You are on page 1of 24

្រពះ ជ ច្រកកមពុជ

ជតិ សន ្រពះម ក ្រត គេ្រមងេហ ្ឋ រចនសមពន


័ ធផូ វ្រកុ
្ល ងចំនួន ៣៤
3 ែខ កនុង្រកុង្រពះសីហនុ
គណៈកមមធិករជតិ
្រគប់្រគងនង
ិ អភវិ ឌ តំបន់េឆនរសមុ្រទកមពុជ

Request For Inspection

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 05-June-2020


Reference : RM-RFI-R1-300
Request for inspection for the following works:
Survey works Prime coat Unsuiltable of Materails
Earth works Seal coat Structures
Clearing and Grubbing Concrete Agg Laboratory
Proof Rolling Concrete sand  Other: Benching slope shoulder.
Location
1 Benching slope shoulder PK 0+000 to 1+800 RHS.

Which will be ready on: Date: 06-June-2020


Time: 9.30 am

Contractor's Description of Works: We wourd like to invite you com to side for inspection benching slope shoulder.

Please see attached document pichture of showing location to be Inspected.

Requested by:______________________ Date: 5-Jun-20


(Contractor)
Received by: _______________________ Date:
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង PK 0+000 to 1+800 (ខង ្ត )ំ


kMNt;sMKal;
KMnUstag GkSrkat; briyay
COP pøÚvmankMralebtug
DBP pøÚvmankMralDIb‘ÍeGsFI
LAP pøÚvmankMralRKYsRkhm
SR/FP pøÚvmandIb¤pøÚvefµIreCIg
UD bNþaBaJRbLayrag G‘uy
CA/PO RbLay/ RsHTwk
CAL épÞkar:ULa
CH sMNg;GKarBI\dæ 6.
00
m

WH sMNg;GKarBIeQI Ø3

NH sMy:abb¤tMbUlpÞH
1Ø60 PC lUmUlkat;TTwgpøÚv
1C BC lURbGb;kat;TTwgpøÚv
BR s<an
FE rbgrwgmaM¬\dæ¦
BO RBMdI¬lYsbnøa eQI¦
KMeragG½kSpøÚvfµI
G½kSpøÚvcas;
bNþaBaJlUTwkePøóg
bNþaBaJlUs¥úy
WS bNþaBaJTwks¥at
OCC bNþaBaExSkabeRkamdI
MH rWháaTwklUTwkePøóg
MHW rWháaTwklUTwks¥úy
TL begÁalExSePøIg tg;süúgTab
TLM begÁalExSePøIg tg;süúgmFüm
TLH begÁalExSePøIg tg;süúgx<s;
TE begÁalExSTUrs½BÞ
LP begÁalePøIgbMPøWpøÚv
KP begÁalKILÚEm:Rt 3.50m
ADB begÁalpSayBaNiCökmµ 3.50m
3.50m
10.50m
TR1 edImeQITMh‘¿tUcCag 0>5 Em:Rt
TR2 edImeQITMh‘¿FMCag 0>5 Em:Rt
CO edImdUg
PT edImetñat Center Line - R1 Ex
STA: 0+000 ~ 0+180

l>r éf¶ Ex qñaM kMEN m©as;KeRmag Rkumh‘unsagsg; eQµaH-muxgar htßelxa éf¶ Ex qñaM TItaMgsagsg;³ sßitkñúgXuMram RsukéRBnb; extþRBHsIhnu
sikSa nigKUreday
Rkumh‘un r:Uy:al;emKgÁxnRsáak;&sDIinevILúbEmn KNnaeday eQµaHKeRmag³ KeRmagGPivDÆnehdæarcnasm<½n§mhavifIram
DEVELOPMENT
ROYAL MEKONG CONSTRUCTION & PTE.,LTD.
Binitüeday eQµaHbøg;³ maRtdæan cMnYnsnøwk elxsnøwk
KN³kmµaFikarCatiRKb;RKg nigGPivDÆn_ #81, Street 315, Sankat Boeung Kak II, Tuol Kok, Phnom Penh, Cambodia

