STRAND: RCC BEAM DESIGN PROGRAM


-------------------------------------------------------------------------------
JOB NO.
-------------------------------------------------------------------------------

BEAM NO. : P 1 Width = 200 mm Depth = 400 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 0.00 0.00 0.33 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 0.64 -0.64 0.04 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 2 Tor 14 1.50 0.00 1.50 3.08 0.42
MID SPAN TOP 2 Tor 14 0.00 0.00 0.00 3.08 0.42

Strps. (Near Supports) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 1.92 cm2/mt (Tor 8 @ 270 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 5.41 T

-------------------------------------------------------------------------------

BEAM NO. : P 2 Width = 200 mm Depth = 500 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 0.00 0.00 2.66 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 2.76 -2.76 0.45 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 14 2.52 0.00 2.52 4.62 0.50
MID SPAN TOP 2 Tor 14 0.00 0.00 0.00 3.08 0.33
SUP.TOP EXTRA 2 Tor 14 0.00 0.00 0.00 3.08 0.33

Strps. (Near Supports) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 1.92 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 6.11 T
BEAM NO. : P 3 Width = 300 mm Depth = 500 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 0.00 -3.60 2.75 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 2.67 -4.23 0.17 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 2.86 0.00 2.86 6.03 0.43
MID SPAN TOP 3 Tor 14 0.00 0.00 0.00 4.62 0.33
SUP.TOP EXTRA 2 Tor 16 3.39 0.00 0.00 4.02 0.29

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 7.35 T

-------------------------------------------------------------------------------

BEAM NO. : P 4 Width = 300 mm Depth = 500 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -1.22 -2.56 0.00 -2.56 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 0.27 -1.85 0.16 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 0.00 0.00 0.00 6.03 0.43
MID SPAN TOP 3 Tor 14 + 2 Tor 16 2.86 0.00 2.86 8.64 0.62

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 7.35 T
BEAM NO. : P 5 Width = 300 mm Depth = 600 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 0.00 -5.65 6.00 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 4.15 -6.63 0.51 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 + 2 Tor 14 Curt 4.68 0.00 4.68 9.11 0.54
MID SPAN TOP 3 Tor 14 0.00 0.00 0.00 4.62 0.27
SUP.TOP EXTRA 2 Tor 16 4.39 0.00 0.00 4.02 0.24

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 8.60 T

-------------------------------------------------------------------------------

BEAM NO. : P 6 Width = 300 mm Depth = 600 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -5.65 -2.50 0.00 -5.65 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 2.94 0.77 0.50 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 0.00 0.00 0.00 6.03 0.36
MID SPAN TOP 3 Tor 14 + 2 Tor 16 4.39 0.00 4.39 8.64 0.51

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 8.60 T
-------------------------------------------------------------------------------