You are on page 1of 2

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND

SERVICES (MYP)

PROACTIVE NOTIFICATION
1. SEPCO(To complete):
Project Title/No:
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES (MYP)

PN No:
SAC-MYP-QA(P4)-PAN-0050
Location /
Package 4
Date Identified:
Date: 02 -April-2020
Responsibility:

Package-4 Construction Group


Project Phase:

Construction
Violation / No Violation:

No Violation
Description of Notification:

Prior to coating application, dew point and relative humidity shall be measured. Readings shall be
every four hours or at the time intervals approved in writing by the Aramco Inspector. The work shall
not proceed if the substrate temperature shall be less than 3°C (5°F) above the dew point.

This is to prevent violation from company.

Reference Document (standards, specifications, drawings, etc.):

SAES-H-003 Para 9.1.4

SEPCO QC Supervisor: Name: Salahuddin Signature: Date:


Prepared by: Name: Shahbaz Ahmed Signature: Date: 02-April-2020

Received by Name: Signature: Date:


Construction
representative:

Page1 of 2
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND
SERVICES (MYP)

PROACTIVE NOTIFICATION

Action Required: YES NO FOR INFORMATION


Action Taken:

Action by: Name: Signature: Date:

Verification:

Verification by:

Name:
Signature:
Date:

Closed:
SEPCO QC Supervisor:
Name: Salahuddin
Signature:
Date
SEPCO QC Manager:

Name: Farhan Sajjad


Signature:
Date:

Page2 of 2

You might also like