tMbn;eqñrsmuRTkm<úCa yl;RBmeday H 1:2000


V 1:200 166 R1-PL-001
STA. 0+010

STA. 0+030

STA. 0+000
STA. 0+020

l>r éf¶ Ex qñaM kMEN m©as;KeRmag Rkumh‘unsagsg; eQµaH-muxgar htßelxa éf¶ Ex qñaM TItaMgsagsg;³ sßitkñúgXuMram RsukéRBnb; extþRBHsIhnu
sikSa nigKUreday
Rkumh‘un r:Uy:al;emKgÁxnRsáak;&sDIinevILúbEmn KNnaeday eQµaHKeRmag³ KeRmagGPivDÆnehdæarcnasm<½n§mhavifIram
DEVELOPMENT
ROYAL MEKONG CONSTRUCTION & PTE.,LTD.
Binitüeday eQµaHbøg;³ maRtdæan cMnYnsnøwk elxsnøwk
KN³kmµaFikarCatiRKb;RKg nigGPivDÆn_ #81, Street 315, Sankat Boeung Kak II, Tuol Kok, Phnom Penh, Cambodia

tMbn;eqñrsmuRTkm<úCa yl;RBmeday 1:200 166 R1-CS-001


STA. 0+050 STA. 0+070

STA. 0+040 STA. 0+060

l>r éf¶ Ex qñaM kMEN m©as;KeRmag Rkumh‘unsagsg; eQµaH-muxgar htßelxa éf¶ Ex qñaM TItaMgsagsg;³ sßitkñúgXuMram RsukéRBnb; extþRBHsIhnu
sikSa nigKUreday
Rkumh‘un r:Uy:al;emKgÁxnRsáak;&sDIinevILúbEmn KNnaeday eQµaHKeRmag³ KeRmagGPivDÆnehdæarcnasm<½n§mhavifIram
DEVELOPMENT
ROYAL MEKONG CONSTRUCTION & PTE.,LTD.
Binitüeday eQµaHbøg;³ maRtdæan cMnYnsnøwk elxsnøwk
KN³kmµaFikarCatiRKb;RKg nigGPivDÆn_ #81, Street 315, Sankat Boeung Kak II, Tuol Kok, Phnom Penh, Cambodia

tMbn;eqñrsmuRTkm<úCa yl;RBmeday 1:200 166 R1-CS-002


STA. 0+110

STA. 0+150

STA. 0+090
STA. 0+130

l>r éf¶ Ex qñaM kMEN m©as;KeRmag Rkumh‘unsagsg; eQµaH-muxgar htßelxa éf¶ Ex qñaM TItaMgsagsg;³ sßitkñúgXuMram RsukéRBnb; extþRBHsIhnu
sikSa nigKUreday
Rkumh‘un r:Uy:al;emKgÁxnRsáak;&sDIinevILúbEmn KNnaeday eQµaHKeRmag³ KeRmagGPivDÆnehdæarcnasm<½n§mhavifIram
DEVELOPMENT
ROYAL MEKONG CONSTRUCTION & PTE.,LTD.
Binitüeday eQµaHbøg;³ maRtdæan cMnYnsnøwk elxsnøwk
KN³kmµaFikarCatiRKb;RKg nigGPivDÆn_ #81, Street 315, Sankat Boeung Kak II, Tuol Kok, Phnom Penh, Cambodia

tMbn;eqñrsmuRTkm<úCa yl;RBmeday 1:200 166 R1-CS-003


្រពះ ជ ច្រកកមពុជ
ជតិ សន ្រពះម ក ្រត គេ្រមងេហ ្ឋ រចនសមពន
័ ផ
ធ ូ វ្រកុ
្ល ងចំនន
ួ ៣៤
3 ែខ កនុង្រកុង្រពះសីហនុ
គណៈកមមធក ិ រជតិ
្រគប់្រគងនង
ិ អភវិ ឌ តំបន់េឆនរសមុ្រទកមពុជ

Request For Inspection

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 08-May-2020


Reference : RM-RFI-R1-287
Request for inspection for the following works:
Survey works Prime coat Unsuiltable of Materails
Earth works Seal coat Structures

 Clearing and Grubbing Concrete Agg Laboratory


Proof Rolling Concrete sand Other:
Location
1 From PK 0+050 to 0+250 BHS.
( Near Road natoinal 4)

Which will be ready on: Date: 09-May-2020


Time: 8.30 AM
Contractor's Description of Works: We wourd like to invite you com to side for inspection clearing and grubbing near
road national 4 for foundabout gardening .
Please see attached Picture showing location to be Inspected.

Requested by:______________________ Date: 08-May-2020.


