Request For Testing

Contractor: Royal Mekong Construction & Development Pte.,Ltd Engineer: គ អ ឆ ក

Contract . No.: Date Submitted: 25-May-2020


Reference : RM-RFI-R1-203
Request for inspection for the following works:
Survey works Prime coat Structures
Earth works Seal coat Laboratory
Clearing and Grubbing Concrete Agg  Other: Test FDT.
Proof Rolling Concrete sand
Location
1 Testing FDT Top subgrade from PK 0+000 to 0+200 BHS at roundabout gardens near N4.

Which will be ready on: Date: 26-May-2020


Time: 9.30 am
Contractor's Description of Works:

Requested by:______________________ Date: 06-April-2020.


(Contractor)
Received by: _______________________ Date:________________________
(Consultant)
Engineer's Comments:..

Approved Approved W/Comment Not Approved, Re-submit


Inspected by:_______________________ Date:________________________
(Inspector)
Checked by:_______________________ Date:________________________
(Assistant Resident Engineer)

Approved by:_______________________ Date:________________________

(Resident Engineer)
របយករណ៍រ ូបភព សំ ប់ករងរ្រតូវចុះពិនិតយ

រ ូបភពបង្ហញពីទី ំង PK 0+000 to 0+200 (សងខង)