OPERATIONS RESEARCH
Workbook
SEQUENCING
There are six jobs, each of which must go through two machines A and B in the
order AB. Processing time in hours is given in table.
Processing time
Job Machine Machine
A B Determine the sequence for
1 2 3 a the six jobs which will
2 5 6 e
minimize the elapse time and
3 6 4 d
4 3 7 c idle time.
5 2 5 b
6 8 8 f
SOLUTION:
Step 1: To find the optimal sequence.
Processing time
Job
Machine A Machine B
1 2 3
2 5 6
3 6 4
4 3 7
5 2 5
6 8 8
Elapse time