai
Pembersihan fifa2 flambing area parkir mobil Lanjut

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt 1 Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pizza hut Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu, 16 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai hitam hypermart lantai 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma zona 2 depan calisto Selesai
Cleaning LIFT Selesai
Pembuangan puing area Roof top Lanjut
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting pipa pipa area zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 18.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan karpet pameran di atrium 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai hitam area lobby belakang Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu, 17 Maret 2013
No Jam Pekerjaan Keterangan
1 07.00 s/d 08.30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai depan time zone lt 1 barat Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08.30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 2 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 2 Lanjut
Spoting trap tangga darurat area luar MO Selesai
Pembersihan Got area zona belakang Selesai

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Pencucian sajadah mushola ( wanita ) Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
11 22,00 s/d 07,00 Pencucian area lantai 1 dan lantai hitam area hypermart Selesai
Pencucian area lantai dasar dan lt depan lobby utama Selesai
Pencucian lantai hitam area atrium belakang Selesai

Rutinitas & Non Rutinitas


Senin, 18 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt coridor dasar barat s/d atrium 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Spoting dinding luar toilet lt dasar barat. Selesai
Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Pembuangan puing area roof top Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 Lanjut
Cleaning lantai tangga darurat textum Selesai
Pembersihan sarang laba2 area parkir mobil belakang Lanjut

7 15.00 s/d 18.00 Stanby area Flotingan


Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Selasa, 19 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning tangga darurat Time zone Selesai
Vacuming debu lantai pintu keluar lobby belakang Selesai
Cleaning lantai pintu masuk samping mushola Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Cleaning Ruang genset Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
Pembersihan gulma / Rumput2 liar area zona 1&2 Lanjut
Pembersihan area roof top Lanjut

7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut


Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 20.30 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning area kantin zona 2 Selesai
9 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu, 20 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Spoting pilar-pilar lobby depan lt dasar Selesai
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat depan loading Selesai
Pembersihan area roof top Lanjut

7 15.00 s/d 18.00 Stanby area Flotingan Lanjut


Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai hitam lobby belakang Selesai

Rutinitas & Non Rutinitas


Kamis, 21 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt Atrium 2-3,lt lobby belakang hypermart,lt lobby baraSelesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Brusing lantai jeruk depan KFC Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut lantai belakang standing astray lt dasar Selesai
Cleaning sudut lantai belakang standing astray lt 1 Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Dusting lampu armater zona 1 Lanjut
Spoting dinding samping posko lt dasar Selesai
Pembersihan area roof top Lanjut
Pembersihan rumput liar samping elpiji Lanjut

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Dusting aksesoris belakang posko Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Jumat, 22 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 samping KFC Lanjut
Spoting trap tangga darurat area luar time zone Selesai
Pembersihan roof top Lanjut

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai hitam lobby belakang Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Sabtu, 23 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai hitam atrium 3 lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Spoting dinding luar toilet lt 1 Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Pembuangan puing samping exit depan fiesta Lanjut
Spoting dinding luar exit depan office fiesta Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 Lanjut
cleaning area roof top Lanjut
Pembersihan daun2 kering area parkir motor tingkat Selesai

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Dusting aksesoris dinding all lantai 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai hitam atrium 3 lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Minggu, 24 Maret 2013
No Jam Pekerjaan Keterangan
1 09,00 s/d 10,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai atrium 1 & coridor depan hokben lt dasar Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
2 10,30 s/d 12,00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 12,00 s/d 13,00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
4 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting dinding pilar zona 2 Lanjut
Dusting standyng astray all area Selesai
5 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning area Roof Top Lanjut
Spoting trap tangga exit samping mushola Selesai

6 15.00 s/d 18.00 Stanby area flotingan

7 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


8 19.00 s/d 20.30 Spoting dinding tempat wudlu mushola Selesai
Cleaning area kantin zona 2 Selesai
9 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan sting Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
10 22.00 s/d 07.00 Pencucian lt .1 all area Selesai
Pencucian lt . Dasar All area Selesai
Pencucian Area Loading Selesai

Rutinitas & Non Rutinitas


Senin, 25 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lt hitam lobby belakang Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai

2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
spoting sudut2 lantai depan gudang MDS Selesai
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting dinding pilar zona 2 Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 3 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan walet area time zone Selesai
Cleaning area kantin zona 3 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah ly dasar Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


selasa, 26 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Cleaning tangga darurat exit time zone Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Brusing lt congcret/semen samping ruang Visual Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
7 15.00 s/d 18.00 Cleaning Gulma area zona 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas


Rabu, 27 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning gulma area zona 1 dekat air mancur Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning area roof top Lanjut
Spoting trap tangga exit samping mushola Selesai

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Spoting pilar-pilar dinding lt dasar Lanjut
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Rutinitas & Non Rutinitas
Kamis, 28 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Pelepasan karpet & cleaning depan travelator hypermart Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 General cleaning R panel samping MDS/Enginering Selesai
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Pembersihan sarang laba2 area lobby depan Selesai
Spoting trap tangga darurat area luar MO Selesai

7 15.00 s/d 18.00 Stenby area flotigan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Pemasangan banner di area lantai 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pizza hut Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Jumat, 29 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
pEmbersihan glass cleaning kaca textum luar,( gondola) Lanjut
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 samping KFC Lanjut
Spoting trap tangga darurat area luar time zone Selesai
Pembersihan roof top Lanjut

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai hitam lobby belakang Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Sabtu, 30 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai hitam atrium 3 lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
Pembersihan glass cleaning kaca luar textum (Gondola) Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Spoting dinding luar toilet lt 1 Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Pembuangan puing samping exit depan fiesta Lanjut
Spoting dinding luar exit depan office fiesta Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 Lanjut
cleaning area roof top Lanjut
Pembersihan daun2 kering area parkir motor tingkat Selesai

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Dusting aksesoris dinding all lantai 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai hitam atrium 3 lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas

Minggu, 31 Maret 2013


No Jam Pekerjaan Keterangan
1 09,00 s/d 10,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai atrium 1 & coridor depan hokben lt dasar Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai

2 10,30 s/d 12,00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 12,00 s/d 13,00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
4 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting dinding pilar zona 2 Lanjut
Dusting standyng astray all area Selesai
5 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning area Roof Top Lanjut
Spoting trap tangga exit samping mushola Selesai

6 15.00 s/d 18.00 Stanby area flotingan

7 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


8 19.00 s/d 20.30 Spoting dinding tempat wudlu mushola Selesai
Cleaning area kantin zona 2 Selesai
9 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan sting Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
10 22.00 s/d 07.00 Pencucian lt .1 all area Selesai
Pencucian lt . Dasar All area Selesai
Pencucian Area Loading Selesai
Cikarang,5 Maret 2013 Mengetahui,
Dibuat Oleh

MAKMUR M Gurning / Eko S


FDU Boulding Service
urning / Eko S
Rutinitas & Non Rutinitas
Kamis, 28 febuari 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Pelepasan karpet & cleaning depan travelator hypermart Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning gulma area zona 3 Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 General cleaning R panel samping MDS/Enginering Selesai
Brusing lt congcret/semen dpn R Panel/Trafo Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Pembersihan sarang laba2 area lobby depan Selesai
Spoting trap tangga darurat area luar MO Selesai
7 15.00 s/d 18.00 Stenby area flotigan Lanjut
8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
9 19.00 s/d 20.30 Pemasangan banner di area lantai 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan pizza hut Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Cikarang,28 Februa2012 Mengetahui,


Dibuat Oleh,
Yanto M Gurning / Eko S
FDU Boulding Service
Jumat, 29 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai depan Time zone s/d escalator barat lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
pEmbersihan glass cleaning kaca textum luar,( gondola) Lanjut
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Brusing lt jeruk depan teras gudang MDS Selesai
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting trap tangga darurat area luar MO Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 samping KFC Lanjut
Spoting trap tangga darurat area luar time zone Selesai
Pembersihan roof top Lanjut

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Cleaning sudut-sudut lantai area lt dasar – lt 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai hitam lobby belakang Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
Rutinitas & Non Rutinitas
Sabtu, 30 Maret 2013
No Jam Pekerjaan Keterangan
1 07,00 s/d 08,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai hitam atrium 3 lt 1 Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai
Detail cleaning area office MO Selesai
Pembersihan glass cleaning kaca luar textum (Gondola) Selesai
2 08,30 s/d 10.00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
Spoting dinding luar toilet lt 1 Selesai
3 10.00 s/d 12.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning area Roof Top Lanjut
Cleaning LIFT Selesai
4 12.00 s/d 13.00 Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
5 13.00 s/d 14,00 Pembuangan puing samping exit depan fiesta Lanjut
Spoting dinding luar exit depan office fiesta Selesai
Dusting standyng astray all area Selesai
6 14,00 s/d 15.00 Cleaning Gulma area zona 1 Lanjut
cleaning area roof top Lanjut
Pembersihan daun2 kering area parkir motor tingkat Selesai

7 15.00 s/d 18.00 Stanby area flotingan

8 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


9 19.00 s/d 20.30 Dusting aksesoris dinding all lantai 1 Selesai
Cleaning area kantin zona 2 Selesai
10 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai hitam atrium 3 lt 1 Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai

Rutinitas & Non Rutinitas

Minggu, 31 Maret 2013


No Jam Pekerjaan Keterangan
1 09,00 s/d 10,30 Sweping-Moping area coridor lt dasar-lt 1 Selesai
Brusing lantai atrium 1 & coridor depan hokben lt dasar Selesai
Sweping area outdorr Zona 1,2,3 Lanjut
Glass cleaning kaca-kaca lobby Selesai

2 10,30 s/d 12,00 Dry bufing coridor lt dasar – lt 1 termasuk all area lobby Selesai
Glass cleaning kaca-kaca luar toko lt dasar – lt 1 Selesai
Dusting standyng astray all area Selesai
Dusting stainless railing – glass claning kaca railing lt 1 Selesai
Dusting wall acsesoris lt dasar – lt 1 Selesai
Cleaning all area exit dari lt dasar s/d lt 1 Lanjut
Cleaning area Toilet lt dasar – lt 1 Selesai
Pengangkatan lemak area kantin Lanjut
Cleaning area mushola Selesai
Cleaning escalator Timur-Barat Selesai
3 12,00 s/d 13,00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Dusting pipa plafond area Zona 2 Lanjut
Cleaning gulma area zona 1 Lanjut
Cleaning LIFT Selesai
Pengangkatan sampah all area indoor-outdoor Selesai
Maintanance indoor – outdoor (termasuk toilet) Lanjut
4 13.00 s/d 14,00 Cleaning sudut-sudut lantai area lt dasar – lt 1 Lanjut
Spoting dinding pilar zona 2 Lanjut
Dusting standyng astray all area Selesai
5 14,00 s/d 15.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut
Cleaning area Roof Top Lanjut
Spoting trap tangga exit samping mushola Selesai

6 15.00 s/d 18.00 Stanby area flotingan

7 18.00 s/d 19.00 Maintanance indoor – outdoor (termasuk toilet) Lanjut


8 19.00 s/d 20.30 Spoting dinding tempat wudlu mushola Selesai
Cleaning area kantin zona 2 Selesai
9 20.30 s/d 22.00 General cleaning toilet all area. Selesai
Washing standyng astray & tempat sampah. Selesai
Brusing lantai jeruk depan sting Selesai
Cleaning alat-alat bantu spt mop,sapu,duspent dll. Selesai
10 22.00 s/d 07.00 Pencucian lt .1 all area Selesai
Pencucian lt . Dasar All area Selesai
Pencucian Area Loading Selesai
Rutinitas & Non Rutinitas
Rabu, 01 Mei 2013
No Jam Pekerjaan Keterangan
1 07.00-08.00 Pencucian lantai dari depan J-Co s/d Eye Evolution Selesai
2 07.00-07.15 Pencucian lantai kulit jeruk lobby utama Selesai
3 08.30-10.00 Dry Buffing Selesai
4 08.35-08.45 Pencabutan gulam/rumput samping luar matahari dept.store Lanjut
5 09.00-selesai Brushing conblock depan lobby utama Selesai
6 11.32-selesai Moceng besi umbul-umbul Selesai
7 11.39-selesai Spoting pilar lobby utama Selesai
8 21.00-selesai Vacuming drain floor toilet pria lt.1 barat Selesai
9 21.00-21.45 Pengangkatan pohon palm dari taman trubus * Selesai
10 21.00-selesai Lanjut

Rutinitas & Non Rutinitas


Kamis, 02 Mei 2013
No Jam Pekerjaan Keterangan
1 07.00-08.00 Pencucian lantai depan matahari dept.store Atrium timur Selesai
2 07.45-selesai Brushing manual escalator Atrium barat Selesai
3 08.30-selesai Pencucian lantai kulit jeruk depan lobby utama Selesai
4 08.30-10.00 Dry buffing Selesai
6 08.45-selesai Spoting pilar Atrium 1 (tengah) Selesai
5 09.25-selesai Squizing conblock yang tergenang air hujan Selesai
7 11.07-selesai Suport pemasangan umbul-umbul Selesai
8 21.15-selesai Pengangkatan lemak di guter belakang mushola Selesai
9 21.15-selesai Pembersihan logo-logo counter Lanjut
10 21.17-selesai Pencucian lantai kulit jeruk depan lobby utama Selesai

Rutinitas & Non Rutinitas


Jumat, 03 Mei 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai kulit jeruk di lobby utama selesai
2 08.00-10.00 Dry Buffing selesai
3 08.00-selesai Penyemprotan Hama di belakang Fizza hut selesai
4 08.25-Selesai Pemasangan bilboard di depan MDS selesai
5 08.45 -selesai Penanaman pohon palem ditaman trubus selesai
6 21.00-selesai Pembersihan air carten selesai
7 21.00-selesai Brusing manual lantai kulit jeruk depan custemer service selesai
8 21.00-selesai Brusing depan Dunkin donats selesai
9 21.00-selesai Pembersihan Duspuser AC Toilet Lanjut
Kamis, 04 April 2013
No Jam Pekerjaan Keterangan
1 07.05-Selesai Pencucian lantai all area lt 1,( scruubing ) Selesai
2 07.36- Selesai Suport pembersihan karpet puri sentosa Selesai
3 07.37- Selesai Brusing lantai kulit jeruk depan customer service Lanjut
4 07.47-Selesai Pembersihan dak parapet bawah kaca relling Selesai
5 08.31-Selesai Pembersihan Ac mushola Selesai
6 08.40-Selesai Dry buufing all area lantai dasar lantai 1 Selesai
7 09.38-Selesai Spoting sudut lantai area axit TPLGB Selesai
8 10.59-Selesai Di lakukan pembersihan genangan air Zona 1 2 3 Selesai
9 11.10- selesai Glass cleaning kaca mushola Selesai
10 15.29-slesai Suport pelepasan umbul umbul the executive Selesai
11 21.00-Selesai Pencucian karpet hypermart Selesai
12 21.15-selesai Pembersihan griil ac lantai dasar Lanjut
13 21.12-selesai Brusing lantai kulit jeruk depan j.co Selesai

Jum'at, 05 April 2013


No Jam Pekerjaan Keterangan
1 07.49-Selesai Brusing lantai kulit jeruk depan customer service dan Dunkin selesai
2 08.21-Selesai Dil;akukan pengeringan air di area zona 1 2 3 Selesai
3 08.24-Selesai Dilakukan Spoting tempat wudhu selesai
4 08.30-Selesai Dry buufing all area lantai dasar dan lantai 1 selesai
5 09.24-Selesai Dilakukan pembersihan rolling door lantai satu barat Lanjut
6 09.31-Selesai Pembersihan gulma zona 2 Lanjut
7 10.49-Selesai Suport penyopotan umbul umbul the executive selesai
8 14.21-Selesai Pebersihan roop toop Lanjut
9 14.25-Selesai Pengangkatan nomet jembatan hypermart di roop toop selesai
10 14.37-selesai Spoting sudut lantai area axit TPL1B selesai
11 21.13-selesai Brusing lantai kulit jeruk depan j.co selesai
12 21.17-selesai Pembersihan dispuser Ac lantai dasar Lanjut
13 21.32-Selesai Spoting satu jengkal keramik tempat wudhu mushola selesai
14 21.33-Selesai Brusing lantai semen lorong mushola selesai

Sabtu, 06 April 2013


No Jam Pekerjaan Keterangan
1 07.32-Selesai Brusing lantai kulit jeruk depan j.co dan customer service Selesai
2 07.48-Selsai Pencabutan gulma zona 1 Lanjut
3 08.00-selesai Pencucian lantai candblok air mancur Selesai
4 08.17-Selesai Suport pembersihan carpet counter hikmah Selesai
5 08.19-selesai Dry buufing all area lantai dasar dan 1 Selesai
6 09.02-selesai Dilakukan pembersihan rolling door area atrium 2 Lanjut
7 09.20-Selesai Pembersihan bendhol lantai dasar Selesai
8 10.38-Selesai Pembersihan genangan air all area zona Selesai
9 14.48-Selesai Pembersihan rooptoop Lanjut
10 16.47-selesai Suport setng panggung acara live miusic Selesai
11 21.24-Selesai Brusing lantai kulit jeruk depan KFC Selesai
12 21.26-Selesai Pembersihan dispuser ac lantai dasar Selesai
13 21.29-Selesai Pencucian sajadah mushola Selesai
14 21.36-selesai Pembersihan grill ac toilet Selesai

Rutinitas & Non Rutinitas


Minggu, 07 April 2013
No Jam Pekerjaan Keterangan
1 07.16-selesai pengangkatan dan penggantian nomed jembatan hypermart selesai
2 07.23-Selesai suport pembersihan karpet pameran puri sentosa selesai
3 07.23-Selesai Brusing lantai kulit jeruk depan j'co dan customer service selesai
4 08.03-Selesai Dilakukan jet player lantai cundblok depan mushola selesai
5 08.30-Selesai Dry buffing all area lantai dasar dan 1 selesai
6 08.43-Selesai Dilakukan pemberesan panggung acara live miusic selesai
7 09.07-Selesai Penjemuran sajadah mushola selesai
8 09.27-Selesai Pembersihan gulma area zona 1 lanjut
9 21.27-Selesai Pencucian nomed jembatan hypermart selesai
10 21.34-Selesai Pencucian standing astray all area luar dalam selesai

Rutinitas & Non Rutinitas


Senin, 08 April 2013
No Jam Pekerjaan Keterangan
1 07.23-Selesai Glass cleaning kaca textum selesai
2 07.26-Selesai Brusing lantai kulit jeruk depan dunkin dan customer service selesai
3 08.30-Selesai Dry buufing all area lantai satu Dan dasar selesai
4 09.24-Selesai Pengangkatan lumut di depan kantin selesai
5 09.42-Selesai Pembersihan gulma area zona 2 lanjut
6 14.32-selesai Pembersihan roop toop lanjut
7 21.10-Selesai Brusing lantai kulit jeruk depan j'co dan kfc selesai
8 21.26-Selesai Penyikatan anak tangga yang menuju MO selesai

Selasa, 09 April 2013


No Jam Pekerjaan Keterangan
1 07.22-Selesai Brusing lantai kulit jeruk depan j'co dan customer service Selesai
2 08.30-selesai Dry buufing all area lantai Dasar dan 1 Selesai
3 08.23-Selesai Suport pembersihan caunter QiQI soflens Selesai
4 08.53-selesai penjemuran Sajadah mushola Selesai
5 11.27-Selesai Pembersihan guuter palkiran motor Selesai
6 11.43-selesai Pembersihan lantai canopi looby barat Selesai
7 14.07-Selesai Pembersihan roop toop Selesai
8 21.18-Selesai pembersihan logo logo counter lantai dasar lanjut
9 21.27-Selesai Brusing lantai kulit jerukdepan fizza dan dunkin Selesai
Rutinitas & Non Rutinitas
Rabu, 10 April 2013
No Jam Pekerjaan Keterangan
1 07.35-Selesai Pencucian lantai all area lantai Dasar Selesai
2 07.42-Selesai Brusaing lantai kulit jeruk depan kfc dan J'co Selesai
3 07.45-selesai Pembersihan gulmazona 1, depan matahari Lanjut
4 08.30-Selesai Dry buffing all area lantai dasar dan 1 Selesai
5 09.11-Selesai Pembersihan gulma zona 2 Lanjut
6 09.55-Selesai Spoting anak tangga di area axit Time zone Selesai
7 14.11-Selesai Pembersihan sarang laba laba Lanjut
8 14.19-Selesai Pembersihan roop toop Lanjut
9 20.59-Selesai Spoting dinding Escalator Selesai
10 21.04-Selesai Brusing lorong axit Samping A&K Selesai
11 21.09-Selesai Brusing lantai kulit jeruk depan kfc dan j'co Selesai
12 21.26-Selesai Pembersihan petunjuk toilet lantai Dasar dan 1 Selesai

Rutinitas & Non Rutinitas


Kamis, 11 April 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Pencucian lantai Satu all area Selesai
2 07.16-Selesai General cleaning Escalator timur-barat Selesai
3 07.20-Selesai Brusing lantai kulit jeruk depan j'co dan customer service Selesai
4 08.30-Selesai Dry buufing all area Selesai
5 09.11-Selesai Spoting anak tangga ,di area axit Natasha Selesai
6 10.36-Selesai Pembersihan pilar Selesai
7 10.47-Selesai Di lakukan Glass cleaning kaca luar MO,Di area roop toop Lanjut
8 14.13-Selesai Pembersihan roop toop Lanjut
9 20.53-Selesai Penyikatan anak tangga ,yang menuju MO Selesai
10 20.59-Selesai Pembersihan logo Counter lantai dasar Lanjut
11 21.08-Selesai Spoting dinding bawah stanlish escalator. Timur-barat Selesai
12 21.14-selesai Brusing lantai kulit jeruk depan fizza dan dunkin donuts Selesai

Rutinitas & Non Rutinitas


jumat, 12 April 2013
No Jam Pekerjaan Keterangan
1 07.44-Selesai Brusing lantai kulit jeruk depan customer service Selesai
2 08.33-Selesai Brusing lantai kulit jeruk Depan Quinn café Lanjut
3 08.40-Selesai Dry buffing all area Selesai
4 09.07-Selesai Pembersihan gulma area zona 3 Lanjut
5 09.25-Selesai Pembersihan pilar pilar atrium 1 Selesai
6 10.37-Selesai Dilakukan pembersihan gudang di blakang KFC Selesai
7 11.12-Selesai Brusing manual lorong samping gudang KFC Selesai
8 11.30-Selesai Pembersihan gulma area zona 2 Lanjut
9 14.45-Selesai Pembersihan roop toop Lanjut
10 16.40-Selesai Pembersihan gulma di depan Quuin café Lanjut
11 21.19-Selesai Brusing lantai kulit jeruk Depan quiin café Selesai
12 21.23-Selesai Brusing lorong axit yang menuju mushola Selesai
13 21.26-Selesai Pembersihan dispuser ac all area toilet Selesai

Rutinitas & Non Rutinitas


Sabtu, 13 April 2013
No Jam Pekerjaan Keterangan
1 07.44-Selesai Brusing lantai kulit jeruk depan j'co dan customer service Selesai
2 08.20-Selesai Pencucian lantai Cundblock air mancur Selesai
3 08.42-Selesai Spoting tempat wudhu mushola Selesai
4 08.46-Selesai Pembersihan gulma area zona 1 Selesai
5 08.48-Selesai Dry buufing all area Selesai
6 08.56-Selesai Pembersihan sisa lakban depan customer service Selesai
7 10.47-Selesai Glass cleaning kaca mushola Selesai
8 15.57-Selesai Suport pelakbanan keramik yang lepas di area depan textum selesai
9 14.20-Selesai Pembersihan roop toop Selesai
10 21.03-Selesai Pembersihan air carten Selesai
11 21.14-Selesai Brusing jembatan hypermart Selesai
12 21.23-Selesai pembersihan logo logo counter lanjut
13 21.25.-Selesai Brusing lantai kulit jeruk depan Kfc dan j'co Selesai
14 21.32-Selesai Pembersihan dispuser ac toilet Selesai

Rutinitas & Non Rutinitas


Minggu, 14 April 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Brusing lantai kulit jeruk depan Customer service Selesai
2 08.00-Selesai Dry buufing all area Selesai
3 14.00-Selesai Pembersihan roop toop Selesai
4 15.20-Selesai Suport Pempakuman washtaphel Textum Selesai
5 15.52-Selesai Pembersihan guuter di area palkiran motor Selesai
6 20.42-Selesai Pembersihan dispuser ac di area axit TPLIB Selesai
7 20.54-Selesai Pencucian karpet Hypermart Selesai
8 21.13-Selesai Brusing lantai kulit jerukdepan fizza dandunkin donuts Selesai
9 21.15-Selesai Pembersihan pipa plumbing di area exit TPLGB Selesai

Rutinitas & Non Rutinitas


Senin, 15 April 2013
No Jam Pekerjaan Keterangan
1 07.07-Selesai Pembersihan lumut di area parkir belakang depan mushola Selesai
2 07.15-Selesai Dry buufing all area Selesai
3 07.16-Selesai Glass cleaning kaca textum Selesai
4 08.01-selesai Brusing lantai kulit jeruk Depan Kfc dan j'co Selesai
5 08.26-Selesai Di lakukan pengurasan air Di area zona 1 2 3 Selesai
6 14.21-Selesai Pengangkatan nomed hypermart di atas roop toop Selesai
7 14.29-Selesai Pembersihan roop toop Selesai
8 21.11-Selesai Brusing lantai kulit jeruk depan dunkin dan fizza Selesai

Rutinitas & Non Rutinitas


Selasa, 16 April 2013
No Jam Pekerjaan Keterangan
1 07.29-Selesai Brusing lantai kulit jeruk depan fizza dan dunkin donuts Selesai
2 08.18-Selesai Dilakukan pembersihan sisa Cat, di area Stobery dan naugty Selesai
3 08.30-Selesai Dry buufing all area Selesai
4 09.04-Selesai Pembersihan logo j'co Selesai
5 14.43-Selesai Pembersihan roop toop Selesai
6 14.40-Selesai Pembersihan sarang laba laba loding mal Lanjut
7 20.52-Selesai Dpoting sudut lantai pilar pilar koridor timur lantai 1 Lanjut
8 21.05-Selesai Brusing lantai kulit jeruk depan fizza dan dunkin donuts Selesai
9 21.10-Selesai Pembersihan logo logo caunter looby barat Lanjut

Rutinitas & Non Rutinitas


Rabu, 17 April 2013
No Jam Pekerjaan Keterangan
1 07.15-Selesai Brusing lantai kulit jeruk depan Kfc dan j'co Selesai
2 07.18-Selesai Pencucian lantai all area lantai dasar Selesai
3 08.30-Selesai Dry buufing all area Selesai
4 09.26-Selesai Dilakukan pembersihan sisa adukan semen di Samping kfc Selesai
5 09.41-Selesai Pembersihan kap kap lampu lobby utama Selesai
6 10.30 Selesai Dilakukan pengurasan air di area zona 1 2 3 Selesai
7 13.02-Selesai Pembersihan lumut di area roop toop lanjut
8 14.19-Selesai Pembersihan sarang laba laba parkir belakang lanjut
9 21.09-Selesai penyikatan anak tangga yang menuju MO Selesai
10 21.28-Selesai Pembersihan dispuser dan griil ac toilet Selesai
11 21.34-Selesai Brusing lantai kulit jeruk depan Kfc dan j'co Selesai

Rutinitas & Non Rutinitas


Kamis, 18 April 2013
No Jam Pekerjaan Keterangan
1 07.45-Selesai Suport pelakbanan karpet Pengerjaan Keramik Selesai
2 07.47-Selesai Brusing lantai kulit jeruk Depan KFC dan j'co Selesai
3 07.59-Selesai Pencucucian lantai all area lantai 1 Selesai
4 08.04-Selesai General cleaning escalator timur barat Selesai
5 08.30-Selesai Dry buufing all area Selesai
6 08.53-Selesai Suport perapihan spanduk ACE hardwer di wath On MLC Selesai
7 09.06-Selesai Dilakukan pengurasan genangan air all area zpna 1 2 3 Selesai
8 14.24-Selesai Pembersihan sarang laba parkir belakang Selesai

Rutinitas & Non Rutinitas


Jumat, 19 April 2013
No Jam Pekerjaan Keterangan
1 07.28-Selesai Brusing lantai kulit jeruk depan fizza dan dunkin Selesai
2 08.34-Selesai Pengurasan air di area zona 1 2 3 Selesai
3 08.43-Selesai Dry buffing all area Selesai
4 09.19-Selesai Penyikatan anak tangga sisa cat di axit di axit TPLIB Selesai
5 09.23-Selesai Pencucian tong sampah all area zona 1 2 3 Lanjut
6 10.10-Selesai Dusting pilar pilar atrium 1 Selesai
7 14.06-Selesai Pembersihan sarang laba laba parkir belakang Lanjut
8 14.13-Selesai Pembersihan roop toop Lanjut
9 09.00-Selesai Suport pemasangan panggung ,Tema season of miusic Selesai

Rutinitas & Non Rutinitas


Sabtu, 20 April 2013
No Jam Pekerjaan Keterangan
1 07.33-Selesai Suport pemasangan bed roop .di atrium 2.season of music Selesai
2 07.43-Selesai Brusing lantai kulit jeruk depan kfc dan j'co Selesai
3 08.06-Selesai Suport pembersihan sisalakban di belakang customer service Selesai
4 08.15-Selesai Pencucian lantai cundblok air mancur Selesai
5 08.30-Selesai Dry bufing all area Selesai
6 09.00-Selesai Suport seting barigade dan meja di acara atrium 2 Selesai
7 09.56-Selesai Pencucian tong sampah all area zona 1 2 3 Selesai
8 10.51-Selesai Suport pempakuman Pudren Rice bowl Selesai
9 15.30-Selesai Suport Pempakuman saluran air di area Es gelori Textum Selesai
10 21.10-Selesai brusing lantai concrit samping mushola Selesai
11 21.13-Selesai Pembersihan dispuser AC dan griil ac , area looby belakang Selesai
12 21.06-Selesai Brusing lantai kulit jeruk Depan Fizza dan Dunkin donuts Selesai

Rutinitas & Non Rutinitas


Minggu, 21` April 2013
No Jam Pekerjaan Keterangan
1 07.43-Selesai Brusing lantai kulit jeruk depan kfc dan j'co Selesai
2 08.30-Selesai Dry bufing all area Selesai
3 18.17-Selesai Dilakukan pengurasa air di area zona 2 Selesai
4 21.00-Selesai Suport bongkar panggung acara di atrium 2 Selesai
5 21.05-Selesai Pengangkatan bangku Textum Selesai
6 21.10-Selesai Pencucian standing astray all area . Luar dalam Selesai
7 21.15-Selesai Brusing lantai kulit jeruk depan kfc dan j'co Selesai

Rutinitas & Non Rutinitas


Senin, 22 April 2013
No Jam Pekerjaan Keterangan
1 07.35_selesai Glass cleaning kaca textum Selesai
2 07.30-Selesai Dry buffing all area Selesai
3 07.47.Selesai Pembersihan sisa lakban di depan Bread tack Selesai
4 08.00-Selesai Brusing lantai kulit jeruk Depan kfc dan j'co Selesai
5 08.07-Selesai Pembersihan gatter di area jalan Daha Selesai
6 14.12-Selesai Pembersihan roop toop Selesai
7 14.36-Selesai Pembersihan sarang laba laba parkir belakang Selesai
8 21.04-Selesai Pencucian nomet hypermart Selesai
9 21.10-Selesai Brusing lantai kulit jeruk Depan kfc dan j'co

Rutinitas & Non Rutinitas


Selasa, 23 April 2013
No Jam Pekerjaan Keterangan
1 07.32-Selesai Brusing lantai kulit jeruk depan kfc dan j'co Selesai
2 07.47-Selesai Pembersihan sisa cat di area koridor barat lantai 1 Selesai
3 08.10-Selesai Pembersihan gulma di area zona 1 Selesai
4 08.30-Selesai Dry Buffing all area Selesai
5 08.50-Selesai Suport perapihan umbul umbul Season of music Selesai
6 09.33-Selesai Suport perapihan Spanduk ACE hadwer. Selesai
7 10.00-Selesai Pembersihan pilar pilar atrium 1 Selesai
8 14.00-Selesai Pembersihan roop toop Selesai
9 19.30-Selesai Dilakukan penjemuran nomed hypermart di area rop toop Selesai
10 20.59-Selesai Brusing lantai kulit jeruk depan fizza dan dunkin donuts Selesai
11 21.29-Selesai Pembersihan dispuser ac dan grill ac lantai dasar Lanjut

Rutinitas & Non Rutinitas


Rabu, 24 April 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Pencucian lantai all area lantai dasar Selesai
3 07.47-Selesai Pembersihan sisa cat di area koridor barat lantai 1 Selesai
2 08.30-Selesai Dry Buffing all area Selesai
3 14.00-Selesai Pembersihan reel lift Selesai
4 14.14-Selesai Pembersihan roop toop Selesai
5 14.30-Selesai Pembersihan sarang labha laba Lanjut
6 14.38-Selesai Pembersihan gulma area depan trubus Lanjut
7 21.15-Selesai Brusing lantai kulit jeruk depan fizza dan dunkin Selesai
8 21.21-Selesai Pembersihan dispuser dan griil ac toilet Selesai