(Contractor)
Received by: _______________________ Date:
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង ពី Pk 0+050 to 0+250 BHS


្រពះ ជ ច្រកកមពុជ
ជតិ សន ្រពះម ក ្រត គេ្រមងេហ ្ឋ រចនសមពន
័ ផ
ធ ូ វ្រកុ
្ល ងចំនន
ួ ៣៤
3 ែខ កនុង្រកុង្រពះសីហនុ
គណៈកមមធក ិ រជតិ
្រគប់្រគងនង
ិ អភវិ ឌ តំបន់េឆនរសមុ្រទកមពុជ

Request For Inspection

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 25-May-2020


Reference : RM-RFI-R1-293
Request for inspection for the following works:
Survey works Prime coat Unsuiltable of Materails
Earth works Seal coat Structures
 Clearing and Grubbing Concrete Agg Laboratory
Proof Rolling Concrete sand Other:
Location
1 From Station: PK 0+000 to 2+000 RHS at roudadout gardens neer N4

Area = 2 x 100 = 200 m2

Which will be ready on: Date: 26-May-2020


Time: 2.30 PM
Contractor's Description of Works: We wourd like to invite you com to side for inspection Clearing & grubbing of
roudabout garden N4.
Please see attached Picture and Drawing showing location to be Inspected.

Requested by:______________________ Date: 25-May-2020.


(Contractor)
Received by: _______________________ Date:
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង ពី Pk 0+000 to 2+000.


ŪĮйŬď₧şŪ˝˝ņįОď

ďijЊ ⅜₤Ĝ ŪĮйņΉ˝℮Ūij គេ្រមាងេហដារចនាសម្ព័ន្ធផ្លូវ្រកុងចំនួន ៣៤


3 ែខ ក្នុង្រកុង្រពះសីហនុ
Ð‗к˝ŌŊĊЊŁũďijЊ
ŪÐĠсŪÐ₣ĕЊ₣ΒķЊŷűΘijеĠĕсЮđĖ ũ₤ņНŪ◦˝ņįОď

Request For Testing

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 25-May-2020


Reference : RM-RFI-R1-203
Request for inspection for the following works:
Survey works Prime coat Structures
Earth works Seal coat Laboratory
Clearing and Grubbing Concrete Agg  Other: Test FDT.
Proof Rolling Concrete sand
Location
1 Testing FDT Top subgrade from PK 0+000 to 0+200 BHS at roundabout gardens near N4.

Which will be ready on: Date: 26-May-2020


Time: 9.30 am
Contractor's Description of Works:

Requested by:______________________ Date: 06-April-2020.


(Contractor)
Received by: _______________________ Date:________________________
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង PK 0+000 to 0+200 (សងខង)


្រពះ ជ ច្រកកមពុជ
ជតិ សន ្រពះម ក ្រត គេ្រមងេហ ្ឋ រចនសមពន
័ ផ
ធ ូ វ្រកុ
្ល ងចំនន
ួ ៣៤
3 ែខ កនុង្រកុង្រពះសីហនុ
គណៈកមមធក ិ រជតិ
្រគប់្រគងនង
ិ អភវិ ឌ តំបន់េឆនរសមុ្រទកមពុជ

Request For Inspection

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 25-May-2020


Reference : RM-RFI-R1-296
Request for inspection for the following works:
Survey works Prime coat Unsuiltable of Materails
Earth works Seal coat Structures
Clearing and Grubbing Concrete Agg Laboratory
Proof Rolling Concrete sand  Other:Filling stone.
Location
1 From Station: PK 0+000 to 2+000 RHS at roudadout gardens neer N4

Which will be ready on: Date: 26-May-2020


Time: 8.30 AM
Contractor's Description of Works: We wourd like to invite you com to side for inspection filling base coarse layer
roudabout garden N4.
Please see attached Picture and Drawing showing location to be Inspected.

Requested by:______________________ Date: 25-May-2020.


(Contractor)
Received by: _______________________ Date:
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង ពី Pk 0+000 to 2+000.


ŪĮйŬď₧şŪ˝˝ņįОď

ďijЊ ⅜₤Ĝ ŪĮйņΉ˝℮Ūij គេ្រមាងេហដារចនាសម្ព័ន្ធផ្លូវ្រកុងចំនួន ៣៤


3 ែខ ក្នុង្រកុង្រពះសីហនុ
Ð‗к˝ŌŊĊЊŁũďijЊ
ŪÐĠсŪÐ₣ĕЊ₣ΒķЊŷűΘijеĠĕсЮđĖ ũ₤ņНŪ◦˝ņįОď

Request For Testing

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 25-May-2020


Reference : RM-RFI-R1-202
Request for inspection for the following works:
Survey works Prime coat Structures
Earth works Seal coat Laboratory
Clearing and Grubbing Concrete Agg Other:
 Proof Rolling Concrete sand
Location
1 Testing proof rolling Existing road PK 0+100 to 0+200 RHS.

