1. WHAT IS AN A3 PROJECT?
An activity that
(a) supports achievement of the continuous improvement objectives
(b) requires > 39 hours dedicated man-hours
(c) has an A3 worksheet
3. A3 OBJECTIVE
4. WHY?
5. WHO?
Team leader of the programme or project, or process owner of the area under review
6. HOW?
7. UPDATE FREQUENCY
The A3 is a living document and is updated as the team moves through the stages of the
project
8. REVIEW FREQUENCY
The A3 document is reviewed by the team and programme or project champion on an as-
required basis during the project lifespan. Review frequencies are determined at the start
of the project.
Improve
18 Convene team at the area & implement changes
19 Train personnel in new way of doing things
20 Standardise new processes, SOPs, visual management & SPC
21 Confirm the financial gains
Control
22 Conduct post implementation review - snag list & action items
23 Present to senior management
24 Recognise and reward team
25 Determine next improvement activities for team members
Planned start date: Planned start date: Planned start date: Planned start date: Planned start date:
Planned finish date: Planned finish date: Planned finish date: Planned finish date: Planned finish date:
Problem Definition
The Goals
1
2
3
4
Problem Definition Spaghetti map Pareto charts Improvement Activities & Contribution to
Bruce's time and resources (bread, butter & 1 TRANSPORT Metrics
energy) are being wasted in the process of 2 INVENTORY 1 Ask the customer what she wants
making toast that fails to meet his wife's
requiremenst. As a result the process needs to 3 MOTION Correct inventory, no dumping, RFT 100%
be repeated. 4 WAITING
5 OVERPRODUCTION 2 Move toaster near plates & bread
The Goals - by 19th Sept 20, 4.30pm 6 OVERPROCESSING Distance: minus 12 metres
1 Improve customer RFT from 0% to 100% 7 DEFECTS Time: minus 1 min
2 Reduce the toast making process time from 3 Have spreadable butter ready
4mins 12 secs to 3 mins Distance: minus 6 metres
3 Reduce the distance travelled during toast Time: minus 20 seconds
making from 21.5 metres to 10 metres
Fishbone analysis
Estimated results of improvement
activities
Time Conclusion
From: 4 mins 12 seconds
To: 2 mins 52 secs
Distance
From: 21.5 metres
To: 9.5 metres One goal met and two goals exceeded. Also
dishwasher stacked and turned on.
Financial Validation Total per annum Lessons Learned & Next Steps
Savings (bread, butter, shoe leather) €200 1. Lean is a different way of looking at things. Focus on the process, and WASTE in the process, not the individual carrying out the process
Productivity gain (dishwasher) €500 2. We need to immediately address the position of the toaster under the paper towel - safety hazard!!!
Soft benefit (domestic harmony) priceless 3. The fridge position needs to be raised to better ergonomic height and contents de cluttered
Finance sign off Bernie Rushe, 6th October 2020
Actual start date: 1st Mar 2020 Actual start date: 14th Mar 2020 Actual start date: 1st April 2020 Actual start date: 5th April 2020 Actual start date: 10th July 2020
Actual finish date: 16th Mar 2020 Actual finish date: 30th Mar 2020 Actual finish date: 10th April 2020 Actual finish date: 4th August 2020 Actual finish date: 10th October 2020
Problem Definition
Bank resources (people, IS, paper) are being
wasted in assessing mortgage applications that 1Jan - 31Sept20
fail to meet the customer SLA of 24 hour
response time. As a result the bank is losing
customers and potential revenue.
The Goals
1 Improve performance to 24hour response
SLA from 56% to 75% by end June 2020
2 Improve form filling RFT from 70% to 90% Data collection sheet Fishbone analysis
by end June 2020
3 Increase revenue by > Euro 1M pa 20 Brainstorm improvement ideas
18
16 Run chart
14
12
10
8
6
4
2
0
#1 #2 #3 #4
IS IS NOT
Description NOTES
(Observation): (Observation):
What process/product?
Where in the
process/product ?
Who is affected?
Is there a pattern?
SMART Goals
Specific
Measurable
Achievable
Relevant
Time bound
ANALYSE
Sam
Task 1 11/26/20 12/1/20
IMPROVE
Sam
Task 1 date date
CONTROL
Sam
Task 1 date date