Rutinitas & Non Rutinitas


Kamis, 25 April 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Pencucian lantai all area lantai dasar Selesai
2 07.30--Selesai General cleaning escalator timur barat Selesai
3 07.35-Selesai Brusing lantai kulit jeruk depan costumer service Selesai
4 08.20-Selesai General cleaning tempat wudhu mushola Selesai
5 08.30-Selesai Dry buffing all area Selesai
6 09.00-Selesai Pembersihan sarang laba laba kap lampu loby utama Selesai
7 09.05-Selesai Pembersihan pilar pilar atrium 1 Selesai
8 12.55-Selesai Pembersihan sisa cat di area koridor barat lantai 1 Selesai
9 14.00-Selesai Pembersihan lantai kanopy loby barat lantai 1 Selesai
10 14.07-Selesai suport pembersihan lakban di sekeliling caunter pin-Q Selesai
11 14.16-Selesai Pembersihan roop toop lanjut
12 14.21-Selesai Pembersihan Sisa lakban di depan papyrus Selesai
13 14.30-Selesai Pembersihan sarang laba laba parkir belakang lanjut
14 14.30-Selesai Pembersihan roop toop lanjut
15 21.00-Selesai Penyikatan anak tangga yang menuju MO Selesai
16 21.10-Selesai Brusing lantai kulit jeruk depan fizza dan dunkin donut Selesai

Rutinitas & Non Rutinitas


Jumat, 26 April 2013
No Jam Pekerjaan Keterangan
1 07.30-Selesai Dilakukan pengurasan air di parkir hypermart Selesai
2 07.32-Selesai Brusing lantai kulit jeruk depan fizza dan dunkin donuts Selesai
3 08.30-Selesai Dilakukan Zet player lantai cundblock depan mushola Selesai
4 08.35-Selesai Dry buufing all area Selesai
5 09.00-Selesai Suport pembetulan umbul umbul seasen of music Selesai
6 09.10-Selesai Spoting pilar pilar loby utama Selesai
7 14.00-Selesai Pembersihan ropp toop lanjut
8 20.20 -Selesai Suport Seting panggung acara live music Selesai
9 21.05-Selesai Dilakukan pempakuman karpet yang akan di gunakan pamera Selesai
10 21.10-Selesai Brusing lantai kulit jeruk depan fizza dan dunkin donuts Selesai

Rutinitas & Non Rutinitas


Sabtu, 27 April 2013
No Jam Pekerjaan Keterangan
1 07.30-Selesai Brusing lantai kulit jeruk Depan Customer service dan jco Selesai
2 08.30-Selesai Pencucian lantai cundblock air mancur Selesai
3 08.40-Selesai Dry buufing all area Selesai
4 09.06-Selesai Pembersihan rooling door jco Selesai
5 14.14-Selesai Pembersihan roop toop Selesai
6 21.30-Selesai Suport pemberesan panggung acara live music Selesai
7 21.30-Selesai Brusing lantai kulit jeruk Depan fizza dan dunkin donuts Selesai

Rutinitas & Non Rutinitas


Minggu, 28 April 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Brusing lantai kulit jeruk depan Customer service dan dunkin Selesai
2 08.30-selesai Dry buffing all area Selesai
3 08.48-Selesai Pembersihan sisa lakban di depan Elisabeth Selesai
4 10.14-Selesai dilakukan pempakuman pudren TPLIB Selesai
5 21.19-Selesai Suport pemasangan karpet pameran global art Selesai
6 21.30-Selesai Pencucian standing astray all area luar dalam Selesai
7 21.50Selesai suport pemberesan panggung di atrium 1,seasen of music Selesai

Rutinitas & Non Rutinitas


Senin, 29 April 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Penggantian dan pengangkatan nomet jembatan hypermart Selesai
2 07.10-Selesai Glass cleaning kaca textum Selesai
3 07.30-Selesai Dry buffing all area Selesai
4 07.40-Selesai Brusing lantai kulit jeruk drpan kfc dan j'co Selesai
5 08.55-Selesai Suport pembtulan umbul umbul Season of music Selesai
6 14.27-Selesai Pembersihan roop toop Selesai
7 14.50-Selesai Brusing lantai kulit jeruk depan Quuin café Selesai
8 14.54-Selesai Pembersihan gulma di depan trubus lanjut
9 21.37-Selesai Spoting sudut lantai anak tangga MO Selesai
10 21.47-Selesai Pencucian nomet hypermart Selesai

Rutinitas & Non Rutinitas


Selasa, 30 April 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Pencucian lantai kulit jeruk depan kfc dan j'co Selesai
2 07.30-Selesai Dry bufing all area Selesai
3 08.00-Selesai Pembersihan sisa lakban depan bread tack Selesai
4 08.00-Selesai Suport pembersihan karpet pameran puri sentosa Selesai
5 08.22-Selesai Pembersihan pilar pilar atrium 1 Selesai
6 14.03-Selesai Pembersihan reel lift Selesai
7 14.08-Selesai Pembersihan roop toop Selesai
8 20.13-Selesai Suport pemasangan karpet pameran MDS Selesai
9 21.30-Selesai Brusing lantai kulit jeruk depan j'co Selesai

Cikarang,5 Mei 2013 Mengetahui,


Dibuat Oleh

ERPAN M Gurning / Eko S


Foreman Boulding Service
ning / Eko S
ing Service
Rutinitas & Non Rutinitas
Senin, 01 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan satu selesai
2 08.11-selesai Pembersihan sisa lakban di area atrium utama selesai
3 08.35-selesai Glass cleaning kaca dalam textum selesai
4 08.42.selesai Penggantian nomet jembatan hypermart selesai
5 09.20-selesai Pemberesan karpet bekas pameran planet ocean selesai
6 14.11-selesai Pembersihan roop toop Lanjut
7 14.29-selesai Pembersihan pintu pintu axit dan bangku bangku customer selesai
8 21.05-selesai Suport penggantian karpet counter soplent QiQi selesai
9 21.11-selesai Pembersihan palang palang pintu tenant all area selesai
10 21.18-selesai Suport pemasangan karpet pameran matahari di depan erafhon selesai

Rutinitas & Non Rutinitas


Selasa, 02 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai satu dan dasar selesai
2 09.08-selesai Dilakukan pembersihan sisa lakban di area depan counter apik selesai
3 09.18-selesai Pembersiha gutter dari sampah sampah lepas di area palkir motor selesai
4 09.41-selesai General cleaning tempat wudhu mushola selesai
6 14.13-selesai Pembersihan gulma di area samping nya gontreng hypermart selesai
5 14.16-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
7 14.18-selesai Pembersihan gutter di area jalan Daha selesai
8 14.28.selesai Pembersihan roop toop Lanjut
9 21.00-selesai Pembersihan lantai teriplek di area bawah eskalator hypermart selesai
10 21.03-selesai Suport penggantian karpet counter New Hikmah selesai
11 21.11-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Rabu, 03 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai satu dan dasar selesai
2 09.00-selesai Dilakukan pembersihan dan pengeringan genangan air di area zona selesai
3 10.20-selesai Suport perbantuan pembongkaran pohon palem di area depan air mancselesai
4 12.11-selesai Pembersihan rell lift selesai
5 14.00-selesai Pembersihan roop toop selesai
6 14.10-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
7 14.48-selesai Pembersihan pintu pintu axit all area selesai
8 18.53-selesai Suport pelepasan spanduk Kharis global selesai
9 20-53-selesai Spoting dinding di area exit barat textum selesai
10 20-53-selesai Brusing manual anak tangga jembatan hypermart selesai
11 21.05-selesai Pembersihan bendhol di Area Loby barat selesai
Rutinitas & Non Rutinitas
Kamis, 04 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai satu dan dasar selesai
2 08.14-selesai Spoting landing escalator timur-barat selesai
3 08.20-selesai Deneral cleaning tempat wudhu mushola selesai
4 08.33-selesai Pembersihan grill ac atm galery selesai
5 09.55-selesai Spoting dinding axit timur textum selesai
6 14.00-selesai Pembersihan sarang laba laba di area palkir hypermart lanjut
7 14.10-selesai Pembersihan pintu pintu axit selesai
8 14.14-selesai Spoting sudut lantai di area axit toilet pria lantai satu selesai
9 15.40-selesai General cleaning lift barang selesai
10 20.15-selesai Suport pemasangan karpet untuk pameran di area depan kedai mie selesai
11 21.00-selesai Pembersihan pipa plumbing di area axit mushola selesai
12 21.21.selesai Pembersihan logo logo counter di area loby barat lantai dasar lanjut

Rutinitas & Non Rutinitas


Jum'at, 05 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
2 08.15-selesai Dilakukan pembersihan genangan air all area zona selesai
3 09.24-selesai Spoting pilar pilar rice bowl selesai
4 09.32-selesai Suport penyapuan pameran bank bukopin selesai
5 09.51-selesai Pembersihan step escalator timur menggunakan koas selesai
6 09.55-selesai Spoting landing escalator timur dan barat selesai
7 14.00-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
8 21.35-selesai Suport seting/pemasangan panggung di area atrium 2 selesai

Rutinitas & Non Rutinitas


Sabtu, 06 July 2013
No Jam Pekerjaan Keterangan
1 07.28-selesai Suport pemasangan renda renda panggung di area atrium dua selesai
2 07.35-selesai Pencucian lantai candblok air mancur selesai
3 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
4 08.40-selesai Pembersihan sarang laba laba di area atas counter baskin robins selesai
5 09.13-selesai Pembersihan list list kaca giordano selesai
6 09.32-selesai Pembersihan pilar stanlist di area textum selesai
7 09.38-selesai Perapihan karpet bekas conter K5 selesai
8 14.00-selesai Pembersihan rooptoop lanjut
9 14.31.selesai Pembersihan sarang laba laba di area palkir hypermaart selesai
10 14.30-selesai Glass cleaning kaca luar Ace hardware selesai
11 14.43-selesai Pembersihan pintu pintu axit selesai
12 17.43-selesai Pem vakuman lubang pudrain di toilet wanita barat selesai
13 21.00-selesai Suport pembersan dan perapihan panggung di atrium 2 selesai
Rutinitas & Non Rutinitas
Minggu, 07 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai kulit jeruk di depan Queen Café selesai
2 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
3 09.35-selesai Spoting anak tangga yang menuju axit Natasha selesai
4 09.40-selesai Pembersihan gutter di area palkir motor selesai
5 14.00-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
6 14,20-selesai Pembersihan roop toop lanjut
7 14.31-selesai Pembersihan gutter di area jalan daha selesai
8 14.20-selesai General cleaning toilet operasional selesai
9 14.41-selesai Pembersihan pintu pintu axit selesai
10 21.13-selesai Suport pemasangan karpet untuk pameran di loby utama selesai
11 21.25-selesai Pencucian nomet jembatan hypermart selesai
12 21.28-selesai Dilakukan pengaangkatan bangku textum selesai

Rutinitas & Non Rutinitas


Senin, 08 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai satu dan dasar selesai
2 09.07-selesai Pembersihan sisa lakban di area depan Silvana computer selesai
3 09.54-selesai Pembersihan step escalator selesai
4 14.16-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
5 14.18-selesai Pembersihan gutter di area jalan daha selesai
6 14.27-selesai Pembersihan roop toop lanjut
7 21.00-selesai Pengangkatan nomet hypermart di roop toop selesai
8 21.19-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Selasa, 09 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
2 21.00-selesai Spoting landing escalator timur dan barat selesai
3 10.45-selesai Pembersihan puing puing di counter Sincrones selesai
4 14.00-selesai Pembersihan roop toop Lanjut
5 14.39-selesai Pembersihan pintu pintu axit selesai
6 14.46-selesai Suport pembawaan cundblok dari bawah TPS ke air mancur baru selesai
7 15.36-selesai Pembersihan rell lift barang selesai
8 21.00-selesai Brusing lantai concrit di area lorong mushola selesai
9 21.21-selesai Pembersihan logo logo counter lantai satu Lanjut
Rutinitas & Non Rutinitas
Rabu, 10 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai satu dan dasar selesai
2 08.46-selesai Pembersihan pintu toilet wanita lantai satu yang sedang di renopasi selesai
3 09.00-selesai Pembersihan rell lift barang selesai
4 10.01-selesai Spoting sudut lantai badan escalator timur dan barat selesai
5 12.36-selesai Pembersihan lantai canofi loby barat selesai
6 14.00-selesai Pembersihan roop toop lanjut
7 14.19-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
8 14.21-selesai Dusting tempat sampat all area zona selesai
9 14.24.selesai Pembersihan gutter di area jalan Daha selesai
10 17.34-selesai Suport penyediaan ta'jil di mushola selesai
11 21.00-selesai Suport pemasangan karpet untuk pameran di depan Hop Hop selesai
12 21.15-selesai Pembersihan logo logo counter di area lantai satu selesai

Rutinitas & Non Rutinitas


Kamis, 11 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.30-selesai General cleaning air mancur Selesai
3 12.00-selesai Suport pemasangan karpet. Keramik yang belm selesai di atrium 3 Selesai
4 14.00-selesai General cleaning toilet operasional Selesai
5 14.30-selesai Pembersihan roop toop lanjut
6 14.37-selesai Pembersihan sarang laba laba di area palkir hypermart Selesai
7 14.14-selesai Pembersihan gutter di area jalan daha Selesai
8 17.30-selesai Suport penyediaan ta'jil di mushola selesai
9 21.23-selesai Brusing jembatan hypermart Selesai
10 21.30-selesai Pembersihan logo logo counter lantai satu Selesai

Rutinitas & Non Rutinitas


Jum'at, 12 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scruubing) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.45-selesai Pembersihan sisa lakban di samping Lotteria selesai
4 09.10-selesai Spoting landing escalator timur-barat selesai
5 09.34-selesai Pembersihan pilar stanlist Textum selesai
6 10.17-selesai Suport pemasangan umbul umbul / giant bener Upin ipin selesai
7 14.00-selesai Pembersihan roop toop lanjut
8 14.17-selesai Pembersihan gutter di area palkir motor selesai
9 17.30-selesai Suport penyediaan ta'jil di mushola selesai
10 21.00-selesai Suport pemasangan karpet untik pameran di depan hop hop selesai
11 21.13-selesai Washing lantai teras BNI sampai Hema selesai

Rutinitas & Non Rutinitas


Sabtu, 13 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai satu all area ( scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai satu dan dasar selesai
3 08.05-selesai Dilakukan pengurasan genangan air all area zona selesai
4 08.06-selesai Pembersihan sisa lakban di depan Salemba selesai
5 09.30-selesai Pembersihan logo logo matahari lantai dasar dan satu selesai
6 11.15-selesai Suport Dry buffing lantai dalam Time Zone selesai
7 14.00-selesai Pembersihan pintu pintu axit dan bangku customer all area selesai
8 17.00-selesai Suport penyediaan ta'jil di area belakan Customer servis & mushola selesai
9 18.30-selesai Dilakukan pengurasan air di area palkir hypermart selesai
10 21.28-selesai Suport pemasangan Henging Bener di atrium selesai
11 21.33-selesai Suport pemasangan karpet untuk pameran di belakang CS selesai

Rutinitas & Non Rutinitas


Minggu, 14 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 08.30-selesai Suport pelepasan semua bener Tema Dora emon selesai
3 09.00-selesai Dilakukan Zet player di area depan mushola selesai
4 14.00-selesai Pembersihan roop toop lanjut
5 17.00-selesai Suport penyediaan ta'jil di area belakan Customer servis & mushola selesai
6 21.00-selesai Pemberesan panggung di area atrium utama selesai
7 21.21-selesai pencucian karpet mushola selesai

Rutinitas & Non Rutinitas


Senin, 15 July 2013
No Jam Pekerjaan Keterangan
1 06.10-selesai Penjemuran karpet hypermart dan karpet mushola selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.34-selesai Suport penggotongan pohon palm untuk di relokasi di depan air mancurselesai
4 08.38-selesai Suport pemberesan karpet bekas pameran di depan textum selesai
5 08.30-selesai Suport pemberesan karpet bekas pameran di loby utama selesai
6 13.35-selesai Pem vakuman pudrain tempat wudhu mushola selesai
7 14.10-selesai Pembersihan gutter di area jalan Daha selesai
8 14.15-selesai Pembersihan roop toop lanjut
9 17.00-selesai Suport penyediaan ta'jil di area mushola selesai
10 21.14-selesai Pencucian karpet mushola selesai
11 21.24-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Selasa, 16 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
2 08.05-selesai Pembersihan sisa lakban di area depan counter Apik selesai
3 08.32-selesai Penjemuran karpet mushola di roop toop selesai
4 09.00-selesai Pembersihan sarang laba laba di area loby barat selesai
5 11.22-selesai Suport pemasangan henging bener di loby utama selesai
6 14.00-selesai Pembersihan roop toop lanjut
7 14.30-selesai Pembersihan bangku customer dan pintu pintu axit all area selesai
8 17.00-selesai Suport penyediaan ta'jil di area mushola selesai
9 21.00-selesai pencucian karpet mushola selesai
10 21.05-selesai Pembersihan bendhol di samping j'co selesai
11 21.10-selesai Pembersihan logo logo counter di area koridor timur klantai dasar selesai

Rutinitas & Non Rutinitas


Rabu, 17 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
2 09.00-selesai Penjemuran karpet mushola di area roop toop selesai
3 09.15-selesai Pembersihan sarang laba laba di loby utama selesai
4 13.18-selesai Pemindahan keramik proyek dari samping nersty room ke toilet wanita selesai
5 14.00-selesai Pembersihan pintu pintu axit all area selesai
6 14.10-selesai Pembersihan roop toop lanjut
7 14.36-selesai Pembersihan guttter di area jalan daha selesai
8 15.00-selesai Pembersihan rell lift barang selesai
9 17.00-selesai Suport penyediaan ta'jil di area mushola selesai
10 21.00-selesai Pembersihan dispuser mdan gril ac di area textum selesai
11 21.30-selessai Pembersihan rolling door tenat di area timur lantai dasar selesai

Rutinitas & Non Rutinitas


Kamis, 18 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) selesai
2 08.00-selesai Dry byuffing all area lantai dasar dan lantai satu selesai
3 08.30-selesai Dilakukan pengurasan genangan air di area zona selesai
4 09.11-selesai Dilakukan penutupan kabel yang melintang di area atrium 2 selesai
5 13.50-selesai Suport pembersihan Chenchoist hypermart selesai
6 14.00-selesai Pembersihan roop toop lanjut
7 14.37-selesai Pembersihan gutter di area jalan daha selesai
8 14.40-selesai Prembersihan pintu pintu axit dan bangku customer all area selesai
9 17.00-selesai Suport penyediaan ta'jil di area mushola selesai
10 21.00-selesai Suport pemasangan karpet untuk pameran di depan Papyrus selesai
11 21.10-selesai Brusing lantai concrit di area lorong mushola selesai

Rutinitas & Non Rutinitas


Jum'at, 19 July 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
2 08.18-selesai Spoting pilar antara misisipi sampai batik keris Selesai
3 09.03-selesai Suport pembersihan counter apik selesai
4 09.31-selesai Pembersihan sarang laba ;laba di area loby utama selesai
5 14.00-selesai Suport pembersihan chenchoist hypermart selesai
6 14.15-selesai Pembersihan pintu pintu axit dan bangku bangku customer all area selesai
7 16.00-selesai Suport pemasangan Umbul umbul late night sale selesai
8 17.00-selesai Suport penyediaan ta'jil di area mushola selesai
9 21.00-selesai Suport pemasangan panggung di area atrium 2 selesai

Rutinitas & Non Rutinitas


Sabtu, 20 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai concrit air mancur selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.37-selesai Pembersihan dispuser toilet di area toilet pria dasar timur selesai
4 10-18-selesai Suport pemasangan lakban di panggung acara di atrium 2 selesai
5 14.00-selesai Suport pembersihan shenchoist hypermart selesai
6 14.00-selesai Pembersihan sarang laba laba di area parkir hypermart selesai
7 14..21-selesai Pembersihan gutter di area palkir motor selesai
8 1430-selesai Dusting tempat sampah all area zona selesai
9 14.35-selesai Penmbersihan roop toop lanjut
10 17.00-selesai Suport penyediaan ta'jil di area belakan Customer servis & mushola selesai
11 21.00-selesai Suport pemberesan panggung di area atrium 2 selesai
12 21.15-selesai Pembersihan logo logo counter di area atrium 3 selesai

Rutinitas & Non Rutinitas


Minggu, 21 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai kulit jeruk di area depan Queen café selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.34-selesai General cleaning tempat wudhu mushola selesai
4 09.00-selesai Suport perapihan karpet pameran Kemang viue selesai
5 10.37-selesai Dilakukan pengurasan genangan air yang meluar dari counter hema selesai
6 14.00-selesai Pembersihan roop toop Lanjut
7 14.19-selesai Pembersihan lampu lampu taman selesai
8 14.21-selesai Dusting all area tempat sampah Zona selesai
9 17.00-selesai Suport penyediaan ta'jil di area belakan Customer servis & mushola selesai
10 21.00-selesai Dilakukan pengangkatan bangku textum selesai
11 21.22-selesai Pencucian nomet jembatan hypermart selesai

Rutinitas & Non Rutinitas


Senin, 22 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.20-selesai Glass cleaning kaca dalam textum selesai
3 07.24-selesai Dilakukan pem vakuman urinoil di toilet pria lantai satu selesai
4 11.00-selesai Suport pemasangan Giant bener di samping tembok MDS selesai
5 13.14-selesai Pembersihan segala puing puing di roop toop MDS selesai
6 14.10-selesai Pembersihan tempat sampah all area zona selesai
7 14.39-selesai Pembersihan sampah sampah di area jalan daha selesai
8 17.00-selesai Suport penyediaan ta'jil di area belakan mushola selesai
9 21.00-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Selasa , 23 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai General cleaning lift barang selesai
2 07.05-selesai Suport perapihan karpet counter puri sentosa di Depan hop hop selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 08.30-selesai Pembersihan conter bekas Sincrones selesai
5 10.00-selesai Suport pemasangan pinil di dalam bekas counter Hema selesai
6 14.00-selesai Pembersihan pintu pintu axit dan bangku bangku customer all area selesai
7 14.30-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
8 17.00-selesai Suport penyediaan ta'jil di area belakan mushola selesai
9 21.00-selesai Pembersihan roling door di area loby belakang lanjut
10 21.15-selesai Pembersihan logo logo counter di area timur lantai satu selesai

Rutinitas & Non Rutinitas


Rabu, 24 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.30-selesai Penyikatan lantai concrit di depan Hema bekas semen putih selesai
4 10.17-selesai Dilakukan pem vakuman urinoil di toilet pria barat lantai dasar selesai
5 10.36-selesai Pem vacuman di belakang counter indothai selesai
6 14.12-selesai Pembersihan roop toop Matahari lanjut
7 14.30-selesai Pembersihan pintu pintu axit all area selesai
8 14.51-selesai Suport pemasangan poster late night sale di setiap toilet selesai
9 17.00-selesai Suport penyediaan ta'jil di area belakang mushola selesai
10 21.00-selesai Pembersihan pipa plumbing di axit mushola selesai
11 21.07-selesai Pembersihan kap kap lampu textum selesai

Rutinitas & Non Rutinitas


Kamis, 25 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai satu all area ( scrubbing ) selesai
2 07.27-selesai Spoting dinding di axit barat textum selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 08.28-selesai spoting dinding di axit timur textum selesai
5 08.36selesai Pembersihan kerangka henging bener di loby utama selesai
6 13.45-selesai Suport pembersihan chenchoist hypermart selesai
7 14.16-selesai General cleaning toilet operasional selesai
8 14.22-selesai Pembersihan gulma di samping BNI Lanjut
9 14.25-selesai Dusting tempat sampah all area zona selesai
10 14.30-selesai Pembersihan rop toop Lanjut
11 17.00-selesai Suport penyediaan ta'jil di area belakang mushola selesai
12 21.00-selesai Suport relokasi counter counter yang di atrium 2 selesai

Rutinitas & Non Rutinitas


Ju'mat, 26 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai General cleaning tempat wudhu mushola selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.14-selesai Pembersihan rell lift barang selesai
4 08.30-selesai Spoting lantai satu jengkal di atas paping blok Atm galery selesai
5 09.00-selesai Pembersihan sarang laba laba di area loby utama selesai
6 14.00-selesai Pembersihan pintu pintu axit all area selesai
7 14.12-selesai Pembersihan gutter di belakang bedeng proyek selesai
8 14.30-selesai Pembersihanb roop toop Lanjut
9 14.34-selesai Dusting all area tempat sampah zona selesai
10 17.00-selesai Suport penyediaan ta'jil di area belakang mushola selesai
11 21.00-selesai Brusing lantai concrit lorong mushola selesai
12 21.21-selesai Pembersihan grill ac di area timur lantai dasar selesai
13 21.37-selesai Pembersihan kap kap lampu texum selesai

Rutinitas & Non Rutinitas


Sabtu, 27 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai cundblok air mancur Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.00-selesai Pembersihan rell lift barang Selesai
4 17.26-selesai Dilakukan pem Vacuman urinoil di toilet barat dasar pria Selesai
5 17.00-selesai Suport penyediaan ta'jil di area belakang mushola selesai

Rutinitas & Non Rutinitas


Minggu, 28 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencopotan spanduk Umbul umbul dan poster late night sale selesai
2 07.25-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.00-selesai Brusing lantai kulit jeruk depan Queen café selesai
4 08.25-selesai Suport pemasangan barigade di area lift barang yang sedang di serviceselesai
5 14.00-selesai Pembersihan pintu pintu axit all area selesai
6 17.00-selesai Suport penyediaan ta'jil di area belakang mushola selesai
7 21.18-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Senin, 29 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.15-selesai Glass cleaning kaca dalam textum selesai
3 08.19-selesai General cleaning tempat wudhu mushola selesai
4 09.00-selesai Spoting landing escalator Timur-Barat selesai
5 09.56-selesai Pencucian nomet jembatan hypermart selesai
6 14.00-selesai Pembersihan roop toop lanjut
7 14.00-selesai Pembersihan pintu pintu axit all area selesai
8 17.00-selesai Suport penyediaan ta'jil di area belakang mushola selesai
9 21.00-selesai Pembersihan pipa plumbing di area palkir hypermart selesai

Rutinitas & Non Rutinitas


Selasa, 30 July 2013
No Jam Pekerjaan Keterangan
1 07.30-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.00-selesai Penjemuran nomet jembatan hypermart di roop toop Selesai
3 09.00-selesai Suport Penggalian / pencangkulan taman di depan air mancur Selesai
4 14.00-selesai Pembersihan roop toop Lanjut
5 14.19-selesai Pembersihan lampu lampu taman selesai
6 14.21-selesai Dusting all area tempat sampah Zona selesai
7 21.00-selesai Pembersihan tanding astray all area Selesai
8 14.19-selesai Pembersihan lampu lampu taman selesai
9 14.21-selesai Dusting all area tempat sampah Zona selesai
10 21.00-selesai Pembersihan tanding astray all area Selesai

Rutinitas & Non Rutinitas


Rabu, 31 July 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scruubing) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.10-selesai Spoting landing escalator timur-barat selesai
4 09.34-selesai Pembersihan pilar stanlist Textum selesai
5 14.00-selesai Pembersihan roop toop lanjut
6 14.00-selesai Pembersihan pintu pintu axit all area selesai
7 14.30-selesai Pembersihan sarang laba laba palkiran hypermart selesai
8 21.00-selesai Pembersihan standing astray all area selesai
9 21.05-selesai Dgeneral cleaning toilet all area selesai
Cikarang,30 July 2013

Di buat oleh Di ketahui oleh

Erpan M.Gurning/ Eko .S


Foreman Building service
eterangan
Rutinitas & Non Rutinitas
kamis, 01 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu (scrubbing) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.15-selesai General cleaning tempat wudhu mushola selesai
4 09.00-selesai Spoting landing escalator Timur-Barat selesai
5 10.00-selesai Dilakukan pemVakuman Pudrain di toilet lantai satu pria selesai
6 13.30-selesai Pembersihan chenchoist hypermart selesai
7 14.00-selesai Pembersihan roop toop Lanjut
8 14.10-selesai Pembersihan pintu pintu axit all area selesai
9 14.26-selesai Pembersihan sarang laba laba di palkiran hypermart selesai
10 14.31-selesai Dusting tempat sampah zona all area selesai
11 17.30-selesai Suport penyediaan ta'jil di depan mushola selesai
12 21.10-selesai Spoting sudut lantai stanlis momo café selesai

Rutinitas & Non Rutinitas


Ju'mat, 02 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.18-selesai Dilakukan pembersihan Reklame di atas atm galery Lanjut
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.00-selesai Pembersihan sisa cat di depan counter A&K lantai satu selesai
4 14.00-selesai Pembersihan rooptoop selesai
5 14.10-selesai Pembersihan pintu pintu axit all area selesai
6 14.26-selesai Pembersihan sarang laba laba di palkiran hypermart selesai
7 17.30-selesai Suport penyediaan ta'jil di depan mushola selesai
8 21.00-selesai Suport pemasangan panggung di area atrium 2 selesai

Rutinitas & Non Rutinitas


Sabtu, 03 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pembersihan lantai cundblok di area air mancur selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 14.00-selesai Pembersihan roop toop lanjut
4 14.36-selesai Dusting tempat sampah all area zona selesai
5 14.40-selesai Pembersihan lampu lampu taman lanjut
6 14.45-selesai General cleaning Toilet operasional selesai
7 17.30-selesai Suport penyediaan ta'jil di depan mushola selesai
8 21.00-selesai Suport pemberesan panggung di atrium 2 selesai
Rutinitas & Non Rutinitas
Minggu, 04 Minggu 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai kulit jeruk di depan Queen café Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.41-selesai Pemberesan karpet sisa pameran di belakang customer service Selesai
4 21.00-selesai Penyikatan anak tangga yang menuju MO Selesai
5 14.00-selesai Pembersihan standing astray apar dan box hidrant Selesai
6 21.18.selesai Washing di area teras Atm galery sampai teras BNI Selesai
7 21.30-selesai Pencucian standing astray all area (luar dalam) Selesai
8 21.35-selesai dilakukan pengangkatan bangku textum Selesai

Rutinitas & Non Rutinitas


Senin, 05 Agustus 2013
No Jam Pekerjaan Keterangan
1 0-7.00-selesai Dry buffing all area lantai satu dan lantai dasar selesai
2 07.30-selesai Glass cleaning kaca dalam textum selesai
3 09.00-selesai Spoting landing escalator timur-barat selesai
4 09.10-selesai Pemberesan karpet sisa pameran di depan hoka hoka bento selesai
5 10.19-selesai Dilakukan pemVakuman pudrain di toilet lantai satu pria selesai
6 14.00-selesai Pembersihan pintu pintu axit all area selesai
7 14.05-selesai Pembersihan rooptoop selesai
8 14.15-selesai Pembersihan gutter di area parkiran motor selesai
9 17.30-selesai Suport penyediaan ta'jil di depan mushola selesai
10 21.28-selesai Pencucian nomet jembatan hypermart selesai

Rutinitas & Non Rutinitas


Selasa, 06 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-Selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 11.00-selesai Perapihan karpet jembatan hypermart yang sedang di jemur selesai
3 14.00-selesai Pembersihan roop toop lanjut
4 14.24-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
5 14.30-selesai Pembersihan apar standing astray dan box hydrant all area selesai
6 17.30-selesai Suport penyediaan ta'jil di depan mushola selesai
7 21.00-selesai Brusing lantai concrit samping lorong mushola selesai
Rutinitas & Non Rutinitas
Rabu, 07 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.00-selesai Suport penambahan karpet pameran matahari di depan kedai mie selesai
4 10.00-selesai Dilakukan pembersihan sisa cat di area teras Hema selesai
5 14.00-selesai Perapihan karpet jembatan hypermart yang sedang di jemur selesai
6 14.17-selesai Pembersihan roop toop lanjut
7 14.27-selesai Pembersihan gutter di area palkir motor selesai
8 14.30-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
9 17.30-selesai Suport penyediaan ta'jil di depan mushola selesai
10 21.00-selesai penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Kamis, 08 Agustus 2013
No Jam Pekerjaan Keterangan
1 10-00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 11.07-selesai Spoting sudut lantai di area toilet timur lantai dasar selesai
3 11.37-selesai dilakukan pembersihan sudut lantai stanlist momo café selesai
4 12.25-selesai General cleaning Janitor timur lantai dasar selesai
5 13.11-selesai Suport pemberesan karpet bekas pameran PKPU selesai
6 13.37-selesai Dilakukan PemVakuman di pudrain toilet pria barat lantai dasar selesai
7 21.00-selesai brusing lantai concrit samping lorong mushola selesai
8 21.15-selesai Pencucian lantai di bawah elevator Hypermart ( scrubbing ) selesai

Rutinitas & Non Rutinitas


Ju'mat, 09 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 08.30-selesai Pembersihan sarang laba laba di area palkir motor selesai
3 08.38-selesai Pembersihan area kantin selesai
4 20.21-selesai Suport pelakbanan karpet pameran scuter atrium 2 selesai
5 21.00-Selesai Washing teras Atm galery sampai teras BNI selesai
6 21.11-selesai Pembersihan air carten all area axit selesai
7 21.20-selesai Pembersihan griil ac di area loby selatan selesai
8 21.28-selesai Penyikatan anak tangga yang menuju MO selesai
Rutinitas & Non Rutinitas
Sabtu, 10 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buiffing all area lantai dasar dan lantai satu selesai
2 08.30-selesai General cleaning tempat wudhu mushola selesai
3 08.54-selesai Pembersihan saluran air di belakang fizza hut selesai
4 09.20-selesai Pembersihan gulma di area palkir hypermart Lanjut
5 20.24-selesai Dusting dinding di area lorong Embun dental clinik selesai
6 21.00-selesai dilakukan pembersihan sudut lantai stanlist momo café selesai
7 21.04-selesai Pembersihan dgrill ac di area timur lantai dasar selesai
8 21.11-selesai Brusing lantai concrit di samping lorong mushola selesai

