You are on page 1of 3

DP/Q

1.20

1.00

0.80

0.60

0.40

0.20

0.00
-0.4 -0.2 0 0.2 0.4 0.6 0.8 1 1.2 1.4
A drawdown test is run on an oil well at a series of three different rates, with each flow period lasting 4 hours.
Given the following information and fluid properties, estimate formation permeability and skin factor.
q1= 250 STB/D, q2= 225 STB/D, q3= 200 STB/D. Pi=2003,80 psi

B 1.181 RB/STB
viscosity 1.661 cp
h 33 ft
A 2.83E+07 ft2
rw 0.2 ft
porosity 29.5 %
ct 1.20E-05 1/psi

time (hours) pwf (psi) q (STB/D) X DP/Q


0.5 1810.32 250 -0.30103 0.77 M 0.21056899
1.0 1794.41 250 0 0.84 K 45.902011
1.5 1785.12 250 0.17609126 0.87 S -1.25E+00
2.0 1778.54 250 0.30103 0.90 B 0.84
2.5 1773.44 250 0.39794001 0.92
3.0 1769.27 250 0.47712125 0.94
3.5 1765.75 250 0.54406804 0.95
4.0 1762.70 250 0.60205999 0.96
4.5 1779.35 225 0.75923946 1.00
5.0 1778.54 225 0.77663334 1.00
5.5 1777.29 225 0.80305952 1.01
6.0 1775.96 225 0.83116472 1.01
6.5 1774.64 225 0.85902151 1.02
7.0 1773.37 225 0.88598435 1.02
7.5 1772.15 225 0.91183829 1.03
8.0 1770.98 225 0.93653776 1.03
8.5 1789.21 200 1.11775084 1.07
9.0 1789.74 200 1.10543189 1.07
9.5 1789.65 200 1.10759776 1.07
10.0 1789.34 200 1.11510234 1.07
10.5 1788.91 200 1.12512995 1.07
11.0 1788.44 200 1.13646344 1.08
11.5 1787.93 200 1.14848114 1.08
12.0 1787.41 200 1.16083281 1.08
lasting 4 hours.

You might also like