PTSL-II Contract No. : KU.08.11-W.07/470/WIL.

I/2004
Sub-Project : Muko Muko Kanan Irrigation Sub-Project Contractor : Nindya - PP - Murni, Joint Oparation

SUMMARY MC - O %

Location : BSL. 1 Mk Sub Secondary Canal


Work Item and No. : Eart Work Ref. DWG No. :
Payment No. : Page No. : of

NO NUMBER ITEM DESCRICPTION UNIT QUANTITY MC - 0 REMAKS

1 III - 1 - 2 Clearing & Grubbing Type - B sqm 35,080.77

2 III - 1 - 4 Striping sqm 0

3 III - 1 - 5b Excavation type - A cu.m 179,288.66


with hauling distance 0.05 - 2 km

4 III - 1 - 10a Eartfill type - A From Excavated Material cu.m 85,238.13

5 III - 1 - 10a Eartfill type - A From Excavated Material

6 III - 1 - 12 Sod facing sqm 4,431.08

Prepared by : Checked by : Technically approved by : Accepted by :


The Contractor The Consultant The Consultant The Engineer
Designated Engineer Designated Engineer Sub-project Leader Designated Engineer
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : CP.2 ( D/S )
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2
Area Excavation
1 - 19.612 (1.251) 36.722 (22.970)
2 1.251 17.110 (3.766) 34.220 (64.439)
3 5.017 17.110 (9.414) 34.302 (161.451)
4 14.431 17.192 (2.395) 32.787 (39.270) Sketsa
5 16.826 15.595 (1.000) 31.190 (15.595)
6 17.826 15.595 (0.200) 30.920 (3.092)
7 18.026 15.395 (0.070) 30.720 (1.075)
8 18.026 15.325 (0.670) 30.050 (10.067)
9 18.096 15.325 (0.600) 29.980 (8.994)
10 18.696 14.725 - 29.380 - 22.000
11 18.696 14.655 (0.640) 29.310 (9.379)
12 19.336 14.655 - 29.380 - 21.000
13 19.336 14.725 (0.600) 30.050 (9.015) 20.000
14 19.936 15.325 (0.070) 30.650 (1.073)
15 20.006 15.325 - 30.720 - 19.000
16 20.006 15.395 (0.200) 30.990 (3.099) 18.000
17 20.206 15.595 (1.000) 31.190 (15.595)
17.000
18 21.206 15.595 (2.518) 32.869 (41.387)
19 23.725 17.274 (5.042) 34.592 (87.202) 16.000
20 28.766 17.318 (1.130) 34.647 (19.575)
15.000
21 29.896 17.328 (0.889) 34.664 (15.408)
22 30.785 17.336 (3.222) 34.675 (55.862) 14.000
23 34.007 17.339 (4.281) 34.678 (74.220)
13.000
24 38.288 17.339 (1.446) 37.570 (27.166) 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00
25 39.734 20.231 5.727 39.952 114.397
26 34.007 19.721 3.222 38.459 61.958
27 30.785 18.738 0.889 40.591 18.043
28 29.896 21.853 1.130 42.935 24.258
29 28.766 21.082 9.750 41.058 200.158
30 19.016 19.976 13.999 39.684 277.768
31 5.017 19.70802 5.017 19.708 49.440
32 - 19.612 - 19.612 -
- - -

Area 60.088 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 79
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 15.696 (9.518) 25.047 (119.192) 16.500
2 9.518 9.351 (12.780) 18.744 (119.774)
3 22.298 9.393 (0.380) 18.774 (3.567) 15.500
4 22.678 9.381 (13.690) 18.382 (125.825) 14.500
5 36.368 9.001 (8.811) 23.876 (105.186)
6 45.179 14.875 6.720 29.961 100.669 13.500

7 38.459 15.086 15.780 30.667 241.963 12.500


8 22.679 15.581 0.380 31.175 5.923
11.500
9 22.299 15.594 13.990 31.252 218.608
10 8.309 15.658 8.309 31.354 130.252 10.500
11 - 15.696 - 15.696 -
9.500
12 - - -
8.500
- 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000 45.000 50.000

Area 223.871 m 2

Area Embankment
1 - 9.351 (10.050) 25.400 (127.635)
2 10.050 16.049 (1.000) 32.148 (16.074) 17.000
3 11.050 16.099 (1.370) 30.828 (21.117)
4 12.420 14.729 - 29.388 - 16.000
5 12.420 14.659 (0.070) 29.318 (1.026) 15.000
6 12.490 14.659 (0.430) 28.888 (6.211)
7 12.920 14.229 - 28.388 - 14.000
8 12.920 14.159 (0.430) 28.318 (6.088)
13.000
9 13.350 14.159 (0.430) 28.818 (6.196)
10 13.350 14.229 (0.500) 28.888 (7.222) 12.000
11 13.780 14.659 (0.070) 29.388 (1.029)
11.000
12 13.850 14.659 - 30.758 -
13 13.850 14.729 (1.370) 30.778 (21.083) 10.000
14 15.220 16.099 (1.000) 25.100 (12.550)
15 16.220 16.049 (10.575) 25.430 (134.461) 9.000
16 26.795 9.001 13.690 18.382 125.825
8.000
17 13.11 9.381 0.380 18.774 3.567 - 5.000 10.000 15.000 20.000 25.000 30.000
18 12.73 9.393 12.725 9.393 59.763
19 - 9.351
20
Area 171.537 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 81
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 12.953 (10.185) 19.121 (97.374)
2 10.185 6.168 (13.670) 12.351 (84.419)
14.000
3 23.855 6.183 (1.260) 12.366 (7.791)
13.000
4 25.115 6.183 (14.720) 12.495 (91.963)
5 39.835 6.312 (10.095) 19.355 (97.694) 12.000
6 49.930 13.043 7.290 26.070 95.025 11.000
7 42.640 13.027 17.730 26.011 230.588 10.000
8 24.910 12.984 1.260 25.968 16.360 9.000
9 23.650 12.984 16.400 25.947 212.765
8.000
10 7.250 12.963 7.250 25.916 93.946
11 - 12.953 - 12.953 - 7.000
6.000
Area 269.442 m2 5.000
. - 10.000 20.000 30.000 40.000 50.000

Area Embankment
1 - 6.167 (12.990) 20.994 (136.356)
2 12.990 14.827 (1.000) 29.704 (14.852)
3 13.990 14.877 (0.200) 29.554 (2.955) 16.000
4 14.190 14.677 - 29.284 -
5 14.190 14.607 (0.070) 29.214 (1.022) 14.000
6 14.260 14.607 (0.430) 28.784 (6.189)
7 14.690 14.177 - 28.284 - 12.000
8 14.690 14.107 (0.490) 28.214 (6.912)
9 15.180 14.107 - 28.284 - 10.000
10 15.180 14.177 (0.430) 28.784 (6.189)
11 15.610 14.607 (0.070) 29.214 (1.022) 8.000
12 15.680 14.607 - 29.284 -
13 15.680 14.677 (0.200) 29.554 (2.955) 6.000

14 15.880 14.877 (1.000) 29.704 (14.852)


