You are on page 1of 1

A B C D E F G H I J K L M N O P Q

KEYPLAN
E: 238214.974407
N: 9251112.900784

E : 238004.49
E : 237917.27 N : 9251080.61 E: 238092.497001
N : 9251080.61 N: 9251081.586713

E : 238168.533
E : 238090.794 N : 9251015.839

BILL OF MATERIAL PS-01 (PIPE RACK)


N : 9251015.055

1
NO MARK NO DESCRIPTION LENGHT QTY UNIT REMARK E : 237917.27
N : 9250878.82
E : 238004.49
N : 9250872.77

E: 238120.186080
E : 238188.186
N : 9250884.331
E: 238255.002901
N: 9250896.965929

1
PLATE 300x300x4 thk 2 EA
E : 238113.010 N: 9250864.499742

1 1
N : 9250866.409

2 2 ANGLE 50x50x5 thk 625 2 EA


3 3 HB-200x200x12x25 1725 2 EA
4 4 UNP 150x75x6 Thk 625 6 EA
5 5 UNP 150x75x6 Thk 70 4 EA SLOPE

SLOPE
SLOPE

TANK LORRY

SLOPE

CO2 SHED

2 WW F WW E WW D WW C WW B WW A
2
7000 7000 4200 6000 6000

6300 WW 1

350

350
1700
WW 1'

400

400
1500

1500
Ø1500

6000
2200

Ø1500

2200
L

B
1200 1300 1200 600 1550 3900 1550

1650

8650
1050 4900 1050 MAINTENANCE ACCESS WW 2

8200

3000

9000
6300

350

E
H

2200
MAINTENANCE ACCESS 7500

1200 600

6000
WW 2' 3100

400

300

300
650 3300 1000 1100 600

350
WW 3

D
4500
3000
3100

8650
Ø5000
Ø4500

Ø4200

6000
300

A
3000

C
3500
3100 300 7500 WW 4

300
500
7500 6000

5000

1000
THIS DRAWING
3 3

4 4

4 4

75
257.5 85 282.5 35.529 560.5
5 5
5 5 625 200 625

75
SECTION C-C

70 70
6 C 4 C 6
SECTION D-D
340

150
D D
5 5 625
7 4 7
4
150

150

150
70 70

DETAIL-5 (2EA)
8 8
625 200 625

DN65 DETAIL-4 (3EA)


FROM SLUDGE ENRICHMENT TO 340 CABLE TRAY A
REV
03-11-20
DATE
ISSUED FOR INFORMATION
DESCRIPTION
IWN
DSGN CHKD APPD
NEUTRALIZATION POND LATER
9 9
DN65 5 5 20
163
280260

FROM SLUDGE PUMP TO 73 2

105 90 105
DN15
SLUDGE ENRICHMENT TANK FROM COAGULANT DOSING PUMP TO

300

50
AND NEUTRALIZING POND COAGULATION TANK
3 1 281.5 85 258.5
1723

1723

10 10
105 90 105 200 625
4
1187

4
300
3 DN65 SECTION B-B TITLE:

FROM NEUTRALIZATION POND TO SECTION A-A


2 SLUDGE TRANSFER PUMPS
1 2
11
100

11
1
A A B B SCALE DRAWING NUMBER SHEET NO.REV. NO.
4

50
1 : 100 CB2-V-LDL-52-60006 3/3 A
ORDER WBS Doc. CODE
4

-
ITEM

PS-01 (2 EA) DETAIL-3 105 90 105 200 625 TEAM CODE


Project DWG. No.
-
REV.
-

Look North 300 DRAWN

CHECKED
Title

FABRICATION SHOP DRAWING


12
12 DETAIL-1 DETAIL-2 APPROVED (MAIN PIPE RACK)
DATE Scale DWG NO. REV. Sheet No.
1 DEPARTMENT
1 : 100 A 1/1

ENGINEERING & CONSTRUCTION


A B C D E F G H I J K L M N O P Q A3 (420mm X 297mm)

You might also like