4A DESIGN & ENGINEERING PVT LTD TEAM LEAD: V.ARAVINTH DEPT: MECHANICAL Date : 22.10.

2020

TOTAL No. OF SECO PLANNED SECO FAEC PLANNED


Job No./ REV. REMARKS
DOCUMENT DESCRIPTION DTS No. DOCUMENTS / SUBMISSION AS COMMENTS SUBMISSION SUBMISSION
S.No. No. (Holds, Pending issues)
DRAWINGS PER DTS / DCI RECEIVED DATE DATE DATE

CONSTRUCTION OF NEW AL ASEELH 380/132/13.8kV


J20638 Commencement Date: 18.03.2020 Completion Date: 31.12.2020
SUBSTATION- NCC, KSA

Pump House Ventilation System Design Calculation and


1 289 2 01 01.10.2020 05.10.2020 Revision Submitted to FAEC
Drawings

2 Plumbing General Notes & Legend Drawings 290 1 01 28.09.2020 05.10.2020 IFC Submitted to FAEC

HVAC System Design Calculation and Drawing for 380kV GIS


3 296 16 01 05.10.2020 13.10.2020 Revision Submitted to FAEC
Building

Plumbing Design Calculations & Drawings for 380kV GIS


4 297 10 02 22.09.2020 22.10.2020 IFC Submitted to FAEC
Building

Plan to Re-Submit on 27.10.2020


HVAC System Design Calculation and Drawing for 132 kV GIS &
5 300 23 01 29.09.2020 27.10.2020 Delay due to Heat Dissipation details of 132kV
Control building GIS and Architecture drawing.

Plumbing Design Calculations & Drawings for 132 kV GIS &


6 301 17 01 08.10.2020 21.10.2020 Revision Submitted to FAEC
Control building

HVAC System Design Calculation and Drawing for 13.8 kV


7 304 8 00 14.09.2020 Rev.00 _ Submitted to FAEC
Building

8 Plumbing Design Calculations & Drawings for 13.8 kV Building 305 7 01 08.10.2020 12.10.2020 Revision Submitted to FAEC

502MVA & SST Submitted to FAEC,


Oil Filled Equipment Drawings System Design Calculation &
9 308 4 00 24.08.2020 06.10.2020 120MVAR Plan to Submit on 27.10.2020,
Drawings Waiting for Civil drawings for 67MVA

1st Submission to FAEC on 16.10.2020


Tunnel Ventilation System Design Calculations & Drawings (Lot-
10 310 12 00 24.08.2020 23.10.2020 Comments received from FAEC.
1) Plan to Submit on 23.10.2020

Tunnel Drainage System Design Calculations & Drawings (Lot- Submitted along with Ground Floor Plumbing
11 311 00 24.08.2020
1) Submission.

Tunnel Ventilation System Design Calculations & Drawings (Lot- Waiting for Civil drawings
12 312 00 24.08.2020 06.11.2020
2) Plan to Submit on 06.11.2020

Tunnel Drainage System Design Calculations & Drawings (Lot- Waiting for Civil drawings
13 313 00 24.08.2020 06.11.2020
2) Plan to Submit on 06.11.2020

HVAC Construction details and HVAC General Notes & Legend


14 316 6 01 05.10.2020 06.10.2020 IFC Submitted to FAEC
Drawings

15 Plumbing Miscellaneous details 317 3 01 28.09.2020 05.10.2020 IFC Submitted to FAEC

16 HVAC System Design Calculation and Drawing for SEB Building - 2 01 22.10.2020 22.10.2020 IFC Submitted to FAEC

17 Plumbing Design Calculations & Drawings for SEB Building - 9 01 22.10.2020 22.10.2020 IFC Submitted to FAEC