CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
RC Mat Slab Design Based on 2018 IBC, ACI 318-19, AASHTO 17th Edition & ACI 360
DESIGN CRITERIA
1. Divide an irregular foundation plan into overlapping rectangles and using this software
design each rectangular section separately.
2. To check soil capacity is based on 2018 IBC 1808.6.2 & ACI 360 9, using the Post-
Tension Institute (PTI) method.
3. To check reinforced concrete (RC) slab capacity is based on ACI 318-19, using plate/shell element method.
APPLIED SERVICE LOAD SHEAR AT L DIRECTION APPLIED SERVICE LOAD SHEAR AT B DIRECTION
FOR CENTER LIFT FOR CENTER LIFT
VL = L0.09 SB0.71 h0.43 P0.44 ym0.16 em0.93 / 1940 = 0.630 kips/ft VB = B0.19 SL0.45 h0.20 P0.54 ym0.04 em0.97 / 1350 = 0.936 kips/ft
FOR EDGE LIFT FOR EDGE LIFT
VL = L0.07 h0.4 P0.03 ym0.67 em0.16 / (3.0 SB0.015) = 0.719 kips/ft VB = B0.07 h0.4 P0.03 ym0.67 em0.16 / (3.0 SL0.015) = 0.702 kips/ft
(cont'd)
5. CHECK REINFORCED CONCRETE SLAB CAPACITY (ACI 318-19 & AASHTO 17th Edition)
MAX FACTORED AXIAL LOAD Pu = 0.07 kips/ft, (1.0 kN/m), 5% shear load for seismic & slading
MAX FACTORED MOMENT Mu = 3.23 ft-kips / ft, (14.4 kN-m / m)
MAX FACTORED SHEAR LOAD Vu = 1.40 kips/ft, (20.5 kN/m)
EXPECTED DIFFERENTIAL DEFLECTION WITHOUT PRESTRESSING EXPECTED DIFFERENTIAL DEFLECTION WITHOUT PRESTRESSING
FOR CENTER LIFT, AT L DIRECTION FOR CENTER LIFT, AT B DIRECTION
D0 = (ym L)0.205 SB1.059 P0.523 em1.296 / (380 h1.214) = 1.23 in D0 = (ym B)0.205 SL1.059 P0.523 em1.296 / (380 h1.214) = 1.57 in
< Dallow < Dallow
[Satisfactory] [Satisfactory]
FOR EDGE LIFT, AT L DIRECTION FOR EDGE LIFT, AT B DIRECTION
D0 = L0.35
ym 0.76
SB 0.88
em
0.74
/ (15.9 h0.85
P
0.01
) = 0.59 in D0 = B 0.35
ym 0.76
SL 0.88
em 0.74
/ (15.9 h 0.85
P
0.01
) = 0.68 in
< Dallow < Dallow
[Satisfactory] [Satisfactory]
7. CHECK SOIL BEARING (ACI 360 & PTI)
APPLIED LOADING
SLAB WEIGHT 150 L B t = 2116800 lbs BEAM BEARING AREA (b)(Total Length) = 6088.333333 ft2
ADDED DL DL L B = 1693440 lbs SOIL PRESSURE q = Total Load / THE AREA = 1099 psf
8. CHECK SLAB STRESS DUE TO LOAD-BEARING PARTITIONS (ACI 360 & PTI)
RELATIVE STIFFNESS LENGTH AT L DIRECTION RELATIVE STIFFNESS LENGTH AT B DIRECTION
Mmax = Pb b / 4 = 2.10 ft-kips / ft Mmax = Pb b / 4 = 2.80 ft-kips / ft
Where b = MIN[(Ec t3 / 3 ks)0.25, SB] = 11 ft Where b = MIN[(Ec t3 / 3 ks)0.25, SL] = 14 ft
ks = 4 lb / in3 ks = 4 lb / in3
Technical References:
1. "Design of Slabs on Grade, ACI Committee 360R-06", American Concrete Institute, 2006.
2. "Design and Construction of Post-Tensioned Slab-on-Ground, 2nd & 3rd Editions", The Post-Tensioning Institute, 2004, 2007, & 2008.
3. "1997 Uniform Building Code, Volume 2", International Conference of Building Officials, 1997.
PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Plate/Shell Element Design Based on ACI 318-14
DESIGN CRITERIA
THE PLATE/SHELL ELEMENT CAN BE FROM BEARING WALL, DIAPHRAGM, TANK, OR OTHER SURFACE STRUCTURES. THE SOFTWARE
IS FOR ONE DIRECTION PERPENDICULAR BENDING AND SHEAR DESIGN, SINCE THERE ARE NO INTERACTION AT BOTH DIRECTIONS.
FOR IN PLAN LOADS, THE SHEAR WALL DESIGN SOFTWARE SHOULD BE USED.
ANALYSIS