Administrative Building at
16 156+600. No. 1
TP-1
25 m high H.M.at Toll
17 156+660 to 156+720 B/S No. 2 400 w /1000 W
Plaza-1 towards Jaipur
10 m high D/A Street
18 Light Poles at Toll Plaza-1 156+780 to 157+100 Median No. 8
towards Jaipur 250 W
10 m high S/A Street
19 Light Poles at Truck lay 162+400 RHS No. 10
bye 250 W
20 Truck lay bye(Utilities) 162+400 RHS No. 4 28 W
10 m high S/A Street
21 Light Poles at Truck lay 168+400 LHS No. 10
bye 250 W
Truck lay bye (Utilities-
22 168+400 LHS No. 5 28 W / 18 W
Drinking Water)
Highway Lighting System
MS-2 Portion (Ch. 120+000 to Ch. 174+000)
HPSV / Halogen
S. No. Type Chainage Location Unit Qty.
Lamp Wattage
HPSV / Halogen
S. No. Type Chainage Location Unit Qty.
Lamp Wattage
Sub-Station 204+600. RHS No. 1
42 Package Type 200 KVA
Transformer Sub-Station 204+600. RHS No. 1
Portion.
25 m high H.M. at T –
52 Junction at Rajesh
Motors 228+135 Island No. 1 400 W / 1000 W
Legend:
S/A - Single Arm Street Light Fitting
D/A - Double Arm Street Light Fitting
TLB - Truck Lay Bye
H.M.- High Mast (25 Metre high)
APPENDIX - 5.7
on (Ch. 120+000 to Ch. 174+000)
Remarks
Working
No fitting fixed.
Working
No fitting fixed.
Working
No fitting is fixed.
Working
No fitting is fixed.
Working
Working
Working
Working
Yet to be constructed.
Working
Working
Working
Working
Tube Lights & CFL fitting are to be
fixed.
APPENDIX - 5.7
on (Ch. 120+000 to Ch. 174+000)
Remarks
Working
Not Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
APPENDIX - 5.7
MS-2 Portion
Remarks
Working
Working
Working
Working
No fitting fixed.
Working
Working
No fitting fixed.
Working
Working