Which will be ready on: Date: 26-May-2020


Time: 9.30 am
Contractor's Description of Works:

Requested by:______________________ Date: 25-May-2020.


(Contractor)
Received by: _______________________ Date:________________________
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង PK 0+100 to 0+200 (ខង ្ត ំ)


្រពះ ជ ច្រកកមពុជ
ជតិ សន ្រពះម ក ្រត គេ្រមងេហ ្ឋ រចនសមពន
័ ផ
ធ ូ វ្រកុ
្ល ងចំនន
ួ ៣៤
3 ែខ កនុង្រកុង្រពះសីហនុ
គណៈកមមធក ិ រជតិ
្រគប់្រគងនង
ិ អភវិ ឌ តំបន់េឆនរសមុ្រទកមពុជ

Request For Inspection

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 25-May-2020


Reference : RM-RFI-R1-294
Request for inspection for the following works:
Survey works Prime coat Unsuiltable of Materails
Earth works Seal coat Structures
Clearing and Grubbing Concrete Agg Laboratory
Proof Rolling Concrete sand  Other:Remove Existing DBST road.
Location
1 From Station: PK 0+000 to 2+000 RHS at roudadout gardens neer N4
2
Area = 7 x 100 = 700 m

Which will be ready on: Date: 26-May-2020


Time: 8.30 AM
Contractor's Description of Works: We wourd like to invite you com to side for inspection Remove Existing DBST road
near roudabout garden N4.
Please see attached Picture and Drawing showing location to be Inspected.

Requested by:______________________ Date: 25-May-2020.


(Contractor)
Received by: _______________________ Date:
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង ពី Pk 0+000 to 2+000.


្រពះ ជ ច្រកកមពុជ
ជតិ សន ្រពះម ក ្រត គេ្រមងេហ ្ឋ រចនសមពន
័ ធផូ វ្រកុ
្ល ងចំនួន ៣៤
3 ែខ កនុង្រកុង្រពះសីហនុ
គណៈកមមធិករជតិ
្រគប់្រគងនង
ិ អភវិ ឌ តំបន់េឆនរសមុ្រទកមពុជ

Request For Inspection

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 05-June-2020


Reference : RM-RFI-R1-301
Request for inspection for the following works:
Survey works Prime coat Unsuiltable of Materails
Earth works Seal coat Structures
Clearing and Grubbing Concrete Agg Laboratory
Proof Rolling Concrete sand  Other: Filling soil embankment.
s
1 Filling soil embankment of shoulder PK 0+000 to 1+800 RHS.

Which will be ready on: Date: 06-June-2020


Time: 9.30 am
Contractor's Description of Works: We wourd like to invite you com to side for inspection Filling soil embankment of
shoulder.
Please see attached document pichture of showing location to be Inspected.

Requested by:______________________ Date: 5-Jun-20


(Contractor)
Received by: _______________________ Date:
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង PK 0+000 to 1+800 (ខង ្ត )ំ


kMNt;sMKal;
KMnUstag GkSrkat; briyay
COP pøÚvmankMralebtug
DBP pøÚvmankMralDIb‘ÍeGsFI
LAP pøÚvmankMralRKYsRkhm
SR/FP pøÚvmandIb¤pøÚvefµIreCIg
UD bNþaBaJRbLayrag G‘uy
CA/PO RbLay/ RsHTwk
CAL épÞkar:ULa
CH sMNg;GKarBI\dæ 6.
00
m

WH sMNg;GKarBIeQI Ø3

NH sMy:abb¤tMbUlpÞH
1Ø60 PC lUmUlkat;TTwgpøÚv
1C BC lURbGb;kat;TTwgpøÚv
BR s<an
FE rbgrwgmaM¬\dæ¦
BO RBMdI¬lYsbnøa eQI¦
KMeragG½kSpøÚvfµI
G½kSpøÚvcas;
bNþaBaJlUTwkePøóg
bNþaBaJlUs¥úy
WS bNþaBaJTwks¥at
OCC bNþaBaExSkabeRkamdI
MH rWháaTwklUTwkePøóg
MHW rWháaTwklUTwks¥úy
TL begÁalExSePøIg tg;süúgTab
TLM begÁalExSePøIg tg;süúgmFüm
TLH begÁalExSePøIg tg;süúgx<s;
TE begÁalExSTUrs½BÞ
LP begÁalePøIgbMPøWpøÚv
KP begÁalKILÚEm:Rt 3.50m
ADB begÁalpSayBaNiCökmµ 3.50m
3.50m
10.50m
TR1 edImeQITMh‘¿tUcCag 0>5 Em:Rt
TR2 edImeQITMh‘¿FMCag 0>5 Em:Rt
CO edImdUg
PT edImetñat Center Line - R1 Ex
STA: 0+000 ~ 0+180

