Work Package 3:
Quality Management
Date: 2013-02-01
Author: Donna Dvorak (IHM)
Distribution: WelDest project team internal use
File name 2012.2.1.QualityPlan.v05.IHM
Version: 5.0
Description: Report presenting the quality
management plan for project WelDest
1 INTRODUCTION ................................................................................................................................................. 3
1.1 Background......................................................................................................................................................................... 3
4 COMMUNICATION ......................................................................................................................................... 14
5 DOCUMENTS ..................................................................................................................................................... 15
1 Introduction
The purpose of this section is to give a brief description of the WelDest project, including the rationale, objectives and
expectations.
1.1 Background
The Wellness trend is a growing demand factor for tourism and leisure activities globally. However, there are specific
needs and challenges regarding this trend that should be met. For both the customer and the industry, there is some
confusion about correct terminology, as well as what constitutes appropriate services and products for varying needs.
This also extends to a lack of proper educational material and course design at the tertiary and adult-learner level on
Health & Well-being destination development. Wellness is less seasonal and more labor-intensive, and there is a need for
this in many European countries where tourism can act as an economic booster.
The WelDest project aims to address the needs that have been identified above by creating a development framework to
be used by public bodies, destination management organizations (DMOs) and private companies at tourism destinations
willing to strengthen the elements influencing the well-being level of tourists and locals alike. The framework, supported
by educational material, enables development of the tourism destination towards a more holistic and sustainable H&WB
destination.
This document, for internal use by the WelDest project team, will act as a guide for the internal quality management of the
WelDest Project and contains the general rules agreed upon in order to ensure its success. The plan shows how the
project will be carried out, measured, and monitored.
This quality plan defines the organization structure and the relationships between the partners so that there is a clear
distinction of roles for all participants, and a clear procedure for how the project will be managed and followed up. It also
contains the project time plan, including a timeframe for milestones and major deliverables.
Quality standards, including criteria and indicators are defined, and an evaluation framework, involving both formative and
summative evaluation, is used to ensure quality and continuous improvement. An important aspect of the quality plan is
the capacity for flexibility, allowing for modification or re-aligning of the project processes and objectives based on
feedback and evaluation findings. All partners will be involved as part of the assessment process while delivering this
project.
QP developed and approved at beginning of project to confirm major deliverables/milestone acceptance criteria and
manage approved project processes.
Management team - The project is led by a management team made up of one representative from each of the partner
countries. Members of this team participate in all partner meetings as well as monthly Skype meetings. They are also
responsible for coordinating communication with their industry and associate partners as well as their other team
members. The Project Manager, responsible for overall project management, leads this team. Team members are:
Susanna Saari (TUAS), Daniel Binder (FH Joanneum), Harprit Thacker (UCB), Donna Dvorak (IHM), Christian Husak
(CHC), Steffen Lange (HNEE)
HEI (Higher Education Institutes) Coordinators – Members of the management team also act as coordinators in their
respective countriesand are responsible for managing the completion of the tasks and subtasks outlined in their work
packages as well as reporting to the Project Manager.
HEI Team members – Responsible for completing the tasks and subtasks of the WPs assigned to their team. In addition,
one member of each team attends the partner meetings along with the coordinator from their team.
Industry partners – Each country in the project is represented by two industry partners. Industry partners provide
research data in the form of interviews and surveys as well as case study material for development of the handbook,
participating also in focus groups as part of the research work package. An industry partner representative also attends
the national-level WelDest camp workshop to be held in pilot destinations, participates in national meetings to discuss and
advise on content issues, and takes part in the international networking and benchmarking event and seminar in Berlin.
Associate partners –Each country in the project is represented by 1-2 associate partners who may provide research
data and material, but whose main role is in disseminating and sustaining the outcomes of WelDest. Associate partners
also participate in local meetings to discuss and advise on content issues.
External auditors – Responsible for assessing the content and usability of the e-handbookand course design.
To achieve the objectives of WelDest, work is divided into 6 work packages, each with specific subtasks. The list of WPs
and subtasks can be seen, along with the project time plan and duration of each WP and specific subtask in chart 1 in the
appendix.
