You are on page 1of 17

26-09-2020

Gravity Dam:Earthquake forces


Effect of acceleration due to earthquake:
(i) Effect of horizontal acceleration
(a) Horizontal inertia force
(b) Hydrodynamic pressure Force
(ii) Effect of vertical acceleration
(a) Vertical inertia force

Hydrodynamic pr force: horizontal force Produced due to


momentary compression of water body in reservoir.
• Approximate method
• Rational method or Zanger’s method
9/26/2020 RCOEM/CIVIL/VII SEM 70
BE/IE/PBK

Gr Dam : Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 71


BE/IE/PBK

1
26-09-2020

9/26/2020 RCOEM/CIVIL/VII SEM 72


BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 73


BE/IE/PBK

2
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 74


BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 75


BE/IE/PBK

3
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces

Seismic coefficient represents


9/26/2020 max. earthquake
RCOEM/CIVIL/VII SEM acceleration values 76
BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 77


BE/IE/PBK

4
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 78


BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 79


BE/IE/PBK

5
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 80


BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 81


BE/IE/PBK

6
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces
Horizontal· acceleration causes two forces:
(1) Inertia force in the body of the dam, and
(2) Hydrodynamic pressure of water.

Inertia forces(energy required to move or acc. The object):


The inertia force acts in a direction opposite to the acceleration
imparted by, earthquake forces and is equal to the product of
the mass of the dam and the acceleration.

For dams up to 100 m height ,


at the top of the dam
horizontal seismic coefficient =1.5 times seismic coefficient αh
then reducing linearly to zero at the base

It causes an overturning moment about the horizontal section


adding to that caused by hydrodynamic force.
9/26/2020 RCOEM/CIVIL/VII SEM 82
BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 83


BE/IE/PBK

7
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 84


BE/IE/PBK

Hydrodynamic pr force- approximate method

9/26/2020 RCOEM/CIVIL/VII SEM 85


BE/IE/PBK

8
26-09-2020

9/26/2020 RCOEM/CIVIL/VII SEM 86


BE/IE/PBK

Earthquake pr force problem :


Determine the hydrodynamic pr force and its moment about base of
dam,if horizontal seismic coeff is 0.01, u/s water depth is 100m and u/s
face of dam is vertical upto 30m from free surface and then slopes at 0.8
H: 1 V upto heel.

9/26/2020 RCOEM/CIVIL/VII SEM 87


BE/IE/PBK

9
26-09-2020

9/26/2020 RCOEM/CIVIL/VII SEM 88


BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Hydrodynamic pr force: Zanger’s Method
forces

9/26/2020 RCOEM/CIVIL/VII SEM 89


BE/IE/PBK

10
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 90


BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 91


BE/IE/PBK

11
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 92


BE/IE/PBK

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 93


BE/IE/PBK

12
26-09-2020

Hydrodynamic pr force- approximate method

9/26/2020 RCOEM/CIVIL/VII SEM 94


BE/IE/PBK

9/26/2020 RCOEM/CIVIL/VII SEM 95


BE/IE/PBK

13
26-09-2020

Gravity Dam
Forces on Gravity Dam
Earthquake forces

9/26/2020 RCOEM/CIVIL/VII SEM 96


BE/IE/PBK

9/26/2020 RCOEM/CIVIL/VII SEM 97


BE/IE/PBK

14
26-09-2020

G
Gr dam – combined stress

9/26/2020 RCOEM/CIVIL/VII SEM 98


BE/IE/PBK

9/26/2020 RCOEM/CIVIL/VII SEM 99


BE/IE/PBK

15
26-09-2020

9/26/2020 RCOEM/CIVIL/VII SEM 100


BE/IE/PBK

9/26/2020 RCOEM/CIVIL/VII SEM 101


BE/IE/PBK

16
26-09-2020

9/26/2020 RCOEM/CIVIL/VII SEM 102


BE/IE/PBK

17

You might also like