4.000
15 16.880 14.827 (12.768) 21.136 (134.932)
16 29.648 6.309 14.720 12.492 91.941
2.000
17 14.93 6.183 1.260 12.366 7.791
18 13.67 6.183 13.668 12.350 84.400
-
19 - 6.167 - 6.167 - - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
20
Area 24.181 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 82
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 13.148 (11.400) 18.714 (106.670)
2 11.400 5.566 (15.540) 11.159 (86.705)
14.000
3 26.940 5.593 (0.270) 11.186 (1.510)
13.000
4 27.210 5.593 (15.670) 11.258 (88.206)
12.000
5 42.880 5.665 (10.605) 18.397 (97.548)
11.000
6 53.485 12.732 10.140 25.488 129.222
7 43.345 12.756 16.130 25.549 206.053 10.000

8 27.215 12.793 0.270 25.587 3.454 9.000


9 26.945 12.794 18.000 25.942 233.478 8.000
10 8.945 13.148 8.945 26.296 117.609 7.000
11 - 13.148 - 13.148 - 6.000
- - 5.000
Area 309.176 m2 4.000
. (5.000) 5.000 15.000 25.000 35.000 45.000 55.000

Area Embankment
1 - 5.566
2 13.866 14.810 (1.000) 29.670 (14.835)
3 14.866 14.860 (0.200) 29.520 (2.952) 16.000
4 15.066 14.660 - 29.250 -
5 15.066 14.590 (0.070) 29.180 (1.021) 14.000
6 15.136 14.590 (0.430) 28.750 (6.181)
12.000
7 15.566 14.160 - 28.250 -
8 15.566 14.090 (0.490) 28.180 (6.904) 10.000
9 16.056 14.090 - 28.250 -
10 16.056 14.160 (0.430) 28.750 (6.181) 8.000
11 16.486 14.590 (0.070) 29.180 (1.021)
6.000
12 16.556 14.590 - 29.250 -
13 16.556 14.660 (0.200) 29.520 (2.952) 4.000
14 16.756 14.860 (1.000) 29.670 (14.835)
15 17.756 14.810 (13.718) 20.475 (140.433) 2.000
16 31.474 5.665 15.670 11.258 88.206
-
17 15.80 5.593 0.270 11.187 1.510 - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
18 15.53 5.594 15.534 5.594 43.447
19 - 5.566 - 5.566 -
20
Area 64.152

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 83
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 13.182 (11.021) 19.017 (104.788)
2 11.021 5.835 (15.360) 11.567 (88.835)
15.000
3 26.381 5.732 (0.770) 11.457 (4.411)
14.000
4 27.151 5.725 (14.860) 11.383 (84.576)
13.000
5 42.011 5.658 (10.397) 18.247 (94.852)
12.000
6 52.407 12.589 8.880 25.226 112.003
7 43.527 12.637 16.400 25.375 208.075 11.000

8 27.127 12.738 0.770 25.463 9.803 10.000


9 26.357 12.725 17.200 25.753 221.476 9.000
10 9.157 13.028 9.157 26.210 120.002 8.000
11 - 13.182 - 13.182 - 7.000
6.000
Area 293.898 m2 5.000
- 10.000 20.000 30.000 40.000 50.000

Area Embankment
1 - 5.835 (13.418) 20.615 (138.301)
2 13.418 14.780 (1.000) 29.610 (14.805)
3 14.418 14.830 (0.200) 29.460 (2.946)
4 14.618 14.630 - 29.190 -
5 14.618 14.560 (0.070) 29.120 (1.019)
6 14.688 14.560 (0.430) 28.690 (6.168) 15.000
7 15.118 14.130 - 28.190 -
8 15.118 14.060 (0.490) 28.120 (6.889)
13.000
9 15.608 14.060 - 28.190 -
10 15.608 14.130 (0.430) 28.690 (6.168)
11 16.038 14.560 (0.070) 29.120 (1.019) 11.000
12 16.108 14.560 - 29.190 -
13 16.108 14.630 (0.200) 29.460 (2.946)
9.000
14 16.308 14.830 (1.000) 29.610 (14.805)
15 17.308 14.780 (13.683) 20.438 (139.827)
16 30.991 5.658 14.860 11.383 84.576 7.000
17 16.131 5.725 0.770 11.457 4.411
18 15.361 5.732 15.360 11.567 88.835
5.000
19 0.0 5.835 0.00 5.835 0.00 - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
20 - - -
Area 157.071 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 84
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 13.633 (6.357) 23.028 (73.194)
2 6.357 9.395 (10.020) 18.890 (94.639)
14.000
3 16.377 9.495 (2.480) 19.015 (23.579)
4 18.857 9.520 (7.700) 18.785 (72.322) 13.000
5 26.557 9.265 (3.495) 22.025 (38.489)
6 30.052 12.760 11.195 25.980 145.423 12.000
7 18.857 13.220 2.480 26.495 32.854
8 16.377 13.275 13.510 26.846 181.345 11.000
9 2.867 13.571 2.867 27.204 38.997
10.000
10 - 13.633 - 13.633 -
11 - - -
9.000
Area 96.396 m2
- - - 8.000
Area Embankment . - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
1 - 6.290 (12.675) 21.030 (133.278)
2 12.675 14.740 (1.000) 29.530 (14.765)
3 13.675 14.790 (0.200) 29.380 (2.938)
4 13.875 14.590 - 29.110 - 15.500
5 13.875 14.520 (0.070) 29.040 (1.016)
14.500
6 13.945 14.520 (0.430) 28.610 (6.151)
7 14.375 14.090 - 28.110 - 13.500
8 14.375 14.020 (0.490) 28.040 (6.870) 12.500
9 14.865 14.020 - 28.110 -
11.500
10 14.865 14.090 (0.430) 28.610 (6.151)
11 15.295 14.520 (0.070) 29.040 (1.016) 10.500
12 15.365 14.520 - 29.110 - 9.500
13 15.365 14.590 (0.200) 29.380 (2.938)
8.500
14 15.565 14.790 (1.000) 29.530 (14.765)
15 16.565 14.740 (12.309) 21.274 (130.931) 7.500
16 28.874 6.534 12.140 12.684 76.992 6.500
17 16.734 6.150 2.120 12.324 13.063
5.500
18 14.61 6.174 14.614 12.464 91.074 - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
19 - 6.290 - 6.290 -
20
Area 31.480

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 85
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2
Area Excavation
1 - 12.946 (9.989) 19.236 (96.069)
2 9.989 6.290 (14.620) 12.464 (91.112)
14.500
3 24.609 6.174 (2.120) 12.324 (13.063)
13.500
4 26.729 6.150 (12.140) 12.684 (76.992)
5 38.869 6.534 (9.960) 19.708 (98.146) 12.500
6 48.829 13.174 4.300 26.245 56.427 11.500
7 44.529 13.071 17.800 25.721 228.917 10.500
8 26.729 12.650 2.120 25.324 26.843 9.500
9 24.609 12.674 14.680 25.512 187.258
8.500
10 9.929 12.838 9.929 25.784 127.998
11 - 12.946 - 12.946 - 7.500
12 - - - 6.500