Lead of WP 2: TUAS, Finland, Susanna Saari (work redistributed after removal of UOP team)
WP 2 covers the following activities & methods in the listed subtasks:
ST 1 Dissemination plan (TUAS)
ST 2 Dissemination follow up templates (UCB)
ST 3 Blog (on-going), (FH JOANNEUM)
ST 4 Logo (FH JOANNEUM)
ST 5 Power point presentations (about WelDest project & blank template) (FH JOANNEUM)
ST 6 Project Newsletters & mailing lists (UCB)
ST 7 Leaflet (language versions (EN/EN, EN/FI, EN/GE, EN/HU, EN/CZ) (FH JOANNEUM, all responsible for
their own language versions)
ST 8 International networking & benchmarking event with seminar (HNEE)
ST 9 WelDest Camp workshop on destination development (IHM, all responsible for the national set-up)
ST 10 Media contacts (press releases, interviews etc.) (IHM)
Lead of WP 3: Donna Dvorak, The Institute of Hospitality Management in Prague (IHM), Czech Republic
WP 3 covers the following activities & methods in the listed subtasks:
ST 1 Quality plan (for internal & external project quality) (IHM)
ST 2 WelDest meeting/workshop quality questionnaire & summary, (IHM)
ST 3 WelDest process quality follow up with mid & end project reports, (IHM)
ST 4 Quality assessment of educational materials (eHandbook), (UCB)
[WP 1, TUAS takes care of all tenders if needed for subcontracting quality experts]
This section includes a list of the methods that will be used to ensure the required level of quality. Quality management is
divided into three categories:
Plans
Performance quality - preventative activities, evaluation of project deliverables)
Process quality
3.2 Plans
Draft versions of the implementation plans for each WP are presented at the first partner meeting. The drafts are
discussed and approved at the meeting by general consensus after feedback and alterations. The plans are then updated
by the WP leaders and reviewed by the partners until final acceptance. There will be a minimum of two rounds of
feedback and alterations for each plan. Updates to the plans should be included in WP status reports.
The WP implementation plans will include qualitative and quantitative indicators for project progress which will be followed
and reported on a regular basis as part of internal project reporting. Plans also include target dates for submission of
deliverables.Plans are stored in the Optima workspace.
A risk assessment matrix (see appendix 2 for original version) has been developed for the various project activities
related to work involved in the project WPs. For each of the activities, the following are identified:
● Risks
● Their potential impact on the project
● Effect (level of impact)
● Probability of occurrence
The level of impact is assessed with a value of “negligible, marginal, critical or uncontrollable.” Probability is assessed
with a value of „low, medium, or high risk.” Following the calculation of risk exposure, the proposed solution or mitigation
strategies are presented.
Work package leaders are responsible for constantly monitoring and assessing risks related to their respective work
packages, paying special attention to the higher level risks. An interactive version of the matrix is posted separately on
Optima and is accessible to all the project team members to allow for tracking of status and monitoring of the evolution of
Meeting and event evaluations – to be done by all participants. Quantitative and qualitative data collected through
questionnaires using a digital survey tool that allows respondents to remain anonymous. A 5-point Likert scale is used
wherever possible. A summary of the data collected, including suggestions for changes and improvements will be
compiled after each meeting or event. A standard questionnaire form is used for partner meetings, and specific
questionnaires are developed for each event.
Peer review of deliverables – For deliverables to be evaluated using this instrument, each is reviewed by a partner, who
is nominated by the WP leader and not involved in the production of the deliverable. The deliverable is sent to the WP
leader at least 15 days before the expected delivery date. The WP leader immediately forwards it to the reviewer for
evaluation. The reviewer verifies whether the deliverable satisfies the requirements, description, or objective; identifies
deviations from requirements or problems; and suggests improvements to author. The reviewer returns the evaluation to
the author, whose responsibility it is to either accept or reject the suggestions and decide what actions are to be
undertaken. The deliverable is then submitted to the WP leader along with the reviewer’s evaluation for final approval or
approval contingent on further modification. For certain deliverables the peer review process may be carried out by
multiple reviewers to ensure quality.
