MATERIAL ESTIMATION FOR CONCRETE WORK

For 30 Mpa Concrete by Volume of Concrete

Water cement Ratio = 0.44


Cement Sand Stone Chips
Aggregate Mixing Ratio = 1 0.75 1.5

Desired volume of Concrete = 1 m3

Cement = 0.308 m3 8.87 bag 443.08 kg

Sand = 0.231 m3 370.4 kg (Sand density varies from 1520 to

Stone Chips = 0.462 m3 766.2 kg (Sand density varies from 1525 to

Water = 194.95 kg 195 litre

By Number of Cement Bags


Cement = 10 bag 0.35 m3 499.68 kg

Sand = 0.260 m3 417.7 kg

Stone Chips = 0.521 m3 864.0 kg

Water = 219.86 kg 220 litre

Output Concrete Volume = 1.128 m3


Sand density varies from 1520 to 1680 kg/m 3)

Sand density varies from 1525 to 1750 kg/m 3)