- Area 252.061 m2 5.500


- 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000 45.000 50.000

Area Embankment
1 - 6.290 (12.675) 21.030 (133.278)
2 12.675 14.740 (1.000) 29.530 (14.765)
3 13.675 14.790 (0.200) 29.380 (2.938)
4 13.875 14.590 - 29.110 -
5 13.875 14.520 (0.070) 29.040 (1.016) 15.000
6 13.945 14.520 (0.430) 28.610 (6.151)
14.000
7 14.375 14.090 - 28.110 -
8 14.375 14.020 (0.490) 28.040 (6.870) 13.000
9 14.865 14.020 - 28.110 - 12.000
10 14.865 14.090 (0.430) 28.610 (6.151)
11.000
11 15.295 14.520 (0.070) 29.040 (1.016)
12 15.365 14.520 - 29.110 - 10.000
13 15.365 14.590 (0.200) 29.380 (2.938) 9.000
14 15.565 14.790 (1.000) 29.530 (14.765)
8.000
15 16.565 14.740 (12.309) 21.274 (130.931)
16 28.874 6.534 12.140 12.684 76.992 7.000
17 16.734 6.150 2.120 12.324 13.063 6.000
18 14.614 6.174 14.614 12.464 91.074
5.000
19 - 6.290 - 6.290 - - 5.000 10.000 15.000 20.000 25.000 30.000
20 - - -
Area 139.690 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 86
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 12.174 (5.949) 20.382 (60.626)
2 5.949 8.208 (11.700) 16.907 (98.906)
14.000
3 17.649 8.699 (2.540) 17.524 (22.255)
4 20.189 8.825 (8.010) 17.796 (71.273) 13.000
5 28.199 8.971 (3.673) 21.615 (39.696)
12.000
6 31.872 12.644 11.683 25.169 147.025
7 20.189 12.525 2.540 25.006 31.758 11.000
8 17.649 12.481 15.250 24.697 188.315
10.000
9 2.399 12.216 2.399 24.390 29.256
10 - 12.174 - 12.174 - 9.000
11
8.000
Area 103.596 m2
- 7.000
Area Embankment . - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
1 - 8.208 (9.753) 22.918 (111.760)
2 9.753 14.710 (1.000) 29.470 (14.735)
3 10.753 14.760 (0.200) 29.320 (2.932)
4 10.953 14.560 - 29.050 - 16.000
5 10.953 14.490 (0.070) 28.980 (1.014)
15.000
6 11.023 14.490 (0.430) 28.550 (6.138)
7 11.453 14.060 - 28.050 - 14.000
8 11.453 13.990 (0.490) 28.050 (6.872) 13.000
9 11.94 13.990 (0.430) 28.480 (6.123)
12.000
10 11.943 14.060 (0.500) 28.550 (7.138)
11 12.373 14.490 (0.070) 28.980 (1.014) 11.000
12 12.443 14.490 - 29.050 - 10.000
13 12.443 14.560 (0.200) 29.320 (2.932) m2
9.000
14 12.643 14.760 (1.000) 29.470 (14.735)
15 13.643 14.710 (8.609) 23.681 (101.929) 8.000
16 22.252 8.971 8.010 17.796 71.273 7.000
17 14.242 8.825 2.540 17.524 22.255
6.000
18 11.70 8.699 11.702 16.907 98.919 - 5.000 10.000 15.000 20.000 25.000
19 - 8.208 - 8.208 -

Area 84.875 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 80
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 13.755 (10.227) 20.692 (105.809) 14.000
2 10.227 6.937 (13.810) 13.838 (95.551)
3 24.037 6.901 (13.900) 13.779 (95.764) 13.000
4 37.937 6.878 (9.854) 20.325 (100.136) 12.000
5 47.791 13.447 5.560 26.860 74.671
6 42.231 13.413 18.200 26.715 243.107 11.000
7 24.031 13.302 16.600 26.917 223.411 10.000
8 7.431 13.615 7.431 27.370 101.686
9 - 13.755 - 13.755 - 9.000

8.000

7.000

Area 245.615 m 2 6.000


- 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000 45.000 50.000

Area Embankment
1 - 6.937 (11.868) 21.786 (129.278)
2 11.868 14.849 (1.000) 29.748 (14.874) 17.000
3 12.868 14.899 (0.200) 29.598 (2.960)
4 13.068 14.699 - 29.328 -
15.000
5 13.068 14.629 (0.070) 29.258 (1.024)
6 13.138 14.629 (0.430) 28.828 (6.198)
7 13.568 14.199 - 28.328 - 13.000
8 13.568 14.129 (0.490) 28.258 (6.923)
9 14.058 14.129 (0.430) 28.758 (6.183) 11.000
10 14.058 14.199 (0.500) 28.828 (7.207)
11 14.488 14.629 (0.070) 29.328 (1.026)
9.000
12 14.558 14.629 - 29.528 -
13 14.558 14.699 (0.200) 29.548 (2.955)
14 14.758 14.899 (1.000) 21.778 (10.889) 7.000
15 15.758 14.849 (11.955) 21.750 (130.011)
16 27.713 6.879 13.900 13.780 95.771
5.000
17 13.813 6.901 13.813 13.838 95.572 - 5.000 10.000 15.000 20.000 25.000 30.000
18 - 6.937 - 6.937 -
19
20
Area 128.185 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : CP.2 / ( D/S )
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Embankment 1
1 - 17.105 (5.614) 37.952 (106.531)
21.000
2 5.614 20.848 (1.000) 41.745 (20.873)
20.500
3 6.614 20.898 (3.461) 39.488 (68.338)
4 10.075 18.590 (1.000) 37.180 (18.590) 20.000

5 11.075 18.590 (2.105) 35.777 (37.647) 19.500


6 13.180 17.187 13.180 34.292 225.979 19.000
7 - 17.105 - 17.105 - 18.500
8 - - -
18.000
9 - - -
17.500
17.000
16.500
Area 1 26.000 m2 16.000
- 2.000 4.000 6.000 8.000 10.000 12.000 14.000

Area Embankment 2
1 - 17.269 (1.982) 35.859 (35.531)
2 1.982 18.590 (1.000) 37.180 (18.590) 21.000
3 2.982 18.590 (3.461) 39.488 (68.338)
20.500
4 6.443 20.898 (3.000) 41.645 (62.468)
5 9.443 20.748 (5.120) 38.081 (97.494) 20.000
6 14.563 17.334 4.281 34.668 74.199
19.500
7 10.283 17.334 3.222 34.665 55.845
8 7.061 17.331 0.889 34.654 15.404 19.000
9 6.172 17.323 6.172 34.592 106.746
18.500
10 5.060 17.313 5.060 17.313 43.803
11 - 17.269 - 17.269 - 18.000
12 - - - 17.500
13 - - -
14 - - - 17.000
15 - - - 16.500
16 - Area 2 39.577 m2
16.000
- 2.000 4.000 6.000 8.000 10.000 12.000 14.000

