Slab Name: s1
For cantilever slab, ENTER "1", otherwise "0" 0
Floor finish 175 kgs/m2
Partition load 100 kgs/m2
Live load: 400 kgs/m2
Input the edge conditions: END CONDITIONS OF SLAB
xxxxxxxxxxxxxxxxxxxxxxxxx
xxxxxxxxxxxx
1- fixed/continuous 0- simple
Continuous along shorter edge 1
0
Continuous along longer edge 1
0
Slab Size:NOT APPLICABLE, Change option for input ENTER "1" to input size in ft dimens
Longer, clear 6.00 m Longer, clear
Shorter, clear 5.00 m Shorter, clear
Minimum spacing 80 mm
Minimum depth of slab 150 mm
Clear cover 20 mm
Steel Grade 420 MPa
Concrete Strength 28 MPa
Depth Revised For Moment: 150.00 Want to change depth? YES=1, NO=0
Final depth 150.00 Suggested depth:
Trial Results:
Calc. Shorter (+) Steel: No. 10 @ 200 mm C/C
Calc. Longer (+) Steel: No. 10 @ 200 mm C/C
Calc. Shorter (-) Steel: No. 10 @ 120 mm C/C
Calc. Longer (-) Steel: No. 10 @ 140 mm C/C
Steel (40) Cost Per Kg = 40 Rs. including cutting, bending and placing
Steel (60) Cost Per Kg = 45 Rs. including cutting, bending and placing
Concrete Per m3 = 4000 Rs. including formwork and contractor's profit
Cement per bag = 350 Rs.
Sand Per m3 = 280 Rs.
Coarse aggregate Per m =
3
700 Rs.
mm C/C
mm C/C
mm C/C
mm C/C
xxxxxxxxxxxx
Minimum spacing 80 mm
Minimum depth of slab= 150 mm 5.00
Clear cover 20.00 mm m
Steel Grade 420 MPa
Concrete Strength 28 MPa
Floor finish 175 kg/m2 6.00 m
Partition walls 100 kg/m2
Live load: 400 kg/m2
Weight
Dia. Length No. No.10 No.13 No.16 No.19
Shorter Bottom 10 4.799 60 161
10 4.799 60 161
Longer Bottom 10 5.698 52 166
10 5.698 52 166
Shorter Top 10 1.800 200 202
10 1.400 200 157
Longer Top 10 2.099 144 169
10 1.620 144 131
Shorter Hangers 10 2.799 8 13
Longer Hangers 10 3.359 8 15
Total weight in kgs: 1407 0 0 0 G.Total= 1407
Volume of Concrete = 18.75 m3 Dry vol. = 31.76 Unit Unit Rate Amount
Steel (40) Cost Per Kg = 40 Rs. Cement= 128.17 Bags @ 350.00 44860
Steel (60) Cost Per Kg = 45 Rs. Sand = 9.07 m3 @ 280.00 2541
Concrete Per m3 = 4000 Rs. Aggregate 5.19 m3 @ 700.00 3630
Total Cost of Slab = 138356 Rs. Steel = 1408.00 Kgs @ 45.00 63360
Total Material Cost = 114391