Rutinitas & Non Rutinitas


Minggu, 11 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 09.00-selesai Pembersihan bangku bangku custmer all area selesai
3 18.23-selesai Suport perapihan spanuk renopasi air mancur selesai
4 21.07-selesai Dilakukan pengangkatan bangku textum selesai
5 21.20-selesai Pembersihan standing astray Luar dalam all area selesai

Rutinitas & Non Rutinitas


Senin, 12 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.36-selesai Glass cleaning kaca dalam textum selesai
3 08.15-selesai Pembersihan area kantin selesai
4 12.11-selesai Dilakukan pemvakuman urinoil di area toilet timur lantai dasar selesai
5 14.00-selesai Pembersihan standing astray, apar ,dan Box hidrant selesai
6 16.50-selesai dilakukan perapihan spanduk renopasi air mancur selesai
7 21.00-selesai Pembersihan air carten all area selesai
8 21.06-selesai Pembersihan lantai teriplek di bawah elevator hypermart selesai
9 2120-selesai Pencucian nomet jembatan hyprrmart selesai

Rutinitas & Non Rutinitas


Selasa, 13 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 09.47-selesai Suport pencangkulan taman di samping air mancur baru Lanjut
3 14.00-selesai Pembersihan roop toop Lanjut
4 14.25-selesai Pembersihan sarang laba laba di area palkir motor Lanjut
5 14.27-selesai Pembersihan gutter di area palkir motor Lanjut
6 14.30-selesai Pembersihan pintu pintu axit all area selesai
7 21.00-selesai Pembersihan sarang laba laba di area loby loby selesai
8 21.16-selesai Brusing jembatan hypermart selesai

Rutinitas & Non Rutinitas


Rabu , 14 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 08.30-selesai Pembersihan area kantin selesai
3 14.00-selesai Pembersihan standing astray, apar ,dan Box hidrant selesai
4 14.25-selesai Pembersihan gutter di area palkir motor selesai
5 21.19-selesai Pembersihan pilar pilar atrium utama selesai
6 21.30-selesai Pembersihan sarang laba laba di area BNI dan Queen Café selesai

Rutinitas & Non Rutinitas


Kamis , 15 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.18-selesai Pembersihan gulma di area Zona depan Lanjut
4 08.30-selesai Spoting dinding di area tangga yang menuju MO selesai
5 09.47-selesai Spoting sudut lantai di area lorong toilet barat dasar selesai
6 14.21-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
7 19.45-selesai Pembersihan toilet operasional selesai
8 21.00-selesai Penyikatan anak tangga yang menuju MO selesai
9 21.10-selesai Washing teras atm galery sampai tertas BNI selesai

Rutinitas & Non Rutinitas


Ju'mat , 16 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 09.00-selesai Spoting sudut lantai di area lorong axit toilet barat selesai
3 09.04-selesai Pembersihan sarang laba laba di area loby barat selesai
4 12.05-selesai Suport pelakbanan karpet pameran matahari di atrium utama selesai
5 14.00-selesai Pembersihan roop toop Lanjut
6 16.43-selesai Suport pemberesan spanduk edu game yang terlepas selesai
7 19.00-selesai Suport pemasangan spanduk pun bike di what on samping BNI selesai
8 21.00-selesai Brusing manual tangga axit samping Cindy selesai

Rutinitas & Non Rutinitas


Sabtu , 17 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 09.13-selesai Pembersihan gulma di area palkir depan lanjut
3 10.00-selesai Dilakukan pembersihan kotoran kucing di karpet pameran INTEX selesai
4 14.00-selesai Pembersihan roop toop lanjut
5 14.25-selesai Pembersihan pintu pintu axit all area selesai
6 14.27-selesai Pembersihan sarang laba laba di area palkir hypermart lanjut
7 14.30-selesai Pembersihan gutter di area palkir motor selesai
8 21.00-selesai Suport pemasangan pinil di counter A&K selesai
9 21.37-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Minggu , 18 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai kulit jeruk di depan Queen café selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.05-selesai Dilakukan pembersihan bangku customer yang ada coretan nya selesai
4 09.00-selesai suport pemberesan panggung bekas acar live music selesai
5 10.17-selesai Dilakukan pembersihan kotoran kucing di karpet pameran INTEX selesai
6 11.13-selesai Pembersihan lantai canopy di area tangga yang menuju NATASHA selesai
7 11.38-selesai Spoting anak tangga yang menuju axit natasha selesai
8 14.00-selesai Pembersihan roop toop lanjut
9 14.30-selesai Pembersihan tangga tangga axit all area selesai
10 14.45-selesai Pembersihan kotoran burung di axit samping PANAMA selesai
11 21.00-selesai Dilakukan pengangkatan bangku Textum selesai
12 21.20-selesai pembersihan lantai teriplek di bawah elevator Hypermart selesai
13 21.25-selesai Penyikatan anak tangga yang menuju MO selesai
14 21.30-selesai washing teras atm galery sampai teras Bni selesai
15 21.35-selesai Pencucian standing astray luar dalam all area selesai

Rutinitas & Non Rutinitas


Senin , 19 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.30-selesai Glass cleaning kaca dalam textum selesai
3 07.41-selesai Pembersihan kotoran burung di area axit samping PANAMA selesai
4 07.51-selesai General cleaning tempat wudhu mushola selesai
5 08.46-selesai Dilakukan brusing manual lantai cundblock di samping cantip pizza selesai
6 14.00-selesai dilakukan perapihan barang barang di loding mal selesai
7 14.30-selesai Pembersihan pintu pintu axit all area selesai
8 21.00-selesai Pembersihan air carten all area axit selesai
9 21.06-selesai dilakukan pembersihan sudut lantai stanlist momo café selesai
10 21.10-selesai Pencucian karpet jembatan hypermart selesai

Rutinitas & Non Rutinitas


Selasa , 20 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 09.00-selesai Dusting pilar stanlist all area textum selesai
3 09.17-selesai Dilakukan pembersihan coretan bulpaint di cubical toilet barat dasar selesai
4 10.00-selesai Penjemuran nomet ram hypermart di area roop toop selesai
5 10.31-selesai Pencopotan keseluruhan spanduk yang bertemakan Upin&Ipin selesai
6 13.00-selesai Dusting dinding di belakang posko securyty selesai
7 14.00-selesai Pembersihan roop toop lanjut
8 14.16-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
9 14.19-selesai Pembersihan gutter di area palkir motor selesai
10 14.32-selesai Pembersihan toilet operasional selesai
11 21.00-selesai pencucian lantai di bawah elevator hypermart ( scrubbing ) selesai

Rutinitas & Non Rutinitas


Rabu , 21 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.00-selesai spoting janitor di area timur lantai dasar selesai
4 10.31-selesai Dusting dinding di area bawah cermin pos securyty selesai
5 14.00-selesai Pembersihan alat alat pemadam kebakaran selesai
6 14.09-selesai Pembersihan roop toop lanjut
7 14.17-selesai Pembersihan pintu pintu axit all area selesai
8 14.19-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
9 21.00-selesai Pembersihan kap kap lampu textum selesai
10 21.13-selesai Pembersihan grill ac di area loby barat selesai

Rutinitas & Non Rutinitas


Kamis , 22 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.00-selesai Pembversihan sarang laba laba di setiap loby loby Selesai
4 09.05-selesai Pembersihan sarang laba laba di area palkir motor Selesai
5 14.14-selesai Pembersihan roop toop lanjut
6 14.16-selesai Pembersihan pintu pintu axit area cantin Selesai
7 14.54-selesai Pembersihan toilet operasional Selesai
8 21.00-selesai Suport seting untuk acara perlombaan 17 Agustusan Selesai

Rutinitas & Non Rutinitas


Ju'mat , 23 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Suport penyediaan segala sesuatu untuk acara lomba 17 agustusan selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.26-selesai Pembersihan pilar pilar di area koridor barat lantai dasar selesai
4 11.00-selesai Suport pemberesan sisa acara lomba 17 agustusan selesai
5 14.00-selesai Pembersihan roop toop lanjut
6 14.39-selesai Pembersihan bola bola lampu taman lanjut
7 21.00-selesai Pembersihan Air carten all area axit selesai
8 21.13-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Sabtu , 24 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Suport pemasangan Giant banner selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.00-selesai Pembersihan pilar pilar di area timur lantai satu selesai
4 14.00-selesai Pembersihan roop toop Lanjut
5 14.21-selesai Dusting all area tempat sampah Zona selesai
6 14.25-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
7 14.26.-selesai Pembersihan pintu pintu axit all area selesai
8 21.00-selesai Suport pemasasngan umbul umbul tema Fit healthy selesai
9 21.30-selesai Suport pemasangan karpet di area atrium 3 depan k-power selesai

Rutinitas & Non Rutinitas


Minggu , 25 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.39-selesai Glass cleaning kaca relling selesai
3 07.40-selesai pembersihan karpet soflent QIQI selesai
4 21.00-selesai Dilakukan pengangkatan bangku textum selesai
5 21.07-selesai Washing teras Depan atm galery sampai teras Bni selesai
6 21.22-selesai Brusing jembatan hypermart selesai
7 21.33-selesai Pencucian standing astray luar dalam all area selesai

Rutinitas & Non Rutinitas


Senin , 26 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.07-selesai Pembersihan sarang laba laba di area palkir motor lanjut
3 08.02-selesai Pembersihan gulma di samping matahari lanjut
4 09.09-selesai Spoting landing escalator timur_barat selesai
5 14.00-selesai Pembersihan roop toop Lanjut
6 14.21-selesai Dusting all area tempat sampah Zona selesai
7 14.25-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
8 14.26.-selesai Pembersihan pintu pintu axit all area selesai
9 21.15-selesai Pencucian nomet jembatan hypermart selesai

Rutinitas & Non Rutinitas


Selasa , 27 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 14.00-selesai Pembersihan roop toop Lanjut
3 14.21-selesai Dusting all area tempat sampah Zona selesai
4 14.25-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
5 14.26.-selesai Pembersihan pintu pintu axit all area selesai
6 21.00-selesai Pembersihan logo logo counter di area atrium 2 Lanjut
7 21.05-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Rabu , 28 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 14.17-selesai Pembersihan gutter di area jalan Daha Lanjut
4 14.20-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
5 14.33-selesai Pembersihan roop toop selesai
6 21.00-selesai Pembersihan logo logo counter di area timur lantai dasar Lanjut

Rutinitas & Non Rutinitas


Kamis , 29 Agustus 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 10.14-selesai Vacuming di area janitor lantai dasar ,timur selesai
4 14.00-selesai Pembersihan roop toop lanjut
5 14.21-selesai Pembersihan sarang laba laba di area palkir hypermart selesai
6 21.00-selesai Pembersihan air carten all area axit selesai
7 21.07-selesai Dusting sudut lantai stanlist momo kafe selesai
8 21.17-selesai Pembersihan pipa plumbing di area axit mushola selesai

Rutinitas & Non Rutinitas


jum'at , 30 Agustus 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.57-selesai dspting dinding di bawah washtafel all area toilet Selesai
3 09.17-selesai Progres saluran air palkiran atas Selesai
4 10.16-selesai Glass cleaning kaca luar atrium di area roop toop Selesai
5 14.00-selesai Pembersihan roop toop lanjut
6 14.28-selesai Pembersihan sarang laba laba di area palkitr hypermart Selesai
7 14.30-selesai Pembersihan gutter di area palkir motor Selesai
8 21.03-selesai Pembersihan sarang laba laba all area loby Selesai

Rutinitas & Non Rutinitas


Sabtu , 31 Agustus 2013
No Jam Pekerjaan Keterangan
1 `07.00-selesai Pencucian lantai cundblok air mancur Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 11.00-selesai Dgeneral cleaning bawah lemari loker mushola Selesai
4 14.19-selesai Pembersihan sarang laba laba di area palkir hypermart Selesai
5 14.24-selesai Pembersihan roop toop lanjut
6 14.18-selesai Pembersihan gutter di area palkir motor Selesai
7 17.00-selesai Suport pemasangan panggung untuk acara live music di depan textu Selesai
8 21.20-selesai Pengangkatan lemak di depan mushola Selesai
9 21.30-selesai Suport pemberesan karpet pameran matahari di area atrium utama Selesai
Rutinitas & Non Rutinitas
Minggu , 01 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Suport pemasangan panggung acara pit healty,di atrium utama selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.38-selesai Suport pemberesan panggung bekas acara live music di depan textumselesai
4 14.00-selesai pembersihan roop toop lanjut
5 14.27-selesai Pembersihan sarang laba laba di area palkir hypermart lanjut
6 21.00-selesai Pemberesan bangku textum selesai
7 21.05-selesai Brusing lantai concrit lorong samping mushola selesai
8 21.27-selesai Pencucian standing astray all area, luar dalam selesai

Rutinitas & Non Rutinitas


Senin , 02 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.05-selesai Glass cleaning kaca dalam textum selesai
3 07.15-selesai Penggantian karpet jembatan hypermart selesai
4 09.41-selesai Suport pemasangan pinil di counter bekas Hema selesai
5 14.00-selesai Pembersihan roop toop lanjut
6 14.16-selesai Pembersihan sarang laba laba di area palkir hypermart lanjut
7 14.35-selesai pembersihan gulma di samping gronteng hypermart lanjut
8 21.06-selesai pencucian karpet jembatan hypermart selesai

Rutinitas & Non Rutinitas


Selasa , 03 September 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 08.26-selesai Pembersihan kotoran burung di samping dinding matahari selesai
3 09.20-selesai Pembersihan kap kap lampu mushola selesai
4 12.38-selesai Dilakukan pembersihan dari dedaunan di atas jaring neustry taman selesai
5 14.07-selesai Pembersihan roop toop Lanjut
6 14.12-selesai Pembersihan sarang laba laba di area palkir hypermart lanjut
7 16.10-selesai suport pemasangan henging benner di area atrium dan loby utama selesai
8 21.00-selesai Pencucian lantai ( scrubbing ) di area bawah elevator hypermart selesai
9 21.08-selesai Pembersihan kak kap lampu di area textum selesai
10 21.10-selesai Brusing jembatan hypermart selesai
11 21.12-selesai Penyikatan anak tangga yang menuju MO selesai
Rutinitas & Non Rutinitas
Rabu 4 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai dasar all area ( scrubbing ) selesai
2 07.44-selesai Pembersihan sisa lakban di depan Calisto selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 10.00-selesai Suport pemasangan umbul umbul fit healty di depan Queen café selesai
5 14.00-selesai Pembersihan sarang laba laba di area palkir hypermart lanjut
6 14.10-selesai Pembersihan roop toop lanjut
7 17.21-selesai Suport glass cleaning kaca offis SPD selesai
8 21.00-selesai Pembersihan air carten all area axit selesai
9 21.05-selesai Pembersihan griil ac di area atrium 2 selesai

Rutinitas & Non Rutinitas


Kamis 5 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai satu all area ( Scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.30-selesai General cleaning tempat wudhu mushola selesai
4 08.48-selesai Pembersihan dispuser ac di area loby selatan selesai
5 09.00-selesai Penyemprotan gulma menggunakan roon up lanjut
6 11.44-selesai Spoting pilar di samping counter Namyang selesai
7 13.00-selesai Spoting sudut lantai satu jengkal di area kaca luar Ace hadware selesai
8 14.20-selesai Pembersihan sarang laba laba di area palkir hypermart lanjut
9 14.30-selesai Pembersihan roop toop lanjut
10 14.30-selesai Dusting tempat sampah all area Zona selesai
11 20.44-selesai Suport pemasangan karpet di depan Ada pasion selesai

Rutinitas & Non Rutinitas


Ju'mat 6 September 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 09.21-selesai Dusting dinding di area lorong toilet barat lantai dasar selesai
3 14.30-selesai Pembersihan roop toop selesai
4 14.36-selesai Pembersihan sarang laba laba di area palkir hypermart lanjut
5 14.38-selesai Pembersihan gutter di area palkir motor selesai
6 21.00-selesai Di lakukan Jumsih jum"at Bersih area MO selesai
7 21.10-selesai Brusing manual lantai granitt lby utama selesai
Rutinitas & Non Rutinitas
Sabtu 7 September 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 08.11-selesai Pencucian lantai cundblok loby utama selesai
3 09.00-selesai Spoting dinding di area lorong yang menuju mushola selesai
4 16.00-selesai Suport penyetingan panggung di area textum selesai
5 20.50-selesai Dilakukan pembersihan barigade di area axit Black berry selesai
6 21.07-selesai Pembersihan pipa plumbing di area lorong yang menuju mushola selesai
7 21.14-selesai Brusing manual anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Minggu 8 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Penggantian karpet jembatan hypermart selesai
2 07.20-selesai Brusing lantai kulit jeruk depan Queen café selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 08.25-selesai Suport perapihan karpet bekas pameran Quattro di atrium 3 selesai
5 09.00-selesai Suport pemberesan bekas panggung acara live music depan textum selesai
6 14.00-selesai Pembersihan roop toop selesai
7 14.29-selesai Pembersihan bola taman di area zona lanjut
8 21.00-selesai Pencucian nomet jembatan hypermart selesai
9 21.10-selesai Pencucian standing astray all area ( luar dalam ) selesai
10 21.18-selesai Washing lantai teras depan atm galery sampai depan BNI selesai
11 21.22-selesai Pengangkatan bangku textum selesai

Rutinitas & Non Rutinitas


Senin 9 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Penjemuran karpet jembatan hypermart di atas roop toop selesai
2 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 07.30-selesai Glass cleaning kaca dalam textum selesai
4 07.45-selesai Pembersihan sarang laba laba di langit langit palkir motor lanjut
5 13.37-selesai general cleaning toilet wanita lantai satu selesai
6 21.20-selesai Pembersihan lantai teriplek di bawah elevator hypermart selesai

Rutinitas & Non Rutinitas


Selasa 10 September 2013
No Jam Pekerjaan Keterangan
1 07.40-selesai Dilakukan pengurasan genangan air di all area zona selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.17-selesai Dilakukan pembersihan gulma di area depan pintu utama Matahari Lanjut
4 09.54-selesai Suport glass cleaning kaca Engineering selesai
5 14.00-selesai Pembersihan roop toop Lanjut
6 14.15-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
7 14.22-selesai penyemprotan gulma di area zonamenggunakan roon up Lanjut
8 21.00-selesai Spoting sudut lantai bawah kaca relling all area selesai
9 21.00-selesai Brusing manual lantai concrit yang menuju LPG selesai
10 21.11-selesai pencucian lantai di area bawah elevator hypermart ( scrubbing ) selesai

Rutinitas & Non Rutinitas


Rabu 11 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( scrubbing ) selesai
2 07.37-selesai Pembersihan gulma di pintu keluar timur mobil selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 14.00-selesai Pembersihan roop toop Lanjut
5 14.25-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
6 14.27-selesai Pembersihan gutter di area palkir hypermart selesai
7 14.40-selesai General cleaning toilet operasional selesai
8 21.00-selesai Spoting krap krap tangga axit yang menuju Mutiara dental clinik selesai
9 21.14-selesai Pembersihan air carten all area axit selesai

Rutinitas & Non Rutinitas


Kamis 12 September 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 08.30-selesai Spoting dinding di depan counter Welcomm selesai
3 09.00-selesai Spoting sudut sudut lantai all area lantai dasar lanjut
4 09.02-selesai Spoting dinding area depan mushola selesai
5 14.13-selesai General cleaning toilet operasional selesai
6 14.15-selesai Pembersihan roop toop lanjut
7 14.25-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
8 14.31-selesai penyemprotan gulma di area zonamenggunakan roon up Lanjut
9 21.00-selesai Brusing manual anak tangga yang menuju MO selesai
10 21.17-selesai Pembersihan pipa plumbing yang menuju Mushola selesai

Rutinitas & Non Rutinitas


Ju'mat 13 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai cundblok palkir delivery KPC dan Hoka hoka bento selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.00-selesai Pembersihan dispuser AC di toilet pria dasar selesai
4 14.15-selesai Pembersihan roop toop lanjut
5 14.25-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
6 20.30-selesai Suport pemasangan karpet di depan counter papyrus selesai
7 21.00-selesai Brusing lantai concrit samping mushola selesai
8 21.00-selesai Pembersihan pust cat depan toko mas baru selesai
Rutinitas & Non Rutinitas
Sabtu 14 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai cundblok area loby utama selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.00-selesai Pembersihan sarang laba laba all area lantai dasar selesai
4 14.00-selesai Dusting all area tempat sampah Zona selesai
5 14.15-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
6 14.20-selesai Pembersihan roop toop selesai
7 14.30-selesai Pembersihan bola bola lampu all area zona selesai
8 17.00-selesai Suport seting panggung untuk acara live music selesai
9 21.13-selesai Suport pemasangan karpet matahari di depan hoka hoka bento selesai
10 21.19-selesai Brusing manual anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Minggu 15 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai kulit jeruk di depan Queen café selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.32-selesai Vacuming washtaphel toilet pria dasar barat selesai
4 09.00-selesai Suport pemberesan panggung sisa acara live music selesai
5 09.30-selesai Suport pemasangan pinil di samping K-Power selesai
6 14.00-selesai Pembersihan roop toop lanjut
7 14.21-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
8 14.26-selesai Dusting all area tempat sampah Zona selesai
9 21.00-selesai Dilakukan pengangkatan bangku textum selesai
10 21.05-selesai Dilakukan pembersihan sisa sisa puing di dalam counter K-power selesai
11 21.10-selesai Pencucian nomet jembatan hypermart selesai
12 21.15-selesai Pencucian standing astray all area lantai satu dan dasar selesai
13 21.20-selesai Washing dari depan teras Atm galery sampai teras Bni selesai

Rutinitas & Non Rutinitas


Senin 16 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.36-selesai Pembersihan sarng laba laba di langit langit palkir motor lanjut
3 14.00-selesai Pembersihan roop toop lanjut
4 14.27-selesai Pembersihan gutter di area palkir motor selesai
5 14.30-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
6 14.34-selesai General cleaning toilet operasional selesai
7 20.07-selesai Brusing manual anak tangga exit textum timur yang menuju MO selesai
8 21.00-selesai Brusing jenbatan Hypermart selesai

Rutinitas & Non Rutinitas


Selasa 17 September 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 08.05-selesai Pembersihan sisa cat dilantai,depan counter K-Power selesai
3 09.00-selesai Pembersihan sgutter di area palkir motor selesai
4 09.42-selesai Dusting Penunjuk arah Ace hadware,Electronic solution,dunkin donuts selesai
5 11.00-selesai Pembersihan dispuser Ac toilet Cacat selesai
6 14.00-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
7 21.00-selesai Brusing lantai Granit pinggiran Loby utama selesai
8 21.04-selesai Pencucian lantai di bawah elevator hypermart ( Scrubbing ) selesai
9 21.07-selesai Pembersihan kap kap lampu di area textum selesai

Rutinitas & Non Rutinitas


Rabu 18 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.47-selesai wall cleaning Tempat wudhu mushola selesai
4 09.00-selesai Brusing manual anak tangga yang Menuju Time zone selesai
5 11.29-selesai Dusting dinding yang menuju lorong toilet timur dasar selesai
6 14.27-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
7 14.31-selesai Pembersiha roop toop Lanjut
8 14.41-selesai Pembersihan gutter di area palkir hypermart selesai
9 21.00-selesai Brusing lantai concrit lorong mushola selesai

Rutinitas & Non Rutinitas


Kamis 19 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.15-selesai Brusing manual anak tangga yang Menuju Natasha selesai
4 09.00-selesai Dusting tempat sampah all area Zona selesai
5 14.21-selesai Dusting bola lampu taman all area Zona selesai
6 14.36-selesai Pembersihan sarang laba laba di area palkir hypermart Lanjut
7 16.00-selesai Vacuming urinoil lantai dasar pria timur selesai
8 21.00-selesai Suport seting panggung acara di atrium Utama selesai
9 21.10-selesai Dilakukan pemberian Pay off di toilet timur pria dasar selesai

Rutinitas & Non Rutinitas


Jum'at 20 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dusting dak parapwt bawah kaca reling all area selesai
2 07.51-selesai Brusing lantai candblok palkir motor delivery selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 09.00-selesai Penyikatan anak tangga di area tangga matahari,samping LPG selesai
5 14.00-selesai pembersihan roop toop lanjut
6 14.22-selesai Pembersihan sarang laba laba langit langit palkir hypermart lanjut
7 14.23-selesai Pembersihan gutter palkir motor selesai
8 14.35-selesai Cleaning bola bola lampu taman selesai
9 18.23-selesai Suport pemasangan karpet di belakang Customer service selesai
10 18.25-selesai Suport pemasangan karpet di belakang Pin-Q selesai
11 20.00-selesai Suport pemberesan panggung acara di atrium utama selesai
12 20.30-selesai Suport perelokasian pameran FO dari atrium 3 ke atrium utama selesai

Rutinitas & Non Rutinitas


Sabtu 21 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai cundblok pintu masuk loby utama selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 08.30-selesai Zet spraying krap tangga batu alam air mancur selesai
4 14.00-selesai Pembershan roop toop lanjut
5 14.40selesai Dusting all area tempat sampah zona selesai
6 14.41-selesai Pembersihan sarang laba laba langit langit palkir hypermart lanjut
7 20.34-selesai Suport pemasangan karpet di area samping BATA selesai
8 21.05-selesai Pembersihan anak tangga yang menuju MO selesai
9 21.14-selesai Brusing lantai concrit lorong mushola selesai

Rutinitas & Non Rutinitas


Minggu 22 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Penggantian nomet jembatan hypermart selesai
2 07.27-selesai Brusing lantai kulit jeruk depan Queen café selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 14.28-selesai pembersihan gutter di area palkir motor selesai
5 14.29-selesai Pembersihan sarang laba laba langit langit palkir hypermart lanjut
6 20.48-selesai Suporrt perelokasian pameran cosmopillo ke depan dream studio selesai

Rutinitas & Non Rutinitas


Senin 23 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 08.32-selesai General cl;eaning tempat wudhu mushola selesai
3 08.40-selesai Glass cleaning kaca dalam textum selesai
4 09.40-selesai Suport pemasangan spandik don bosco di samping MDS selesai
5 14.28-selesai pembersihan gutter di area palkir motor selesai
6 14.29-selesai Pembersihan sarang laba laba langit langit palkir hypermart lanjut
7 14.36-selesai Vacumming di area roop toop hypermart selesai
8 21.00-selesai Pencucian nomet jembatan hypermart selesai

Rutinitas & Non Rutinitas


Selasa 24 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Penjemuran nomet jembatan hypermart ke roop toop selesai
2 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.54-selesai Suport pemasangan spanduk yang terlepas di samping BNI selesai
4 14.15-selesai Pembersihan gutter di area palkir motor selesai
5 14.17-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
6 14.23-selesai Pembersihan roop toop hypermart Lanjut
7 17.00-selesai Suport pemberesan ruang Visual selesai
8 21.00-selesai Suport perelokasian pameran FO ke atrium 3 selesai
9 21.30-selesai Suport perelokasian pameran cosmopillo dari depan Dream ke asal selesai

Rutinitas & Non Rutinitas


Rabu 25 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 11.00-selesai Suport pelakbanan stap kontak yang terlepas di area atrium utama selesai
4 14.26-selesai Pembersihan roop toop barat Lanjut
5 14.29-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
6 14.21-selesai Dusting tempat sampah all area Zona selesai
7 21.20-selesai Penyikatan anak tangga yang menuju MO selesai

Rutinitas & Non Rutinitas


Kamis 26 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) selesai
2 07.00-selesai Pembersihan kaca kanopi Area roop toop timur lanjut
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 09.00-selesai Pembersihan sarang laba laba di area pintu pintu loby selesai
5 14.00-selesai Pembersihan roop toop timur matahari selesai
6 14.18-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
7 21.00-selesai Pembersihan pipa plumbing di area axit yang menuju Mushola selesai

Rutinitas & Non Rutinitas


Jumat 27 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pembersihan kaca kanopi Area roop toop Barat lanjut
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.00-selesai Pembersihan sisa sisa semen di krap tangga atrium 3 selesai
4 14.28-selesai Pembersihan talang air roop toop timur hypermart lanjut
5 21.00-selesai Pembersihan kap kap lampu textum selesai

Rutinitas & Non Rutinitas


Sabtu 28 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai cundblok loby utama selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 14.00-selesai Pembersihan talang air roop toop timur hypermart lanjut
4 16.00-selesai Suport seting panggung acara live music , depan textum selesai
5 19.38-selesai Pembersihan lantai canovi lobi barat time zone selesai
6 21.07-selesai Brusing lantai concrit rong mushola selesai
7 21.10-selesai Pembersihan lantai teriplek bawah elevator hypermart selesai
8 21.16-selesai Penyikatan anak tangga yang menuju MO selesai
Minggu 29 September 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai area loading MLC ( Scrubbing ) selesai
2 07.30-selesai Brusing lantai kulit jeruk depan Queen café selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
4 09.00-selesai suport pemberesan panggung bekas acara live music depan textum selesai
5 14.11-selesai Pembersihan gutter di area palkir motor selesai
6 21.00-selesai Dilakukan pengangkatan bangku textum selesai
7 21.10-selesai Washing lantai teras, dari depan ATM Galery sampai depan BNI selesai
8 21.30-selesai Pencucian nomet jembatan hypermart selesai

Senin 30 September 2013


No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
2 07.15-selesai8 Glass cleaning kaca dalam textum selesai
3 09.00-selesai Penyikatan tangga darurat yang menuju Mushola selesai
4 21.00-selesai Pembersihan air carten all area axit selesai
5 21.25-selesai Suport pemasangan karpet di depan counter Pin-Q selesai

Cikarang, 30 september 2013,

Di Buat oleh Diketahui oleh

ERPAN.K M.Gurning / Eko.S


FOREMAN Building Service
Rutinitas & Non Rutinitas
Selasa, 01 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.30-selesai Brusing manual lantai cundblock loby selatan selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu selesai
3 09.23-selesai Suport penyiraman pohon di area roop toop belakang MO selesai
4 14.00-selesai Pembersihan roof toof Lanjut
5 14.13-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
6 14.16-selesai Pembersihan gutter di area palkiran motor selesai
7 19.00-selesai Suport perapihan spanduk Edu game di samping MDS selesai
8 21.00-selesai Pencucian lantai bawah elevator hypermart ( Scrubbing ) selesai
9 21.10-selesai Spoting badan dinding escalator timur barat selesai
10 21.30-selesai Suport pemasangan karpet Inovasion stork di area atrium 1 selesai

Rutinitas & Non Rutinitas


Rabu, 02 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) selesai
2 07.30-selesai Pembersihan neon Box/papan reklame yang di atas atm galery Lanjut
3 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
4 09.47-selesai Pembersihan gutter di area palkir Motor selesai
5 14.20-selesai Pembersihan roof toof selesai
6 14.22-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
7 14.30-selesai Pembersihan bola bola lampu taman all area selesai
8 21.00-selesai Pembersihan kap kap lampu textum selesai

Rutinitas & Non Rutinitas


Kamis, 03 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) selesai
2 07.30-selesai Pembersihan neon Box/papan reklame yang di atas atm galery selesai
3 08.00-selesai Dry buffing all area lantai dasar dan satu selesai
4 08.39-selesai General cleaning tempat wudhu mushola selesai
5 09.08-selesai Pembersihan Hexsospan di area toilet pria lantai dasar timur selesai
6 14.17-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
7 14.21-selesai Pembersihan roof toof barat Lanjut
8 21.13-selesai Penyikatan anak tangga di axit yang menuju Natasha selesai
Rutinitas & Non Rutinitas
Jumat, 04 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.06-selesai Brusing lantai candblok palkiran Delivery Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.31-selesai pembersihan segala sesuatu bersifat sampah di belakang Kedai mie Selesai
4 14.16-selesai Pembersihan roof toof area bundaran Selesai
5 14.20-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
6 21.23-selesai Penyuikatan anak tangga axit yang menuju LPG,area timu Selesai
7 21.29-selesai Brusing manual area lantai concrit saming lorong mushola Selesai
8 21.30-selesai Pembersihan pipa plumbing di area langit langit palkir hypermart Lanjut

Rutinitas & Non Rutinitas


Sabtu, 05 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Suport pemasangan giant benner Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 12.33-selesai Suport pemberesan /perapihan dan penataan batu alam air mancur Selesai
4 14.00-selesai Suport pemasangan henging banner Selesai
5 14.26-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
6 14.29-selesai Pembersihan gutter di area palkir Motor selesai
7 14.30-selesai Pembersihan roof toof Lanjut
8 21.00-selesai Penyikatan anak tangga yang menuju MO Selesai
9 21.10-selesai Suport perapihan / pemberesan karpet pameran inovasion stork Selesai