Total Area 65.577 m2

BSL 1 MK
area 2983.181
length 437.8028

at point X= 0 Y= 38.0598 0.000 7.612


at point X= 6.2551 Y= 25.5495 1.251 5.110
at point X= 25.0861 Y= 25.5495 5.017 5.110
at point X= 72.1538 Y= 25.9599 14.431 5.192
at point X= 84.1311 Y= 17.9751 16.826 3.595
at point X= 89.1311 Y= 17.9751 17.826 3.595
at point X= 90.1311 Y= 16.9751 18.026 3.395
at point X= 90.1311 Y= 16.6251 18.026 3.325
at point X= 90.4811 Y= 16.6251 18.096 3.325
at point X= 93.4811 Y= 13.6251 18.696 2.725
at point X= 93.4811 Y= 13.2751 18.696 2.655
at point X= 96.6811 Y= 13.2751 19.336 2.655
at point X= 96.6811 Y= 13.6251 19.336 2.725
at point X= 99.6811 Y= 16.6251 19.936 3.325
at point X= 100.0311 Y= 16.6251 20.006 3.325
at point X= 100.0311 Y= 16.9751 20.006 3.395
at point X= 101.0311 Y= 17.9751 20.206 3.595
at point X= 106.0311 Y= 17.9751 21.206 3.595
at point X= 118.6225 Y= 26.3693 23.725 5.274
at point X= 143.8311 Y= 26.5914 28.766 5.318
at point X= 149.4811 Y= 26.6412 29.896 5.328
at point X= 153.9261 Y= 26.6804 30.785 5.336
at point X= 170.0361 Y= 26.695 34.007 5.339
at point X= 191.4388 Y= 26.695 38.288 5.339
at point X= 198.6695 Y= 41.1564 39.734 8.231
at point X= 170.0361 Y= 38.6051 34.007 7.721
at point X= 153.9261 Y= 33.6901 30.785 6.738
at point X= 149.4811 Y= 49.2651 29.896 9.853
at point X= 143.8311 Y= 45.4101 28.766 9.082
at point X= 95.0811 Y= 39.8801 19.016 7.976
at point X= 25.0861 Y= 38.5401 5.017 7.708
at point X= 0 Y= 38.0598 0.000 7.612

area 1409.46
length 392.335

at point X= 6.2551 Y= 25.5495 1.25102 5.1099


at point X= 34.3247 Y= 44.2626 6.86494 8.85252
at point X= 39.3247 Y= 44.5126 7.86494 8.90252
at point X= 56.6311 Y= 32.9751 11.32622 6.59502
at point X= 61.6726 Y= 32.9474 12.33452 6.58948
at point X= 72.1538 Y= 25.9599 14.43076 5.19198
at point X= 118.6225 Y= 26.3693 23.7245 5.27386
at point X= 128.5311 Y= 32.9751 25.70622 6.59502
at point X= 133.5311 Y= 32.9751 26.70622 6.59502
at point X= 150.8374 Y= 44.5126 30.16748 8.90252
at point X= 165.8374 Y= 43.7626 33.16748 8.75252
at point X= 191.4388 Y= 26.695 38.28776 5.339
at point X= 170.0361 Y= 26.695 34.00722 5.339
at point X= 153.9261 Y= 26.6804 30.78522 5.33608
at point X= 149.4811 Y= 26.6412 29.89622 5.32824
at point X= 143.8311 Y= 26.5914 28.76622 5.31828
at point X= 118.6225 Y= 26.3693 23.7245 5.27386
at point X= 72.1538 Y= 25.9599 14.43076 5.19198
at point X= 25.0861 Y= 25.5495 5.01722 5.1099
at point X= 6.2551 Y= 25.5495 1.25102 5.1099

area 1409.529
length 392.3433

at point X= 0
at point X= 28.0696
at point X= 33.0696
at point X= 50.3759
at point X= 55.3759
at point X= 65.8987
at point X= 112.3673
at point X= 122.2759
at point X= 127.2759
at point X= 144.5822
at point X= 159.5822
at point X= 185.1837
at point X= 163.7809
at point X= 147.6709
at point X= 143.2259
at point X= 137.5759
at point X= 112.3673
at point X= 65.8987
at point X= 18.8309
at point X= 0

area 650.0033
length 143.088

at point X= 0 Y= 25.5245 0
at point X= 28.0696 Y= 44.2375 5.61392
at point X= 33.0696 Y= 44.4875 6.61392
at point X= 50.3759 Y= 32.95 10.07518
at point X= 55.3759 Y= 32.95 11.07518
at point X= 65.8987 Y= 25.9348 13.17974
at point X= 0 Y= 25.5245 0

0 5.1049
5.61392 8.8475
6.61392 8.8975
10.07518 6.59
11.07518 6.59
13.17974 5.18696
0 5.1049

area 755.6618
length 156.3138

at point X= 0 Y= 26.3443 0
at point X= 9.9086 Y= 32.95 1.98172
at point X= 14.9086 Y= 32.95 2.98172
at point X= 32.2149 Y= 44.4875 6.44298
at point X= 47.2149 Y= 43.7375 9.44298
at point X= 72.8163 Y= 26.6699 14.56326
at point X= 51.4136 Y= 26.6699 10.28272
at point X= 35.3036 Y= 26.6553 7.06072
at point X= 30.8586 Y= 26.6162 6.17172
at point X= 25.3001 Y= 26.5672 5.06002
at point X= 0 Y= 26.3443 0
19.612
17.110
17.110
17.192
15.595
15.595
15.395
15.325
15.325
14.725
14.655
14.655
14.725
15.325
15.325
15.395
15.595
15.595
17.274
17.318
17.328
17.336
17.339
17.339
20.231
19.721
18.738
21.853
21.082
19.976
19.708
19.612

17.1099
20.85252
20.90252
18.59502
18.58948
17.19198
17.27386
18.59502
18.59502
20.90252
20.75252
17.339
17.339
17.33608
17.32824
17.31828
17.27386
17.19198
17.1099
17.1099

Y= 25.5245 Z= 0
Y= 44.2375 Z= 0
Y= 44.4875 Z= 0
Y= 32.95 Z= 0
Y= 32.95 Z= 0
Y= 25.9348 Z= 0
Y= 26.3443 Z= 0
Y= 32.95 Z= 0
Y= 32.95 Z= 0
Y= 44.4875 Z= 0
Y= 43.7375 Z= 0
Y= 26.6699 Z= 0
Y= 26.6699 Z= 0
Y= 26.6553 Z= 0
Y= 26.6162 Z= 0
Y= 26.5664 Z= 0
Y= 26.3443 Z= 0
Y= 25.9348 Z= 0
Y= 25.5245 Z= 0
Y= 25.5245 Z= 0

