[>] DOCUMENT
CONTROL No.
svonsasctt “TRANSMITTAL rroant0-Ro3e9
sate Amar Proto STK caacar Seed AAG Praag, SA00 TSO
se a a
J. Yuan Bung, 2 Fr WsleyPasans ce wy —< = Risj2eig
fauvanrosveerema 3140, Fot 3, Easier Adin Bulg (lg 980 Aba
eee eee oee a — oe
fone a aT
_ Upgrade Electrical System at ABQANO Plants
LP ce eee Pie ee ee ee eee (foes
ran ocomeTanon ocimenr mae [REV TEMnans
inspection Assignment Package (AP- AP has been evewed by iD
1 Joos) -Rev. A125V DC Battery Charger |AUVAIBEPRTSOIAP-) [ors sates wie ata
System fevew connens
tig Fans
jrceve ov TO WBER
HM Nrwar
iowa = ONE
42a
aus rama: Company General UseAttachment 1 to B1-40-02480-TROS8S
js i.
Review Comments,
7 ‘Comment Description Reviewer | Org
endear emeacrsh onpy wih aenenens of atated SANS, SAE ondTIS | an
L. [nspecton tt 107000146426 has been crested & shale referenced inal ltd inspections] cy ne
WtRr AUVA Projects and Supplies
AUVA :
Document Transmittal
‘GurRet ——[AUVANTOSTOaAET TEA [Bate [28 Novenbar 2078
a ‘Saeed Chandi
‘Atntion
Project, Upgrade Electrical System at ABQAIQ Plants | BI-10-02130_| LSTK : 6600041340
Bere Inspection Assignment Package (IAP -004), Rev. A
125V DC Battery Charger System
Tesued VA mal & Hand Delvery
Issued For Review & Approval
=, DescnpTion Document Number | QUANTITY | REMARKS
Inspection Assignment Package (AP - ‘AUVAIBE :
1. | 004), Rev. A 125V DC Battery Charger 02130/1AP-004 1File | Attached
System
Note
{eoued By: Received By:
Name Novataane Name ohm Alomar
‘Signature he a i Signature
Date i eNO 208 Date QR- poy ~ OF