Rutinitas & Non Rutinitas


minggu, 06 Oktober 2013
No Jam Pekerjaan Keterangan
1 06.00-selesai Refreshing senam bersama seluruh cruw FDU Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.00-selesai Suport pemasangan umbul umbul Selesai
4 14.00-selesai Pembersihan roof toof lanjut
5 20.00-selesai Suport pemasangan karpet untuk pameran Pajakdi depan calisto Selesai
6 21.00-selesai Suport pemberesan panggung besar di area atrium utama Selesai
7 21.05-selesai Pemberesan dan pengangkatan bangku textum Selesai
8 21.10-selesai Pencucian standing astray luar dalam all area Selesai
Rutinitas & Non Rutinitas
Senin, 07 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pembersihan dak parapet bawah kaca reling all area Selesai
2 07.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 07.10-selesai Glass cleaning kaca dalam textum Selesai
4 07.45-selesai Penyikatan anak tangga, axit yang menuju mushola Selesai
5 14.29-selesai Pembersihan saluran air , area jalan Daha Selesai
6 21.00-selesai Pencucian nomet jembatan hypermart Selesai
7 21.18-selesai Penyikatan anak tangga ram Hypermart Selesai

Rutinitas & Non Rutinitas


Selasa, 08 Oktober 2013
No Jam Pekerjaan Keterangan
1 06.52-selesai Penjemuran nomet hypermart di area roof toof selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.33-selesai Spoting landing escalator Timur-Barat selesai
4 09.00-selesai General cleaning tempat wudhu mushola selesai
5 09.46-selesai Pembersihan saluran air area palkiran motor selesai
6 21.00-selesai Spoting dinding di area lorong axit barat textum selesai
7 21.08-selesai Pencucian bawah escalator hypermart ( Scrubbing ) selesai
8 21.18-selesai Penyikatan lantai granit loby utama selesai
9 21.31-selesai Suport pemasangan sekaligus penggantian karpet jajanan pasar selesai

Rutinitas & Non Rutinitas


Rabu, 09 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) Selesai
2 07.29-selesai Suport pemberesan /perapihan dan penataan batu alam air mancur Selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
4 09.00-selesai Pembersihan kap kap lampu di area textum Selesai
5 09.13-selesai Vacuming pud rain toilet wanita barat Selesai
6 10.00-selesai Pembersihan gullma di area samping kantip fizza hut Selesai
7 13.45-selesai Pembersihan lantai canovi loby barat time zone Selesai
8 21.09-selesai Pemykatan anak tangga yang menuju MO Selesai
9 21.28-selesai Zet splaying Nomet axit pos security Selesai
Rutinitas & Non Rutinitas
Kamis, 10 Oktober 2013
No Jam Pekerjaan Keterangan
1 08-00.selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.21-selesai Penyikatan lantai cunblock di area belakang Calisto Selesai
3 09.21-selesai Pembersihan gulma di area depan Queen café Selesai
4 14.00-selesai Pembersihan roof toof Lanjut
5 14.30-selesai Pembersihan saluran air area palkiran motor selesai
6 16.46-selesai Pembersihan dinding di lorong axit dental cleaning yang menuju 21 Selesai
7 21.01-selesai Cleaning Air carten all area axit Selesai

Rutinitas & Non Rutinitas


Jum'at, 11 Oktober 2013
No Jam Pekerjaan Keterangan
1 08-00.selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.10-selesai Suport perelokasian pushcat dari toko mas baru,ke depan mister baso Selesai
3 11.27-selesai Pembersihan sarang laba laba di area loby barat Selesai
4 13.15-selesai Cleaning sampah lepas di area taman, di samping batagor bandung Selesai
5 14.19-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
6 14.23-selesai Pembersihan saluran air area palkiran motor selesai
7 14.30-selesai Pembersihan roof toof Lanjut
8 21.10-selesai Penyikatan anak tangga di area tangga ram Hypermart Selesai
9 21.26-selesai Pembersihan pipa plumbing di area lorong mushola Selesai

Rutinitas & Non Rutinitas


Sabtu, 12 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai cundblok loby utama sampai dengan air mancur Selesai
2 08-00.selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.41-selesai Penikatan lantai concrit area axit timur 21 Selesai
4 09.00-selesai Zet spraying krap tangga batu alam air mancur Selesai
5 09.46-selesai Pembersihan sarang laba laba di areav loby selatan Selesai
6 14.00-selesai Pembersihan gutter di area jalan Daha Lanjut
7 14.20-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
8 14.27-selesai Pembersihan roof toof di area Bundaran Lanjut
9 21.16-selesai Suport seting panggung di area depan salemba Selesai
Rutinitas & Non Rutinitas
Minggu, 13 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai kulit jeruk di depan Queen café Selesai
2 08-00.selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.27-selesai Dilakukan pengurasan genangan air all area zona Selesai
4 21.05-selesai Suport perapihan dan pemberesan panggung di area depan salemba Selesai
5 21.00-selesai Pengangkatan dan perapihan bangku textum Selesai
6 21.30-selesai Pencucian standing astray all area (luar dalam ) Selesai

Rutinitas & Non Rutinitas


Senin, 14 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.39-selesai Dilakukan pembersihan gutter di samping Mushola Selesai
3 14.00-selesai Pembersihan roof toof Lanjut
4 14.13-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
5 14.30-selesai Pembersihan pintu pintu axit all area Selesai
6 21.00-selesai Pebersihan rolling door area atrium 3 Selesai
7 21.10-selesai Penyikatan anak tangga di area tangga ram Hypermart Selesai
8 21.16-selesai Pencucian nomet jembatan hypermart Selesai

Rutinitas & Non Rutinitas


Selasa, 15 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Penjemuran nomet jembatan hypermart ke atas roof toof Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 07.55-selesai Pembersihan pilar pilar area depan missisipi sampai Batik keris Selesai
4 09.15-selesai Pemberesan/Perapihan karpet bekas pameran PKPU,di samping Bata Selesai
5 09.23-selesai Suport perapihan umbul umbul yang terlepas di bawah polsent Fizza Selesai
6 14.26-selesai Pembersihan gutter di area Jalan Daha Selesai
7 21.00-selesai Perapihan/perapihan karpet bekas pameran matahari di depan ada pasio Selesai
8 21.08-selesai Brusing tangga jembatan hypermart Selesai
9 21.11-selesai Penyikatan anak tangga yang menuju MO Selesai

Rutinitas & Non Rutinitas


Rabu, 16 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) Selesai
2 07.03-selesai Suport perapihan karpet bekas pameran di area depan pin-Q Selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
4 09.55-selesai Penyikatan anak tangga yang menuju Mushola Selesai
5 14.00-selesai Pembersihan roof toof Lanjut
6 18.20-selesai Suoport perelokasian pushcat dari axit A&K ke depan Enginering Selesai
7 21.05-selesai Pembersihan air carten all area axit Selesai
8 21.11-selesai Pembbersihan grill ac di area loby barat Selesai

Rutinitas & Non Rutinitas


Kamis, 17 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.42-selesai Pembersihan sarang laba laba di area pintu masuk calisto selesai
4 14.00-selesai Suport pencopotan spanduk Aldo computer di wat's On MDS selesai
5 14.21-selesai Pembersihan gulma di area samping matahari pintu masuk timur mobil selesai
6 14.27-selesai Pembersihan roof toof Lanjut
7 14.30-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
8 14.33-selesai Pembersihan saluran air di area jalan Daha selesai
9 21.00-selesai Pembersihan kap lampu di area textum selesai
10 21.16-selesai Vacuming karpet mushola MO selesai

Rutinitas & Non Rutinitas


Jum'at, 18 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Zet spraying di area belakang toilet operasional. selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.29-selesai Penyiraman lantai cundblok bekas semen putih di area belakang calisto selesai
4 09.15-selesai Dilakukan pembersihan gulma di area belakang calisto selesai
5 14.21-selesai Pembersihan gulma di area samping matahari pintu masuk timur mobil selesai
6 14.30-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
7 20.28-selesai Suport pemasangan karpet untuk psmeran widia dara di depan ada pasioselesai
8 21.00-selesai Suport pemasangan panggung di area atrium 2 selesai

Rutinitas & Non Rutinitas


Sabtu, 19 Oktober 2013
No Jam Pekerjaan Keterangan
1 06.53-selesai Suport pembersihan ruangan enginering Selesai
2 07.31-selesai Pencucian lantai cundblok di area loby utama sampai air mancur Selesai
3 09.00-selesai Zet spraying krap tangga batu alam air manur Selesai
4 09.12-selesai Dilakukan pembersihan Bendhol di area timur lantai dasar Selesai
5 14.20-selesai Pembersihan box hydran all area palkiran Selesai
6 14.22-selesai Pembersihan gulma di area samping matahari pintu masuk timur mobil selesai
7 14.26-selesai Pembersihan roof toof Selesai
8 14.34-selesai Pembersihan saluran air di area jalan Daha selesai
9 20.09-selesai Suport pemasangan karpet pameran gran cikarang center di belakang CSSelesai
10 21.09-selesai penyikatan anak tangga yang menuju MO Selesai

Rutinitas & Non Rutinitas


Minggu, 20 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lanttai kulit jeruk depan Queen café Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.00-selesai Dilakukan pengurasan genangan air all area zona Selesai
4 08.42-selesai Pembersihan sarang laba laba di area langit langit palkir motor Lanjut
5 14.14-selesai Pembersihan roop toop area timur Lanjut
6 14.19-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
7 14.22-selesai Pembersihan saluran air di area jalan daha Lanjut
8 21.00-selesai Dilakukan perapihan dan pengangkatan bangku textum Selesai
9 21.12-selesai Pencucian standing astray all area Selesai
10 21.23-selesai Washing dari depan teras Atm galerry sampai teras Bni Selesai
11 21.29-selesai Pencucian nomet jembatan hypermart Selesai

Rutinitas & Non Rutinitas


Senin, 21 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.00-selesai Glass cleaning kaca dalam textum Selesai
3 11.00-selesai Suport pembersihan Lift barang / Chenchoist hypermart Selesai
4 14.00-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
5 14.23-selesai Dilakukan pembersihan Gulma di area pintu masuk mobil samping MDS Lanjut
6 14.30-selesai Pembersihan roof toof Selesai
7 21.00-selesai Suport pemasangan Bener LOVE LOLY di area Bekas counter A&K Selesai
8 21.10-selesai Pembersihan sudut lantai stanlist momo café Selesai

Rutinitas & Non Rutinitas


Selasa, 22 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Vacuming Washtapel toilet pria lantai dasar timur Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.39-selesai Brusing manual lantai concrit area lorong mushola Selesai
4 10.55-selesai Pembersihan stap stap Escalator all area Selesai
5 14.00-selesai Dusting all area tempat sampah Zona Selesai
6 14.09-selesai Pembersihan roof toof Lanjut
7 21.00-selesai Pembersihan kap kap lampu Textum Selesai
8 21.10-selesai Brusing lantai cundblock di area belakang Fizza Selesai
9 21.20-selesai Brusing manual lantai Granit sudut sudut, area loby utama Selesai

Rutinitas & Non Rutinitas


Rabu, 23 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.00-selesai Pembersihan bendhol area timur lantai dasar Selesai
4 10.00-selesai Suport pemberesan Karpet bekas pameran Pajak, Area depan Calisto Selesai
5 14.16-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
6 14.20-selesai Pembersihan saluran air di area jalan Daha Selesai
7 14.27-selesai Pembersihan gulma di area samping MDS Selesai
8 14.30-selesai Pembersihan roof toof Selesai
9 21.10-selesai Pembersihan Air carten all area axit Selesai
10 21.10-selesai Penyikatan anak tangga di area atrium 3 Selesai

Rutinitas & Non Rutinitas


Kamis, 24 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.34-selesai Penyiraman taman di area Dekat halte menggunakan Karbol, Selesai
4 08.40-selesai Suport Pemasangan Bener Sekolah dian harapan, di area depan MDS Selesai
5 10.30-selesai General cleaning toilet baru Selesai renopasi di area TPL1B Selesai
6 14.15-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
7 21.00-selesai Brusing Lantai cundblok area palkir Delivery Selesai
8 21.05-selesai Penyikatan Anak tangga yang menuju MO Selesai

Rutinitas & Non Rutinitas


Jum'at, 25 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing Lantai cundblok area palkir Delivery Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.00-selesai Pembersihan Bendhol di area lantai dasar barat Selesai
4 14.27-selesai Pembersihan roof toof lanjut
5 14.33-selesai Pembersihan Gulma di area samping Gronteng Hypermart, lanjut
6 14.34-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
7 14.36-selesai Pembersihan saluran air di area jalan Daha lanjut
8 21.00-selesai Suport pemasangan dan Penyetingan panggung di atrium 2 Selesai

Rutinitas & Non Rutinitas


Sabtu, 26 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Progres kaca Canopy area loby barat selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.00-selesai Pembersihan bendhol di area loby barat lantai dasar selesai
4 14.16-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
5 14.22-selesai Pembersihan roof toof selesai
6 14.32-selesai Pembersihan saluran air di area jalan Daha selesai
7 14.39-selesai Pembersihan Gulma di area samping Gronteng Hypermart, Lanjut
8 21.00-selesai Suport pemberesan dan perapihan panggung di area atrium 2 selesai
9 21.23-selesai Dilakukan pembersihan lantai triplek bawah elevator hypermart selesai

Rutinitas & Non Rutinitas


Minggu, 27 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai cundblock area palkir Delivery Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.06-selesai Dusting dinding pilar di area loby barat lantai dasar Selesai
4 14.16-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
5 14.23-selesai Pembersihan gutter di area palkir motor Selesai
6 21.23-selesai Penyikatan anak tangga yang menuju MO Selesai

Rutinitas & Non Rutinitas


Senin, 28 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 07.30-selesai Glass cleaning kaca dalam area Textum Selesai
3 08.00-selesai General cleaning tempat wudhu mushola Selesai
4 09.25-selesai Spoting Sudut lantai satu jengkal dari Cundblok di area Loby selatan Selesai
5 21.00-selesai Pembersihan pipa plumbing Di area Lorong mushola Selesai
6 21.16-selesai Penyikatan anak tangga area Atrium 3 Selesai
7 21.25-selesai Pencucian Nomet jembatan Hypermart Selesai
8 21.29-selesai Pembersihan Air carten all area Exit Selesai

Rutinitas & Non Rutinitas


Selasa, 29 Oktober 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.48-selesai Pembersihan sarang laba laba all area pintu masuk Selesai
3 14.00-selesai Pembersihan rof toof Lanjut
4 14.21-selesai Pembersihan gutter di area palkir hypermart Selesai
5 14.23-selesai Pembersihan saluran air di area palkir hypermart Selesai
6 21.00-selesai Pembersihan Air carten all area Exit Selesai
7 21.06-selesai Pembersihan rolling Door area atrium 3 Selesai
8 21.06-selesai Penyikatan anak tangga area Atrium 3 Selesai

Rutinitas & Non Rutinitas


Rabu, 30 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) Selesai
2 08.00-selesai General Cleaning tempat wudhu Mushola Selesai
3 08.15-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
4 08.51-selesai Spoting landing Escalator all area Selesai
5 14.12-selesai Pembersihan saluran air Area palkir Motor Selesai
6 14.14-selesai Pembersihan sarang laba laba di langit langit palkiran hypermart Lanjut
7 21.00-selesai Vacuming Karpet mushola MO Selesai
8 21.08-selesai Pencucian lantai Bawah Elevator hypermart ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Kamis, 31 Oktober 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.00-selesai Opening Soon Elisabeth ,Suport Glasss Cleaning kaca Selesai
4 10.00-selesai Suport pemberesan pager BRC samping loding Electronik Solotion Selesai
5 10.46-selesai Vacuming pood rain toilet pria dasar timur Selesai
6 14.35-selesai Pembersihan Roof toof Lanjut
7 21.00-selesai Pembersihan Bendhol area loby barat Lanjut
8 21.30-selesai Suport Pemasangan Vinil di area Noya salon Selesai

Cikarang, 31 Oktober 2013,

Di Buat oleh Diketahui oleh


ERPAN.K M.Gurning / Eko.S
FOREMAN Building Service
Rutinitas & Non Rutinitas
Jum'at, 01 November 2013
No Jam Pekerjaan Keterangan
1 07.13-selesai Washing lantai teras loby selatan Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.04-selesai Suport pemasangan karpet pameran di area depan Ada fasion Selesai
4 10.38-selesai Pembersihan sisa cat di lantai area depan Elizabeth Selesai
5 14.20-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
6 14.37-selesai Suport pemasangan Candblok di antara pipa hydrant palkir Motor Lanjut
7 21.02-selesai Pembersihan Grill ac di area koridor timur lantai dasar Selesai
8 21.04-selesai Suport Pemasangan panggung di area atrium 2 Selesai

Rutinitas & Non Rutinitas


Sabtu, 02 November 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.21-selesai Suport pemasangan Giant Banerr Selesai
3 14.22-selesai Pembersihan gulma di area Loby utama Selesai
4 14.26-selesai Pembersihan pintu pintu axit all area Selesai
5 21.00-selesai pemberesan panggung di area atrium 1 dan 2 Selesai

Rutinitas & Non Rutinitas


Minggu, 03 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai kulit jeruk depan Queen café Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.10-selesai pembersihan sisa lakban di area atrium satu Selesai
4 08.40-selesai pembersihan sarang laba laba di area loby utama Selesai
5 14.00-selesai pembersihan area roof toof lanjut
6 14.27-selesai pembersihan stanlist pintu dan kaca engineering Selesai
7 14.39-selesai Dusting tempat sampah all area zona Selesai
8 21.04-selesai Penyikatan anak tangga yang menuju MO Selesai
9 21.08-selesai Washing lantai teras depan teras ATM galerry sampai depan BNI Selesai
10 21.13-selesai Pencucian nomet jembatan hypermat Selesai
11 21.17-selesai Pengangkatan bangku textum Selesai
12 21.24-selesai Pencucian standing AstrayAll area Selesai
Rutinitas & Non Rutinitas
Senin, 04 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 07.06-selesai Vacuming puud rain Toilet timur dasar Selesai
3 07.18-selesai Glass claning kaca dalam textum Selesai
4 08.53-selesai Penyikatan anak tangga EXIT yang menuju musola Selesai
5 09.43-selesai Pembersihan sarang laba laba di area loby utama Selesai
6 12.13-selesai Pembersihan ruang AHU hypermart lanjut
7 21.02-selesai Pembersihan Air carten all area Exit Selesai
8 21.17-selesai Pembersihan logo tenant area loby selatan Selesai
9 21.20-selesai Penyikatan anak tangga hypermart Selesai
10 21.21-selesai Brushing jembatan hypermart Selesai

Rutinitas & Non Rutinitas


Selasa, 05 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai cunblock loby utama sampai air mancur selesai
2 07.44-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.17-selesai Pembersihan gutter parkir motor selesai
4 08.22-selesai Pembersihan sarang laba laba area loby barat selesai
5 08.46-selesai Spoting landing Escalator timur-barat selesai
6 09.20-selesai Spoting wall cleaning all area Exit menuju toilet selesai
7 10.48-selesai Suport Vacuming area timezone ( Kebocoran Pipa AC ) selesai
8 21.06-selesai Penyikatan lantai granit loby utama selesai
9 21.09-selesai Spoting sudut lantai All area lantai dasar selesai
10 21.19-selesai Pencucian lantai bawah elevator hypermart ( Scrubbing ) selesai
11 21.22-selesai Zet spraying belakang pos security selesai

Rutinitas & Non Rutinitas


Rabu, 06 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai All area lantai dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 14.32-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
4 14.34-selesai Pembersihan Gutter di area Jalan Daha Lanjut
5 14.42-selessai Pembersihan gutter di area palkir motor Selesai
6 14.56-selesai pembersihan stanlist pintu dan kaca engineering Selesai
7 21.11-selesai Pembersihan Air carten all area Exit Selesai
8 21.20-selesai Wall Cleaning di area Lorong Textum yang menuju LPG Selesai
Rutinitas & Non Rutinitas
Kamis, 07 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.49-selesai Spoting sudut lantai pintu Kusen all area Axit Selesai
4 10.08-selesai Vacuming ouud rain toilet dasar timur ( air Meluap dari Janitor ) Selesai
5 13.08-selesai Pembersihan segala sesuatu sampah di bawah tanjakan TPS Selesai
6 14.46-selesai Pembersihan Gutter di area jalan daha Selesai
7 14.54-selesai Pembersihan Roof toof Selesai
8 21.00-selesai Spoting sudut lantai bawah elevator Hypermart Selesai

Rutinitas & Non Rutinitas


Ju'mat, 08 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brusing lantai Cundblock palkir Delivery Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.30-selesai Pengeringan genangan air all area Zona Selesai
4 09.33-Selesai Spoting anak tangga Exit yang Menuju Natasha Selesai
5 14.19-selesai Pembersihan Gutter area Jalan Daha Lanjut
6 14.27-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
7 14.30-selesai Pembersihan Roof toof Lanjut
8 20.00-selesai zet spraying Cundblok palkir Delivery Selesai
9 21.20-selesai Wall Cleaning Area lorong Textum Exit timur Selesai

Rutinitas & Non Rutinitas


Sabtu, 09 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai Cundblock Dari depan Loby utama sampai Air mancur Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.00-selesai Pengeringan genangan air all area Zona Selesai
4 09.15-selesai Plapon Cleaning Area Loby barat Dasar Selesai
5 14.00-selesai Pembersihan Gutter area Jalan Daha Lanjut
6 14.18-selesai Dusting all area Tempat sampah Zona Selesai
7 14.19-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
8 14.27-selesai Pembersihan Roof toof Lanjut
9 21.09-selesai Penikatan anak tangga Hypermart Selesai
10 21.16-selesai Pencucian lantai bawah Elevator Hypermart ( Scrubbing ) Selesai
11 21.19-selesai Brusing cundblock area Belakang Fizza Samping Sampit Fizza Selesai
12 21.14-selesai Brusing Jembatan Hypermart Selesai
Rutinitas & Non Rutinitas
Minggu, 10 November 2013
No Jam Pekerjaan Keterangan
1 07.53-selesai Perapihan Panggung palet Sisa Acara Live music,Area Depan Textum Selesai
2 08.00-selesai Brushing lantai kulit jeruk Depan Queen Café Selesai
3 08.30-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
4 14.27-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
5 14.30-selesai Pembersihan gutter jalan Daha Selesai
6 14.35-selesai Pembersihan Roof toof Selesai
7 21.08-selesai Perapihan Dan Pengangkatan Bangku Textum Agenda rutin Mingguan Selesai
8 21.18-selesai Pencucian Nomet Jembatan Hypermart Selesai
9 21.22-selesai Washing Teras Atm galeryy sampai Teras BNI Selesai

Rutinitas & Non Rutinitas


Senin, 11 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 07.25-selesai Glass Cleaning kaca dalam Textum Selesai
3 09.00-selesai Pembersihan Ruangan Genset Selesai
4 09.10-selesai Penyikatan sudut lantai marmer Loby utama Selesai
5 09.23-selesai Suport pembetulan / perapihan spanduk yang terlepas di Samping MDS Selesai
6 14.10-selesai Pembersihan Gutter di area jalan Daha Lanjut
7 14.16-selesai Pembersihan Ruang AHU hypermart Lanjut
8 21.26-selesai Pembersihan Grill ac area Loby barat Selesai

Rutinitas & Non Rutinitas


Selasa, 12 November 2013
No Jam Pekerjaan Keterangan
1 07.30-selesai Pencucian Tong sampah all area zona Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.38-selesai Suport Perelokasian Pustcat Dari Ruang Engineering ke depan mas BaruSelesai
4 14.00-selesai Penmbersihan Roof toof Selesai
5 14.18-selesai Pembersihan Gutter area Jalan Daha Selesai
6 21.00-selesai Cleaning air carten all area Axit Selesai
7 21.13-selesai Pencucian lantai bawah Telepator Hypermart ( Scrubbing ) Selesai
8 21.27-selesai Vacuming Urinoil Toilet pria MO, Selesai
Rutinitas & Non Rutinitas
Rabu, 13 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantar all area lantai dasar ( Scrubbing ) selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 14.00-selesai Pembersihan Gutter area Jalan Daha Lanjut
4 14.18-selesai Dusting all area Tempat sampah Zona Selesai
5 14.19-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
6 16.35-selesai Suport Perapihan Dan pemberesan Gudang samping Inul Vista selesai
7 21.13-selesai Suport pemasangan Karpet untuk pameran di depan Hoka hoka Bento Selesai
8 21.12-selesai Brushing lantai concrit area Lorong mushola selesai
9 21.15-selesai Penyikatan anak tangga Yang Menuju Mo selesai
10 21.23-selesai Suport Pencucian karung Goni atribut Pemadam selesai

Rutinitas & Non Rutinitas


Kamis, 14 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai General Cleaning Escalator Timur-Barat Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 09.07-selesai Wall Cleaning Lorong Exit Manageman Selesai
4 14.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
5 21.00-selesai Pembersihan Box hidrant all area Zona Selesai
6 21.03-selesai Washing lantai Area Cantin Selesai
7 21.25-selessai Cleaning air carten all area Exit Selesai
8 21.30-selesai Cleaning Dispuser Dan Grill Ac area Timur Lantai Dasar Selesai

Rutinitas & Non Rutinitas


Jum'at, 15 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Sweeping Moping all area Tangga Exit Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 21.00-selesai Pengeringan genangan air all area Zona Selesai
4 09.00-selesai Spoting Tempat Wudhu Mushola Selesai
5 09.22-selesai Cleaning segala sesuatu sampah, kolong jembatan palkiran naik Motor Selesai
6 09.54-selesai Pembersihan In door Ruang AHU hypermart Selesai
7 21.05-selesai Suport Pemasangan karpetuntuk pameran di depan Counter Pin-Q Selesai
8 21.16-selesai Vacuming Karpet musola MO Selesai
Rutinitas & Non Rutinitas
Sabtu, 16 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dilakukan Pengeringan genangan air all area Zona Selesai
2 07.30-selesai Pencucian Lantai Cundblok loby utama sampai Dengan air mancur Selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
4 09.00-selesai Wall Cleaning all area Lorong Exit yang menuju toilet Selesai
5 10.30-selesai Pembersihan Gulma di area Samping Sampit Pizza Hut Selesai
6 14.18-selesai Progres Area AHU hypermart Lanjut
7 14,34-selesai Dusting all area Tempat sampah Zona Selesai
8 17.00-selesai Suport pemasangan Panggung palet untuk acara Live music,area Textu Selesai
9 21.00-selesai Pencucian lantai area Bawah elevator hypermart Selesai
10 21.10-selesai Vacuming Karpet mushola Selesai
11 2116-selesai Penyikatan anak tangga yang menuju MO Selesai
12 21.20-selesai Penyikatan anak tangga hypermart Selesai
13 21.23-selesai Cleaning Roling Doorr area Loby barat Lantai Satu Lanjut

Rutinitas & Non Rutinitas


Minggu, 17 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dilakukan Pengurasan genangan air all area Zona Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.30-selesai Plapon Cleaning Area Loby selatan Lanjut
4 14.00-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
5 14.30-Selesai Pembersihan Roof toof Lanjut
6 21.00-selesai Pengangkatan bangku textum Selesai
7 21.30-selesai Washing Standing astray all area Selesai

Rutinitas & Non Rutinitas


Senin, 18 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 07.19-selesai Glass Cleaning Kaca dalam Textum Selesai
3 08.51-selesai Cleaning Kap lampu Area Loby utama Lanjut
4 14.00-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
5 14.30-selesai Pembersihan Roff toof Lanjut
6 21.00-selesai Penyikatan anak tangga Exit yang Menuju Natasha Selesai
7 21.31-selesai Cleaning Grill Ac area Lantai Dasar Lanjut
Rutinitas & Non Rutinitas
Selasa, 19 November 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.15-selesai Washing all area Tempat sampah Zona Selesai
3 09.32-selesai Dilakukan Pembersihan sisa Lem di lantai area Samping O'crepes Selesai
4 14.28-selesai Progres penurunan Puing Ruang AHU Lanjut
5 14.38-selesai Pembersihan Gutter Area jalan Daha Lanjut
6 17.52-selesai Suport Penutupan Counter Pondok pujian Menggunakan Pinil Selesai
7 21.14-selesai Penyikatan Lantai Granit Pinggiran Loby Utama Selesai
8 21.21-selesai Pencucian lantai Bawah Elevator Hypermart ( Scrubbing ) Selesai
9 21.37-selesai Cleaning all area Air carten Semua Exit Selesai

Rutinitas & Non Rutinitas


Rabu, 20 November 2013
No Jam Pekerjaan Keterangan
1 07.30-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 09.33-selesai Perapihan Dan Pemberesan Sisa Ledakan simulasi Kebakaran Selesai
3 14.10-selesai Progres penurunan Puing Ruang AHU Lanjut
4 14.33-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
5 14.55-selesai Progres Gutter area jalan Daha Selesai
6 14.47-selesai General Cleaning toilet operasional Selesai
7 15.11-selesai Cleaning rel lift barang Selesai
8 21.05-selesai Brusing lantai Concrit area lorong Mushola Selesai
9 21.15-Selesai Penyikatan ank tangga Yang Menuju MO Selesai
10 21.42-selesai Cleaning air Carten all area Exit Selesai

Rutinitas & Non Rutinitas


Kamis, 21 November 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Pencucian lantai all area Lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.57-selesai Pembersihan sarang laba laba Di area Loby Barat Lantai Dasar Selesai
4 09.21-selesai Spoting pilar pilar Loby Utama Selesai
5 10.00-selesai Glass cleaning Kaca dalam Textum Selesai
6 14.00-selesai Pembuangan Puing AHU hypermart ke area Bedeng Proyek Lanjut
7 14.17-selesai Pembersihan Gutter area jalan Daha Lanjut
8 09.00-selesai Dusting Hexsospan all area Toilet Selesai

Rutinitas & Non Rutinitas


Jum'at, 22 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area Lantai Satu ( Scrubbing ) Selesai
2 07.30-selesai Pencucian lantai Coneblock palkir Delivery Selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
4 08.18-selesai Pencucian Tempat sampah Zona 2 dan 3 Selesai
5 14.00-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
6 14.25-selesai Dusting all area Tempat sampah Zona Selesai
7 14.27-selesai Dusting all area Lampu taman Selesai
8 19.30-selesai Suport pemasangan Spanduk Senam AEROBIC, di What's on BNI&MDSSelesai
9 21.01-Selesai Dusting Pipa Plumbing Di area Exit Lorong Mushola Selesai
10 21.18-selesai Brushing Jembatan Hypermart Selesai
11 21.23-selesai Vacuming Karpet mushola MO Selesai
12 21.28-selesai Zet spraying Coneblock palkir Delivery Selesai

Rutinitas & Non Rutinitas


Sabtu, 23 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai Coneblock lobby Utama sampai Dengan Air mancur Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.10-selesai Cleaning Kap Lampu yang di lantai Dasar Palkiran Motor Lanjut
4 14.10-selesai Penurunan Puing Di area Ruang AHU hypermart Selesai
5 14.16-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
6 14.23-selesai Pembersihan Gutter area Jalan Daha Lanjut
7 14.35-selesai Dusting all area Tempat sampah Zona Selesai
8 21.00-selesai Vacuming Karpet Mushola Dasar Selesai
9 21.31-selesai Cleaning kap lampu area Textum Selesai

Rutinitas & Non Rutinitas


Minggu, 24 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing Lantai Kulit Jeruk Depan Queen Café Selesai
2 08.00-selesai Penggantian Nomet jembatan Hypermart Dengan Yang Baru Selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
4 09.00-selesai Cleaning Kap Lampu yang di lantai Dasar Palkiran Motor Lanjut
5 09.17-selesai Wall Cleaning Area Lorong Mutiara Dental Selesai
6 09.24-selesai Cleaning List Reklame samping Bata Selesai
7 14.00-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
8 14.10-selesai Cleaning Gutter area Jalan Daha Lanjut
9 14.15-selesai Pembersihan Roof toof Selesai
10 14.45-selesai Cleaning Lampu taman all area Zona Selesai
11 21.00-selesai Pengangkatan bangku textum Selesai
12 21.10-selesai Washing Standing astray all area lantai dasar dan lantai satu Selesai
13 21.14-selesai Washing Nomet jembatan Hypermart Selesai
14 21.40-selesai Washing lantai Teras Dari samping ATM Galerry sampai Depan BNI Selesai

Rutinitas & Non Rutinitas


Senin, 25 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 07.30-selesai Glass cleaning kaca Dalam Textum Selesai
3 08.00-selesai Cleaning Duckting textum Lanjut
4 14.00-selesai Pembersihan Roof toof Lanjut
5 14.21-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
6 15.43-selesai Cleaning gulma Samping Matahari Lanjut
7 21.00-selesai Spoting Tangga yang Menuju Natasha Selesai
8 21.134-selesai Pencucian Coneblock belakang Fizza hut Selesai
9 21.19-selesai Cleaning Duckting textum Lanjut

Rutinitas & Non Rutinitas


Selasa, 26 November 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
2 08.39-selesai Washing tempat sampah all area Zona Selesai
3 14.00-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
4 14.10-selesai Cleaning Gutter area Jalan Daha Lanjut
5 18,38-selesai Suport pembetulan umbul umbul yang terlepas samping air mancur lama Selesai
6 21.13-selesai Cleaning Logo logo tenant area lantai dasar loby selatan Lanjut

Rutinitas & Non Rutinitas


Rabu, 27 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 14.00-selesai Cleaning Ruang AHU hypermart Lanjut
4 14.30-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
5 21.07-selesai Brushing lantai concrit samping Lorong Mushola Selesai
6 21.09-selesai Cleaning air carten all area Exit Selesai
7 21.11-selesai Cleaning Duckting Selesai
8 21.27-selesai Penyikatan Lantai Granit Pinggiran Loby Utama Selesai