5.1049 17.1049
8.8475 20.8475
8.8975 20.8975
6.59 18.59
6.59 18.59
5.18696 17.18696
5.1049 17.1049
5.26886 17.26886
6.59 18.59
6.59 18.59
8.8975 20.8975
8.7475 20.7475
5.33398 17.33398
5.33398 17.33398
5.33106 17.33106
5.32324 17.32324
5.31344 17.31344
5.26886 17.26886
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL.87
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 13.440 (3.362) 23.518 (39.534) 14.500
2 3.362 10.078 (8.880) 20.274 (90.017)
3 12.242 10.196 (3.300) 20.436 (33.719) 13.500
4 15.542 10.240 (6.370) 19.788 (63.025)
5 21.912 9.548 (3.241) 22.337 (36.197) 12.500
6 25.153 12.789 9.610 26.329 126.511
7 15.543 13.540 3.300 27.059 44.647 11.500
8 12.243 13.519 12.243 26.959 165.030
9 - 13.440 - 13.440 - 10.500
10 - - -
11 - - - 9.500
- Area 73.696 m2
8.500
- 5.000 10.000 15.000 20.000 25.000 30.000

m 2

Area Embankment
1 - 10.078 (6.933) 24.778 (85.893)
2 6.933 14.700 (1.000) 29.450 (14.725) 17.000
3 7.933 14.750 (0.200) 29.300 (2.930)
4 8.133 14.550 - 29.030 - 16.000
5 8.133 14.480 (0.070) 28.960 (1.014) 15.000
6 8.203 14.480 (0.430) 28.530 (6.134)
7 8.633 14.050 - 28.030 - 14.000
8 8.633 13.980 (0.490) 27.960 (6.850)
13.000
9 9.123 13.980 (0.430) 28.460 (6.119)
10 9.123 14.050 (0.500) 28.530 (7.133) 12.000
11 9.553 14.480 (0.070) 29.030 (1.016)
11.000
12 9.623 14.480 - 29.230 -
13 9.623 14.550 (0.200) 29.250 (2.925) 10.000
14 9.823 14.750 (1.000) 24.298 (12.149)
15 10.823 14.700 (7.728) 24.940 (96.368) 9.000
16 18.551 9.548 6.370 19.788 63.025
8.000
17 12.18 10.24 3.300 20.436 33.719 - 2.000 4.000 6.000 8.000 10.000 12.000 14.000 16.000 18.000 20.000
18 8.88 10.196 8.881 10.196 45.275
19 - 10.078
20
Area 101.236 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 88
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 12.764 (13.038) 16.836 (109.754)
2 13.038 4.072 (17.910) 7.836 (70.171)
3 30.948 3.764 (1.710) 7.488 (6.402) 13.000
4 32.658 3.724 (16.430) 7.641 (62.771)
5 49.088 3.917 (13.334) 16.723 (111.488) 11.000
6 62.422 12.806 10.960 25.355 138.945
7 51.462 12.549 18.800 24.730 232.462 9.000
8 32.662 12.181 1.710 24.390 20.853
9 30.952 12.209 15.090 24.668 186.120 7.000
10 15.862 12.459 15.862 25.223 200.037
11 - 12.764 - 12.764 - 5.000

Area 417.832 m2 3.000


- - . - 10.000 20.000 30.000 40.000 50.000 60.000 70.000

Area Embankment
1 - 4.072 (15.897) 18.742 (148.971)
2 15.897 14.670 (1.000) 29.390 (14.695)
3 16.897 14.720 (0.200) 29.240 (2.924) 16.000
4 17.097 14.520 - 28.970 -
5 17.097 14.450 (0.070) 28.900 (1.012) 14.000
6 17.167 14.450 (0.430) 28.470 (6.121)
7 17.597 14.020 - 27.970 - 12.000
8 17.597 13.950 (0.490) 27.900 (6.835)
9 18.087 13.950 - 27.970 - 10.000
10 18.087 14.020 (0.430) 28.470 (6.121)
11 18.517 14.450 (0.070) 28.900 (1.012) 8.000
12 18.587 14.450 - 28.970 -
13 18.587 14.520 (0.200) 29.240 (2.924) 6.000

14 18.787 14.720 (1.000) 29.390 (14.695)


4.000
15 19.787 14.670 (16.263) 18.587 (151.140)
16 36.050 3.917 16.430 7.641 62.771
2.000
17 19.62 3.724 1.710 7.488 6.402
18 17.91 3.764 15.090 7.836 59.123
-
19 2.82 4.072 2.820 8.144 11.483 - 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000
20 - 4.072 - 4.072 -
Area 216.671 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 89
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 12.312 (7.352) 19.723 (72.497)
2 7.352 7.411 (12.800) 14.567 (93.229) 14.000
3 20.152 7.156 (1.550) 14.281 (11.068)
13.000
4 21.702 7.125 (11.425) 14.421 (82.380)
5 33.127 7.296 (8.120) 20.005 (81.215) 12.000
6 41.246 12.709 3.147 25.308 39.822 11.000
7 38.099 12.599 16.397 24.624 201.880 10.000
8 21.702 12.025 1.552 24.067 18.676 9.000
9 20.150 12.042 12.800 24.354 155.866
8.000
10 7.350 12.312 7.350 24.624 90.493
11 - 12.312 - 12.312 - 7.000
- - - 6.000
Area 166.348 m 2 5.000
. - 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000 45.000

Area Embankment
1 - 7.411
2 10.859 14.650 (1.000) 29.350 (14.675)
3 11.859 14.700 (0.200) 29.200 (2.920) 16.000
4 12.059 14.500 - 28.930 -
5 12.059 14.430 (0.070) 28.860 (1.010) 14.000
6 12.129 14.430 (0.430) 28.430 (6.112)
12.000
7 12.559 14.000 - 27.930 -
8 12.559 13.930 (0.490) 27.860 (6.826) 10.000
9 13.049 13.930 - 27.930 -
10 13.049 14.000 (0.430) 28.430 (6.112) 8.000
11 13.479 14.430 (0.070) 28.860 (1.010)
6.000
12 13.549 14.430 - 28.930 -
13 13.549 14.500 (0.200) 29.200 (2.920) 4.000
14 13.749 14.700 (1.000) 29.350 (14.675)
15 14.749 14.650 (11.031) 20.155 (111.165) 2.000
16 25.780 5.505 11.425 11.098 63.397
-
17 14.35 5.593 1.550 11.187 8.670 - 5.000 10.000 15.000 20.000 25.000 30.000
18 12.80 5.594 12.805 5.594 35.814
19 - 7.411 - 7.411 -
20 - - -
Area 59.544

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 90
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 12.070 (11.837) 16.249 (96.166)
2 11.837 4.179 (17.610) 8.103 (71.347)
3 29.447 3.924 (1.550) 7.819 (6.060) 13.000
4 30.997 3.895 (16.110) 8.038 (64.746)
5 47.107 4.143 (12.332) 16.507 (101.778) 11.000
6 59.438 12.364 9.840 24.566 120.865
7 49.598 12.202 18.600 24.097 224.102 9.000
8 30.998 11.895 1.550 23.799 18.444
9 29.448 11.904 17.450 23.906 208.580 7.000
10 11.998 12.002 11.998 24.072 144.408
11 - 12.070 - 12.070 - 5.000

