KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND

SERVICES (MYP)

PROACTIVE NOTIFICATION
1. SEPCO(To complete):
Project Title/No:
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES (MYP)

PN No:
SAC-MYP-QA(P4)-PAN-0033
Location /
Package 4.
Date Identified:
Date:
Responsibility:

HUTA Construction Group


Project Phase:

Construction

Violation / No Violation:

No Violation
Description of Notification:
It’s proactively advised to HUTA that for planed 24 hour static load test of all bored piles, provide
quality coverage all the time during test as HOLD point as per ITP.

This is to prevent violation from company.

Reference Document (standards, specifications, drawings, etc.):


SACTIP-BP-003-00
SEPCO QC Supervisor: Name: Mr Salahudin Signature: Date:
Prepared by: Name: Wasim Javeed Signature: Date:

Received by Name: Signature: Date:


Construction
representative:

Action Required: YES NO


Action Taken:

Page1 of 2
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND
SERVICES (MYP)

PROACTIVE NOTIFICATION
Action by: Name: Signature: Date:

Verification:

Verification by:

Name:
Signature:
Date:

Closed:
SEPCO QC Supervisor
Name:
Signature:
Date
SEPCO QC Manager:

Name:
Signature:
Date:

Page2 of 2