Rutinitas & Non Rutinitas


Kamis, 28 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Satu ( Scrubbing ) Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.19-selesai Cleaning Kap Lampu yang di lantai Dasar Palkiran Motor Lanjut
4 09.00-selesai Cleaning Sarang laba laba all area Pintu Lobby Selesai
5 14.00-selesai Pembersihan roof toof Selesai
6 14.28-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
7 14.30-selesai Pembersihan Gutter area Jalan Daha Lanjut
8 21.00-selesai Pembersihan Duckting textum Selesai

Rutinitas & Non Rutinitas


jum'at, 29 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Zet spraying Coneblock palkir Delivery Selesai
2 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
3 08.21.selesai Cleaning biil Board Tenant Lanjut
4 11.00-selesai Suport pemasangan Hennging Baner Selesai
5 14.17-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
6 21.00-selesai Penyikatan anak tangga yang Menuju MO Selesai
7 21.23-selesai Vacuming carpet Mushola Mo Selesai
8 21.25-selesai Brushing Jembatan Hypermart Selesai

Rutinitas & Non Rutinitas


Sabtu, 29 November 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Suport Pemasangan Giant Baner Selesai
2 07.30-selesai Opening Hanamasa Suport Glass cleaning Selesai
3 08.00-selesai Dry buffing all area lantai dasar dan lantai satu Selesai
4 14.19-selesai Dusting all area Tempat sampah Zona Selesai
5 14.20-selesai Pembersihan sarang laba laba di langit langit palkir Hypermart Lanjut
6 21.00-selesai Suport Pemberesan Panggung Acara Edu Fiera Selesai

Cikarang, 30 November 2013,

Di Buat oleh Diketahui oleh

Erpan.kusnadi M.Gurning / Eko.S


Supervisor Building Service
v
Rutinitas & Non Rutinitas
Minggu, 01 Desember 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 08.10-selesai Suport Seting panggung Untuk acara Live music, Depan textum Selesai
3 08.17-selesai Perapihan karpet Berkas pameran Di area depan counter Pin-Q Selesai
4 10.21-selesai Dilakuakan Vacuming Urinoil No 5 area Toilet lantai Satu pria Selesai
5 14.23-selesai Pembersihan Gutter area Jalan Daha Lanjut
6 14.24-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
7 21.00-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
8 21.15-selesai Washing Standing astray all area Selesai
9 21.30-selesai Washing Nomet Jembatan Hypermart Selesai

Rutinitas & Non Rutinitas


Senin, 02 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 07.45-selesai Glass Cleaning kaca dalam Textum Selesai
3 14.00-selesai Pembersihan roof toof Selesai
4 14.30-selesai Pembersihan Gutter area Jalan Daha Lanjut
5 20.14-selesai Spoting anak tangga Exit yang Menuju Natasha Selesai
6 21.17-selesai Pembersihan Grill ac dan Dispuser Ac area Lantai Dasar Lanjut
7 21.30-selesai Brushing Coneblock belakang Fizza Hut Selesai

Rutinitas & Non Rutinitas


Selasa, 03 Desember 2013
No Jam Pekerjaan Keterangan
1 07.46-selesai Pembersihan Sarang laba laba Di area ATM Gallery Selesai
2 07.50-selesai Dilakukan Pengurasan/Pengeringan Genangan air all area Zona Selesai
3 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
4 14,00-selesai Pembersihan Roof toof Lanjut
5 14.27-Selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 17.13-selesai Pembersihan Lantai Triplek bawah Elevator Hypermart Selesai
7 21.00-selesai Pembersihan air Carten all area Exit Selesai
8 21.12-selesai Penyikatan Lantai Granit Pinggiran Loby Utama Selesai
9 21.30-selesai Washing lantai bawah Elevator Hypermart ( Scrubbing ) Selesai
Rutinitas & Non Rutinitas
Rabu, 04 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Washing lantai all area Lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.37-selesai Spoting Tempat Wudhu mushola Bawah Selesai
4 09.00-selesai Washing Tempat sampah all area Zona Selesai
5 09.47-selesai Vacuming Washtafel Toilet wanita Lantai dasar Timur Selesai
6 21.11-selesai Penyikatan anak tangga yang menuju Mo Selesai
7 21.14-selesai Brushing lantai Concrit samping Lorong Mushola Selesai

Rutinitas & Non Rutinitas


Kamis, 05 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Washing lantai all area lantai Satu ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.32-selesai Pembersihan Sarang laba laba all area Pintu Loby Selesai
4 14.00-selesai Pembersihan Gutter area Jalan Daha Lanjut
5 21.05-selesai Zet spraying Coneblock palkir Delivery Selesai

Rutinitas & Non Rutinitas


Ju'mat, 06 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-Selesai Zet spraying Lantai Coneblock palkir Delivery Selesai
2 07.30-selesai Dilakukan Pengurasang Genangan air all area Zona Selesai
3 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
4 08.52-selesai Cleaning Rooling Door lantai dasar area Loby Barat Lanjut
5 11.00-selesai Suport Pemasangan Giant Banner SPH di area Samping MDS Selesai
6 14,00-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
7 14.11-selesai Pembersihan gutter area jalan Daha Lanjut
8 21.00-selesai Suport pemasangan panggung palet di area Depan Salemba Selesai
9 21.22-selesai Vacuming karpet mushola Mo Selesai

Rutinitas & Non Rutinitas


Sabtu, 07 Desember 2013
No Jam Pekerjaan Keterangan
1 07,00-selesai Washing lantai coneblock dari depan loby utama sampai air mancur Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 09.16-selesai Cleaning Gutter area depan Kantin Lanjut
4 12.00-selesai Cleaning Gutter area palkir motor Lanjut
5 14.25-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 17.58-selesai Cleaning lantai teriplek bawah elevator hypermart Selesai
7 21.05-selesai Suport pemberesan pangggung palet sisa acara di area depan salemba Selesai
8 21.07-selesai Cleaning Kap lampu area Textum Selesai
9 21.16-selesai Vacuming karpet Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Minggu, 08 Desember 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 09.00-selesai Suport Setting panggung palet Acara live Music,Area Depan Textum Selesai
3 14.08-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
4 14.10-selesai Cleaning Gutter area Jalan Daha Lanjut
5 21.00-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
6 21.15-selesai Washing Standing astray all area Selesai

Rutinitas & Non Rutinitas


Senin, 09 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 08.00-selesai Glass Cleaning kaca dalam Textum Selesai
3 09.00-selesai Dilakukan Pengurasang Genangan air all area Zona Selesai
4 14.00-selesai Cleaning Gutter area Jalan Daha Lanjut
5 14.14-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 14.18-selesai Pembersihan roof toof Lanjut
7 15.10-selesai Cleaning Gulma Di area Belakang Loading Hypermart Lanjut
8 20.00-selesai Spoting anak tangga yang menuju Natasha Selesai
9 21.00-selesai Cleaning Griill ac dan Dispuser Ac area Lantai dasar Timur Lanjut
10 21.12-selesai Brushing jembatan Hypermart Selesai

Rutinitas & Non Rutinitas


Selesa, 10 Desember 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 08.05-selesai Penukaran Nomet jembatan hypermart yang lama Dengan yang Baru Selesai
3 08.17-selesai Cleaning Rooling door Tenant Area Loby Selatan lantai Dasar Lanjut
4 09.00-selesai Spoting Tempat wudhu mushola Selesai
5 09.45-selesai Spoting Dinding belakang Hoka hoka bento Selesai
6 10.39-selesai Suport Pembersihan Counter Momo Selesai
7 14.16-selesai Cleaning Gutter area Jalan Daha Lanjut
8 14.18-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
9 14.23-selesai Pembersihan roof toof Lanjut
10 16.03-selesai Pembersihan & sekaligus pembuangan tanah progres saluran air motor Lanjut
Rutinitas & Non Rutinitas
Rabu, 11 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Washing lantai all area lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.02-selesai Pengangkatan Lemak di area Depan Mushola Selesai
4 09.39-selesai Pembersihan sarang laba laba Di area loby utama Selesai
5 11.00-selesai Suport pemasangan Umbul umbul Selesai
6 21.15-selesai Pembersihan pipa plumbing di area lorong mushola Selesai
7 21.20-selesai Brushing lantai concrit samping lorong mushola Selesai
8 21.25-selesai Penyikatan anak tangga yang menuju Mo Selesai

Rutinitas & Non Rutinitas


Kamis, 12 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.19-selesai Cleaning rooling door tenant area Loby selatan lantai dasar Selesai
4 09.00-selesai Suport pembersihan sarang laba laba di toko posh boy Selesai
5 14.00-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 14.13-selesai pembersihan Roof toof Selesai
7 21.00-selesai Cleaning Box hydrant all area zona Selesai
8 21.13-selesai Penyikatan anak tangga yang menuju Hypermart Selesai
9 21.18-selesai Pencucian batu putih air mancur Selesai
10 21.21-selesai Cleaning rooling door tenat area timur lantai dasar Selesai

Rutinitas & Non Rutinitas


Ju'mat, 13 Desember 2013
No Jam Pekerjaan Keterangan
1 07.57-selesai Cleaning rooling door area timur lantai dasar Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.21-selesai Dilakukan pengeringan dan pengurasan genangan air all area zona Selesai
4 09.00-selesai Pencucian batu putih air mancur Lanjut
5 14.27-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 14.30-selesai Pembersihan Gutter area jalan daha Lanjut
7 14.37-selesai Pembersihan roof toop Lanjut
8 21.32-selesai Suport pemasangan karpet untuk pameran depan calisto Selesai
9 21.45-selesai Suport pemasangan karpet setengah atrium di area atrium utama Selesai
Rutinitas & Non Rutinitas
Sabtu, 14 Desember 2013
No Jam Pekerjaan Keterangan
08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 08.44-selesai Cleaning rooling door tenant area lantai satu barat Lanjut
3 10.00-selesai pembersihan gulma di depan Queen Café Lanjut
4 14.00-selesai Dusting all area pintu axit Selesai
5 14.24-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 21.00-selesai Suport perapihan panggung acara Christmas marvelous journey Selesai

Rutinitas & Non Rutinitas


MInggu, 15 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai kulit jeruk Depan Queen café Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.30-selesai Pembersihan gulma di depan KPC Selesai
4 09.00-selesai Suport Setting panggung palet acara live music,depan textum Selesai
5 10.51-selesai Suport pembeetulan spanduk ASUS yang terlepas,area Loby barat Selesai
6 14.00-selesai Pembersihan Roof toof Selesai
7 14.34-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
8 21.00-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
9 21.05-selesai Cleaning rooling door tenant area timur lantai satu Lanjut
10 21.30-selesai Brushing jembatan hypermart Selesai

Rutinitas & Non Rutinitas


Senin, 16 Desember 2013
No Jam Pekerjaan Keterangan
1 07.22-selesai Penukaran nomet jembatan hypermart nomet kotor dengan yang baru Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 07.20-selesai Glass cleaning kaca Dalam Textum Selesai
4 07.33-selesai Pembersihan gulma di depan Matahari Lanjut
5 14.20-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 14.22-selesai Pembersihan gutter area jalan Daha Selesai
7 14.25-seleasai Pembersihan roof toof Lanjut
8 21.00-selesai pengurasan dan pengeringan air yang banjir di palkir hypermart Selesai

Rutinitas & Non Rutinitas


selasa, 17 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Zet spraying coneblock palkir delivery Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 14.00-selesai Pembersihan gutter area jalan Daha Lanjut
4 14.20-selesai Pembersihan roof toof Lanjut
5 21.00-selesai Pembersihan Sudut lantai Stanlist Counter MOMO Café Selesai
6 21.04-selesai Penyikatan Lantai Granit Pinggiran Loby Utama Selesai
7 21.08-selesai Pembersihan air carten all area Exit Selesai

Rutinitas & Non Rutinitas


Rabu, 18 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Penjemuran nomet jembatan hypermart ke area roof toof Selesai
2 07.05-selesai Pencucian lantai all area lantai Dasar ( Scrubbing ) Selesai
3 07.30-selesai Pembersihan gulma di area depan matahari Selesai
4 07.44-selesai Pembersihan Sisa lem bekas counter MOMO Café Selesai
5 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
6 09.00-selesai Washing tempat sampah all area Zona Selesai
7 14.11-selesai pembersihan roof toof Selesai
8 14.22-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
9 14.24-selesai Pembersihan gutter area jalan daha Selesai
10 16.39-selesai Suport pemberesan batu sprit di area palkir motor Selesai
11 21.00-selesai Brushing lorong mushola Selesai
12 21.07-selesai Penyikatan anak tangga yang menuju MO Selesai
13 21.10-selesai Cleaning Logo tenant area lantai dasar Lanjut

Rutinitas & Non Rutinitas


Kamis, 19 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai General cleaning Escalator Timur-Barat Selesai
2 07.10-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
3 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
4 14.17-selesai Cleaning gutter area jalan Daha Lanjut
5 14.25-selesai Pembersihan sarang laba laba di area loading dook MLC Selesai
6 14.38-selesai Cleaning Box hydrant all area Zona Selesai
7 21.15-selesai Penyikatan anak tangga yang menuju Hypermart Selesai
8 21.18-selesai Cleaning Pipa Plumbing area lorong Mushola Selesai
9 21.20-selesai Cleaning Logo tenant area lantai dasar Lanjut

Rutinitas & Non Rutinitas


Jum'at, 20 Desember 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 08.30-selesai Dilakukan pengurasan dan pengeringan genangan air all area Zona Selesai
3 08.44-selesai Spoting Sudut lantai bawah Badan Escalator Timur-Barat Selesai
4 09.04-Selesai Cleaning rolling door tenant area barat lantai satu Selesai
5 14.21-selesai Pembersihan Gutter area jalan Daha Lanjut
6 14.23-selesai Pembersihan Gutter area jalan Daha Lanjut
7 14.25-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
8 21`.00-selesai Spoting anak tangga Yang Menuju Natasha Selesai
9 21.24-selesai Vacuming Karpet Mushola MO Selesai
10 21.30-selesai brushing jembatan Hypermart Selesai

Rutinitas & Non Rutinitas


Sabtu 21 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing manual Lantai Air Mancur Selesai
2 07.30-Selesai Cleaning Kaca Kanovi Loby barat Selesai
3 08.00-Selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
4 09.44-Selesai Pembersihan Sarang laba laba All area Pintu loby Selesai
5 14.12-selesai Pembersihan Roof toof Lanjut
6 14.34-selesai Cleaning gutter area jalan Daha Lanjut
7 14.36-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
8 21.00-selesai Spoting pilar pilar area Barat lantai Satu Selesai
9 21.05-selesai Cleaning Rolling door tenant area Atrium 2 Selesai
10 21.09-selesai Cleaning Kap lampu Textum Selesai
11 21.24-selesai Vacuming Carpet mushola Umum Selesai

Rutinitas & Non Rutinitas


Minggu 22 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai kulit jeruk Depan Queen café Selesai
2 08.00-Selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.19-selesai Spoting anak tangga yang menuju Natasha Selesai
4 14.00-selesai Pembersihan roof toof Selesai
5 21.00-selesai Suport pemasangan Karpet Di area Depan Calisto Lantai dasar Selesai
6 21.17-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
7 21.24-selesai Washing Nomet jembatan hypermart Selesai
8 21.28-selesai Pencucian lantai teras, Dari samping ATM gallery sampai Depan BNI Selesai
9 21.30-selesai Washing standing astray all area Selesai

Rutinitas & Non Rutinitas


Senin 23 Desember 2013
No Jam Pekerjaan Keterangan
1 06.56-selesai Penukaran/penggantian nomet jembatan hypermart dengan yang baru Selesai
2 07.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 07.30-selesai Glass cleaning kaca dalam textum Selesai
4 07.41-selesai Cleaning rooling door tenat area timur lantai dasar Selesai
5 20.00-selesai Spoting anak tangga yang menuju Natasha Selesai
6 21.11-selesai Cleaning grill AC area lantai Satu time zone Selesai
7 21.24-selesai Brushing lantai concrit lorong Mushola Selesai

Rutinitas & Non Rutinitas


Selasa 24 Desember 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 08.35-selesai cleaning Rolling Door tenant area atrium 3 lantai satu Selesai
3 09.44-selesai Spoting sudut lantai area loby selatan lantai dasar Selesai
4 13.20-selesai Vacuming tempat wudhu mushola Selesai
5 14.00-selesai Cleaning roof toof Lanjut
6 14.23-selesai Cleaning Gutter area jalan Daha Lanjut
7 21.00-selesai Penyikatan Lantai Granit Pinggiran Loby Utama Selesai
8 21.03-selesai Pencucian lantai Bawah elevator hypermart ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Rabu 25 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) Selesai
2 08.00-selesai Pembersihan sarang laba laba all area pintu Loby Selesai
3 08.05-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
4 08.43-selesai Washing tempat sampah all area Zona Selesai
5 09.12-selesai Cleaning palang pintu tenant all area Lantai dasar Selesai
6 21.00-selesai Cleaning air carten all area Exit Selesai
7 21.04-selesai Penyikatan anak tangga yang menuju MO Selesai
8 21.30-selesai Brushing Lantai Concrit Lorong Mushola Selesai

Rutinitas & Non Rutinitas


Kamis 26 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.51-selesai Spoting rel lift lantai dasar dan lantai satu Selesai
4 08.54-selesai Spoting Landing Escalator all area Escalator Selesai
5 21.00-selesai Cleaning Pipa Plumbing area lorong yang menuju Mushola Selesai
6 21.11-selesai Spoting sudut lantai bawah kaca reling area Timur lantai satu Lanjut
7 21.12-selesai Cleaning Rooling door tenant area Loby selatan lantai dasar Selesai

Rutinitas & Non Rutinitas


Ju'mat 27 Desember 2013
No Jam Pekerjaan Keterangan
1 07.45-selesai Pembersihan Logo penunjuk arah toilet Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.30-selesai Spoting all area Sudut lantai bawah kaca Relling Selesai
4 14.25-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
5 21.00-selesai Brushing lantai Concril area Lorong Mushola Selesai
6 21.25-selesai Brushing Jembatan Hypermart Selesai
7 21.37-selesai Suport pemasangan Karpet di samping Counter Nanas Bebe Selesai

Rutinitas & Non Rutinitas


Sabtu 28 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai textum ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
3 08.39-selesai Vacuming karpet mushola Umum Selesai
4 14.15-selesai Cleaning gutter area jalan daha Lanjut
5 14.30-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 21.00-selesai Cleaning kap lampu area textum Selesai

Rutinitas & Non Rutinitas


Minggu 29 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selasa Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 08.00-selesai Brushing lantai kulit jeruk depan Queen café Selesai
3 08.34-selesai Cleaning griil Ac area lantai satu Atrium 2 Selesai
4 09.00-selesai Cleaning Sudut Sudut Dalam Kaca Giordano Selesai
5 11.50-selesai Vacuming Pudrain Toilet pria lantai dasar timur Selesai
6 14.10-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
7 14.27-selesai Pembersihan Roof toof Lanjut
8 14.34-selesai Pembersihan Gutter area jalan Daha Lanjut
9 21.00-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
10 21.10-selesai Washing standing astray all area Selesai
11 21.15-selesai Washing nomet jembatan hypermart Selesai
12 21.18-selesai Pencucian lantai teras dari depan Bni sampai dengan ATM galery Selesai

Rutinitas & Non Rutinitas


Senin 30 Desember 2013
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 07.25-selesai Glass cleaning kaca dalam textum Selesai
3 07.46-selesai Spoting sudut lantai bawah dak kaca reling area Timur lantai satu Selesai
4 13.00-selesai Dilakukan pembersihan genangan air all area Zona Selesai
5 14.00-selesai Pembersihan Roof toof Lanjut
6 21.14-selesai Cleaning Griil AC area Loby barat lantai dasar Lanjut

Rutinitas & Non Rutinitas


Selasa 31 Desember 2013
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai dasar dan Lantai Satu Selesai
2 08.46-selesai Penyikatan lantai Concrit Exit samping Cindy Selesai
3 09.45-selesai Suport perelokasi Pameran Indovasion ke Ruang Meeting MO Selesai
4 14.00-selesai Dusting all area pintu pintu exit Selesai
5 14.30-selesai Sweeping mopping all area Tangga Exit Selesai
6 21.00-selesai cleaning air carten all area Exit Selesai
7 21.30-selesai Penyikatan Lantai Granit Pinggiran Loby Utama Selesai

Cikarang, 31 Desember 2013,

Di Buat oleh Diketahui oleh

Erpan.kusnadi M.Gurning / Eko.S


Supervisor Building Service
s
Rutinitas & Non Rutinitas
Rabu, 01 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 08.35-selesai Penykikatan Teras belakang Fizza Hut Selesai
4 11.14-selesai Suport Perapihan / pemberesan Karpet sisa pameran Depan Era phone Selesai
5 14.19-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 21.00-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
7 21.15-selesai Brushing lantai Concrit samping Lorong Mushola Selesai
8 21.18-selesai Penyikatan anak tangga Yang menuju Manageman Selesai
9 21.24-selesai Brushing jembatan Hypermart Selesai

Rutinitas & Non Rutinitas


Kamis, 02 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selasai Pencucian Lantai all area lantai Satu ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 08.34-selesai Perapihan /pemberesan karpet bekas pameran Depan Calisto Selesai
4 09.37-selesai Perapihan /pemberesan karpet bekas pameran Samping Nanas Bebe Selesai
5 14.00-selesai Pembersihan roof tooof Selesai
6 20.25-selesai Perelokasian Puschat Dari depan Mister baso ke Samping Dua Tang Selesai
7 21.08-selesai Cleaning Air carten all area Exit Selesai

Rutinitas & Non Rutinitas


Ju'mat, 03 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 08.05-selesai Spoting all lorong Exit Yang menuju Toilet Selesai
3 09.00-selesai Spoting sudut lantai Dari Depan Fizza Hut sampai Depan KFC Selesai
4 14.00-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
5 14.30-selesai Dusting all area Pintu pintu Exit Selesai
6 21.00-selesai Penyikatan lantai Granit area pinggiran Loby utama Selesai
7 21.08-selesai Brushing jembatan Hypermart Selesai
8 21.12-selesai Vacuming Karpet Mushola MO Selesai

Rutinitas & Non Rutinitas


Sabtu, 04 Januari 2014
No Jam Pekerjaan Keterangan
1 07.41-selesai Brushing Manual pinggiran air Mancur Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 08.43-selesai Spoting Landing Escalator ,atas bawah, Escalator timur-barat Selesai
4 09.19-selesai Vacuming karpet Mushola Umum Selesai
5 09.25-selesai Penyikatan anak tangga yang Menuju Exit Natasha Selesai
6 14.30-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
7 14.35-selesai Spoting sudut lantai lorong Exit timur Textum Selesai
8 21.00-selesai Cleaning Cup lampu Area Textum Selesai
9 21.04-selesai Cleaning Rolling Door tenant area timur lantai satu Lanjut
10 21.06-selesai Cleaning Rolling Door tenant area Loby selatan lantai Dasar Selesai
11 21.08-selesai Penyikatan Lantai Granit Pinggiran Loby utama Selesai
Rutinitas & Non Rutinitas
Minggu, 05 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai kulit jeruk depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 14.00-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
4 14.15-selesai Pembersihan Roof toof Selesai
5 14.21-selesai Spoting Sudut lantai Exit samping Panama Selesai
6 21.00-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
7 21.30-selesai Washing Standing Astray all area Selesai
8 21.32-selesai Pencucian nomet Jembatan Hypermart Selesai

Rutinitas & Non Rutinitas


Senin, 06 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 07.10-selesai Glass Cleaning Kaca Dalam Textum Selesai
3 08.49-selesai Spoting Dinding tempat Wudhu Mushola Selesai
4 08.55-selesai Spoting Dinding lorong Exit yang Menuju Mushola Selesai
5 21.00-selesai Penyikatan lantai granit pinggiran loby utama Selesai
6 21.07-selesai Washing Nomet atm Gallery Selesai
7 21.09-selesai Cleaning Grill AC area Loby barat Selesai

Rutinitas & Non Rutinitas


Selasa, 07 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 09.00-selesai Dusting Pipa Pralon Area Pinggir Anak tangga Yang menuju Hypermart Selesai
3 09.05-selesai Spoting Sudut lantai Samping Toko Bahagia Cosmetik Selesai
4 09.08-selesai Cleaning Penunjuk arah Ace Hadware/Electronik Solution/Dunkin Donuts Selesai
5 14.00-selesai Pembuangan tanah bekas Proyek Samping MO,area Roof toof Lanjut
6 21.00-selesai Suport Pembongkaran dan pemindahan cunter 2tang ke Loading Mal Selesai
7 21.14-selesai Pembersihan air carten all area Exit Selesai

Rutinitas & Non Rutinitas


Rabu, 08 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area Lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 08.05-selesai Spoting Sudut lantai Satu jengkal Bawah Teras ATM Gallery Selesai
4 09.14-selesai Spoting anak tangga Exit yang menuju Mutiara Dental Clinik Selesai
5 10.51-selesai Suport Sudut lantai Pinggiran Mandi Bola ,area Atrium 2 Selesai
6 14.17-selesai Cleaning Gutter area Jalan Daha Selesai
7 21.00-selesai Spoting anak tangga yang Menuju MO Selesai
8 21.06-selesai Brushing Lantai Concrit samping Lorong Mushola Selesai
9 21.12-selesai wall Cleaning Exit timur Textum Selesai

Rutinitas & Non Rutinitas


Kamis, 09 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area Lantai Satu ( Scrubbing ) Selesai
2 07.30-selesai Glass Cleaning Kaca Kanovi Roof toof timur - Barat Selesai
3 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
4 08.39-selesai Pembersihan Sisa Cat di area Depan ASUS Selesai
5 14.00-selesai Pembersihan Roof tooof Lanjut
6 14.25-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
7 14.26-selesai Pembersihan Gutter Area Jalan Daha Lanjut
8 21.00-selesai Spoting Dinding Area Lorong Exit Natasha Selesai
9 21.29-selesai Spoting Dinding Badan Escalator Timur-Barat Selesai
10 21.37-selesai Dusting Box hidrant all area Zona Selesai

Rutinitas & Non Rutinitas


Ju'mat, 10 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 09.20-selesai Cleaning TPS akhir Lanjut
3 10.00-selesai Pembersihan Puing Puing Bekas Bedeng Di area Samping Visual Selesai
4 14.00-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
5 14.19-Selesai Pembersihan Gutter Area Jalan Daha Lanjut
6 21.10-selesai Brushing Jembatan Hypermart Selesai
7 21.12-selesai Vacuming Karpet Mushola MO Selesai
8 21.16-Selesai Cleaning Pipa Plumbing Area Lorong Yang menuju Mushola Selesai
9 21,17-selesai Spoting Sudut lantai area Loby Selatan Selesai

Rutinitas & Non Rutinitas


Sabtu, 11 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing Lantai Coneblock Loby utama Sampai Dengan Air Mancur Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 09.00-selesai Pembersihan Jiplakan Tangan Di atas Plapon,Area Depan Stobery & 21 Selesai
4 09.10-selesai Pembersihan Sarang Laba laba all area Pintu Lobby Selesai
5 09.21-selesai Spoting Sudut lantai Bawah Badan Escalator .( Escalator timur-Barat ) Selesai
6 09.27-selesai Vacuming karpet mushola Umum Selesai
7 10.19-selesai Cleaning Neon Sign Natasha Selesai
8 14.26-selesai Pembersihan Gutter area Jalan Daha Selesai
9 21.00-selesai Cleaning Cup lampu area Textum Selesai
10 21.03-selesai Penyikatan anak tangga Yang menuju Hypermart Selesai
Rutinitas & Non Rutinitas
Minggu, 12 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai Kulit jeruk Depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 09.13-selesai Spoting Pilar Pilar Coridor Lantai Satu Lanjut
4 14.00-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
5 21.00-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
6 21.10-selesai Suport perapihan karpet Bekas pameran Widia Dara Depan Hokben Selesai
7 21.12-selesai Washing nomet jembatan Hypermart Selesai
8 21.30-selesai Washing Standing astray all area Coridor lantai Dasar dan lantai satu Selesai

Rutinitas & Non Rutinitas


Senin, 13 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 08.00-selesai Glass Cleaning kaca dalam Textum Selesai
3 08.36-selesai Cleaning Rolling Door Tenant lantai dasar area Loby Barat Lanjut
4 14.19-selesai Cleaning Gutter area jalan Daha Lanjut
5 14.28-selesai Cleaning Roof toof Selesai
6 20.30-Selesai Spoting anak tangga yang menuju Natasha Selesai
7 21.12-selesai Cleaning Griil dan Dispuser Ac lantai Satu Lanjut
8 21.22-selesai Cleaning Griil dan Dispuser Ac lantai Dasar Lanjut

Rutinitas & Non Rutinitas


Selasa, 14 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 08.12-selesai Progres pengangkatan pasir area pinggir kanstin, palkir motor Selesai
3 08.35-selesai Washing tempat sampah all area zona Selesai
4 09.12-selesai Spoting landing escalator atas dan bawah ,area timur-barat Selesai
5 09.21-selesai Cleaning sarang laba-laba all area pintu loby Selesai
6 14.12-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
7 14.36-selesai Cleaning gutter area jalan Daha Lanjut
8 21.00-selesai Cleaning air carten all area Exit Selesai
9 21.11-selesai Penyikatan anak tangga yang menuju Hypermart Selesai
10 21.17-selesai Penyikatan lantai Granit area pinggiran loby utama Selesai

Rutinitas & Non Rutinitas


Rabu, 15 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 09.12-selesai Dusting sudut-sudut Stanlist counter Momo café Selesai
4 10.50-selesai Suport pencopotan umbul-umbul Shaun the sheep all area Selesai
5 14.12-selesai Pembersihan roof toof Selesai
6 14.31-selesai Pembersihan gulma di area palkir depan bawah poul sign Hypermart Selesai
7 21.07 -selesai Cleaning logo-logo tenan area timur lanyai satu Lanjut
8 21.11-selesai Penyikatan anak tangga yang menuju MO Selesai
9 21.14-selesai Brushing Lantai Concrit area samping lorong mushola Selesai

Rutinitas & Non Rutinitas


Kamis, 16 Januari 2014
No Jam Pekerjaan Keterangan
1 07.30-selesai Pengurasan Dan Pengeringan genangan air all area Zona Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 14.00-selesai Pembersihan Gulma Di area Samping LPG Lanjut
4 14.22-selesai Cleaning TPS akhir Selesai
5 14.27-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 21.00-selesai Suport pemasangan vinil bekas counter world space Selesai
7 21.09-selesai Pembersihan logo logo tenant area timur lantai Dasar Lanjut

Rutinitas & Non Rutinitas


Ju'mat, 17 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 14.15-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
4 21.00-selesai Vacuming karpet Mushola MO Selesai
5 21.10-selesai Brushing Jembatan hypermart Selesai
6 21.15-selesai Brushing Lantai coneblock area Belakang fizza Selesai

Rutinitas & Non Rutinitas


Sabtu, 18 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 09.00-selesai Vacuming Karpet Mushola Umum Selesai
3 09.42-selesai Spoting Dinding Area samping LOVE POLY lantai dasar Selesai
4 14.14-selesai Pembersihan Sarang Laba laba Di area Langit langit Palkir Motor Dasar Selesai
5 14.17-selesai Pembersihan Gutter area Jalan Daha Selesai
6 14.22-selesai Suport Setting Panggung Palet Untuk acara Live Music,Depan TEXTUM Selesai
7 21.13-selesai Spoting Dinding area Lorong Exit yang Menuju Toilet lantai dasar Timur Selesai
8 21.18-selesai Dusting Rooling Door Tenant area Timur Lantai Satu Lanjut
9 21.19-selesai Cleaning Cup Lampu Area Textum Selesai
10 21.23-selesai Suport Pemberesan / Perapihan Panggung Live Music Selesai

Rutinitas & Non Rutinitas


Minggu, 19 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing Lantai kulit jeruk Area Depan Queen Café Selesai
2 08.00-selesai Pemasangan Vinil Mulia Watch,Tempat bekas Counter Bahagia Cosmetik Selesai
3 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
4 14.00-selesai Dusting all Apar , Box Hidrant Dan Standing Astray Selesai
5 21.00-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
6 21.15-selesai Washing Standing Astray all area Selesai
7 21.32-selesai Suport Pemasangan Karpet Setengah Atrium , Untuk Pameran MDS Selesai

Rutinitas & Non Rutinitas


Senin, 20 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 07.29-selesai Glass Cleaning Kaca Dalam Textum Selesai
3 08.31-selesai Spoting Dinding Area Lorong Exit toilet lantai satu Selesai
4 14.00-selesai Dusting all Apar , Box Hidrant Dan Standing Astray Selesai
5 20.00-selesai Spoting anak tangga exit yang menuju Natasha Selesai
6 21.00-selesai Cleaning Dispuser dan Grill AC , area Koridor loby barat Selesai
7 21.06-selsai Cleaning Rolling Door tenant area barat Lantai Satu Selesai

Rutinitas & Non Rutinitas


Selasa, 21 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 09.00-selesai Spoting Sudut lantai Area Depan Hoka hoka Bento sampai Solaria Dasar Selesai
3 10.00-Selesai Vacuming Urinoil No 4, Area Toilet lantai Satu Barat Selesai
4 14,00-Selesai Vacuming Nomet Tangga Manageman Office Selesai
5 14.11-selesai Pembersihan Ruang Visual Selesai
6 21.00-selesai Penyikatan lantai Granit area pinggiran loby utama Selesai
7 21.10-selesai Cleaning Logo tenant area Loby barat lantai Dasar Selesai
8 21.11-selesai Wall Cleaning Area Time Zone lantai satu Lanjut
9 21.13-selesai Cleaning Air carten all area Exit Selesai