Area 376.302 m2 3.000


- 10.000 20.000 30.000 40.000 50.000 60.000

Area Embankment
1 - 4.179 (15.662) 18.799 (147.210)
2 15.662 14.620 (1.000) 29.290 (14.645)
3 16.662 14.670 (0.200) 29.140 (2.914)
4 16.862 14.470 - 28.870 -
5 16.862 14.400 (0.070) 28.800 (1.008) 16.000
6 16.932 14.400 (0.430) 28.370 (6.100)
7 17.362 13.970 - 27.870 -
14.000
8 17.362 13.900 (0.490) 27.800 (6.811)
9 17.852 13.900 - 27.870 -
12.000
10 17.852 13.970 (0.430) 28.370 (6.100)
11 18.282 14.400 (0.070) 28.800 (1.008)
12 18.352 14.400 - 28.870 - 10.000
13 18.352 14.470 (0.200) 29.140 (2.914)
14 18.552 14.670 (1.000) 29.290 (14.645) 8.000
15 19.552 14.620 (15.716) 18.763 (147.435)
16 35.267 4.143 16.110 9.868 79.487 6.000
17 19.157 5.725 1.550 11.457 8.879
18 17.607 5.732 17.607 9.911 87.251
4.000
19 - 4.179 - 4.179 - - 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000
20 - - -
Area 175.172 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 91
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 12.146 (12.215) 16.149 (98.626)
2 12.215 4.003 (17.880) 7.899 (70.617)
3 30.095 3.896 (1.550) 7.780 (6.030) 13.000
4 31.645 3.884 (17.150) 7.336 (62.906)
5 48.795 3.452 (11.127) 14.322 (79.680) 11.000
6 59.922 10.870 11.510 22.071 127.019
7 48.412 11.201 16.770 22.885 191.891 9.000
8 31.642 11.684 1.550 23.368 18.110
9 30.092 11.684 16.450 23.631 194.365 7.000
10 13.642 11.947 13.642 24.093 164.332
11 - 12.146 - 12.146 - 5.000
8.206 Area 377.858 m2
- 3.000
Area Embankment . - 10.000 20.000 30.000 40.000 50.000 60.000
1 - 4.004 (15.896) 18.605 (147.868)
2 15.896 14.601 (1.000) 29.252 (14.626)
3 16.896 14.651 (0.200) 29.102 (2.910)
4 17.096 14.451 - 28.832 - 16.500
5 17.096 14.381 (0.070) 28.762 (1.007)
6 17.166 14.381 (0.430) 28.332 (6.091) 14.500
7 17.596 13.951 - 27.832 -
8 17.596 13.881 (0.490) 27.762 (6.802) 12.500
9 18.086 13.881 - 27.832 -
10 18.086 13.951 (0.430) 28.332 (6.091) 10.500
11 18.516 14.381 (0.070) 28.762 (1.007)
12 18.586 14.381 - 28.832 - 8.500
13 18.586 14.451 (0.200) 29.102 (2.910)
6.500
14 18.786 14.651 (1.000) 29.252 (14.626)
15 19.786 14.601 (16.795) 18.054 (151.604)
4.500
16 36.580 3.453 17.150 7.337 62.915
17 19.430 3.884 1.550 7.780 6.030
2.500
18 17.88 3.896 16.450 7.899 64.969 - 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000
19 1.43 4.003 1.430 8.007 5.725
20 - 4.004 - 4.004 -
Area 30.508

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 92
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 10.870 (9.536) 15.383 (73.342)
2 9.536 4.513 (17.040) 9.553 (81.392) 12.000
3 26.576 5.040 (1.620) 10.143 (8.216)
4 28.196 5.103 (14.710) 10.085 (74.175) 11.000

5 42.906 4.982 (9.392) 16.225 (76.189) 10.000


6 52.297 11.243 6.120 22.578 69.089
9.000
7 46.177 11.335 17.990 22.939 206.336
8 28.187 11.604 1.620 23.165 18.764 8.000
9 26.567 11.561 18.350 22.645 207.768 7.000
10 8.217 11.084 8.217 21.954 90.198
6.000
11 - 10.870 - 10.870 -
12 - - - 5.000

Area 278.841 m 2 4.000


- 10.000 20.000 30.000 40.000 50.000 60.000

Area Embankment
1 - 4.513 (15.086) 19.083 (143.938)
2 15.086 14.570 (1.000) 29.190 (14.595)
3 16.086 14.620 (0.200) 29.040 (2.904)
4 16.286 14.420 - 28.770 -
5 16.286 14.350 (0.070) 28.700 (1.005)
6 16.356 14.350 (0.430) 28.270 (6.078) 14.000
7 16.786 13.920 - 27.770 -
8 16.786 13.850 (0.490) 27.700 (6.786)
12.000
9 17.276 13.850 - 27.770 -
10 17.276 13.920 (0.430) 28.270 (6.078)
11 17.706 14.350 (0.070) 28.700 (1.005) 10.000
12 17.776 14.350 - 28.770 -
13 17.776 14.420 (0.200) 29.040 (2.904)
8.000
14 17.976 14.620 (1.000) 29.190 (14.595)
15 18.976 14.570 (14.382) 19.552 (140.598)
16 33.358 4.982 14.710 10.085 74.175 6.000
17 18.648 5.103 1.620 10.143 8.216
18 17.028 5.040 17.028 9.553 81.332
4.000
19 - 4.513 - 4.513 - - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
20 - - -
Area 176.763 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 93 / BSL 1 MK
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 10.862 (1.280) 19.164 (12.265)
2 1.280 8.302 (12.320) 16.992 (104.671) 13.000
3 13.600 8.690 (1.300) 17.422 (11.324)
4 14.900 8.732 (11.560) 16.671 (96.358) 12.000
5 26.460 7.939 (2.980) 18.858 (28.098)
11.000
6 29.440 10.919 14.540 22.351 162.492
7 14.900 11.432 1.300 22.814 14.829 10.000
8 13.600 11.382 13.600 22.244 151.259
9.000
9 - 10.862 - 10.862 -
8.000

7.000
Area 75.863 m2
6.000
Area Embankment . - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
1 - 8.302 (4.875) 19.854 (48.394)
2 4.875 11.552 (6.500) 26.154 (85.001)
3 5.875 11.552 (5.700) 25.954 (73.969)
4 10.375 14.552 (1.200) 28.884 (17.330)
5 11.375 14.602 (0.270) 28.934 (3.906)
6 11.575 14.402 (0.500) 28.304 (7.076) 16.000
7 11.575 14.332 (0.070) 28.164 (0.986)
15.000
8 11.645 14.332 (0.430) 28.234 (6.070)
9 12.075 13.902 - 27.734 - 14.000
10 12.075 13.832 (0.490) 27.734 (6.795) 13.000
11 12.57 13.832 (0.430) 28.164 (6.055)
12.000
12 12.565 13.902 (0.500) 28.234 (7.059)
13 12.995 14.332 (0.070) 28.664 (1.003) 11.000
14 13.065 14.332 - 28.734 - 10.000
15 13.065 14.402 (0.200) 29.004 (2.900)
9.000
16 13.265 14.602 (1.000) 29.154 (14.577)
17 14.265 14.552 (4.500) 26.104 (58.734) 8.000
18 18.765 11.552 (1.000) 23.104 (11.552) 7.000
19 19.765 11.552 (5.415) 19.494 (52.780)
6.000
20 25.18 7.94 11.560 16.674 96.376 - 5.000 10.000 15.000 20.000 25.000
21 13.62 8.732 1.300 17.422 11.324
22 12.32 8.690 12.320 16.992 104.671
23 - 8.302 - 8.302 -
24
Area 191.817 m2

