Ans. No, there is no scope for any extension beyond 30 years for toilets on
DBOOMT basis. However, the discretion of the Commissioner will be final. It
can be terminated before the stipulated period in case it is not maintained properly
and if violates any other terms and conditions of RFP.
Ans. As is clear in the RFP, the construction of the Model Tehbazari Kiosk is
based on the following:
(i) Construction on the basis of Engineering rate contract: The space for the
tehbazari need to be tiled properly, pylons need to be made, CC TV and solar
system need to be provided. All these and others as specified in the RFP need to
be made on rate contract basis, for which MCD will make payment.. The kiosks
have to be made by the preferred/selected bidder as per specification laid down.
However, the tehbazari allottees will pay for the kiosks, which need to be
taken away by them after business hours.
Q4 Total estimated cost given for the execution of project as Rs. 1.00 crore is
too less.
Ans. The cost for toilet and maintenance need to be recovered from the
advertisements placed on the toilets. However, it need to be quoted alongwith
composite tender.
Ans. All type of energy needs to come from solar panels installed for this
purpose.
Contd…..
Q7 Why only joint venture or consortium has been made as mandatory pre-
requirement for the project?
Ans. In this project, there are many components; for example kiosk maker,
provider of solar power, the civil contractor who will maintain/or pay money for
the construction of toilet, those who will provide CC TV etc. Hence, it is felt that
a consortium will help with or without stake of the partners.
Q8 Why only those who have executed 3 projects of Rs. 1.00 crore for street
furniture and beautification project are entitled to participate? The present project
falls under the category of project management.
Ans. The present project falls under the category of both execution and
management for which necessary experience is required.
Q9 Will there be a single window clearance from MCD for executing the
project?
(Amiya Chandra)