METHOD OF STATEMENT FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
By: Pelita Dinamik Engineering Sdn. Bhd.
i. Introduction
We provide reliable underground installations of pipes and conduits for a wide variety of services,
utilities, & cables.
We maintain plenty of quality equipment, in operation with proper maintenance and support,
including compact equipment for in-city work and heavy-duty pipelines and multiple duct / pipe
installations.
Properly performed, this method of Trenchless Technology has zero settlement to the ground
surface, since there is no excavation displacement is used instead of excavation.
This method statement covers the method utilized to construct an underground pipeline utilizing
Horizontal Directional Drilling. We are proposing to use HDD (Horizontal Directional Drilling)
equipment. This method statement will apply for the followings:
Project Name :
Project No. :
PO No. :
Client :
Scope : Horizontal Directional Drilling Works (4 ways 225 mm) HDPE PN10 pipe.
2
METHOD OF STATEMENT HORIZONTAL DIRECTIONAL DRILLING (HDD)
By: Pelita Dinamik Engineering Sdn. Bhd.
3
METHOD OF STATEMENT FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
By: Pelita Dinamik Engineering Sdn. Bhd.
4
METHOD OF STATEMENT FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
By: Pelita Dinamik Engineering Sdn. Bhd.
5
METHOD OF STATEMENT HORIZONTAL DIRECTIONAL DRILLING (HDD)
By: Pelita Dinamik Engineering Sdn. Bhd.
6
METHOD OF STATEMENT HORIZONTAL DIRECTIONAL DRILLING (HDD)
By: Pelita Dinamik Engineering Sdn. Bhd.
1. Project Manager
2. Safety Supervisor
The Site Safety Supervisor is responsible to the Project Manager for the day-to-day
implementation of the safety program.
He must be familiar with all the safety requirements in the contract along with the safety
local regulations and applicable safety codes and practices.
Carryout regular site safety audits and reports, correct unsafe work practices and
potential hazards.
Investigate and report all accidents including “near miss” incidents and recommend
preventive measures.
Maintain a record of all injuries and damages on site and submit reports as required.
Assist with safety training.
Attend weekly supervisor’s meeting and discuss accident prevention techniques and
safety performance.
Ensure maintenance of good hygiene standards and availability of first aid treatment.
Advise field supervision on safe working methods.
Enforce the observance of the work permit procedures.
Promote an understanding among the work force that accident prevention is an
indispensable part of any efficient construction activity.
7
METHOD OF STATEMENT FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
By: Pelita Dinamik Engineering Sdn. Bhd.
3. Field Supervisor
The effectiveness of the company’s accident prevention effort will largely depend on the
attitude and approach of the field supervisor.
He must understand and comply with requirements of client’s safety manual and work
permit procedures.
Organize the work area so that men can perform their duties without maximum risk to themselves
or equipment’s.
Maintain a good housekeeping.
Inspect equipment and tools before use and ensure correct storage facilities are available and
properly utilized.
Enforce the use of applicable personnel protective equipment.
Correct unsafe conditions immediately as they arise.
Conduct induction training on weekly safety meetings with work crews.
Attend weekly supervisor’s meeting.
Cooperate with site safety supervisor to create and maintain safe workings conditions in all
operations being performed.
Set a personal example.
4. Workers
The workmen, also has responsibilities for accident prevention, for not even the best
supervisor can watch over each man every minute of the working day.
v. Resources
Materials
Type Quantity
HDD Machine 2
Crane Truck 2
Excavator 4
Electromagnetic Locator 1
Transmitter 2
Pipe Jointer Set 2
Generator Set 3
Water Pump 2
Mag 6 Big Sonde 1
Mag 6 Small Sonde 1
Cable Winch 2
8
METHOD OF STATEMENT FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
By: Pelita Dinamik Engineering Sdn. Bhd.
Safety Equipment -
Manpower
Role Quantity
Supervisor 1
Machine Operator 1
Tracker Operator / Locator 1
Pipe Jointer / Welder 1
Bentonite Mixer 1
Helper 1
2. Traffic Control Work area not properly Ensure there is adequate advance
identified with Traffic Control signage, flaggers, cones, flashers &
Devices. strobes as required.
Trucks & workers getting hit by Pull off roadway as far as safely
other vehicles in traffic control possible. Use Caution Entering &
zone. Exiting vehicles.
9
METHOD OF STATEMENT FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
By: Pelita Dinamik Engineering Sdn. Bhd.
4. HDD Works Damaging Existing Utilities Use safe and appropriate potholing
techniques to the planned drill path's
depth to expose any hidden
underground utilities.
10
METHOD OF STATEMENT FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
By: Pelita Dinamik Engineering Sdn. Bhd.
Cable exposed to watery area Make sure the digging area is dry
and if the area is watery, use a water
pump to dry the area.
8. Cable Installation In Trench Trench Wall Collapse While Installing Cable in Trench
Trench
While Standing At Edge Lines, Enter The Trench. Do Not
Install From The Edge
9. Cable Installation Installing Cable In Energized Use Extreme Caution. Always Have
("Hot") Pedestals, Switchgear, Another Qualified Person at The
Transformers Location. Tape The Ends Before
Installation And Secure The Cable,
Don't Leave A Dangerous Situation
Mixing Phases Phase All Cable Before Installation
11
METHOD OF STATEMENT FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) WORKS
By: Pelita Dinamik Engineering Sdn. Bhd.
and URD
Mixing Phases- Flash or Phase All Cable Before Terminating
Outage
Sharp Edges or Corners Wear Leather Gloves While
Terminating
Damage to Conductors Being Ensure Proper Tools Are Used to
Terminated Avoid Damaging the Conductors
13. Final Testing Grounds Still on When Testing Ensure Grounds Are All Removed
Before Testing
Forgetting to Test A Cable Double Check to Ensure All Cables
Before Energizing Have Been Tested Before Placing
into Service
Testing Equipment Not Verify Testing Equipment Is in
Working Properly Working Order at Each Switch Point,
Equipment Must Be Clean, Within
Test Dates and Functional
Mixing Phases Check Phasing (Hot Phase/Bottle)
Before Energizing
Stray Voltages and Neutral Be Aware of The Possibility of Such
Imbalances Conditions and Test
12