BSL 1 MK
QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Profile Number : SL. 93 / BSL 1 MK
Coordinate
Point
x y a. X(n+1)-Xn b.Yn+Y(n+1) (a*b)/2 Sketsa
Area Excavation
1 - 10.862 (1.280) 19.164 (12.265)
2 1.280 8.302 (12.320) 16.992 (104.671) 13.000
3 13.600 8.690 (1.300) 17.422 (11.324)
4 14.900 8.732 (11.560) 16.671 (96.358) 12.000
5 26.460 7.939 (2.980) 18.858 (28.098)
11.000
6 29.440 10.919 14.540 22.351 162.492
7 14.900 11.432 1.300 22.814 14.829 10.000
8 13.600 11.382 13.600 22.244 151.259
9.000
9 - 10.862 - 10.862 -
8.000

7.000
Area 75.863 m2
6.000
Area Embankment . - 5.000 10.000 15.000 20.000 25.000 30.000 35.000
1 - 8.302 (4.875) 19.854 (48.394)
2 4.875 11.552 (6.500) 26.154 (85.001)
3 5.875 11.552 (5.700) 25.954 (73.969)
4 10.375 14.552 (1.200) 28.884 (17.330)
5 11.375 14.602 (0.270) 28.934 (3.906)
6 11.575 14.402 (0.500) 28.304 (7.076) 16.000
7 11.575 14.332 (0.070) 28.164 (0.986)
15.000
8 11.645 14.332 (0.430) 28.234 (6.070)
9 12.075 13.902 - 27.734 - 14.000
10 12.075 13.832 (0.490) 27.734 (6.795) 13.000
11 12.57 13.832 (0.430) 28.164 (6.055)
12.000
12 12.565 13.902 (0.500) 28.234 (7.059)
13 12.995 14.332 (0.070) 28.664 (1.003) 11.000
14 13.065 14.332 - 28.734 - 10.000
15 13.065 14.402 (0.200) 29.004 (2.900)
9.000
16 13.265 14.602 (1.000) 29.154 (14.577)
17 14.265 14.552 (4.500) 26.104 (58.734) 8.000
18 18.765 11.552 (1.000) 23.104 (11.552) 7.000
19 19.765 11.552 (5.415) 19.494 (52.780)
6.000
20 25.18 7.94 11.560 16.674 96.376 - 5.000 10.000 15.000 20.000 25.000
21 13.62 8.732 1.300 17.422 11.324
22 12.32 8.690 12.320 16.992 104.671
23 - 8.302 - 8.302 -
24
Area 191.817 m2

BSL 1 MK
PTSL-II Contract No. : KU.08.11-W.07/470/WIL.I/2004
Contractor : Nindya - PP - Murni, Joint Oparation

CALCULATION OF EMBANKMENT

: BSL. 1 Mk Sub Secondary Canal


: EMBANKMENT ( III - 1 - 10a ) Ref. DWG No. :
: Page No. : of

Area of Ave. Area of Embankmentl Type A1 Earthfill Type B1 From Borrow Area Distance
Distance
No. Section Type Embankment Embankment From Exc. Material 0.05 ~ 2 km 2 ~ 4 km 4 ~ 6 km 6 ~ 10 km
(sqm) (sqm) (m) (cu.m) (cu.m) (cu.m) (cu.m) (cu.m)

### CP.2 65.577


118.557 50.55 5,993.06
### SL. 79 171.54
149.861 49.70 7,448.10
### SL. 80 128.18
76.183 49.66 3,783.24
### SL. 81 24.18
44.167 50.40 2,226.00
### SL. 82 64.15
110.612 50.30 5,563.77
### SL. 83 157.07
94.275 53.60 5,053.16
### SL. 84 31.48
85.585 50.00 4,279.23
### SL. 85 139.69
112.282 49.60 5,569.21
### SL. 86 84.88
93.056 32.40 3,015.00
### SL. 87 101.24
158.953 50.60 8,043.04
### SL. 88 216.67
138.108 50.00 6,905.38
### SL. 89 59.54
117.358 63.70 7,475.71
### SL. 90 175.17
102.840 53.50 5,501.95
### SL. 91 30.51
103.636 51.10 5,295.79
### SL. 92 176.76

Sumarry Eartfill BSL 1 MK


184.290 49.30 9,085.50
### SL. 93 191.82

Total Embankment BSL 1 Mk 85,238.13

Prepared by : Checked by : Technically approved by : Accepted by :

The Contractor The Consultant The Consultant The Engineer


Designated Engineer Designated Engineer Sub-project Leader Designated Engineer

Sumarry Eartfill BSL 1 MK


PTSL-II Contract No. : KU.08.11-W.07/470/WIL.I/2004
Sub-Project : Muko Muko Kanan Irrigation Sub-Project Contractor : Nindya - PP - Murni, Joint Oparation

CALCULATION OF EXCAVATION
Location : BSL. 1 Mk Sub Secondary Canal
Work Item and No. : Excavation III - 1 - 5b Ref. DWG No. :
Payment No. : Page No. : of

Area of Ave. Area of Quantity of Excavation Type A with Hauling Distance Qauntity of Excavation for
Distance
No. Section Type Excavation Excavation 50 m < 0.05 ~ 2 km. 2 ~ 4 km. 4 ~ 6 km. 6 ~ 14 km. Type F Type G
(sqm) (sqm) (m) (cu.m) (cu.m) (cu.m) (cu.m) (cu.m) (cu.m) (cu.m)

1 CP.2 B 60.087619
141.979 50.55 7,177.05
2 SL. 79 B 223.87
176.028 49.70 8,748.58
3 SL. 80 B 128.18
198.814 49.66 9,873.09
4 SL. 81 B 269.44
289.309 50.40 14,581.19
5 SL. 82 B 309.18
301.537 50.30 15,167.31
6 SL. 83 B 293.90
195.147 53.60 10,459.87
7 SL. 84 B 96.40
174.228 50.00 8,711.41
8 SL. 85 B 252.06
177.829 49.60 8,820.30
9 SL. 86 B 103.60
88.646 32.40 2,872.13
10 SL. 87 B 73.70
245.764 50.60 12,435.66
11 SL. 88 B 417.83
292.090 50.00 14,604.50
12 SL. 89 B 166.35
271.325 63.70 17,283.42
13 SL. 90 B 376.30
377.080 53.50 20,173.78
14 SL. 91 B 377.86
328.349 51.10 16,778.65
15 SL. 92 B 278.84
235.329 49.30 11,601.71
16 SL. 93 B 191.82

Total Excavation BSL 1 Mk 179,288.66


Prepared by : Checked by : Technically approved by : Accepted by :

The Contractor The Consultant The Consultant The Engineer


Designated Engineer Designated Engineer Sub-project Leader Designated Engineer

Summary EXcavation BSL 1 MK


QUANTITY CALCULATION SHEET

Project : Mukomuko Kanan irrigation


Contractor : Nindya - PP Murni JO
Canal : BSL. 1 Mk Sub Secondary Canal
Work item : SOD FACING