Rutinitas & Non Rutinitas


Rabu, 22 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 08.29-selesai Pembersihan sarang laba laba di langit langit palkiran motor Dasar Selesai
4 14.00-selesai Pembersihan Roof toof Lanjut
5 20.41-selesai Suport pemasangan Karpet Untuk pameran di Depan Counter Pin-Q Selesai
6 20.50-selesai Spoting dinding area Lorong Exit timur Textum lantai Satu Selesai
7 21.00-selesai Brusing lantai Concrit area Lorong Saping Mushola Selesai
8 21.10-selesai Penyikatan anak tangga yang Menuju Manageman Office Selesai

Rutinitas & Non Rutinitas


Kamis, 23 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Satu ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 08.35-selesai Wall cleaning Area Atas Kaca Toko ASUS POINT Selesai
4 14,00-selesai Pembersihan Roof toof Lanjut
5 14.14-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 14.20-selesai Pembersihan Gutter area Jalan Daha Lanjut
7 21.04-selesai Pembersihan Pipa Plumbing area Lorong Exit yang menuju Mushola Selesai
8 21.10-selesai Spoting Anak tangga yang menuju Hypermart Selesai
9 21.10-selesai Spoting Anak tangga yang menuju Hypermart Selesai
10 21.19-selesai Brushing lantai Coneblock area Belakang fizza Hut Selesai

Rutinitas & Non Rutinitas


Jum'at, 24 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 08.07-selesai Spoting anak tangga Exit yang menuju time Zone Selesai
3 08.14-selesai Pembersihan sarang laba laba di langit langit palkiran motor Dasar Selesai
4 08.48-selesai Cleaning Rolling Door tenat area barat Lantai Dasar Lanjut
5 14.17-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 14.19-selesai Pembersihan gutter area jalan Daha Lanjut
7 14.25-Selesai Pembersihan Roof toof Lanjut
8 16.01-selesai Pembersihan Gulma Di area Pintu keluar barat Depan Lanjut
9 21.13-selesai Vacumming Karpet mushola MO Selesai
10 21.15-selesai Cleaning Rolling Door tenat area barat lantai Satu Lanjut
11 21.20-selesai Brushing jembatan Hypermart Selesai

Rutinitas & Non Rutinitas


Sabtu 25 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 08.21-Selesai Cleaning Rolling Door tenat area barat Lantai Dasar Lanjut
3 08.22-selesai Vacuming Karpet Mushola Umum Selesai
4 08.25-selesai Pembersihan sarang laba laba di langit langit palkiran motor Dasar Selesai
5 08.47-Selesai Pembersihan Gulma Di area Pintu keluar barat Depan Selesai
6 13.00-selesai Suport perataan tanah yang menggunung di area Pintu masuk mobil Timu Lanjut
7 14.17-selesai Pembersihan Roof toof Lanjut
8 14.20-selesai Pembersihan Gulma si area Samping Gronteng Hypermart Lanjut
9 14.26-selesai Pembersihan sarang laba laba di langit langit palkiran motor Dasar Selesai
10 21.00-selesai pembersihan sarang laba laba di area loby barat Selesai
11 21.05-selesai Pembersihan Cup lampu textum Selesai
12 21.13-selesai Penyikatan anak tangga yang menuju Hypermart Selesai
13 21.27-selesai Cleaning Rooling Door tenant area loby selatan Selesai

Rutinitas & Non Rutinitas


Minggu 26 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai kulit jeruk area depan Quen café Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 08.30-selesai Suport perapihan panggung palet area depan textum Selesai
4 09.18-selesai pencucian lantai manual area lorong Exit Embun Dental Selesai
5 09.35-selesai Spoting pilar pilar area lantai Dasar Lanjut
6 11.00-selesai Suport pemasangan panggung area atrium 2 Selesai
7 14.10-selesai Pembersihan Roof toof Selesai
8 14.14-selesai Pembersihan Gulma di area Samping gronteng Hypermart Lanjut
9 14.16-selesai Pembersihan gutter area jalan Daha Lanjut
10 14.21-selesai Pembersihan sarang laba laba di langit langit palkiran motor Dasar Selesai
11 21.00-selesai Suport pemberesan panggung bekas acara di area atrium 2 Selesai
12 21.04-selesai Pengangkatan Bangku textum agenda rutin Scrubbing malam Senin Selesai
13 21.22-selesai Pencucian lantai teras ,dari depan Asus sampai BNI ( Scrubbing ) Selesai
14 21.30-selesai Washing standing astray all area Selesai

Rutinitas & Non Rutinitas


Senin 27 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 08.00-selesai Cleaning Bilboard tenant Lanjut
3 08.14-selesai Glass cleaning kaca dalam textum Selesai
4 14.00-selesai Pembersihan Roof toof Lanjut
5 16.05-selesai Pembersihan gulma di area palkir depan di bawah neon poul BNI Lanjut
6 21.00-selesai Spoting anak tangga area Exit timur Textum Selesai
7 21.05-selesai Penyikatan anak tangga yang Menuju Hypermart Selesai

Rutinitas & Non Rutinitas


Selasa 28 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 08.05-selesai Perapihan Batu putih air Mancur Selesai
3 08.55-selesai Washing tempat sampah all area Zona Selesai
4 13.00-selesai Suport perataan tanah yang menggunung di area Pintu masuk mobil Timu Lanjut
5 14.13-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
6 14.15-selesai Pembersihan Gutter area Jalan Daha Lanjut
7 20.34-selesai Cleaning Rell Lift Selesai
8 21.13-selesai Brushing lantai Concrit samping lorong Mushola Selesai

Rutinitas & Non Rutinitas


Rabu 29 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
3 09.02-selesai Spoting pilar pilar area timur lantai satu Lanjut
4 14.17-selesai Pembersihan sarang laba laba di langit langit palkiran Hypermart Lanjut
5 14.22-selesai Cleaning Gutter area jalan Daha Lanjut
6 21.00-selesai Cleaning air Carten all area Exit Selesai
7 21.15-selesai Brushing lantai Concrit area lorong Mushola Selesai
8 21.30-selesai Penyikatan anak tangga yang Menuju Manageman Office Selesai

Rutinitas & Non Rutinitas


Kamis 30 Januari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai General Cleaning Escalator all area Escalator Selesai
2 07.15-selesai Pencucian lantai all area lantai Satu ( Scrubbing ) Selesai
3 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
4 09.00-selesai Suport pemberesan karpet sisa pameran Lanscape Di depan Papyrus Selesai
5 09.09-selesai Cleaning Grill AC area Loby selatan Selesai
6 09.30-selesai Cleaning Box Hydrant all area Zona Selesai
7 15.25-selesai Pembersihan Gulma Di area Samping Loading Ace hadware Lanjut
8 21.02-selesai Spoting sudut lantai area Lorong Exit Timur Textum Selesai
9 21.10-selesai C;eaning Rooling door lantai satu Lanjut
10 21.21-selesai Spoting sudut lantai area Lorong Exit Barat Textum Selesai

Rutinitas & Non Rutinitas


Ju'mat 31 Januari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan Lantai dasar Selesai
2 08.09-selesai Glass Cleaning kaca Kanovi lobby barat Selesai
3 08.42-selesai Wall cleaning Exit lorong toilet lantai Satu Selesai
4 08.56-selesai Spoting pilar pilar luar loby utama Selesai
5 09.26-selesai Spoting dinding Samping toko LOTERIA Selesai
6 14.27-selesai Pembersihan Gutter area jalan Daha Lanjut
7 14.31-selesai Dusting tempat sampah all area Zona Selesai
8 21.00-selesai vacuming karpet mushola MO Selesai
9 21.15-selesai Brushing jembatan hypermart Selesai

Cikarang, 31 Januari 2014,

Di Buat oleh Diketahui oleh

Erpan.kusnadi M.Gurning / Eko.S


Supervisor Building Service
Rutinitas & Non Rutinitas
Sabtu, 01 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai ConeBlock Area Depan Loby utama sampai tangga air mancur Selesai
2 07.19-selesai Dusting Sudut lantai stanlist counter Momo Café Selesai
3 07.36-selesai Suport setting panggung Valet acara Live Music,Depan Textum Selesai
4 07.35-selesai Dusting Rooling Door Tenant area Loby Barat lantai Dasar Lanjut
5 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
6 08.13-selesai Dusting Rooling Door Tenant area Loby Barat lantai Satu Lanjut
7 08.14-selesai Dusting Cup lampu area Textum Selesai
8 08.21-selesai Vacuming Karpet Mushola Umum Dasar Selesai
9 08.32-selesai Spoting Pilar pilar area Luar loby Barat lantai Dasar Selesai
10 14.22-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
11 14.24-selesai Pembersihan Gutter area jalan Daha Lanjut
12 14.30-selesai Pembersihan Roof toof Lanjut
13 21.30-selesai Suport Pemasangan karpet setengah atrium untuk pameran MDS Selesai
14 21.52-selesai Suport pemasangan Karpet Untuk pameran baru,di area Depan Hokben Selesai

Rutinitas & Non Rutinitas


Minggu, 02 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai kulit jeruk depan Queen café Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.24-selesai Dusting Cup lampu dan Exhaus fan all area Toilet Selesai
4 08.51-selesai Spoting landing Escalator all area Escalator Selesai
5 09.06-selesai Spoting sudut lantai area Depan KFC samping J'co Selesai
6 14.27-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
7 14.29-selesai Pebersihan Gutter area jalan Daha Lanjut
8 14.43-selesai Pembersihan Ruang Genset Hypermart Lanjut
9 21.00-selesai Washing standing astray all area Selesai
10 21.11-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
11 22.30-selesai Pencucian lantai all area lantai satu dan Dasar ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin, 03 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 07.39-selesai Glass Cleaning kaca dalam Textum Selesai
3 07.35-selesai Dry Vacum Karpet pameran matahari ,area Atrium Utama Selesai
4 09.23-selesai Cleaning Ruang panel lantai Dasar Lanjut
5 14.19-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
6 14.21-selesai Pembersihan Gutter area jalan Daha Lanjut
7 20.30-selesai Spoting anak tangga Exit yang Menuju Natasha Selesai
8 21.00-selesai Spoting anak tangga Exit timur Textum Selesai
9 21.08-selesai Suport pemasangan Karpet untuk pameran di area Depan Counter Pin-Q Selesai
10 21.34-selesai Pembersihan All area Dinding&Accessories toilet Lanjut
Rutinitas & Non Rutinitas
Selesa, 04 Pebruari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 09.00-selesai Cleaning rell lift lantai satu dan lantai Dasar Selesai
3 09.24-selesai Spoting landing Escalator Timur Dan barat Selesai
4 09.45-selesai Cleaning Ruang panel lantai satu Barat Lanjut
5 14.00-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
6 21.00-selesai Cleaning Air carten all area Exit Selesai
7 21.05-selesai Brushing Di area Samping Visual Selesai

Rutinitas & Non Rutinitas


Rabu, 05 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.41-selesai Spoting Dinding area Samping Lotteria Selesai
4 09.07-selesai Pembersihan sarang laba laba all area pintu Loby Selesai
5 14.00-selesai Pembersihan Roof toof Selesai
6 14.06-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
7 14.06-selesai Pembersihan Gutter area jalan Daha Lanjut
8 21.09-selesai Cleaning logo logo Tenant area lantai dasar timur Lanjut
9 21.11-selesai Brushing Lantai Concrit area Lorong Mushola Selesai
10 21.13-selesai Penyikatan anak tangga ,Exit yang menuju Manageman Office Selesai
11 21.15-selesai Pembersihan Cup lampu Area Textum Selesai

Rutinitas & Non Rutinitas


Kamis, 06 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Satu ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 09.29-selesai Brushing Jembatan turunan palkiran motor barat Lanjut
4 14.00-selesai Pembersiham roof toof Lanjut
5 21.00-selesai Pencucian lantai area Teras luar depan Asus sampai dengan depan BNI Selesai
6 21.08-selesai Penyikatan anak tangga yang menuju Hypermart Selesai
7 21.10-selesai Pembersihan Logo tenant area lantai dasar Barat Lanjut

Rutinitas & Non Rutinitas


Ju'mat, 07 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.37-selesai Spoting Teras bawah Depan Atm Gallery Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.05selesai Brushing Jembatan turunan palkiran motor barat Selesai
4 09.00-selesai Cleaning Rolling Door area barat lantai Dasar Lanjut
5 09.14-selesai Cleaning Ac Griil all area Toilet Selesai
6 14.18-selesai Pembersihan Gutter area jalan Daha Lanjut
7 21.00-selesai Dry Vacum Karpet Mushola Manageman Office Selesai
8 21.17-selesai Brushing Jembatan Hypermart Selesai
9 21.24-selesai Brushing lantai concrit area lorong samping Mushola Selesai

Rutinitas & Non Rutinitas


Sabtu, 08 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai cone block Dari Depan Loby utama sampai Dengan Air Mancu Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.48-selesai Cleaning Rooling Door Tenant Area Timur Lantai Dasar Lanjut
4 09.00-selesai Dry Vacum karpet Mushola Umum Selesai
5 09.15-selesai Wall Cleaning area Lorong Exit barat yang Menuju toilet Barat Dasar Selesai
6 09.44-selesai Spoting dinding Badan escalator area escalator Timur-Barat Selesai
7 14.18-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
8 14.21-selesai Cleaning Gutter area jalan Daha Lanjut
9 21.12-selesai Penyikatan anak tangga yang Menuju Hypermart Selesai
10 21.17-selesai Spoting Pilar pilar Belakang standing astray all area lantai satu Selesai
11 21.24-selesai Pembersihan cup lampu area Textum Selesai
12 21.25-selesai Wall Cleaning area lorong Exit timur Textum Selesai

Rutinitas & Non Rutinitas


Minggu, 09 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai kulit Jeruk area Depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.29-selesai Cleaning Cup lampu dan Exhaus fan all area Toilet Selesai
4 10.30-selesai Vacuming Urinoil No 2 area Toilet lantai Satu Selesai
5 14.18-selesai Cleaning Gutter area jalan Daha Lanjut
6 14.20-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
7 21.00-selesai Washing standing astray all area Selesai
8 21.11-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
9 22.30-selesai Pencucian lantai all area lantai satu dan Dasar ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin, 10 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 08.30-selesai Glass Cleaning kaca dalam textum Selesai
3 09.00-selesai Cleaning Kap lampu area Gedung bagian luar Lanjut
4 09.15-selesai Cleaning Dinding Dan Accessories all area Toilet Lanjut
5 09.30-selesai Cleaning Grill Ac lantai dasar Dan lantai satu Lanjut
6 10.00-selesai Cleaning Ruang panel lantai dasar Selesai
7 14.00-selesai Pembersihan Roof toof Selesai
8 14.06-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
9 14.06-selesai Pembersihan Gutter area jalan Daha Lanjut
10 21.00-selesai Penyikatan anak tangga Exit yang menuju Natasha Selesai
11 21.05-selesai Penyikatan anak tangga Exit yang menuju Timezone Selesai
12 21.20-selesai Spoting pilar pilar lantai Dasar dan lantai satu Lanjut
13 21.30-selesai Brushing lantai Coneblock area Belakang Fizza Hut Selesai
Rutinitas & Non Rutinitas
Selasa, 11 Pebruari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 08.30-selesai Washing tempat sampah all area Zona Selesai
3 09.00-selesai Pembersihan Rell lift Selesai
4 10.00-selesai Pembersihan Ruang panel lantai satu Barat Selesai
5 14.00-selesai Pembersihan Roof toof Selesai
6 14.10-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
7 14.14-selesai Pembersihan Gutter area jalan Daha Lanjut
8 21.00-selesai Pembersihan air curten all area Exit Selesai

Rutinitas & Non Rutinitas


Rabu, 12 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 14.00-selesai Pembersihan Roof toof Selesai
4 14.06-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
5 14.20-selesai Pembersihan Gutter area jalan Daha Lanjut
7 21.00-selesai Dusting Grill AC lantai Dasar Lanjut
8 21.15-selesai Penyikatan anak tangga yang Menuju Managemant Selesai
9 21.30-selesai Penyikatan lantai Marmer ara Pinggiran loby utama Selesai
10 21.35-selesai Dusting Grill ac all area Toilet Selesai

Rutinitas & Non Rutinitas


Kamis, 13 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Satu ( Scrubbing ) Selesai
2 07.30-selesai General cleaning Escalator Selesai
3 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
4 14.00-selesai Pembersihan Box Hydrant all area Zona Selesai
5 14.05-selesai Pembersihan Roof toof Selesai
6 14.10-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
7 14.30-selesai Pembersihan Gutter area jalan Daha Lanjut
8 21.00-selesai Pencucian lantai area Teras luar depan Asus sampai dengan depan BNI Selesai

Rutinitas & Non Rutinitas


Ju'mat, 14 Pebruari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 09.00-selesai Cleaning TPS akhir Lanjut
3 09.15-selesai Dusting Ac grill all area Toilet Selesai
4 14.00-selesai Pembersihan Ruang genset MLC Lanjut
5 14.05-selesai Pembersihan Roof toof Selesai
6 14.10-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
7 14.30-selesai Pembersihan Gutter area jalan Daha Lanjut
8 21.00-selesai Brushing jembatan hypermart Selesai
9 21.30-selesai Dry Vacum Karpet mushola MO Selesai

Rutinitas & Non Rutinitas


Sabtu, 15 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai Cone block depan loby utama sampai dengan air mancur Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.30-selesai Pembersihan Gulma area Depan MDS Selesai
4 09.00-selesai Dusting Kap lampu all area Toilet Selesai
5 09.15-selesai Vacuming karpet Mushola dasar Selesai
6 14.05-selesai Pembersihan Roof toof Selesai
7 14.10-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
8 14.30-selesai Pembersihan Gutter area jalan Daha Lanjut
9 21.00-selesai Dusting Kap lampu Textum Selesai

Rutinitas & Non Rutinitas


Minggu, 16 Pebruari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 08.30-selesai Glass Cleaning kaca dalam textum Selesai
3 09.00-selesai Cleaning Kap lampu area Gedung bagian luar Lanjut
4 09.15-selesai Cleaning Dinding Dan Accessories all area Toilet Lanjut
5 09.30-selesai Cleaning Grill Ac lantai dasar Dan lantai satu Lanjut
6 10.00-selesai Cleaning Ruang panel lantai dasar Selesai
7 14.00-selesai Pembersihan Roof toof Selesai
8 14.06-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
9 14.06-selesai Pembersihan Gutter area jalan Daha Lanjut
10 21.00-selesai Suport pemberesan panggung Acara Depan Time Zone Selesai
11 21.11-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
12 21.30-selesai Washing standing astray all area Selesai
13 22.30-selesai Pencucian lantai all area lantai satu dan Dasar ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin, 17 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 07.10-selesai Pembersihan gulma Di area Depan MDS palkir Depan Lanjut
3 07.23-selesai Glass Cleaning Kaca Dalam Textum Selesai
4 14.19-selesai Pembersihan Dinding Di area Exit tangga Tanga Menuju Natasha Selesai
5 14.20-selesai Pembersihan Sarang laba laba di langit langit palkir Motor Dasar Lanjut
6 14.26-selesai Soting Lantai bawah teras area Teras ATM Gallery Selesai
7 21.00-selesai Brushing lantai Coneblock area Belakang Fizza Selesai
8 21.05-selesai Pembrsihan Grill Ac area barat lantai Dasar Lanjut

Rutinitas & Non Rutinitas


Selasa, 18 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.40-selesai Pembersihan Sisa lakba bekas Gapura all area Pintu Loby Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 09.00-selesai Washing Tempat sampah all area Zona Selesai
4 09.45-selesai Cleaning Sarang laba laba Di area Depan Queen café sampai belakang Calist Selesai
5 13.00-selesai Pembersihan Gulma di area loby utama Depan Fizza Lanjut
6 14.11-selesai Pembersihan Gulma Di area Samping Loading Hypermart Lanjut
7 14.18-selesai Pembersaihan Roof toof Lanjut
8 16.00-selesai Pemberesan dan perapihan di area Belakang Bata Loading MLC Selesai
9 21.00-selesai Pembersihan Air Curten all area Exit Selesai
10 21.05-selesai Pencucian lantai Area Loading Mal Belakang Bata Selesai
11 21.10-selesai Penyiakatan anak tangga Yang Menuju Hypermart Selesai

Rutinitas & Non Rutinitas


Rabu, 19 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pembersihan Bil Board Tenant Lanjut
2 07.30-selesai Pencucian lantai all area lantai Dasar ( Scrubbing ) Selesai
3 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
4 08.56-selesai Spoting Pilar area Samping Toko Cindy lantai satu Selesai
5 14.00-selesai Pembersihan Roof toof Selesai
6 14.06-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
7 14.10-selesai Pembersihan Gutter area jalan Daha Lanjut
8 21.00-selesai Pembersihan sarang laba laba Di area All area Pintu Loby Selesai
9 21.14-selesai Brushing lantai teras tempat Wudhu mushola Dasr Selesai
10 21.17-selesai Soting Lantai bawah teras area Teras Depan BNI Selesai
11 21.19-selesai Penyikatan anak tangga Yang menuju Manageman Selesai

Rutinitas & Non Rutinitas


Kamis, 20 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 07.54-selesai Spoting Sudut lantai area Teras Belakang Calisto&Exit Yang menuju Timezon Selesai
3 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
4 08.05-selesai Pembersihan Lumut Air mancur Selesai
5 09.15-selesai Spoting Dinding Logo Ace Hadware samping Loading Ace Hadware Selesai
6 14.09-selesai Dusting Box Hydrant all area Zona Selesai
7 14.11-selesai Pembersihan Gutter area Jalan Daha Selesai
8 21.00-selesai Pencucian lantai area Teras luar depan Asus sampai dengan depan BNI Selesai
9 21.16-selesai Pembersihan Grill Ac area Timur lantai satu Lanjut
10 21.17-selesai Penyikatan anak tangga Yang Menuju Hypermart Selesai

Rutinitas & Non Rutinitas


Ju'mat, 21 Pebruari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 09.47-selesai Glass Cleaning Kaca Bundaran luar Atrium, Di area Roof Toof Selesai
3 12.22-selesai Vacuming Urinoil Toilet Pria Lantai satu , Urinoil No 4 Dari sebelah kanan Lanjut
4 12.39-selesai Spoting Dinding Area Lorong Exit toilet timur lantai Dasar Selesai
5 14.16-selesai Spoting Anak tangga Exit yang Menuju Natasha Selesai
6 14.19-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
7 21.14-selesai Suport pemasangan Karpet untuk pameran area Depan Pin-Q Selesai
8 21.23-selesai Brushing jembatan hypermart Selesai

Rutinitas & Non Rutinitas


Sabtu, 22 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.30-selesai Glass Cleaning Kaca Canovi Loby Barat Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.15-selesai Spoting Sudut lantai Teras Belakang Calisto Selesai
4 08.24-selesai Cleaning rooling door Tenant, area Loby selatan lantai Dasar Lanjut
5 08.43-selesai Wall Cleaning Area Lorong exit toilet lantai satu barat Selesai
6 08.47-selesai Glass Cleaning Kaca ATM Galery Selesai
7 08.53-selesai Vacuming Karpet Mushola Dasar Selesai
8 09.19-selesai Spoting Landing Escalator Area Escalator timur Barat Selesai
9 14.00-selesai Dusting Apar , Standing Astray , Dan Box hidrant all area Selesai
10 14.30-selesai Pembersihan Gulma Di area Tembok miring turunan jembatan palkir motor Lanjut
11 21.00-selesai Cleaning rooling door Tenant, area Loby barat lantai satu Lanjut
12 21.04-selesai Dusting Kap lampu area Textum Selesai
13 21.30-selesai Brushing lantai teras tempat Wudhu mushola Dasr Selesai

Rutinitas & Non Rutinitas


Minggu, 23 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.30-selesai Brushing Lantai kulit jeruk Depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.47-selesai Spoting pilar pilar luar Area Pilar palkiran hypermart Lanjut
4 14.00-selesai Pembersihan sarang laba laba di area Loading mal Selesai
5 14.14-selesai Pembersihan Roof toof area Roof toof Hypermart Lanjut
6 14.27-selesai Pembersihan Gulma Di area Tembok miring turunan jembatan palkir motor Lanjut
7 21.00-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
8 21.22-selesai Washing Nomet jembatan hypermart Selesai
9 21.30-selesai Washing Standing astray alll area Selesai
10 22.30-selesai Pencucian lantai all area lantai satu dan Dasar ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin, 24 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 07.41-selesai Glass cleaning Kaca Dalam textum Selesai
3 09.15-selesai Suport perapihan Kabel yang Berseliwiran di area depan Papyrus Lt Dasar Selesai
4 14.00-selesai Pembersihan puing di area Bawah Neon pool nya Hypermart area Roof toof Lanjut
5 14.19-selesai Pembersihan gutter area jalan daha Lanjut
6 21.10-selesai Pembersihan Grill ac area barat lantai dasar Lanjut
7 21.19-selesai Plapon Cleaning Area luar Loby utama Selesai
8 21.26-selesai Spoting anak tangga Exit yang Menuju Natasha Selesai

Rutinitas & Non Rutinitas


Selasa, 25 Pebruari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 09.00-selesai Cleaning Rell lift Selesai
3 13.42-selesai Pembersihan Lumut di area Depan LPG palkir Depan Selesai
4 14.00-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
5 14.10-selesai Pembersihan puing di area Bawah Neon pool nya Hypermart area Roof toof Selesai
6 16.23-selesai Pembersihan Lumut dan pasir di area Samping Toilet operasional Lanjut
7 21.04-selesai Pembersihan Bendhol plapon si area Depan J'co Selesai
8 21.06-selesai Pembersihan Air Curten all area Exit Selesai
9 21.07-selesai Brushing area Kantin Baru Selesai
10 21.18-selesai Brushing lantai teras tempat Wudhu mushola Dasr Selesai

Rutinitas & Non Rutinitas


Rabu, 26 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area Lantai dasar ( scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 09.05-selesai Spoting Pilar pilar Depan toko Penguin Selesai
4 09.11-selesai Plapon cleaning Area Depan Elisabeth sampai Spot station Selesai
5 13.00-selesai Cleaning Ruang Gestrape Hypermart Lanjut
6 14.17-selesai Pembersihan Gutter area Jalan Daha Lanjut
7 21.00-selesai Penyikatan anak tangga yang Menuju Manageman Office Selesai
8 21.12-selesai Brushing lantai teras tempat Wudhu mushola Dasr Selesai

Rutinitas & Non Rutinitas


Kamis, 27 Pebruari 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
3 08.48-selesai Dusting Neon Sign Toko Chantime area Loby selatan Selesai
4 12.51-selesai Suport pemasangan Karpet untuk pameran Water Kingdom area Loby Selata Selesai
5 14.05-selesai Pembersihan Sarang laba laba Area langit langit palkir Hypermart Lanjut
6 14.09-selesai Pembersihan Gutter area Jalan Daha Lanjut
7 21.25-selesai Pembersihan Pilar pilar Atriu, utama Lantai Dasar Lanjut

Rutinitas & Non Rutinitas


Ju'mat, 28 Pebruari 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area Lantai dasar dan lantai satu Selesai
2 09.00-selesai Dusting apar apar, area Depan Lift lantai Dasar ,Depan Posko Security Selesai
3 09.07-selesai Dusting Dinding all area Toilet Lanjut
4 14.14-selesai Pemberesan&Pemindahan Besi besi dari Depan Enginering ke Gudang Inul Selesai
5 14.19-selesai Pembersihan sarang laba laba di area langit langit palkir motor Lt Dasar Lanjut
6 14.31-selesai Pembersihan Roof toof Selesai
7 21.00-selesai Suport Bongkaran dan pemindahan Counter Cendol Keraton,Ke Loading Mal Selesai
8 21.20-selesai Brushing lantai Cone block Palkir Delivery Lanjut
9 21.40-selesai Suport pemasangan Karpet pameran matahari di area Entrance Lt 1 &Dasar Selesai

Cikarang, 28 Februari 2014,

Di Buat oleh Diketahui Oleh,

Erpan.Kusnadi Bpk,Eko.S/Endro
Supervisor House Keeping
Rutinitas & Non Rutinitas
Sabtu, 01 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing Lantai Cone Block Palkir Delivery Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.25-selesai Cleaning Rooling Door Tenant area barat Lantai Dasar Lanjut
4 09.10-selesai Vacuming Karpet Mushola Dasar Selesai
5 09.19-selesai Pembersihan sarang laba laba all area Pintu Lobby Selesai
6 13.37-selesai Glass Cleaning Kaca Luar Ace Hadware Selesai
7 14.00-selesai Pembersihan Puing Di area Roof toof Barat Lanjut
8 14.22-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
9 14.20-selesai Pembersihan Gulma Di Bawah pagar Tralis area Palkir Motor Lanjut
10 14.31-selesai Pembersihan Gutter area Jalan Daha Lanjut
11 21.00-selesai Spoting Pilar pilar Atrium area Lantai satu Dan Dasar Lanjut
12 21.14-selesai Brushing Jembatan Hypermart Selesai
13 21.15-selesai Penyikatan anak tangga gedung Bagian luar Depan Engeneering Selesai

Rutinitas & Non Rutinitas


Minggu, 02 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing Lantai Kulit Jeruk Area Depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.08-selesai Cleaning Rooling Door Area Timur lantai Satu Lanjut
4 08.44-selesai Penyikatan Anak tangga Exit samping A&K Selesai
5 09.07-selesai Pembersihan Dinding Area Lorong Yang Menuju toilet Lantai Satu Selesai
6 09.39-selesai Glass Cleaning Jendela Bagian luar Manageman Office Selesai
7 14.20-selesai Dusting bola lampu taman Area Barat palkir Depan Lanjut
8 14.25-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
9 14.33-selesai Penyikatan anak tangga Exit Timur Textum Selesai
10 21.18-selesai Washing lantai ,area Teras Depan Asus Sampai Dengan Depan BNI (Scrubbing) Selesai
11 21,22-selesai Washing Standing Astray all area Lantai satu Dan dasar Selesai
12 21.23-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
13 21.26-selesai Pembersihan Kap lampu area Textum Selesai
14 21.33-selesai Washing Nomet jembatan Hypermart Selesai
15 22.30-selesai Pencucian lantai all area Gedung ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin, 03 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 07.15-selesai Glass Cleaning Kaca Dalam Textum Selesai
3 08.00-selesai Penyikatan anak tangga Exit yang Menuju Natasha Selesai
4 08.19-selesai Pemberesan Dan perapihan karpet Bekas Pameran Water Kingdom Selesai
5 09.09-selesai Cleaning Dispuser Dan Grill Ac all area Toilet Selesai
6 14.00-selesai Pembersihan puing di Area Roof toof Barat Lanjut
7 14.19-selesai Dusting Box Hydrant all area Zona Selesai
8 21.10-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
Rutinitas & Non Rutinitas
Selasa, 04 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 08.46-selesai Pembersihan Palang pintu toko all area lantai Dasar Selesai
3 09.01-selesai Spoting pilar pilar area timur lantai Satu Selesai
4 10.00-selesai Glass clraning Kaca all area Exit Selesai
5 14.00-selesai Dusting all area pintu Exit Lanjut
6 21.00-selesai Penyikatan anak tangga Exit yang menuju Natasha Selesai
7 21,02-selesai Pembersihan Pipa Plumbing Area Lorong yang Menuju Mushola Selesai
8 21.05-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Rabu, 05 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 09.00-selesai Pembersihan Rooling Door area timur lantai satu Lanjut
4 14.00-selesai Pembersihan Puing di area Roof toof Barat Lanjut
5 21.00-selesai Penyikatan anak tangga yang Menuju Manageman Selesai
6 21.10-selesai Brushing lantai concrit area samping lorong mushola Selesai

Rutinitas & Non Rutinitas


Kamis, 06 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 07.49-selesai Penyikatan anak tangga exit Gedung bagian luar area Tangga Exit Barat Matahari Selesai
3 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
4 08.17-selesai Penyikatan Anak tangga Exit samping Cindy Selesai
5 14.00-selesai Pembersihan Puing Area Roof Toof barat Lanjut
6 21.00-selesai Pembersihan Air Curten all area Exit Selesai
7 21.05-Selesai Pembersihan Rooling Door tenant area Barat lantai Satu Lanjut
8 21.10-selesai Pembersihan kap lampu Textum Selesai
9 21.1-Selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Jum'at, 07 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 09.00-selesai Perapihan Batu Putih air Mancur Selesai
3 09.08-selesai General Cleaning TPS Akhir Lanjut
4 09.40-selesai Glass Cleaning Kaca Luar Bundaran atrium Di area Roof toof Selesai
5 09.46-selesai Cleaning Kap Lampu Dan speaker all area Toilet Selesai
6 14.00-selesai Dusting bola lampu taman Area Barat palkir Depan Lanjut
7 21.10-selesai Brushing Jembatan Hypermart Selesai
8 21.21-selesai Vacuming Karpet Mushola Manageman Office Selesai
9 21.29-selesai Brushing lantai cone block area palkir Delivery Selesai

