AMIN SYSTEM Rev. No A
JMS FOR INSTALLATION OF
SDN BHD COPPER PLATE Date 28/02/2020
Page No 1 of 14
Prepared By: Adrian Bentai Approved By: Lyndon Yeo Kian Verified By
Joseph Hin SAMYOUNG
GLOBAL:
28/02/2020 28/02/2020
Doc. No
AMIN SYSTEM Rev. No A
JMS FOR INSTALLATION OF
SDN BHD COPPER PLATE Date 28/02/2020
Page No 2 of 14
PROJECT DESCRIPTION
Proposed 3 storey factory with ancillary building on Lot 3972 (PL 3954), Block 12, Muara Tebas
Land District, Jalan Usaha Jaya, Samajaya Free Industrial Zone, Kuching, Sarawak (Phase 2)
PROJECT OWNER
SITE ADDRESS
Lot 3972 (PL 3954), Block 12, Muara Tebas Land District, Jalan Usaha Jaya, Samajaya Free
Industrial Zone, Kuching, Sarawak
Doc. No
AMIN SYSTEM Rev. No A
JMS FOR INSTALLATION OF
SDN BHD COPPER PLATE Date 28/02/2020
Page No 3 of 14
TABLE OF CONTENTS
SECTION CONTENTS
1.0 SCOPE OF WORK
2.0 PURPOSE/ OBJECTIVES
3.0 LIST OF WORK ACTIVITIES ON SITE
4.0 DEFINITIONS
5.0 BASIC HSE MEASURES RELATED TO THE SPECIFIC WORK ACTIVITY
(EXISTING & ADDITIONAL CONTROL MEASURES FROM HIRARC)
6.0 ROLES & RESPONSIBILITIES OF KEY PERSONNEL ON EXECUTING THE WORK
ACTIVITY ON SITE
7.0 COMMUNICATIONS/ TRANSPORTATION STORAGE FACILITIES
8.0 PPE COMPLIANCE
9.0 EMERGENCY PREPAREDNESS PROCEDURE
Doc. No
AMIN SYSTEM Rev. No A
JMS FOR INSTALLATION OF
SDN BHD COPPER PLATE Date 28/02/2020
Page No 4 of 14
4.0 DEFINITIONS
● All work personnel must attend SAMYOUNG Safety Induction prior to work
● All work personnel are to be provided with full Personal Protection Equipment
● Prior to mobilization, all personnel assigned for the work shall be adequately trained for
performing work in green field
● In related to mobilization and required training, Safety Coordinator/ Supervisor must check
for compliance with project’s HSE plan and safe work procedure
● Drivers and operators must be certified and competent to carry out their job
● All workers should have valid work passes
● All plants and equipments to be pre-mob inspected and approved by SAMYOUNG HSE
Dept
● Ensure all materials/tools/equipment are properly secured to avoid rolling or falling object
causing of personnel injury / property damages
● Do not stack materials too high or exceed transport bed
● Trained & approved signal man shall guide all vehicles such as lorry, lorry/mobile crane,
and trailer etc. while moving inside the work site. The signal man shall be equipped with
whistle, red and green flag/light stick (night work). The driver for the mobile plant must wind
down the window for easy communication with the signal man.
● For a long vehicle additional signal man shall be provided.
● All Lifting gears shall be inspected 4 times a year (quarterly) and to be color tagged.
5.2 Control Measures for Prepping of Copper Plate at Laydown Workshop Using Power
Tools ( Angle Grinder)
● Stay alert at all times. Never to use tool while under the influence of intoxication of any
substance
● Never wear loose clothes in order to avoid getting caught by moving parts
● Never overreach and keep proper footing and balance at all times while operating tool
● Always wear face shield, protective gloves and steel toe boots while grinding
● Always be at a safe distance from another worker while grinding
● Grinder to be fitted with proper guard to protect operator from broken fragments
● Never use cutting disc for grinding
● Conduct inspection on power tools 4 times a year (quarterly) and be sure each power tool is
tagged with the right color coding according to the project
Doc. No
AMIN SYSTEM Rev. No A
JMS FOR INSTALLATION OF
SDN BHD ALUMINIUM BUSBAR Date 28/02/2020
Page No 7 of 14
5.3 Control Measures for Driving of Lorry for Materials Transportation to Site
● Ensure that all equipment and materials are secured properly and keep within vehicle
parameters
● Adhere to speed limit of 20km/h or below and follow site rules and regulations
● Provide signal man to guide the transporting vehicle into site
● Ensure lorry crane materials are stacked within vehicle bed perimeters and secured
● Signal man to assist operator/driver at all times when mobilizing to site
● Secured load by lashing using ratchet and additional lashing or ratchet is required
depending on how big the load is to ensure that the load is securely tight
● Provide signal man to guide the transporting vehicle/lorry crane into site and to provide
additional signal man when required for congested tight spot area
● Drivers should lower down their vehicle window for better view and communication with the
signal man positioning front and back side of the vehicle
● Educate workers on load splitting and making multiple trips to finish the task
● Ensure sufficient manpower is planned and deployed for job
● For manual lifting, assess the weight load before lifting. Workers should not exceed to his
physical limitation (20Kg to 25kg load) and must wear appropriate hand glove and PPE
● Use of mechanical aids to move where it is practicable such as forklift or lorry crane
● To provide more manpower for frequent work rotation
● All workers are advised to adopt proper manual handling posture at all times
● Lifting crew involved in the operation shall undergo and complete SAMYOUNG in house
safe lifting & rigging training.