Author accepts/rejects
Author submits WP leader forwards suggestions, makes
deliverable to WP leader deliverable to nominated Reviewer evaluates WP leader gives final or
deliverable and sends changes, returns
(or directly to reviewer) reviewer deliverable and eval. to contingent approval
evaluation to author
WP leader
General comments:
Thoroughness of contents
Correspondence to project objectives
Specific comments:
Relevance
Format(layout, spelling, etc.)
10 WP 3: Quality| ERASMUS WelDest 2012 - 2014
Suggested actions:
The following changes should be implemented
Missing information
Further improvements
A template to be used by reviewers for writing peer review evaluations can be found in the WP 3 folder in Optima.
Expert review of deliverables - external audits - 3 to 5 external specialists will be subcontracted to quality audit the
outcomes of WP 5. The specialists will be representing different area of knowledge (e.g. eLearning, destination/regional
development, tourism development, health and well-being) and will check on the content and usability of the e-
Handbook& course design and the Self-assessment & development tool. They will be named later as this is a procedure
that involves tenders. The instructions and auditing documents will be created by the lead of WP 5as part of WelDest. The
feedback from the audit will be used to improve the final e-Handbook and its attachments.
Process quality will be monitored through summary reports, which are based on meeting or event questionnaires and
focus sessions, WP status reports, and evaluation reports from external audits. Process quality involves
Focus sessions – These sessions will allow for more in-depth monitoring of key questions related to the project. They
will also provide a forum for complaints, suggestions, and satisfaction or dissatisfaction with changes and progress.
Quality will be included in the agendas, and focus sessions will take place at both partner meetings and Skype meetings.
WP status reports - Status reports ensure the quality of the WPs and should be submitted by each WP leader three
times per years to the Quality WP lead in order to compile the interim and end project progress reports.
WP status reports shall be structured as follows:
Introduction
Project activities - (summarize activities in the previous reporting period, list deliverables produced,
presentations given, meetings attended),
WP status - (including subtask reporting*) (Describe the WP started, continued or completed during reporting
period. Summarize their status – e.g. in progress, completed, etc).
(Status should include reference to the risk assessment matrix – noting any updates, new risks or changes,
continuing risks, and strategies that have been implemented to reduce risks).
Project deliverables status–(list deliverables and summarize their status [started, delivered, under evaluation,
accepted)
Comments on the project – (general issues arising from activities performed during the reporting period, new
risks that have arisen during the reporting period)
Project work plan – (forecast what progress is expected in next period and highlight any changes of plan with
respect to the quality plan and last status report)
*Subtask reporting – subtask leaders will send their own status reports to the lead of each WP they are involved in at
least 10 days before the submission of the WP status report.
Meetings are important to ensure the progress of WelDest and to maintain the technical and social relationships among
the partners in the project.
Location Date
Austria October 2012
CzechRepublic May 2013
Belgium October 2013
Germany March 2014
UK June 2014
Finland September 2014
National meetings - conducted by HEI to industry and associate members to discuss and advise on content
related issues.
Decisions in all international partner meetings will be made based on simple majority should consensus not be reached. If
the distribution of votes is even, the project manager’s vote decides. If the national meetings will not reach consensus, the
matter should be taken to the international (Skype) meeting for decision making.
All documents and computer data files should be exchanged as much as possible viathe Optima workspace. Colleagues
should post in the general discussion area when a file has been added or changed. Colleagues are alerted to new
messages through a message sent to their work email.
All documents are to be stored in the Optima workspace for visibility and use for all partners when needed.
Documents are to be stored in the following folders (folders may be added or updated as needed):
Folder/Content
Introduction to WelDest and Contacts
Full proposal and support documents - the project application and official documents related to the application
EACEA agreements and subcontracts - the official project award, evaluation feedback related to the
application
Reporting folders–LLPProject handbook 2012 and official reports submitted to the EACEA as part of the project
management process
Partner meetings 2012-2014 - Agendas, minutes, presentations, working papers for all partner meetings and
Skype meetings
Work packages 1-6 - Details of the working documents and outputs related to each work package
Photos, etc.
