Professional Documents
Culture Documents
Design and Construction of Sewer Tunnels for DTSS Phase 2 Project – Contract T-09
Page 1 of 2
T09-H&S-FRM+00+LOA+ Excavator Operator
Leighton Asia- South East Asia Construction
Design and Construction of Sewer Tunnels for DTSS Phase 2 Project – Contract T-09
I, hereby undertake to abide to the above-mentioned conditions of my appointment and fully comprehend
with the importance of my roles and duties as an appointed competent person/s. I shall take all necessary
measures to safely carry out the assigned site operations.
Name/ Signature/ Date (Competent person) Name/ Signature/ Date (Interpreter, If any)
Page 2 of 2
T09-H&S-FRM+00+LOA+ Excavator Operator