● Ensure sufficient manpower is planned and deployed for job.
● The lifting operation shall be suspended during heavy wind conditions. No lifting operation
shall be carried out during lightning alert
● The riggers should not stand under the load while the load is still elevated, they should
attach the tagline to control the load and lower it to the ground. The position of the hand
should not be in between the load or in the line of fire to prevent pinch point or injuries
● The lorry crane being used for the operation shall be adequately maintained as per the
project’s maintenance regime plan. Lifting gears and accessories shall be colour coded as
per project’s colour coding
● Communications between the lorry crane operator and riggers needs to be clear at all times
Doc. No
AMIN SYSTEM Rev. No A
JMS FOR INSTALLATION OF
SDN BHD COPPER PLATE Date 28/02/2020
Page No 8 of 14
● The load to be lifted shall be checked for any loose objects to ensure no objections which
prevent a clean lift from the transport
● Tag line to be attached to the base of the object before the lifting operation starts
● Lorry crane is to be driven out from the site once the lifting operation has ended
● All tools will be stored at our temporary storage, an iron cabinet which bares the company’s
name
● Storage should have proper access with adequate lighting for workers to walk safely.
Housekeeping should be maintained at all times in the temporary storage area to prevent
slipping and tripping hazards
5.7 Control measures for Hoisting of Material (Copper Plate) into Position Using Chain
Block
● Chain block is to be inspected prior to use. Be sure chain block isn’t kinked, twisted or
damaged
● The load must not be over the capacity of the chain block
● Proper maintenance and storage is parallel. Never expose block to rain and excessive
humidity. Be sure chain block is color tagged according to the project’s maintenance regime
● Workers wear gloves while operating chain blocks to avoid pinch points and never stand
under a raised load
● Never leave a raised load unattended
5.8 Control Measures for Bolt Tensioning using Hydraulic Wrench Torque
● Always wear safety goggles/safety glasses when using a torque wrench or any other hand
tool
● Wrench needs to be inspected for cracked/worn out sockets and lubricate tool to avoid
crack
Doc. No
AMIN SYSTEM Rev. No A
JMS FOR INSTALLATION OF
SDN BHD COPPER PLATE Date 28/02/2020
Page No 9 of 14
● Never use handle extension unless the wrench manufacturer allows such modification
● Never drop wrench to avoid loss of calibration. Equip wrench with lanyard
● Never expose wrench to extreme humidity, heat or any corrosive environment
● Wrench to be inspected and calibrated regularly
● All tools and materials are to be kept in proper storage area with proper signage
● Cables are to be elevated 2m above grounds and work area are to be maintained with good
cable management
● All access route or passageway are to be clear of any materials at all times as to prevent
any obstruction during course of emergency
● To spray water before cleaning on area to prevent from any flying dust or particles
● Workers are to be provided with proper dust mask to prevent from direct inhalations of
particles
● All materials are to be properly stacked and secured to prevent any toppling
● Educate workers to drink sufficient quantities of water while working on hot weather to avoid
dehydration. Ensure water supplies are sufficient by providing the water containers near the
working place.
● Workers should have enough breaks (Lunch and Coffee).
● In case of haze condition, notify workers to stop and rest if PSI reading is in hazardous limit
● Workers exposed to haze conditions should be verified according to the PSI reading,
outdoor activities involving strenuous activity should be minimized or avoid during 100 –
200 PSI readings
● Between 200 – 300 PSI, all outdoor activities should be stopped and check on worker
health
● Particulate respirators (N95) should be provided to protect workers from exposed haze
conditions
● In case of raining and lightning alert, the workforce should be evacuated to the rain and
lightning protected shelter and wait for further instruction. All works at open area are to
stopped at once
5.12 Control Measures for After Hours Work (overtime after 5pm)
● A permit to work (PTW) request form needs to be filled and submitted to Samyoung HSE
department before 4pm
● There is to be enough or sufficient manpower provided during night works so as to have
more regular work rotations
● All workers are to be advice to have an adequate resting time and proper meals before
work start
Doc. No
AMIN SYSTEM Rev. No A
JMS FOR INSTALLATION OF
SDN BHD COPPER PLATE Date 28/02/2020
Page No 10 of 14
● Management is to control working hours on site so as to ensure that all personnel have not
worked excessive hours.
● Supervisors are to give direct supervision during night work and to monitor workers
behavior for any signs of fatigue or overworked which may lead to any incident or accident
at workplace
● Ensure that all work area and access are provided with adequate lighting to have better
visibility on site
7.2 Transportation
Construction equipment and materials will be transported into the project site using necessary.
Trailer beds or lorry cranes. Materials transported shall be adequately secured during vehicle
movement
3 Lorry Crane Major Injuries a) Immediately Sound alarm and notify HSE personnel
Topple
b) Immediately summon first aid and Site emergency
coordinator. If the deceased can be safely removed
from the machine without endangering others, do so.
Otherwise, wait for the rescue team unless operator’s;
life is in danger.
Note: Do not move anything at the accident location
except to prevent further injury.
4. Falling from Minor Injuries a) Render First aid
Height
b) Alert HSE department
Major Injuries a) Alert HSE and ERT to rescue man overboard