5.2 Outputs
Project outputs will be stored separately in the relevant folder in the Optima workspace as they are developed
All documents will be saved in MS Word or MS Excel. A template (including font, built-in header, footer, page numbers,
etc.) to be used for the creation of Word documents can be found posted as a separate document in the WP 3 folder in
Optima.
Final versions of documents should be marked as final and uploaded to Optima in read-only format.
All documents must be listed giving for each the issue date, its name, version number (if necessary), status, the author’s
institution, and a sequential number to use as reference (R1,R2....Rn) in communication and correspondence.
Documents should be named as follows:
Date: yy.mm.dd
Document name: Chosen by author (the name should clearly identify the document by stating the purpose or information
it contains)
Version number: (v01, v02....)
15 WP 3: Quality| ERASMUS WelDest 2012 - 2014
Status – (draft, final)
Author’s institution: Authors should use the proper acronym for their institution (IHM, TUAS, UCB, FHJ, CHC)
Reference number: R1, R2....Rn (any change to the document must be followed up with a new reference number)
Example: 2012-10-11-QualityPlan-v01-Draft-IHM-R1
Example: 2012-11-01-PressRelease-FHJ-R6
In communication, the document can simply be referred to as Quality Plan R1 or Press Release R6.
Nov
Jul
Jul
May
Nov
May
Oct
Jan
Oct
Feb
Aug
Jan
Apr
Jun
Feb
Agu
Mar
Mar
Apr
Jun
Dec
Dec
Sep
Sep
Work Packages and Tasks
WP1 Project management 24 months
ST 1 Project implementation plan
ST2 Financial management 30 % 30 %
ST3 Contract process
ST4 Reports for TUAS F&F F&F
ST5 Reports for EU 1.10 . 30.9.
ST6 Tenders if/ when needed
ST7 Partner meetings, agendas PM/AT PM/CZ PM/HU PM/DE PM/UK PM/FI
ST8 Partner meetings, minutes
Skype meetings to take place once a month S. S. S. S. S. S. S. S. S. S. S. S. S. S. S. S. S. S. S. S.
WP 2 Dissemination 24 months
ST 1 Dissemination plan
ST 2 Dissemination follow up templates
ST 3 Blog
ST 4 Logo
ST 5 Power point presentations
ST 6 Project Newsletters & mailing lists from all partners 1 2 3 4 5
ST 7 Leaflet
ST 8 International event Berlin
ST 9 WelDest Camp workshop WS WS WS
ST 10 Media contacts
WP 3 Quality 24 months
ST 1 Quality plan
ST 2 WelDest meeting/workshop quality
ST 3 WelDest process quality
ST 4 Quality of outcomes
WP 4 Impl; research (16 months)
ST1 Research methodology plan
ST 2 Destination and consumer needs analyses (primary research) Plan
ST 3 Current status of H&WB destinations (secondary research) plan
ST 4 Stakeholder research (interviews and Open Space Technology)
ST 4 Summary and framework
WP 5 Impl: Creation of educational material (14 months)
ST 1 Development plan for educational material plan
ST 2 Creation of ehandbook
ST 3 Course design development including educator material
ST 4 Piloting of the educational material and the course design
ST 5 Improvements and amendments of the educational material
WP 6 Exploitation (24 months)
ST 1 exploitation plan plan
ST 2 exploitation follow up templates
ST 3 An article in a national, professional magazine
ST 4 Conference participation with an academic article
call for call for
ST 5 End project seminar y.2014 with a webinar papers papers Finland
ST 6 Exploitation of the educational material and other outcomes
RISK EXPOSURE
PROBABILITY
IMPACT
HIGH MEDIUM LOW
UNCOTROLLABLE High High Medium
CRITICAL High Medium Medium
MARGINAL Medium Medium Low
NEGLIGIBLE Medium Low Low