L total 1 2 3 4 5 6 7
NO Patok
( m1 ) Xst.L Xst.L Xst.L Xst.L Xst.L Xst.L Xst.L

1 CP.2 D/S 21.809


0.566 2.400 8.487 6.535 2.055 1.767
2 SL. 79 6.532
0.793 3.875 1.064 0.800
3 SL. 80 6.756
2.650 0.566 2.740 0.800
4 SL. 81 8.000
3.335 0.566 3.299 0.800
5 SL. 82 8.541
3.515 0.566 3.660 0.800
6 SL. 83 8.649
3.533 0.566 3.750 0.800
7 SL. 84 6.810
2.524 0.566 2.920 0.800
8 SL. 85 10.416
5.408 0.566 3.642 0.800
9 SL. 86 9.442
4.182 0.566 3.894 0.800
10 SL. 87 5.692
4.327 0.566 0.800
11 SL. 88 9.983
4.273 0.566 4.345 0.800
12 SL. 89 10.398
4.561 0.566 4.471 0.800
13 SL. 90 10.975
4.831 0.566 4.777 0.800
14 SL. 91 12.327
5.408 0.566 5.553 0.800
15 SL. 92 12.579
5.733 0.566 5.480 0.800
16 SL. 93 14.479
10.817 1.600 0.865 0.566 0.631
PTSL-II Contract No. : KU.08.11-W.07/470/WIL.I/2004
Sub-Project : Muko Muko Kanan Irrigation Sub-Project Contractor : Nindya - PP - Murni, Joint Oparation

CALCULATION OF SOD FACING


Location : BSL. 1 Mk Sub Secondary Canal
Work Item and No. : Sod Facing ( III - I - 12 ) Ref. DWG No. :
Payment No. : Page No. : of

Area of Average Area of Quantity of Accumulativv Quantity of


Distance
No. Section Sod Facing Sod Facing Sod Facing Sod Facing
(m) (m) (m) (sqm) (sqm)

1 CP.2 21.809
14.170 50.55 716.312
2 SL. 79 6.532 716.312
6.644 49.70 330.205
3 SL. 80 6.756 1,046.52
5.046 49.66 250.565
4 SL. 81 3.335 1,297.08
3.425 50.40 172.634
5 SL. 82 3.515 1,469.71
3.524 50.30 177.279
6 SL. 83 3.533 1,646.99
3.029 53.60 162.336
7 SL. 84 2.524 1,809.33
3.966 50.00 198.305
8 SL. 85 5.408 2,007.64
4.795 49.60 237.851
9 SL. 86 4.182 2,245.49
4.255 32.40 137.847
10 SL. 87 4.327 2,383.33
4.300 50.60 217.561
11 SL. 88 4.273 2,600.89
4.417 50.00 220.840
12 SL. 89 4.561 2,821.73
4.696 63.70 299.15
13 SL. 90 4.831 3,120.88
5.120 53.50 273.91
14 SL. 91 5.408 3,394.80
8.994 51.10 459.58
15 SL. 92 12.579 3,854.38
11.698 49.30 576.70
16 SL. 93 10.817 4,431.08

Prepared by : Checked by : Technically approved by : Accepted by :

The Contractor The Consultant The Consultant The Engineer


Designated Engineer Designated Engineer Sub-project Leader Designated Engineer

Summary Sod Facinfg BSL 1 MK


PTSL-II Contract No. : KU.08.11-W.07/470/WIL.I/2004
Sub-Project : Muko Muko Kanan Irrigation Sub-Project Contractor : Nindya - PP - Murni, Joint Oparation

CALCULATION OF CLEARING AND GRUBBING


Location : BSL. 1 Mk Sub Secondary Canal
Work Item and No. : Clearing And Grubing ( III - 1 - 2 ) Ref. DWG No. :
Payment No. : Page No. : of

Width of Ave. Width of Quantity of Clearing for Accum. Qauntity of Clearing


Distance
No. Section Type Clearing Clearing Type A Type B Type C Type A Type B Type C
(m) (m) (m) (sqm) (sqm) (sqm) (sqm) (sqm) (sqm)

1 CP.2 (D/S) B 27.056


36.118 50.55 1,825.76
2 SL. 79 B 45.18 1,825.76
46.49 49.70 2,310.55
3 SL. 80 B 47.8 4,136.32
48.87 49.66 2,426.88
4 SL. 81 B 49.94 6,563.20
51.71 50.40 2,606.18
5 SL. 82 B 53.48 9,169.39
52.945 50.30 2,663.13
6 SL. 83 B 52.41 11,832.52
41.22 53.60 2,209.39
7 SL. 84 B 30.03 14,041.91
39.425 50.00 1,971.25
8 SL. 85 B 48.82 16,013.16
40.35 49.60 2,001.36
9 SL. 86 B 31.88 18,014.52
28.78 32.40 932.47
10 SL. 87 B 25.68 18,946.99
44.05 50.60 2,228.93
11 SL. 88 B 62.42 21,175.92
51.835 50.00 2,591.75
12 SL. 89 B 41.25 23,767.67
50.345 63.70 3,206.98
13 SL. 90 B 59.44 26,974.65
59.68 53.50 3,192.88
14 SL. 91 B 59.92 30,167.53
56.42 51.10 2,883.06
15 SL. 92 B 52.92 33,050.59
41.18 49.30 2,030.17
16 SL. 93/ B 29.44 35,080.77
BSL 1 MK

Prepared by : Checked by : Technically approved by : Accepted by :

The Contractor The Consultant The Consultant The Engineer


Designated Engineer Designated Engineer Sub-project Leader Designated Engineer
Sum. Clearing Grubbing BSL 1 MK
SUMMARY OF QUANTITY
Project : Muko-Muko Kanan Irrigation Sub-Project
Item of Work : Excavation & Embankment
Item No :
Cross Area
Cross Area
No Patok ( Emb. Average Area Average Area Distance Volume ( Emb. ) Volume ( Exc. )
(Exc)
)
1 CP.2 (D/S) - 60.088
2 SL. 79 171.54 85.77 223.87 141.98 50.55 4,335.61 7,177.05
3 SL. 80 128.18 149.86 128.18 176.03 49.70 7,448.10 8,748.58
4 SL. 81 24.18 76.18 269.44 198.81 49.66 3,783.24 9,873.09
5 SL. 82 64.15 44.17 309.18 289.31 50.46 2,228.65 14,598.55
6 SL. 83 157.07 110.61 293.90 301.54 50.30 5,563.77 15,167.31
7 SL. 84 31.48 94.28 96.40 195.15 53.60 5,053.16 10,459.87
8 SL. 85 139.69 85.58 252.06 174.23 50.00 4,279.23 8,711.41
9 SL. 86 84.88 112.28 103.60 177.83 49.60 5,569.21 8,820.30
10 SL. 87 101.24 93.06 73.70 88.65 32.40 3,015.00 2,872.13
11 SL. 88 216.67 158.95 417.83 245.76 50.60 8,043.04 12,435.66
12 SL. 89 59.54 138.11 166.35 292.09 50.00 6,905.38 14,604.50
13 SL. 90 175.17 117.36 376.30 271.33 63.77 7,483.93 17,302.41
14 SL. 91 30.51 102.84 377.86 377.08 53.50 5,501.95 20,173.78
15 SL. 92 176.76 103.64 278.84 328.35 51.10 5,295.79 16,778.65
16 SL. 93 191.82 184.29 191.82 235.33 49.30 9,085.50 11,601.71

TOTAL VOLUME 83,591.54 179,325.01

Prepared by : Checked by : Technically approved by : Accepted by :

The Contractor The Consultant The Consultant The Engineer


Designated Engineer Designated Engineer Sub-project Leader Designated Engineer