Rutinitas & Non Rutinitas


Sabtu, 08 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai Cone block Depan Pintu Loby Utama sampai Dengan Air Mancur Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 09.00-selesai Spoting landing Escalator all area Escalator Selesai
4 09.00-selesai Vacuming karpet Mushola Umum Dasar Selesai
5 09.36-selesai Pembersihan sarang laba laba Di area pintu masuk loby Selatan Selesai
6 14.03-selesai Pembersihan Ruang Genset Hypermart Lanjut
7 14.00-selesai Glass Cleaning Kaca Luar Ace hadware Selesai
8 21.10-selesai Spoting Dinding Badan Escalator area Timur dan barat Selesai
9 21.14-selesai Pembersihan Kap lampu area Depan loby utama Lanjut
10 21.30-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Minggu, 09 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai kulit jeruk Depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.15-selesai Penyikatan anak tangga exit timur textum Selesai
4 08.34-selesai Perapihan batu Putih Air Mancur Selesai
5 08.40-selesai Penyikatan anak tangga yang menuju Air Mancur Lanjut
6 14.00-selesai Pembersihan Roof toof Selesai
7 14.18-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
8 14.20-selesai Pembersihan Gutter area Jalan daha Lanjut
9 21.00-selesai Washing standing astray all area Selesai
10 21.10-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
11 21.17-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
12 21.31-selesai Washing Nomet jembatan Hypermart Selesai
13 22.30-selesai Pencucian lantai all area Gedung ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin, 10 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Penukaran Nomet Kotor Dengan Nomet Baru area Jembatan Hypermart Selesai
2 07.30-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.00-selesai Glass cleaning kaca Dalam Textum Selesai
4 08.45-selesai Pembersihan Gutter Area Depan Kantin Dan Samping Kantin Lanjut
5 14.00-selesai Dusting all area Pintu Exit Lanjut
6 14.25-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
7 21.00-selesai Pembersihan Pipa Plumbing Area Lorong Yang Menuju Mushola Selesai
8 21.11-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
9 21.15-selesai Pembersihan Grill Ac area Lantai Dasar Barat Lanjut
Rutinitas & Non Rutinitas
Selasa, 11 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 08.50-selesai Washing tempat sampah all area Zona Selesai
3 09.00-selesai Glass cleaning Kaca pintu pintu Exit Selesai
4 09.20-selesai Cleaning Rell Lift lantai satu Dan Dasar Selesai
5 14.08-selesai Pembersihan Roop toop Lanjut
6 14.19-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
7 21.00-selesai Suport Penggantian Karpet Soplent QiQi di area Depanj Stobery Selesai
8 21.20-selesai Pemasangan Panggung Valet Di area Depan Salemba Selesai

Rutinitas & Non Rutinitas


Rabu, 12 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 09.17-selesai Glass Cleaning Kaca Mushola Umum Selesai
4 13.28-selesai Pemasangan batu kanstin di sepanjang jalur kanovi Musola , belakang Hokben Selesai
5 14.00-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
6 14.02-selesai Pembersihan Ruang Genset MLC Lanjut
7 14.07-selesai Pembersihan Roof toof Lanjut
8 21.00-selesai Pemberesan Panggung Bekas acara Di area Depan Salemba Selesai

Rutinitas & Non Rutinitas


Kamis, 13 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai General Cleaning Escalator All area Escalator Timur-Barat Selesai
2 07.21-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
3 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
4 09.00-selesai Glass Cleaning Kaca Atm Gallery Selesai
5 09.05-selesai Pembersihan Akubin Atm Gallery Selesai
6 09.25-selesai Pembersihan Kap Lampu area Textum Selesai
7 14.21-selesai Pembersihan Puing Di area Roof toof barat Lanjut
8 21.09-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
9 21.12-selesai Pembersihan Gril Ac area Barat Lantai Dasar Lanjut
10 21.19-selesai Pembersihan Rooling Door Tenant Area Timur Lantai Dasar Lanjut
11 21.24-selesai Pembersihan Rooling Door Tenant Area Barat lantai Satu Lanjut

Rutinitas & Non Rutinitas


Jum'at, 14 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 08.49-selesai Pembersihan Gulma Di area Depan Atm Gallery Lanjut
3 09.20-selesai Penyikatan Tangga Palkiran Motor Selesai
4 09.37-selesai Pembersihan Kap lampu dan Speaker all area Toilet Selesai
5 09.27-selesai Suport pemasangan Karpet Widia Dara Di area Depan Kedai Mie lantai Dasar Selesai
6 14.13-selesai Pembersihan Bola Lampu Taman Area Palkir Depan Lanjut
7 14.18-selesai Pembersihan Gulma Di area Roof Toof Barat Lanjut
8 14.21-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
9 21.20-selesai Brushing jembatan Hypermart Selesai
10 21.30-selesai Vacuming karpet Mushola Manageman Office Selesai

Rutinitas & Non Rutinitas


Sabtu,15 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 08.06-selesai Penyikatan anak tangga Yang menuju air mancur Selesai
3 08.30-selesai Pembersihan Bilboard Tenant Selesai
4 08.52-selesai Spoting pilar pilar area lantai satu Lanjut
5 14.21-selesai Pencucian lantai area Loading MLC ( Scrubbing ) Selesai
6 14.25-selesai Pembersihan Gutter area Jalan Daha Selesai
7 14.27-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
8 14.30-selesai Pembersihan Jalan Air area Roof toof timur Lanjut
9 21.16-selesai Pembersihan Roling Door Tenant area Timur lantai Satu Lanjut
10 21.30-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
11 21.32-selesai Spoting Pilar pilar area lantai Dasar Lanjut
12 21.39-selesai Penyikatan anak tangga Exit, gedung bagian luar depan Office Engineering Selesai

Rutinitas & Non Rutinitas


Minggu,16 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing lantai Kulit Jeruk Area Depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.25-selesai Penyikatan anak tangga Exit Gedung Bagian luar ,Area tangga Timur Matahari Selesai
4 08.45-selesai Spoting landing Escalator area Timur-barat Selesai
5 09.28-selesai Glass Cleaning Jendela Bagian luar Manageman Office Selesai
6 14.00-selesai Pembersihan Roof toof Lanjut
7 14.18-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
8 14.20-selesai Pembersihan Gutter area Jalan daha Lanjut
9 21.00-selesai Washing lantai ,area Teras Depan Asus Sampai Dengan Depan BNI (Scrubbing) Selesai
10 21.14-selesai Washing Nomet Jembatan Hypermart Selesai
11 21.20-selesai Washing Standing astray all area Lantai satu Dan Dasar Selesai
12 21.21-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
13 22.30-selesai Pencucian lantai all area Gedung ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin,17 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 07.30-selesai Glass Cleaning Kaca Dalam Textum Selesai
3 14.00-selesai Pembersihan Roof toof Selesai
4 14.18-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
5 14.20-selesai Pembersihan Gutter area Jalan daha Lanjut
6 21.00-selesai Penyikatan anak tangga Exit Yang Menuju Manageman Office Selesai
7 21.22-Selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Selasa,18 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Pembersihan Kaca Luar Textum Menggunakan Mobil Curine Selesai
2 08.30-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.45-selesai Washing Tempat sampah all area Zona Depan Selesai
4 14.00-selesai Pembersihan Gutter Dan saluran air Area Roof Toof Barat Lanjut
5 14.09-Selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
6 21.00-selesai Cleaning Grill AC area Barat Lantai Satu Lanjut
7 21.40-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Rabu,19 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai dasar ( scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.09-selesai Perapihan Batu Putih Air Mancur Selesai
4 09.33-Selesai Glass Cleaning kaca Mushola Umum Selesai
5 14.00-selesai Pembersihan Gutter Dan saluran air Area Roof Toof Barat Lanjut
6 14.31-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
7 14.34-selesai Pembersihan Gutter Area Jalan Daha Lanjut
8 14.45-selesai Pembersihan Gulma Area Depan Matahari Selesai
9 21.11-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
10 21.15-selesai Pembersihan Rooling Door Tenant Area Barat Lantai Dasar Selesai
11 21.25-selesai Penyikatan anak atangga yang menuju manageman office Selesai

Rutinitas & Non Rutinitas


Kamis,20 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area lantai satu ( Scrubbing ) Selesai
2 07.49-selesai Penyikatan anak tangga exit Gedung bagian luar area Tangga Exit Barat Matahari Selesai
3 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
4 08.17-selesai Penyikatan Anak tangga Exit samping Cindy Selesai
5 14.00-selesai Pembersihan Puing Area Roof Toof barat Lanjut
6 21.00-selesai Pembersihan Air Curten all area Exit Selesai
7 21.05-Selesai Pembersihan Rooling Door tenant area Barat lantai Satu Lanjut
8 21.10-selesai Pembersihan kap lampu Textum Selesai
9 21.1-Selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Jum'at,21 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 08.15-selesai Pembersihan Dispuser dan Speaker all area Toilet Selesai
3 09.00-selesai Penyikatan anak tangga palkir motor Selesai
4 09.15-selesai General cleaning TPS akhir Lanjut
5 09.21-selesai Penyikatan anak tangga gedung bagian luar Exit barat Matahari Selesai
6 09.24-selesai Cleaning Kap lampu all area Toilet Selesai
7 20.8-selesai Suport pemasangan Karpet Untuk Pameran,area Depan Pin-Q Selesai
8 21.28-selesai Vacuming Karpet Mushola MO Selesai
9 21.34-selesai Brushing Jembatan Hypermart Selesai

Rutinitas & Non Rutinitas


Sabtu,22 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 08.05-selesai Spoting pilar pilar Area Barat Lantai satu Selesai
3 08.15-selesai Penyikatan Anak tangga Area Yang Menuju Air Mancur Selesai
4 08.25-selesai Vacuming Karpet Mushola Dasar Selesai
5 14.00-selesai Prembersihan Roof Toof Lanjut
6 21.26-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
7 21.41-selesai Penyikatan anak tangga Exit Depan Enggenering Selesai

Rutinitas & Non Rutinitas


Minggu,23 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing Lantai Kulit Jeruk Depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.17-selesai Penyikatan Anak Tangga Exit Samping A&K Selesai
4 09.01-selesai Penyikatan Anak Tangga Exit Yang Menuju Mutiara Dental Clinik Selesai
5 14.18-selesai Pembersihan Puing Puing Dan Gulma Di area Roof Toof Barat Lanjut
6 21.00-selesai Pencucian lantai area Teras Depan ASUS sampai Dengan Depan BNI ( Scrubbing ) Selesai
7 21.13-selesai Washing Standing Astray all area Selesai
8 21.27-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
9 21.30-selesai Washing Nomet Jembatan Hypermart Selesai
10 22.30-selesai Pencucian lantai all area Gedung ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin,24 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing Lantai Kulit Jeruk Depan Queen Café Selesai
2 07.23-selesai Glass Cleaning Kaca Dalam Textum Selesai
3 08.06-selesai Spoting anak tangga exit yang Menuju Natasha Selesai
4 14.21-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
5 14.23-selesai Pembersihan Gutter area Jalan Daha Lanjut
6 14.33-selesai Pembersihan Puing Puing Dan Gulma Di area Roof Toof Barat Lanjut
7 21.34-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Selasa,25 Maret 2014
No Jam Pekerjaan Keterangan
1 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 09.00-selesai Washing Tempat sampah all area Zona Belakang Selesai
3 14.00-selesai Pembersihan Puing Puing Dan Gulma Di area Roof Toof Barat Lanjut
4 14.22-selesai Spoting anak tangga Exit Yang Menuju Natasha Selesai
5 20.36-selesai Suport Pemasangan Karpet Untuk Pameran , Di Area Depan Elizabeth Selesai
6 21.09-selesai Pembersihan Griil ac area Barat Lantai Satu Selesai
7 21.14-selesai Pembersihan Griil Ac Area Selatan lantai Dasar Selesai

Rutinitas & Non Rutinitas


Rabu,26 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian lantai all area Lantai Dasar ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.02-selesai Kristalisasi lantai Teras Loby Selatan Selesai
4 08.30-selesai Perapihan Batu Putih Air Mancur Selesai
5 09.20-selesai Glass Cleaning Kaca Mushola Dasar Selesai
6 11.21-selesai Suport Pembobokan Plapon area Depan Ace hadware Menggunakan Scapoldhing Selesai
7 14.00-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
8 21.00-selesai Pembersihan Dack Parapet Bagian Atas Di area Timur Lantai Satu Lanjut
9 21.13-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
10 21.18-selesai Pencucian lantai area Loading Mal ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Kamis,27 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Pencucian Lantai All area Lantai Satu ( Scrubbing ) Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 14.00-selesai Pembersihan sarang laba laba Di langit langit palkir Hypermart Lanjut
4 21.10-selesai Suport Pemasangan Karpet Untuk Pameran baru Di area Belakang CS ukuran 2X2 Selesai
5 20.21-selesai Suport Pemasangan Karpet Untuk Pameran baru area Depan Elizabeth ukuran 2X3 Selesai
6 21.16-selesai Pembersihan Dack Parapet Bagian Atas Di area Timur Lantai Satu Lanjut
7 21.27-selesai Pembersihan Cup Lampu Area Textum Selesai

Rutinitas & Non Rutinitas


Jum'at,28 Maret 2014
No Jam Pekerjaan Keterangan
1 07.46-selesai Wall Cleaning Di area Samping Loading Ace Hadware menggunakan Scapholding Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.28-selesai Penyikatan Anak tangga Palkir Motor Selesai
4 08.38-selesai Pembersihan Dispuser Ac all area Toilet Selesai
5 09.01-selesai General Cleaning TPS akhir Lanjut
6 09.19-selesai Penyikatan anak tangga yang menuju Hypermart Lanjut
7 11.00-selesai Pembuangan kayu kayu Di area Roof Toof Barat Selesai
8 12.00-selesai Pembersihan Pipa Hydrant Di area Samping Kantin Baru Selesai
9 14.00--selesaiPembersihan Gulma Di area Roof Toof timur Lanjut
10 14.17-selesai Spoting Anak Tangga Yang Menuju Natasha Selesai
11 21.09-selesai Penyikatan anak tangga yang menuju Hypermart Selesai
12 21.24-selesai Brushing jembatan Hypermart Selesai
13 21.27-selesai Vacuming Karpet Mushola Manageman Office Selesai

Rutinitas & Non Rutinitas


Sabtu,29 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Glass Cleaning Kaca Kanovi Loby Barat Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.15-Selesai Spoting anak tangga Exit Timur Textum Selesai
4 09.56-selesai Dusting AC mushola Selesai
5 14.00-selesai Pembersihan Gulma Area Roof Toof Timur Lanjut
6 21.24-selesai Pembersihan Dack Parapet Bagian Atas Di area Timur Lantai Satu Selesai
7 21.30-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai

Rutinitas & Non Rutinitas


Minggu,30 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Brushing Lantai Kulit jeruk Depan Queen Café Selesai
2 08.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
3 08.31-selesai Spoting sudut lantai,Dinding area Samping Matahari Area Teras Barat Matahari Lanjut
4 08.55-selesai Pembersihan Sisa Cat Di Dinding bagian atas Toilet Lantai satu Lanjut
5 14.00-selesai Pembersihan Puing Puing Area Roof Toof Timur Selesai
6 14.23-selesai Pembersihan sarang Laba laba Di area Loading Mal Selesai
7 21.00-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
8 22.30-selesai Pencucian lantai all area Gedung ( Scrubbing ) Selesai

Rutinitas & Non Rutinitas


Senin,31 Maret 2014
No Jam Pekerjaan Keterangan
1 07.00-selesai Dry Buffing all area lantai satu dan dasar Selesai
2 07.21-selesai Glass Cleaning Kaca Dalam Textum Selesai
3 07.36-selesai Vacuming Kursi Bangku Stap Manageman Office Selesai
4 07.50-selesai Pembersihan Pipa Plumbing Area Palkir Hypermart samping Ace Hadware Lanjut
5 10.50-selesai Suport Pemindahan gerobak Bakwan surabaya Dari Kantin Lama Ke gudang Inul Selesai
6 14.00-selesai Pembersihan Gulma Area Roof toof timur Lanjut
7 21.00-selesai Penyikatan anak tangga yang Menuju Natasha Selesai
8 21.06-selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing ) Selesai
9 21.14-selesai Brushing Lantai Teras Tempat Wudhu Mushola Dasar Selesai
10 21.22-selesai Washing Nomet Jembatan Hypermart Selesai
Cikarang, 31 Maret 2014,

Di Buat oleh Diketahui Oleh,

Erpan.Kusnadi Bpk,Eko.S/Endro
Supervisor House Keeping
Rutinitas & Non Rutinitas
Jum'at, 01 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.20-Selesai Washing tempat sampah all area parkir depan
4 08.47-Selesai Pembersihan rooling door tenant di area koridor timur lantai satu
5 13.16-Selesai Pembersihan ruang panel samping posko
6 13.26-Selesai Pembersihan ruang MDF timur lantai dasar
7 14.00-Selesai Pembersihan all area pintu kaca exit
8 14.26-Selesai Pembersihan ruang mesin lift timur 1
9 14.27-Selesai Pembersihan gulma dan lumut lumut di area roof toof bundaran atrium
10 14.31-Selesai Pembersihan sarang laba laba di area parkir motor lantai dasar
11 14.37-Selesai Pembersihan gutter di area sepanjang dinding pembatas meedow green
12 21.00-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.14-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
14 21.17-Selesai Penyikatan kanopi polikarbonat di area bawah tangga exit yang menuju natasha
15 21.30-Selesai Pencucian lantai all area textum ( Scrubbing )

Rutinitas & Non Rutinitas


Sabtu, 02 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08. 02-Selesai Pembersihan ruang genset dan trapo area MLC
4 08.05-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
5 09.06-Selesai Pembersihan sarang laba laba di area koridor lantai dasar
6 14.31-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
7 14.34-Selesai Pembersihan ruang panel timur lantai satu
8 17.06-Selesai Pembersihan ruang WCP timur 1
9 21.14-Selesai Pembersihan grill ac area koridor timur lantai satu
10 21.16-Selesai Pembersihan kap lampu gantung area textum
11 21.12-Selesai Pembersihan neon sign tenant di area koridor timur lantai satu
12 21.23-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.26-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
14 21.32-Selesai Penyikatan anak tangga exit area anak tangga exit yang menuju natasha

Rutinitas & Non Rutinitas


Minggu, 03 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.07-Selesai Pembersihan neon sign tenant di area koridor timur lantai satu
3 08.20-Selesai Pembersihan dinding parapet atas menggunakan schafolding di area koridor timur lantai 1
4 14.00-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
5 14.20-Selesai Spoting sudut lantai di area lorong exit toilet barat lantai dasar
6 14.22-Selesai Wall cleaning di area exit samping A&K
7 14.30-Selesai Pembersihan ruang WCP timur 2
8 14.41-Selesai Pembersihan ruang genset area hypermart
9 20.00-Selesai Pembersihan ruang panel barat lantai dasar
10 21.04-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
11 21.09-Selesai Washing standing astray all area lantai dasar dan lantai satu
12 21.10-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
13 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )
Rutinitas & Non Rutinitas
Senin, 04 Januari 2016
No Jam Pekerjaan
1 07.16-Selesai Pembersihan dinding parapet atas menggunakan schafolding di area koridor barat lantai 1
2 07.20-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 07.51-Selesai Pencucian lantai area kantin ( Scrubbing )
4 08.13-Selesai General cleaning valet escalator area escalator timur-barat
5 08.57-Selesai Glass cleaning kaca dalam textum
6 13.26-Selesai Pembersihan ruang sampit area hypermart
7 14.21-Selesai Pembersihan ruang panel barat lantai satu
8 14.30-Selesai Wall cleaning area lorong exit timur textum
9 15.00-Selesai Pembersihan ruang wcp tengah 3
10 21.06-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
11 21.07-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.13-Selesai Pembersihan pilar pilar di area bundaran atrium lantai satu ( Spoting )
13 21.07-Selesai Penyikatan anak tangga exit area tangga exit depan enggenering
14 21.20-Selesai Pembersihan neon sign tenant di area textum

Rutinitas & Non Rutinitas


Selasa, 05 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.10-Selesai Washing tempat sampah all area parkir belakang
3 08.36-Selesai Pembersihan rooling door tenant area atrium 2 lantai satu
4 19.49-Selesai Pembersihan ruang ground trank
5 1`9.53-Selesai Pembersihan ruang LPMDV hypermart
6 20.14-Selesai Pembersihan ruang WCP tengah 4
7 21.00-Selesai Suport pemasangan karpet untuk pameran baru di area samping mochimaru
8 21.10-Selesai Pembersihan kap lampu gantung area textum ( Dusting )
9 21.12-Selesai Brushing area parkir delivery
10 21.13-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
11 21.15-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Rabu, 06 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 07.24-Selesai Glass cleaning kaca kanopi depan pizza
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 08.18-Selesai Glass cleaning kaca kanopi depan kfc
5 08.46-Selesai Glass cleaning kaca kanopi depan BNI
6 09.33-Selesai Pembersihan neon sign tenant di area koridor barat lantai satu
7 12.13-Selesai Pembersihan ruang pompa
8 13.00-Selesai Pembersihan ruang lift barang bagian rell lift
9 13.43-Selesai Pembersihan ruang trapo area hypermart
10 14.18-Selesai Wall cleaning di area exit samping A&K
11 14.22-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
12 14.23-Selesai Pembersihan ruang WCP barat 5
13 14.33-Selesai Pembersihan gutter di area sepanjang dinding pembatas meedow green
14 21.22-Selesai Pembersihan grill ac area loby selatan
15 21.24-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
16 21.29-Selesai Pembersihan griil ac dan dispuser ac all area toilet
17 21.30-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Kamis, 07 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
2 07.59-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju timezone
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 08.22-Selesai Penyikatan anak tangga yang menuju parkir motor atas
5 08.54-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
6 09.22-Selesai Glass cleaning kaca atm gallery
7 08.32-Selesai Pembersihan neon sign tenant di area koridor barat lantai satu
8 13.54-Selesai Pembersihan ruang LPG
9 14.01-Selesai Pembersihan ruang STP
10 14.20-Selesai Pembersihan ruang mesin lift barat 2
11 14 .21-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
12 21.07-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
13 21.15-Selesai Pembersihan neon sign tenant di area koridor barat lantai satu
14 21.22-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju managemant office
15 21.24-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Jum'at, 08 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai area loby utama loby barat dan loby selatan ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.29-Selesai Pembersihan neon sign tenant di area koridor timur lantai dasar
4 09.26-Selesai Pembersihan neon sign tenant di area atrium 2 lantai satu
5 13.26-Selesai Pembersihan ruang fcu esol
6 14.23-Selesai Pembersihan gulma dan genangan air di area roof toof hypermart
7 14.26-Selesai Pembersihan ruang mesin lift timur 1
8 14.30-Selesai Pembersihan pilar pilar parkir hypermart ( Spoting )
9 14.31-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
10 21.12-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
11 21.14-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Sabtu, 09 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.02-Selesai Spoting sudut lantai di area teras depan queen cafe
3 08.08-Selesai Pembersihan pipa plumbing menggunakan sckafollding di area parkir hypermart
4 08.12-Selesai Pembersihan neon sign tenant di area atrium 2 lantai satu
5 08.12-Selesai Pembersihan rooling door tenant di area atrium 2 lantai satu
6 13.31-Selesai Pembersihan ruang fcu calisto
7 14.12-Selesai Pembersihan armater lampu parkir di area parkir samping MDS
8 14.15-Selesai Pembersihan all area box hydrant area parkir
9 14.25-Selesai Pebersihan ruang WCP timur 1
10 14.29-Selesai Pembersihan gulma dan genangan air di area roof toof hypermart
11 14.32-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
12 21.07-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
13 21.16-Selesai Penyikatan anak tangga exit di area exit timur textum
14 21.18-Selesai Pembersihan neon sign tenant di area koridor barat lantai satu
15 21.30-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Minggu, 10 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai General cleaning valet escalator area escalator timur barat
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.27-Selesai Pembersihan pipa plumbing menggunakan sckafollding di area parkir hypermart
4 09.00-Selesai Pembersihan rooling door tenant di area koridor timur lantai dasar
5 13.17-Selesai Pembersihan ruang panel MDS
6 14.17-Selesai Pembersihan armater lampu parkir di area parkir depan
7 14.18-Selesai Pembersihan ruang WCP timur 2
8 14.20-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
9 14.30-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
10 21.09-Selesai Pembersihan neon sign tenant di area koridor barat lantai satu
11 21.11-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
12 21.13-Selesai Brushing area jembatan hypermart
13 21.20-Selesai Spoting sudut lantai di area teras depan pizza dan kfc
14 21.22-Selesai Washing standing astray all area lantai dasar dan lantai satu
15 21.25-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
16 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )

Rutinitas & Non Rutinitas


Senin, 11 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 07.06-Selesai Pembersihan pipa plumbing menggunakan sckafollding di area parkir hypermart
3 07.07-Selesai Pencucian lantai teras loby selatan ( Scrubbing )
4 07.44-Selesai Pencucian lantai area kantin ( Scrubbing )
5 08.26-Selesai Glass cleaning kaca dalam textum
6 13.37-Selesai Pembersihan ruang panel textum
7 14.17-Selesai Pembersihan ruang WCP tengah 3
8 14.19-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
9 14.29-Selesai Pembersihan sarang laba laba di area parkir motor lantai dasar
10 21.06-Selesai Pembersihan neon sign tenant di area atrium 3
11 21.10-Selesai Pembersihan air curten all area pintu loby dan all area exit
12 21.13-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.14-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola

Rutinitas & Non Rutinitas


Selasa, 12 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 09.00-Selesai Pembersihan rooling door tenant di area koridor barat lantai dasar
3 13.12-Selesai Pembersihan panel timur lantai dasar
4 14.00-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
5 14.18-Selesai Pembersihan ruang WCP tengah 4
6 14.12-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
7 21.08-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju managemant office
8 21.12-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
9 21.15-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
10 21.25-Selesai Pembersihan grill ac area koridor barat lantai dasar

Rutinitas & Non Rutinitas


Rabu, 13 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 07.36-Selesai Glass cleaning kaca kanopi area loby barat
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 08.51-Selesai Pembersihan grill ac area atrium 2
5 13.14-Selesai Pembersihan ruang MDF timur lantai dasar
6 14.18-Selesai Pembersihan ruang WCP barat 5
7 14.21-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
8 14.31-Selesai Pembersihan pilar pilar area hypermart
9 14.32-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
10 21.17-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
11 21.18-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.20-Selesai Pembersihan kap lampu area textum ( Dusting )

Rutinitas & Non Rutinitas


Kamis, 14 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.41-Selesai Pembersihan rooling door tenant di area koridor barat lantai dasar
3 08.52-Selesai Washing tempat sampah area parkir depan
4 09.26-Selesai Glass cleaning kaca atm gallery
5 13.14-Selesai Pembersihan ruang panel timur lantai satu
6 14.14-Selesai Pembersihan ruang mesin lift barat 2
7 14.17-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
8 21.00-Selesai Washing nomet area jembatan hypermart
9 21.05-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
10 21.09-Selesai Pembersihan neon sign tenant di area atrium 3
11 21.13-Selesai Dry vacum area karpet managemant office
12 21.21-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.23-Selesai Pembersihan rooling door tenant di area koridor barat lantai dasar

Rutinitas & Non Rutinitas


Jum'at, 15 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.44-Selesai Brushing area depan TPS
3 13.00-Selesai Pembersihan ruang panel barat lantai dasar
4 14.25-Selesai Pembersihan ruang mesin lift timur 1
5 14.27-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
6 14.34-Selesai Pembersihan sarang laba laba di area parkir motor
7 21.00-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
8 21.19-Selesai washing baby rooler yang terkena ompol
9 21.30-Selesai Pelepasan karpet di area atrium utama

Rutinitas & Non Rutinitas


Sabtu, 16 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.26-Selesai Pembersihan bilboard tenant dari bank danamon sampai batik keris di atas kaca kanopi BNI
4 09.00-Selesai Pembersihan neon sign tenant di area atrium 3 lantai satu
5 09.49-Selesai Suport vacuming di area sudut kaca toko SIMURA
6 13.19-Selesai Pembersihan ruang panel barat lantai satu
7 14.26-Selesai Pembersihan gulma dan lumut lumut di area roof toff timur
8 14.16-Selesai Pembersihan ruang WCP timur 1
9 14.30-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
10 14.32-Selesai Pembersihan sarang laba laba di area parkir motor lantai dasar
11 14.40-Selesai Pembersihan armater lampu parkir di area parkir depan ( Dusting )
12 21.17-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.19-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
14 21.22-Selesai Suport pemasangan karpet pameran untuk di area atrium 3 lantai satu
15 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )
Rutinitas & Non Rutinitas
Minggu, 17 Januari 2016
No Jam Pekerjaan
1 07.30-Selesai Pembersihan bilboard tenant dari bank danamon sampai batik keris di atas kaca kanopi BNI
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.04-Selesai Glass cleaning kaca kanopi atas atm gallery
4 08.22-Selesai Brushing lantai coneblock di area depan LPG ex proyek sampit
5 09.00-Selesai Dry vacum di area karpet mushola umum lantai dasar
6 13.15-Selesai Pembersihan ruang ground trank
7 14.23-Selesai Pembersihan ruang gulma dan lumut lumut di area roof toof timur
8 14.28-Selesai Pembersihan ruang wcp timur 2
9 14.39-Selesai Pembersihan armater lampu parkir di area depan queen cafe parkir depan
10 21.00-Selesai Pembersihan neon sign tenant di area loby barat lantai dasar
11 21.06-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.13-Selesai Brushing lantai concrette di area air mancur parkir depan
13 21.18-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
14 21.23-Selesai Pembersihan ac kaset di area loby barat lantai dasar
15 21.25-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
16 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )

Rutinitas & Non Rutinitas


Senin, 18 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 07.04-Selesai Washing lantai teras area loby selatan ( Scrubbing )
3 07.13-Selesai Pencucian batu hias air mancur
4 07.21-Selesai Glass cleaning kaca dalam textum
5 08.00-Selesai Pencucian lantai area kantin ( Scrubbing )
6 08.26-Selesai General cleaning valet escalator area escalator timur-barat
7 13.20-Selesai Pembersihan ruang pompa
8 14.10-Selesai Pembersihan ruang WCP tengah 3
9 14.17-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
10 14.26-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
11 21.17-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.23-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.30-Selesai Brushing coneblock area parkir delivery

Rutinitas & Non Rutinitas


Selasa, 19 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.11-Selesai Pembersihan pipa plumbing menggunakan sckafollding di area parkir hypermart
3 13.31-Selesai Pembersihan ruang STP
4 14.23-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
5 14.24-Selesai Pembersihan ruang WCP tengah 4
6 21.08-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
7 21.11-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
8 21.13-Selesai Pembersihan air curten area all area exit
9 21.15-Selesai Pembersihan grill ac area atrium 2 dan koridor timur lantai satu
10 21.16-Selesai Pembersihan kap lampu gantung area textum

Rutinitas & Non Rutinitas


Rabu, 20 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.01-Selesai Pembersihan pipa plumbing menggunakan sckafollding di area parkir hypermart
4 08.44-Selesai Pembersihan rooling door tenant di area koridor loby selatan ( Dusting )
5 12.36-Selesai Pembersihan ruang panel samping posko
6 14.08-Selesai Pembersihan ruang WCP barat 5
7 14.09-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
8 14.20-Selesai Pembersihan sarang laba laba di area parkir motor
9 14.22-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
10 21.07-Selesai Pembersihan grill ac di area textum
11 21.10-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
12 21.15-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
13 21.30-Selesai Brushing lantai coneblock di area samping pizza hut

Rutinitas & Non Rutinitas


Kamis, 21 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.12-Selesai Pembersihan pipa plumbing menggunakan sckafollding di area parkir hypermart
4 08.53-Selesai Pembersiha neon sign tenant di area inul vista dan coffe break
5 13.10-Selesai Pembersihan ruang genset mlc dan ruang trapo mlc
6 14.11-Selesai Pemebrsihan gulma dan lumut lumut di area roof toof timur
7 14.20-Selesai Pembersihan sarang laba laba di area langit langit parkir motor
8 14.23-Selesai Pembersihan pilar pilar area parkir hypermart
9 14.38-Selesai Pembersihan ruang lift barat 2
10 17.17-Selesai Brushing coneblock di area bawah giant banner parkir depan
11 21.13-Selesai Pembersihan grill ac area atrium 2 dan koridor timur lantai satu
12 21.21-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.25-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola

Rutinitas & Non Rutinitas


Jum'at, 22 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.15-Selesai Pembersihan pipa plumbing menggunakan sckafollding di area parkir hypermart
3 14.00-Selesai Pembersihan ruang mesin lift timur 1
4 14.14-Selesai Pembersihan pilar pilar area parkir hypermart
5 14.15-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
6 14.25-Selesai Pembersihan ruang genset hypermart
7 14.38-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
8 21.05-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
9 21.07-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
10 21.08-Selesai Pembersihan neon sign tenant di koridor barat lantai dasar
11 21.13-Selesai Wall cleaning di area exit timur textum

Rutinitas & Non Rutinitas


Sabtu, 23 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.15-Selesai Pembersihan rooling door tenant di area koridor timur lantai dasar
3 09.00-Selesai Wall cleaning di area depan pizza loby utama
4 13.00-Selesai Pembersihan ruang sampit area hyperamart
5 14.08-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
6 14.09-Selesai Pembersihan ruang WCP timur 1
7 14.19-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
8 21.08-Selesai Pemebrsihan kipas angin area kantin ( Dusting )
9 21.09-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
10 21.13-Selesai Pembersihan neon sign tenant di area koridor barat lantai dasar
11 21.15-Selesai Pembersihan air curten all area exit
12 21.27-Selesai Penyikatan lantai granit area pinggiran loby utama
13 21.30-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
14 21.33-Selesai Pembersihan rooling door tenant di area koridor timur lantai dasar

