REVISION REGISTER
Clause Authorised
Description of Revision Date
Number By
CONTENTS
Clause Page No
GENERAL ............................................................................................................................. 4
303.01 Scope.............................................................................................................. 4
303.02 References ..................................................................................................... 4
303.03 – 303.25 NOT USED ............................................................................................ 4
OPERATIONS ....................................................................................................................... 5
303.26 General – Materials ......................................................................................... 5
303.27 – 303.30 NOT USED ............................................................................................ 5
303.31 Construction Pit Management Plan ................................................................. 5
303.32 General – Water Supplies ............................................................................... 6
303.33 Water Bores .................................................................................................... 6
303.34 Reporting ........................................................................................................ 7
303.35 – 303.80 NOT USED ............................................................................................ 7
AS BUILT AND HANDOVER REQUIREMENTS ................................................................... 7
303.81 Handover Requirements ................................................................................. 7
303.82 – 303.90 NOT USED ............................................................................................ 7
CONTRACT SPECIFIC REQUIREMENTS ............................................................................ 7
303.91 – 303.99 NOT USED ............................................................................................ 7
ANNEXURE 303A ................................................................................................................. 8
Principal’s Material Sources................................................................................................ 8
ANNEXURE 303B ................................................................................................................. 9
Construction Pit Management Plan Template ..................................................................... 9
ANNEXURE 303C ............................................................................................................... 10
Principal’s Pit Management Requirements ....................................................................... 10
ANNEXURE 303D ............................................................................................................... 26
Principal’s Water Abstraction Locations ............................................................................ 26
ANNEXURE 303E ............................................................................................................... 27
Principal’s Water Management Requirements .................................................................. 27
GENERAL
303.01 SCOPE
303.02 REFERENCES
Author’s Note: Please select the relevant Specification 304 in consultation with the
Environmental Officer and delete all other versions.
OPERATIONS
303.26 GENERAL – MATERIALS
4. Site operations at all pits or sites where the Principal has Site
obtained Environmental and Heritage Approvals must be in accordance Operations
with this Specification.
4. The Contractor must ensure that water procured from all Contractor
sources for the Works is suitable for the purpose for which it is Nominated
used. Any cost associated with testing of water, must be borne by the Water
Contractor.
6. Water used by the Contractor for material compaction and Water for
dust suppression must be obtained from sources other than Water material
Corporation water supply services, existing wetlands or rivers, unless it compaction
can be demonstrated to the satisfaction of Superintendent that and or dust
suppression
alternatives are not viable, and all required approvals have been
obtained.
3. Any test results provided cannot be guaranteed and may be Test Results
subject to seasonal fluctuations.
303.34 REPORTING
ANNEXURE 303A
PRINCIPAL’S MATERIAL SOURCES
TABLE 303A.1 PRINCIPAL’S MATERIAL SOURCE LOCATIONS WITH ENVIRONMENTAL AND HERITAGE APPROVALS – GENERAL DETAILS
ANNEXURE 303B
CONSTRUCTION PIT MANAGEMENT PLAN TEMPLATE
ANNEXURE 303C
PRINCIPAL’S PIT MANAGEMENT REQUIREMENTS
Author’s Note: For the items in this Annexure 303C, if not applicable retain item number,
insert ‘NOT USED’ and delete the table(s) relating to the item.
303C.2 ACCESS
HOLD
MANAGEMENT REQUIREMENTS RESPONSIBILITY
POINT
Insert Text
303C.6 CLEARING
303C.8 COMMUNICATION
HOLD
MANAGEMENT REQUIREMENTS RESPONSIBILITY
POINT
Insert Text
303C.9 CONTAMINATION
303C.10 DEWATERING
DURING WORKS
Insert text from Contaminated Sites PEMR
POST WORKS
In Insert text from Contaminated Sites PEMR
Table 303C.11.3 Dieback Infested, Dieback Uninterpreteable and Dieback Free Locations
LOCATION REFERENCE Location (e.g. Drawing
Number, Shapefile, Clearing
Map)
303C.12 DOCUMENTATION
DURING WORKS
Insert text from Pit Management PEMR
POST WORKS
Insert text from Pit Management PEMR
DURING WORKS
Insert text from Mulch and Topsoil Management PEMR
POST WORKS
Insert text from Mulch and Topsoil Management PEMR
303C.29 PERMITS
DURING WORKS
Insert text from Pit Management PEMR
POST WORKS
Insert text from Pit Management PEMR
DURING WORKS
Insert text from Pit Management PEMR
POST WORKS
Insert text from Pit Management PEMR
303C.34 REVEGETATION
DURING WORKS
Insert text from Sidetracks and Temporary Access Tracks PEMR
POST WORKS
Insert text from Sidetracks and Temporary Access Tracks SPEMR
HOLD
MANAGEMENT REQUIREMENTS RESPONSIBILITY
POINT
303.39 STOCKPILES
ANNEXURE 303D
ANNEXURE 303E
Author’s Note: For the items in this Annexure 303E, if not applicable retain item number,
insert ‘NOT USED’ and delete the table(s) relating to the item.
All edits to downloaded TDP documents shall be tracked (most word processing software
allows this to be done automatically). Deletions shall be struck through e.g. example.
Insertions shall be in italics e.g. example. If all information relating to a clause is deleted then
the clause number should be retained and the words "NOT USED" should be inserted.
The proposed documents with tracked changes shall be submitted to the Project Manager for
review, prior to printing the final batch of documents. When this final printing is carried out,
the tracked changes option is to be turned off.
Insert the partially populated Contractor’s Pit Management Plan in Annexure 303B. The plan
must be prepared by an experienced person and reviewed by the Main Roads Regional
Environment Officer or the Main Roads Environment Branch. The Construction Pit
Management Plan must be prepared and approved prior to the start of pit site operations.
Consultation with landholders or land managers must be included in the preparation of the
plan and in determining completion criteria.
Insert Contract Specific Requirements into relevant section, if not required put NOT USED.
Insert details into Table or <<insert location>> as relevant. If not required, Put NOT USED
Specification Details: No: 303 Revision No: __________Title: MATERIAL AND WATER
SOURCES