6
Improvement, Operation, Maintenance, Rehabilitation and Strengthening of existing 2 Lane Road and widening to four lane divided highway from Km 120+000 to Km
228+000 of
NH-11 (Jaipur – Mahua Section).
Checking of Original
Start Borrow Earth
Ground Level by IC &
Approved
Contractor
Yes Embankment
NoON
PASS
Is the Clay Soil/Organic No Oo0
Soil/Marshy Soil for 500 mm
Approval by IC Ready Field Density Test (>95% Checking Levels;
Sub-grade Minimum)
for Next Layer for embankment) Tolerance Level in
Embankment
Yes Sub-grade
Yeses
Remove the soil of sub- Collect Soil sample
Sieve Analysis, LL, PI Scarification/spreading Check for Field
grade and replace it by and carry out Density
& Soaked CBR ,, ,Grading and Rolling Density (>97%) and
approved borrow soil Test (MDD/ OMC)
requirements satisfied FMC close to OMC Level Tolerances
Checking for Level Field Density Test Rolling at FMC close Loosen Earth Surface; Approval by IC Ready
Tolerances of Sub-grade (>97% for Sub-grade) to OMC Sprinkling water for Next Layer
Pass
2. FLOW CHART FOR THE CONSTRUCTION OF GRANULAR SUB-BASE AND DRAINAGE LAYER
Identification of Quarries Contractor obtains Collection of samples Test on aggregate samples; Prepare Mix
by CONTRACTOR clearance from Coarse and f Fine ( Gradation, Aggregate Design
Local /central Aggregates from Impact Value, EI &FI, Sp.
Authorities to operate crusher /quarry sites Gr ,Water Absorption,
quarry Soundness LA Abrasion
YesS
Allow
for the
Trial run
Does the mix Trial If all materials are OK, Test on blended samples
Test for MDD and
confirm to the allow them for (Gradation, LL & PI, EI &
OMC
Specifications construction by mixing FI etc)
requirement? materials in the plant.
No
Complete Production
granular sub WMM Plant fully No Rectify Shortcomings &
base Layer Is the mix acceptable Yes
with respect to water Produce mix Operational with all perform Calibrations of the
No content & workability? Calibrations Plant
No
Is sub base layer Reject /adjust
completed, inspected the mix
and approved
Has the construction of Spreading of WMM material
Check Rate of spread/ layer
shoulders for lateral confine- uniformly over prepared sub-base
thickness and moisture content
Yes ment completed & approved using power / motor grader
OK
Brooming till all loose
Materials and dust are Test Field Density Scarify & Re-grade
removed Passss (FDD >98% of MDD) Fail
pASS
Checking with templates or 3 m long Rolling / Compaction using
Light sprinkling of water prior
straight edge and take levels Vibratory Roller
to the spraying of prime coat Pass Fail
6. FLOW CHART FOR LAYING OF PROFILE CORRECTIVE COURSE (PCC) using WMM
Scarification of Existing Carry out Surveys after Compare the scarified level with the bottom level of
Bituminous surfaces Scarification and Compaction WMM . Find thickness of PCC at centre and edges.
( PCC thickness = Difference of the design bottom
level of WMM - Actual level after scarification and
compaction )
Scarification
Fail
Yes
Laying of PCC of required thickness
Check level and Field Check whether maximum thickness of
,Grading and Rolling following the
Density (FDD>98% MDD PCC>75 mm
procedure laid down in the specification
Pass
No
Approval by IC Ready Determine the thickness of No need to lay PCC as a separate layer,
for laying WMM 1st WMM 1st layer combine it with WMM first layer
layer
Pass
Test Cube
Check For Check Timing of Slump OK
for
Fine Proportion Mixer Operation Test Compressive
Aggregates All Materials Strength
Approved
NO
Check whether any rectification can be
Coarse
done, other-wise reject the material and
Aggregates
remove from the site
(*)
Water
No Check whether the mix is
Reject the material and remove from the delivered site in time before
site the start setting
Reinforcement OK
Steel (Where Check for Bar Placement, Placement of
required) Bending, Binding, etc Concrete
NOTE (*): If Test Results are not satisfactory, corrective action shall be taken as directed by the IC
Water (*)
Note (*) : If Test Results are not satisfactory, corrective action shall be taken as directed by the IC.
NO
Field Survey & Are the details matching Inform deviations to the design Approval of required
Details with contract drawings? IC/Employer changes by IC
YES
EXTENSION
Is the Culvert an Establish the Scrutinize working Demolish the head
Extension or new requirements drawings/method walls/wing walls Remove unsuitable material
Culvert? statement
NEW
Provide bedding
Establish foundation soil Review working Excavate for the Improve/treat Type of Lay pipes, seal
conditions drawings/method statement foundation foundation, if required Culverts all joints & pipe
collars
CD STRUCTURES
Check appropriateness Preparation, bending , Preparation and Erection Backfill with granular
Rectification
of the formation & placement and binding of Formwork materials and compact
Reinforcement of Reinforcement
PASS PASS YES
Allow the contractor for
Is the weather Are the supplies of the concreting
favourable for concreting Materials are adequate
Pass
No Check for soft pockets or
honey combing
Fail
Don’t allow Instruct contractor(s) to Rectify defects to
for concreting give method statement satisfy the
or repair or reconstruct requirements