Rutinitas & Non Rutinitas


Minggu, 24 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area atrium utama danloby utama ( Scrubbing )
2 07.38-Selesai Brushing lantai coneblock area loby utama sampai dengan air mancur
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 08.15-Selesai Pembersihan neon sign tenant di area koridor barat lantai dasar
5 08.19-Selesai Pembersihan pipa plumbing menggunakan sckafollding di area parkir hypermart
6 13.16-Selesai Pembersihan ruang LPMDV area hypermart
7 21.00-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
8 21.30-Selesai Washing standing astray all area lantai dasar dan lantai satu
9 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )

Rutinitas & Non Rutinitas


Senin, 25 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 07.35-Selesai Pencucian lantai area kantin ( Scrubbing )
3 13.26-Selesai Pembersihan ruang trapo area hypermart
4 14.20-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
5 14.21-Selesai Pembersihan pilar pilar area parkir motor dasar
6 14.28-Selesai Pembersihan gulma dan lumut lumut di area roof toof bundaran atrium
7 21.00-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
8 21.11-Selesai Penyikatan anak tangga yang menuju atrium 3
9 21.17-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
10 21.30-Selesai Brushing lantai concrette di area lorong samping mushola umum

Rutinitas & Non Rutinitas


Selasa, 26 Januari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.11-Selesai Penyikatan anak tangga exit di area anak tangga exit timur dan barat matahari
3 08.19-Selesai Washing tempat sampah all area parkir depan
4 08.22-Selesai Pembersihan neon sign tenant di area koridor loby selatan
5 13.26-Selesai Pembersihan ruang LPG
6 14.04-Selesai Pemberasihan ruang WCP tengah 4
7 14.10-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
8 21.06-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
9 21.08-Selesai Pembersihan lampu emergency di area all area exit ( Dusting )
10 21.09-Selesai Pembersihan neon sign tenant di area koridor timur lantai dasar
11 21.11-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju managemant office
12 21.15-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Rabu, 27 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 07.35-Selesai Glass cleaning kaca kanopi loby barat
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 13.08-Selesai Pembersihan ruang FCU esol
5 14.23-Selesai Pembersihan ruang WCP barat 5
6 14.28-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
7 14.29-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
8 21.00-Selesai Pembersihan grill ac area textum
9 21.05-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
10 21.06-Selesai Pembersihan neon sign tenant di area koridor timur lantai dasar
11 21.22-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.27-Selesai Suport pemasangan karpet untuk pameran baru di area depan body shop

Rutinitas & Non Rutinitas


Kamis, 28 Januari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
2 07.22-Selesai Glass cleaning kaca kanopi depan KFC
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 08.02-Selesai Glass cleaning kaca kanopi depan pizza
5 08.05-Selesai Pembersihan dan pengurasan air mancur klasik di area depan pizza dan depan kfc
6 08.41-Selesai Glass cleaning kaca kanopi depan BNI
7 14.14-Selesai Pembersihan pilar pilar area parkir motor lantai dasar ( Spoting )
8 14.16-Selesai Pembersihan pilar pilar area parkir hypermart
9 14.23-Selesai Pembersihann ruang mesin lift barat 2
10 14.25-Selesai Pembersihan gulma dan lumut lumut di area roof toof bundaran atrium
11 14.38-Selesai Pembersihan ruang FCU calisto
12 21.00-Selesai Pembersihan pilar pilar area koridor timur lantai satu ( Spoting )
13 21.13-Selesai Washing nomet area jembatan hypermart
14 21.17-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
15 21.18-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola

Rutinitas & Non Rutinitas


Jum'at, 29 Januari 2016
No Jam Pekerjaan
1 07.40-Selesai Pencucian lantai area loby utama ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.13-Selesai Pembersihan dan pengurasan air mancur klasik di area depan MDS,Atm gallery,dan P.motor
4 08.26-Selesai Pembersihan neon sign tenant di area atrium 3 lantai satu
5 08.29-Selesai Pembersihan ruang panel textum
6 09.37-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju toilet lantai satu
7 11.25-Selesai Pembersihan sudut lantai di area depan KFC loby utama ( Spoting )
8 13.13-Selesai Pembersihan ruang panel MDS
9 14.09-Selesai Pembersihan ruang mesin lift timur 1
10 14.11-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
11 14.15-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
12 14.17-Selesai Pembersihan pilar pilar area parkir motor lantai dasar ( Spoting )
13 21.03-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
14 21.09-Selesai Brushing area jembatan hypermart
15 21.18-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola

Rutinitas & Non Rutinitas


Sabtu, 30 Januari 2016
No Jam Pekerjaan
1 07.39-Selesai Glass cleaning kaca kanopi exit managemant
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 12.47-Selesai Pembersihan ruang panel textum
4 14.00-Selesai Pembersihan ruang WCP timur 1
5 14.18-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
6 14.22-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
7 14.31-Selesai Dusting all area box hydrant area parkiran
8 21.22-Selesai Penyikatan area tangga atrium 3
9 21.15-Selesai Pembersihan grill ac area atrium 2
10 21.23-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
11 21.25-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
12 21.30-Selesai Penyikatan anak tangga exit area tangga exit depan enggenering

Rutinitas & Non Rutinitas


Minggu, 31 Januari 2016
No Jam Pekerjaan
1 07.35-Selesai Dry vacum all area kursi kursi staff managemant office
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.25-Selesai Penyikatan anak tangga parkir motor
4 13.36-Selesai Pembersihan ruang panel timur lantai dasar
5 14.01-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
6 14.03-Selesai Pembersihan armater lampu parkir di area depan Ace hadware
7 14.07-Selesai Dusting all area box hydrant area parkiran
8 14.08-Selesai Pembersihan sarang laba laba di area parkir motor lantai dasar
9 14.15-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
10 14.16-Selesai Pembersihan ruang WCP timur 2
11 21.00-Selesai Washing standing astray all area lantai dasar dan lantai satu
12 21.05-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
13 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )

Cikarang 01 Februari 2016

Di Buat Oleh Di Ketahui Oleh

Erpan Kusnadi Bpk Eko/Endro


Supervisor House Keeping
Keterangan
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut

Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai

Keterangan
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai

Keterangan
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Rutinitas & Non Rutinitas
Senin, 01 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 07.23-Selesai Pembersihan dak parapet dinding atas menggunakan schafolldong di area koridor timur L1
3 07.24-Selesai General cleaning valet escalator area escalator timur-barat
4 07.30-Selesai Pencucian lantai area kantin ( Scrubbing )
5 07.38-Selesai Glass cleaning kaca dalam textum
6 08.11-Selesai Pencucian lantai area teras loby selatan ( Scrubbing )
7 13.48-Selesai Pembersihan ruang panel samping posko
8 14.09-Selesai Pembersihan ruang lift timur 1
9 14.12-Selesai Pembersihan roof toof area bundaran atrium
10 14.22-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
11 14.23-Selesai Dusting vinil dekorasi di area exit all area yang menuju toilet
12 14.32-Selesai Pembersihan ruang panel MDS
13 21.00-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Selasa, 02 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.17-Selesai Suport pengangkatan pasir di area pintu keluar parkir hypermart
3 08.28-Selesai Pembersihan rooling door tenant di area koridor timur lantai satu
4 13.28-Selesai Pembersihan ruang genset dan ruang trapo MLC
5 14.01-Selesai Pembersihan ruang panel textum
6 14.14-Selesai Pembersihan pilar pilar area parkir motor lantai dasar ( Spoting )
7 14.16-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
8 14.29-Selesai Pembersihan ruang wcp timur 1
9 21.10-Selesai Pembersihan neon sign tenant di area koridor timur lantai satu
10 21.14-Selesai Penyikatan anak tangga exit yang menuju managemant office
11 21.20-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
12 21.23-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola

Rutinitas & Non Rutinitas


Rabu, 03 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.39-Selesai Washing tempat sampah all area parkir depan
4 13.40-Selesai Pembersihan ruang genset area hypermart
5 14.00-Selesai Pembersihan ruang panel timur lantai dasar
6 14.10-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
7 14.12-Selesai Pembersihan ruang WCP timur 2
8 14.17-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
9 14.19-Selesai Pembersihan armater lampu parkir di area parkir depan sebelah barat
10 14.24-Selesai Pembersihan all area box hydrant area parkir ( dusting )
11 14.36-Selesai Pembersihan pilar pilar area parkir hypermart ( Spoting )
12 21.00-Selesai Penyikatan anak tangga exit di area anak tangga exit timur textum
13 21.02-Selesai Pembersihan grill ac all area toilet ( Dusting )
14 21.07-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
15 21.10-Selesai Pembersihan neon sign tenant di area textum
16 21.14-Selesai Penyikatan anak tangga exit di area tangga exit yang menuju natasha
17 21.24-Selesai Pembersihan ac kaset di area atm gallery
18 21.30-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Kamis, 04 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.02-Selesai Wall cleaning di area depan gudang pest control
4 09.52-Selesai Pembersihan rooling door tenant di area atrium 2
5 13.12-Selesai Pembersihan ruang sampit hypermart
6 13.51-Selesai Pembersihan ruang MDF timur
7 14.20-Selesai Pembersihan gutter di area jalan daha perbatasan mal dengan meedow green
8 14.22-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
9 14.29-Selesai Pembersihan ruang wcp tengah 3
10 14.31-Selesai Pembersihan gulma dan lumut lumut di area roof toof bundaran atrium
11 14.37-Selesai Pembersihan pilar pilar area parkir motor lantai dasar (spoting)
12 21.06-Selesai Pembersihan neon sign tenant di area textum
13 21.07-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
14 21.09-Selesai Penyikatan ruang lift barang karna bekas tumpahan minyak
15 21.13-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola

Rutinitas & Non Rutinitas


Jum'at, 05 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.44-Selesai Pembersihan rooling door tenant di area koridor barat lantai satu
3 08.46-Selesai Washing tempat sampah all area parkir belakang
4 13.57-Selesai Pembersihan ruang panel timur lantai satu
5 14.07-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
6 14.18-Selesai Pembersihan gulma dan lumut lumut di area belakang managemant office
7 14.20-Selesai Pembersihan ruang wcp tengah 4
8 14.23-Selesai Pembersihan ruang LPMDV hypermart
9 21.02-Selesai Pembersihan neon sign tenant di area textum
10 21.09-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
11 21.19-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola

Rutinitas & Non Rutinitas


Sabtu 06 Februari 2016
No Jam Pekerjaan
1 07.31-Selesai Pembersihan rooling door tenant di area koridor timur lantai satu
2 07.59-Selesai Pembersihan sampah sampah struk di area atm- atm yang berada di atm gallery
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 08.08-Selesai Pembersihan neon sign tenant di area koridor barat lantai satu
5 13.20-Selesai Pembersihan ruang trapo area hypermart
6 13.44-Selesai Pembersihan ruang panel barat lantai dasar
7 14.25-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
8 14.27-Selesai Pembersihan ruang wcp barat 5
9 21.00-Selesai Pemasangan karpet untuk pameran baru di area depan toko mas murni
10 21.14-Selesai Pembersihan sampah sampah lepas di area plapon bawah elevator hypermart
11 21.19-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.20-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.21-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju natasha
14 21.25-Selesai Pembersihan kap lampu gantung area textum

Rutinitas & Non Rutinitas


Minggu 07 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.43-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju gudang timezone
3 13.11-Selesai Pembersihan ruang gas LPG
4 13.17-Selesai Pembersihan ruang panel barat lantai 1
5 14.12-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
6 14.13-Selesai Pembersihan ruang lift barat 2
7 14.16-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
8 14.19-Selesai Pembersihan kap lampu area parkir depan area depan MDS
9 14.23-Selesai Pembersihan gutter area samping BNI
10 21.00-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
11 21.03-Selesai Pembersihan neon sign tenant di area atrium 2 lantai satu
12 21.13-Selesai Pembersihan air curten all area exit
13 21.15-Selesai Pembersihan rooling door tenant di area koridor barat lantai dasar
14 21.21-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
15 21.25-Selesai Washing standing astray all area lantai dasar dan lantai satu
16 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )

Rutinitas & Non Rutinitas


Senin 08 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 07.21-Selesai Pembersihan rooling door tenant di area koridor barat lantai dasar
3 07.23-Selesai Pencucian lantai area kantin ( Scrubbing )
4 07.33-Selesai Pembersihan bolboard tenant dari bank danamon sampai batik keris atas kaca kanopi BNI
5 08.03-Selesai Penyikatan anak tangga exit samping exsport
6 08.05-Selesai Glass cleaning kaca dalam area textum
7 08.25-Selesai Pencucian lantai area loby selatan ( Scrubbing )
8 08.32-Selesai Pembersihan cerobong hexsous yang berwarna kuning di area exit timur roof toof
9 08.47-Selesai Penyikatan anak tangga exit area anak tangga exit yang menuju natasha
10 14.04-Selesai Pembersihan dekorasi vinil di area all exit yang menuju toilet
11 14.12-Selesai Pembersihan pilar pilar area parkir hypermart ( Spoting )
12 16.00-Selesai Pembersihan ruang mesin lift timur 1
13 16.31-Selesai Pembersihan ruang ground trank
14 16.38-Selesai Pembersihan ruang FCU esol
15 21.01-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
16 21.14-Selesai Pembersihan ac kaset di area loby barat
17 21.16-Selesai Pembersihan neon sign tenant di area koridor barat lantai satu
18 21.23-Selesai Pencucian lantai area textum ( Scrubbing )
19 21.25-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
Rutinitas & Non Rutinitas
Selasa 09 Februari 2016
No Jam Pekerjaan
1 07.30-Selesai Pencucian lantai area loby utama lantai dasar ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.40-Selesai Pembersihan rooling door tenant di area koridor barat lantai dasar
4 08.42-Selesai Penyikatan anak tangga parkir motor
5 08.55-Selesai Penyikatan anak tangga exit yang menuju natasha
6 13.10-Selesai Pembersihan ruang pompa
7 13.13-Selesai Pembersihan ruang FCU calisto
8 14.06-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
9 14.10-Selesai Pembersihan ruang wcp timur 1
10 14.12-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
11 21.02-Selesai Penyikatan anak tangga atrium 3
12 21.03-Selesai Pembersihan neon sign tenant di area koridor timur lantai satu
13 21.11-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju mutiara dental clinik
14 21.13-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
15 21.15-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Rabu 10 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.38-Selesai Pembersihan cerobong hexsous yang berwarna kuning di area exit barat roof toof
4 13.09-Selesai Pembersihan ruang panel MDS
5 13.26-Selesai Pembersihan ruang stp
6 14.14-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
7 14.29-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
8 14.29-Selesai Pembersihan ruang wcp timur 2
9 21.10-Selesai Pembersihan neon sign tenant di area atrium 3 lantai satu
10 21.02-Selesai Penyikatan anak tangga atrium 3
11 21.16-Selesai Washing nomet area jembatan hypermart
12 21.18-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Kamis 11 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.19-Selesai Pembersihan dak parapet dinding atas menggunakan schafolldong di area koridor barat L1
4 08.54-Selesai Glass cleaning kaca atm gallery
5 09.00-Selesai Pembersihan rooling door tenant di area loby selatan
6 13.35-Selesai Pembersihan ruang panel area textum
7 14.28-Selesai Pembersihan gulma dan lumut lumut di area roof toof bundaran atrium
8 14.30-Selesai Pembersihan ruang wcp tengah 3
9 21.04-Selesai Pembersihan neon sign tenant di area atrium 3 lantai satu
10 21.10-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
11 21.12-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Jum'at 12 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai area koridor barat ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.22-Selesai Pengangkatan tanah di area parkir motor
4 08.37-Selesai Pembersihan cerobong hexsous yang berwarna kuning di area exit samping exsport
5 08.41-Selesai Pembersihan neon sign tenant di area loby utama
6 12.47-Selesai Pembersihan ruang panel timur lantai dasar
7 14.08-Selesai Pembersihan ruang wcp tengah 4
8 14.11-Selesai Pembersihan gulma dan lumut lumut di area roof toof bundaran atrium
9 14.16-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
10 21.10-Selesai Brushing area jembatan hypermart
11 21.15-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
12 21.19-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
Rutinitas & Non Rutinitas
Sabtu 13 Februari 2016
No Jam Pekerjaan
1 07.12-Selesai Pencucian lantai area loby utama ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.4-Selesai Pebersihan sisa sisa struk di belakang belakang atm di area atm gallery
4 08.21-Selesai Pembersihan neon sign tenant di area koridor barat lantai dasar
5 08.27-Selesai Wall cleaning area depan gudang managemant
6 08.33-Selesai Pembersihan pipa plumbing di area parkir hypermart menggunakan schaffolding
7 09.00-Selesai Pembersihan neon sign tenant area inul vista dan coffe break
8 13.46-Selesai Pembersihan ruang MDF timur
9 14.21-Selesai Pembersihan ruang wcp barat 5
10 14.23-Selesai Pembersihan roof toof area bundaran atrium
11 14.28-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
12 14.29-Selesai Pembersihan gutter area jalan daha depan tps sampai pintu masuk motor
13 21.08-Selesai Pembersihan pilar pilar area bundaran atrium lantai satu
14 21.12-Selesai Pembersihan neon sign tenant di area koridor barat lantai dasar
15 21.15-Selesai Pembersihan grill ac area loby selatan
16 21.22-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
17 21.25-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
Rutinitas & Non Rutinitas
Minggu 14 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai area atrium utama ( Scrubbing )
2 07.43-Selesai Glass cleaning kaca kanopi area loby barat
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 08.11-Selesai Glass cleaning kaca kanopi area depan pizza
5 08.23-Selesai Pembersihan pipa plumbing di area parkir hypermart menggunakan schaffolding
6 08.35-Selesai Glass cleaning kaca kanopi di area depan BNI
7 08.45-Selesai Glass cleaning kaca kanopi di area depan KFC
8 08.54-Selesai Pembersihan neon sign tenant di area koridor barat lantai dasar
9 08.58-Selesai Dry vacum di area karpet mushola bawah
10 09.33-Selesai Pembersihan gutter di area perbatasan mal dengan meedow green
11 13.13-Selesai Pembersihan ruang panel timur lantai satu
12 14.15-Selesai Pembersihan vinil dekorasi di all area yang menuju toilet
13 19.23-Selesai Pembersihan ruang mesin lift barat 2
14 21.01-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
15 21.06-Selesai Washing standing astray all area lantai dasar dan lantai satu
16 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )

Rutinitas & Non Rutinitas


Senin 15 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 07.28-Selesai Pencucian lantai area kantin ( Scrubbing )
3 08.13-Selesai Pencucian lantai area teras loby selatan ( Scrubbing )
4 13.31-Selesai Pembersihan panel barat lantai dasar
5 14.12-Selesai Pemebrsihan ruang mesin lift timur 1
6 14.13-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
7 14.20-Selesai Pembersihan pilar pilar area parkir motor lantai dasar ( Spoting )
8 14.21-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
9 21.04-Selesai Pembersihan kap lampu gantung area textum
10 21.10-Selesai Pembersihan neon sign tenant area koridor barat lantai dasar
11 21.13-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.13-Selesai Pembersihan kipas angin area kantin ( Dusting )
13 21.15-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Selasa 16 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.14-Selesai Washing tempat sampah all area parkir depan
3 08.26-Selesai Pembersihan pipa plumbing di area parkir hypermart menggunakan schaffolding
4 13.37-Selesai Pembersihan ruang panel barat lantai satu
5 14.04-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
6 14.09-Selesai Pembersihan ruang wcp timur 1
7 14.15-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
8 14.28-Selesai Pembersihan armater lampu parkir area parkir depan area depan MDS
9 21.00-Selesai Suport pemasangan karpet setengah atrium di area atrium utama lantai dasar
10 21.11-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
11 21.12-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.15-Selesai Pembersihan grill ac area lantai satu koridor barat - timur
13 21.21-Selesai Pembersihan pilar pilar area atrium utama lantai satu

Rutinitas & Non Rutinitas


Rabu 17 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.45-Selesai Pembersihan pipa plumbing di area parkir hypermart menggunakan schaffolding
4 09.00-Selesai Pembersihan neon sign tenant di area koridor selatan lantai dasar
5 13.06-Selesai Pembersihan ruang ground trank
6 14.28-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
7 14.31-Selesai Pembersihan ruang wcp timur 2
8 14.39-Selesai Pembersihan gutter area jalan daha depan tps sampai depan pintu masuk parkir motor
9 14.40-Selesai Pembersihan pilar pilar area parkir motor lantai dasar ( Dusting )
10 14.42-Selesai Pembersihan pilar pilar area parkir hypermart
11 21.21-Selesai Pembersihan kap lampu area loby barat
12 21.23-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.24-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola

Rutinitas & Non Rutinitas


Kamis 18 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.05-Selesai Pemindahan meja bundar di area kantin opung pindah ke gudang samping inul
4 08.32-Selesai Pembersihan neon sign tenant di area koridor selatan lantai dasar
5 13.23-Selesai Pembersihan ruang pompa
6 14.25-Selesai Pembersihan all area box hydrant area parkir
7 14.26-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
8 14.29-Selesai Pembersihan armater lampu parkir area parkir depan MDS
9 14.34-Selesai Pembersihan ruang wcp tengah 3
10 14.16-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
11 15.53-Selesai Pengangkatan tanah di pinggiran kanstin bawah poul sign ace hadware
12 21.09-Selesai Pembersihan air curten all area exit
13 21.11-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
14 21.12-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
15 21.15-Selesai Pembersihan sudut lantai di area bawah teras atm gallery
16 21.18-Selesai Pembersihan grill ac area lantai dasar

Rutinitas & Non Rutinitas


Jum'at 19 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.02-Selesai Pembersihan air curten all area loby loby
3 08.14-Selesai Pembersihan pipa plumbing di area parkir hypermart menggunakan schaffolding
4 08.36-Selesai Pembersihan rooling door area koridor selatan
5 09.29-Selesai Pembersihan ex lakban di area travelator hypermart
6 14.14-Selesai Pembersihan ruang STP
7 14.17-Selesai Pembersihan ruang wcp tengah 4
8 14.18-Selesai Pembersihan gulma dan lumut lumut di area belakang managemant
9 14.28-Selesai Pembersihan gutter area jalan daha depan tps sampai depan pintu masuk parkir motor
10 15.49-Selesai Pencucian lantai area lorong exit timur textum
11 21.03-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Sabtu 20 Februari 2016
No Jam Pekerjaan
1 07.55-Selesai Pembersihan gutter area samping BNI
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.35-Selesai Polishing sign mal lippo cikarang belakang customer service managemant
4 08.45-Selesai Pembersihan pipa plumbing di area parkir hypermart menggunakan schaffolding
5 09.48-Selesai Pembersihan kap lampu area loby utama
6 14.05-Selesai Pembersihan ruang wcp barat 5
7 14.06-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
8 14.10-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
9 14.13-Selesai Pembersihan gutter area jalan daha
10 14.17-Selesai Pembersihan pilar pilar area parkir hypermart ( Spoting )
11 14.34-Selesai Pembersihan ruang panel samping posko
12 21.12-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.15-Selesai Pembersihan neon sign tenant di area koridor timur lantai dasar

Rutinitas & Non Rutinitas


Minggu 21 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.00-Selesai Pembersihan neon sign tenant di area koridor timur lantai dasar
3 08.00-Selesai Penyikatan anak tangga exit timur matahari
4 08.00-Selesai Pembersihan roof toof atas ruang FCU Esol
5 08.00-Selesai Wall cleaning di area bawah out door ac ace hadware area depan trubus
6 08.00-Selesai Pembersihan ruang genset dan trapo area MLC
7 08.00-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
8 08.00-Selesai Pembersihan ruang mesin lift barat 2
9 08.00-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
10 08.00-Selesai Pembersihan gutter area jala daha
11 08.00-Selesai Pembersihan gutter area samping BNI
12 08.00-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
13 08.00-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
14 08.00-Selesai Washing standing astray all area lantai dasar dan lantai satu
15 08.00-Selesai Penyikatan lantai granit area pinggiran loby utama
16 08.00-Selesai Brushing lantai coneblock area samping pizza
17 08.00-Selesai Pencucian lantai all area gedung ( Scrubbing )

Rutinitas & Non Rutinitas


Senin 22 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 07.23-Selesai Washing batu putih air mancur
3 07.41-Selesai Pencucian lantai area kantin ( Scrubbing )
4 13.14-Selesai Pembersihan ruang genset area hypermart
5 14.09-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
6 14.12-Selesai Pembersihan ruang mesin lift timur 1
7 14.19-Selesai Pembersihan gutter area jalan daha
8 21.07-Selesai Brushing lantai concrette di area lorong samping mushola
9 21.08-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
10 21.10-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Selasa 23 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.16-Selesai Pembersihan kap lampu di area parkir motor lantai dasar
3 08.28-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju gudang timezone
4 13.36-Selesai Pembersihan ruang sampit hypermart
5 14.09-Selesai Pembersihan pilar pilar area parkir motor lantai dasar
6 14.14-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
7 14.18-Selesai Pembersihan ruang wcp timur 1
8 14.24-Selesai Pembersihan pilar pilar area parkir hypermart
9 14.26-Selesai Pembersihan gutter area jalan daha
10 21.07-Selesai Penyikatan lantai granit area pinggiran loby utama depan kfc
11 21.09-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.09-Selesai Brushing coneblock area parkir delivery
13 21.10-Selesai Brushing lantai concrette di area lorong samping mushola
14 21.15-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Rabu 24 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai dasar ( Scrubbing )
2 07.42-Selesai Brushing coneblock area loby utama sampai air mancur
3 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
4 08.40-Selesai Pengurasan dan pembersihan air mancur klasik di area parkir motor
5 12.00-Selesai Wall cleaning di area lorong posko
6 13.15-Selesai Pembersihan ruang LPMDV hypermart
7 14.05-Selesai Pembersihan gutter area jalan daha
8 14.14-Selesai Pembersihan ruang wcp timur 2
9 14.16-Selesai Pembersihan gulma dan lumut lumut di area roof toof bundaran atrium
10 21.19-Selesai Pembersihan grill ac area koridor timur lantai dasar
11 21.34-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
12 21.36-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
13 21.38-Selesai Pembersihan grill ac di area anak tangga atrium 3

Rutinitas & Non Rutinitas


Kamis 25 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Pencucian lantai all area lantai satu ( Scrubbing )
2 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
3 08.16-Selesai Pembersihan dan pengurasan air mancur klasik di area depan atm gallery & depan MDS
4 13.38-Selesai Pembersihan ruang trapo area hypermart
5 14.11-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
6 14.14-Selesai Pembersihan gutter area jalan daha
7 14.19-Selesai Pembersian ruang wcp tengah 3
8 14.24-Selesai Pembersihan lumut lumut dan gulma di area roof toof timur
9 21.00-Selesai Pembersihan neon sign matahari di atas counter o'creffes
10 21.17-Selesai Penyikatan anak tangga exit di area anak tangga exit yang menuju managemant office
11 21.20-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu
12 21.22-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
13 21.24-Selesai Penyikatan anak tangga exit di area anak tangga exit depan enggenering
Rutinitas & Non Rutinitas
Jum'at 26 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.45-Selesai Pembersihan air mancur klasik di area depan pizza dan depan kfc
3 13.00-Selesai Pembersihan ruang LPG
4 14.12-Selesai Pembersihan ruang wcp tengah 4
5 14.15-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
6 21.00-Selesai Suport pemasangan karpet di area atrium 2
7 21.10-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Sabtu 27 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.12-Selesai Dry vacum kursi kursi staf managemant office
3 08.19-Selesai Glass cleaning kaca kanopi area loby barat
4 08.41-Selesai Penyikatan anak tangga exit di area anak tangga exit barat matahari
5 13.09-Selesai Pembersihan ruang FCU Esol
6 14.11-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
7 14.12-Selesai Pembersihan ruang wcp barat 5
8 14.19-Selesai Pembersihan gutter area jalan daha
9 14.22-Selesai Glass cleaning kaca luar ace hadware
10 14.23-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
11 14.26-Selesai Pembersihan armater lampu parkir di area parkir barat depan
12 14.27-Selesai Pembersihan box hydrant all area parkiran
13 21.05-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
14 21.29-Selesai Washing bucket standing astray all area lantai dasar dan lantai satu

Rutinitas & Non Rutinitas


Minggu 28 Februari 2016
No Jam Pekerjaan
1 08.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 08.36-Selesai Pembersihan grill ac area atrium 3 menggunakan schaffolding
3 08.52-Selesai Pembersihan pilar pilar di area koridot barat lantai satu
4 13.14-Selesai Pembersihan ruang FCU calisto
5 14.08-Selesai Pembersihan ruang mesin lift barat 2
6 14.10-Selesai Pembersihan gulma dan lumut lumut di area roof toof timur
7 14.18-Selesai Pembersihan armater lampu parkir di area parkir depan sebelah timur
8 14.21-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
9 21.00-Selesai Washing Standing astray all area lantai dasar dan lantai satu
10 21.08-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
11 21.10-Selesai Penyikatan anak tangga exit di area anak tangga exit timur textum
12 21.14-Selesai Pengangkatan bangku textum agenda rutin malam senin ( Scrubbing )
13 21.18-Selesai Washing nomet area jembatan hypermart
14 23.00-Selesai Pencucian lantai all area gedung ( Scrubbing )

Rutinitas & Non Rutinitas


Senin 29 Februari 2016
No Jam Pekerjaan
1 07.00-Selesai Dry Buffing all area lantai dasar dan lantai satu
2 07.25-Selesai Glass cleaning kaca dalam textum
3 07.37-Selesai Glass cleaning kaca kanopi exit managemant
4 08.00-Selesai Pencucian lantai area kantin ( Scrubbing )
5 13.00-Selesai Pembersihan ruang panel MDS
6 14.00-Selesai Pembersihan ruang mesin lift timur 1
7 14.11-Selesai Pembersihan gulma dan lumut lumut di area roof toof barat
8 14.18-Selesai Pembersihan sarang laba laba di area langit langit parkir hypermart
9 21.00-Selesai Washing Standing astray all area lantai dasar dan lantai satu
10 21.15-Selesai Penyikatan lantai teras tempat wudhu mushola dan spoting dinding tempat wudhu mushola
11 21.18-Selesai Penyikatan anak tangga exit area anak tangga exit yang menuju managemant office

Cikarang 01 Maret 2016

Di Buat Oleh Di Ketahui Oleh

Erpan Kusnadi Bpk Eko/Endro


Supervisor House Keeping
Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai

Keterangan
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai

Keterangan
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Lanjut
Lanjut
Lanjut
Lanjut
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Lanjut
Selesai
Selesai
Selesai
Lanjut

Keterangan
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Keterangan
Selesai
Lanjut
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Keterangan
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Lanjut
Selesai
Selesai
Selesai
Rutinitas & Non Rutinitas

Minggu,31 Desember 2017


No Jam Pekerjaan
1 01,34-Selesai Sweeping Lantai Area Parkiran Motor Bagian Bawah
2 08,00-Selesai Dusting Meja CS Area Lobby Utama Lantai Dasar
3 08,13-Selesai Sweeping & Mopping Lantai Area Selasar Bagian Barat
4 08,45-Selesai Dry Buffing Lantai Koridor Area Lantai Dasar & Lantai Satu
5 09,22-Selesai Dusting Dack Parapet Area Void Koridor Lantai Satu
6 14,32-Selesai Sweeping & Mopping Lantai Area Selasar Bagian Timur
7 14,35-Selesai Pembersihan Sarang Laba-Laba Area Depan Inul Vizta
8 14,37-Selesai Dusting & Sweeping Area Ruang Panel Blower Stp
9 14,39-Selesai Sweeping & Mopping Lantai Area Exit Barat
10 14,40-Selesai Dusting Pintu-Pintu Area Exit
11 14,43-Selesai Dusting NEON SIGN Tenant Mujigae Area Lantai Dasar
12 21,49-Selesai Spoting Anak tangga Area Exit Hanamasa
13 21,54-Selesai Pencucian All Area Standing Astray Lantai Dasar & Lantai Satu

Cikarang 01 Januari 2018

Di Buat Oleh Di Ketahui Oleh

Farhan Bpk Gurning


Foreman Buillding Service
Keterangan
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Lanjut
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Jakarta ,12 Mei 2018

BERITA ACARA
Dengan dibuatnya pernyataan ini sy selaku Penanggung jawab area Supermall Cilegon memastikan
bahwa Karyawan dibawah ini dengan nama :
No Nama Jabatan Tanggal Masuk Ket.
1 Sdr.Faqih Maulana Cleaner 12/4/2018
2 Sdr.Wisnu Maulana Cleaner 12/4/2018
3 Sdr.Umron Febriana R Cleaner 16/04/2018
4 Sdr.Didi Efendi Cleaner 12/4/2018
5 Sdr.Ahmad Junaeni Cleaner 14/04/2018

Bahwa benar karyawan tersebut masih bergabung di area Supermall Cilegon dan aktif.
Demikian berita acara/keterangan ini saya buat untuk dipergunakan dan sebagai mana mestinya,

Atas waktu dan perhatiannya saya ucapkan terima kasih.

Dibuat Oleh Mengetahui

( Hasan ) ( Daiman )
S.Manager Ops.Manager

NB : * Data Absensi Terlampir .

You might also like