l>r éf¶ Ex qñaM kMEN m©as;KeRmag Rkumh‘unsagsg; eQµaH-muxgar htßelxa éf¶ Ex qñaM TItaMgsagsg;³ sßitkñúgXuMram RsukéRBnb; extþRBHsIhnu
sikSa nigKUreday
Rkumh‘un r:Uy:al;emKgÁxnRsáak;&sDIinevILúbEmn KNnaeday eQµaHKeRmag³ KeRmagGPivDÆnehdæarcnasm<½n§mhavifIram
DEVELOPMENT
ROYAL MEKONG CONSTRUCTION & PTE.,LTD.
Binitüeday eQµaHbøg;³ maRtdæan cMnYnsnøwk elxsnøwk
KN³kmµaFikarCatiRKb;RKg nigGPivDÆn_ #81, Street 315, Sankat Boeung Kak II, Tuol Kok, Phnom Penh, Cambodia

tMbn;eqñrsmuRTkm<úCa yl;RBmeday H 1:2000


V 1:200 166 R1-PL-001
STA. 0+010

STA. 0+030

STA. 0+000
STA. 0+020

l>r éf¶ Ex qñaM kMEN m©as;KeRmag Rkumh‘unsagsg; eQµaH-muxgar htßelxa éf¶ Ex qñaM TItaMgsagsg;³ sßitkñúgXuMram RsukéRBnb; extþRBHsIhnu
sikSa nigKUreday
Rkumh‘un r:Uy:al;emKgÁxnRsáak;&sDIinevILúbEmn KNnaeday eQµaHKeRmag³ KeRmagGPivDÆnehdæarcnasm<½n§mhavifIram
DEVELOPMENT
ROYAL MEKONG CONSTRUCTION & PTE.,LTD.
Binitüeday eQµaHbøg;³ maRtdæan cMnYnsnøwk elxsnøwk
KN³kmµaFikarCatiRKb;RKg nigGPivDÆn_ #81, Street 315, Sankat Boeung Kak II, Tuol Kok, Phnom Penh, Cambodia

tMbn;eqñrsmuRTkm<úCa yl;RBmeday 1:200 166 R1-CS-001


STA. 0+050 STA. 0+070

STA. 0+040 STA. 0+060

l>r éf¶ Ex qñaM kMEN m©as;KeRmag Rkumh‘unsagsg; eQµaH-muxgar htßelxa éf¶ Ex qñaM TItaMgsagsg;³ sßitkñúgXuMram RsukéRBnb; extþRBHsIhnu
sikSa nigKUreday
Rkumh‘un r:Uy:al;emKgÁxnRsáak;&sDIinevILúbEmn KNnaeday eQµaHKeRmag³ KeRmagGPivDÆnehdæarcnasm<½n§mhavifIram
DEVELOPMENT
ROYAL MEKONG CONSTRUCTION & PTE.,LTD.
Binitüeday eQµaHbøg;³ maRtdæan cMnYnsnøwk elxsnøwk
KN³kmµaFikarCatiRKb;RKg nigGPivDÆn_ #81, Street 315, Sankat Boeung Kak II, Tuol Kok, Phnom Penh, Cambodia

tMbn;eqñrsmuRTkm<úCa yl;RBmeday 1:200 166 R1-CS-002


STA. 0+110

STA. 0+150

STA. 0+090
STA. 0+130

l>r éf¶ Ex qñaM kMEN m©as;KeRmag Rkumh‘unsagsg; eQµaH-muxgar htßelxa éf¶ Ex qñaM TItaMgsagsg;³ sßitkñúgXuMram RsukéRBnb; extþRBHsIhnu
sikSa nigKUreday
Rkumh‘un r:Uy:al;emKgÁxnRsáak;&sDIinevILúbEmn KNnaeday eQµaHKeRmag³ KeRmagGPivDÆnehdæarcnasm<½n§mhavifIram
DEVELOPMENT
ROYAL MEKONG CONSTRUCTION & PTE.,LTD.
Binitüeday eQµaHbøg;³ maRtdæan cMnYnsnøwk elxsnøwk
KN³kmµaFikarCatiRKb;RKg nigGPivDÆn_ #81, Street 315, Sankat Boeung Kak II, Tuol Kok, Phnom Penh, Cambodia

tMbn;eqñrsmuRTkm<úCa yl;RBmeday 1:200 166 R1-CS-003