Professional Documents
Culture Documents
(General Equipment)
Project Name HISA expansion project Date 25-2-2023
Construction
Equipment Name Forklift Insurance N/A Supply Partner IMTIAJ
Inspection Validity
Specification FD45 Date 21-12-2023 Supply Partner SM IMTIAJ
01-03-2023 TO
Model FD45 Operation Period
31-03-2023
Supervisor Abu Bakkar
Registration No. HMX-FL-04 Operation place ECT/ICT Operator Name Md Bappy
Registered
Company
HYUNDAI MOVEX Training Date 13-2-23 Operator License DK0107720100007
User Company
HYUNDAI MOVEX User of PIC Tae Hyung Kim ADC PIC Mr. Nur Islam
Name
Place of Operation & Travel Route (Specify the location and travel route on a drawing)
Provide Daily check list before start work Must have body harness with tie up must be under SWL.
Assign skilled and certified signalman. Work area must be tidy up and clean.
Checking driver license & equipment fitness certificate
Given awareness training for safely driving safety.
before start the work .
Adequate lighting should be provided if work at night Entry gate must lock before starting work
ADC (HSEM):
Supply Partner: ADC (CM): ADC (PM/SPM):
Name of
Name of SM………………… Name of CM….….………….. Name of PM………………......
Manager…………….
(Signature) (Signature) (Signature)
(Signature)
☞Attachments
Lifting equipment: Construction equipment inspection certificate, Operator license, Insurance document,
Safety Checklist, and equipment specification
Others: Construction equipment inspection certificate, Operator license, Insurance document, Safety
Checklist