KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND

SERVICES (MYP)

PROACTIVE NOTIFICATION
1. SEPCO(To complete):
Project Title/No:
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES (MYP)

PN No:
SAC-MYP-QA(P4)-PN-0003
Location /
Package 4.
Date Identified:
Date:
Responsibility:

HUTA Construction Group


Project Phase:

Construction

Violation / No Violation:

No Violation
Description of Notification:

This is to be proactively notified to the HUTA construction team that Placing of concrete shall not be
commenced until the Company has inspected and passed the pre concreting inspections and any
reinforcement, cast in fixings etc., against which the concrete is to be placed.

This is to prevent violation from company.

Reference Document (standards, specifications, drawings, etc.):

Proj Specs RE-614005 Rev.0 Sec 4.14.3.

SEPCO QC Supervisor: Name: Mr Salahudin Signature: Date:


Prepared by: Name: Wasim Javeed Signature: Date:

Received by Name: Signature: Date:


Construction
representative:

Page1 of 2
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND
SERVICES (MYP)

PROACTIVE NOTIFICATION
Action Required: YES NO
Action Taken:

Action by: Name: Signature: Date:

Verification:

Verification by:

Name:
Signature:
Date:

Closed:
SEPCO QC Supervisor
Name:
Signature:
Date
SEPCO QC Manager:

Name:
Signature:
Date:

Page2 of 2