KEYPLAN
E: 238214.974407
N: 9251112.900784

E : 238004.49
E : 237917.27 N : 9251080.61 E: 238092.497001
N : 9251080.61 N: 9251081.586713

E : 238168.533
E : 238090.794 N : 9251015.839

BILL OF MATERIAL PS-14 (PIPE RACK)


N : 9251015.055

1
NO MARK NO DESCRIPTION LENGHT QTY UNIT REMARK E : 237917.27
N : 9250878.82
E : 238004.49
N : 9250872.77

E: 238120.186080
E : 238188.186
N : 9250884.331
E: 238255.002901
N: 9250896.965929

1
PLATE 300x300x4 thk 1 EA
E : 238113.010 N: 9250864.499742

1 1
N : 9250866.409

2 2 ANGLE 50x50x5 thk 500 2 EA


3 3 HB-200x200x12x25 1623 1 EA
4 4 UNP 150x75x6 Thk 500 3 EA
5 5 UNP 150x75x6 Thk 70 2 EA SLOPE

SLOPE
SLOPE

TANK LORRY

SLOPE

CO2 SHED

2 WW F WW E WW D WW C WW B WW A
2
7000 7000 4200 6000 6000

6300 WW 1

350

350
1700
WW 1'

400

400
1500

1500
Ø1500

6000
2200

Ø1500

2200
L

B
1200 1300 1200 600 1550 3900 1550

1650

8650
1050 4900 1050 MAINTENANCE ACCESS WW 2

8200

3000

9000
6300

350

E
H

2200
MAINTENANCE ACCESS 7500

1200 600

6000
WW 2' 3100

400

300

300
650 3300 1000 1100 600

350
WW 3

D
4500
3000
3100

8650
Ø5000
Ø4500

Ø4200

6000
300

A
3000

C
3500
3100 300 7500 WW 4

300
500
7500 6000

5000

1000
THIS DRAWING
3 3

114
4 21 4 21 4

75
4 4

29 29 29 29 340
267 126 107 221 91 130
66 271 105 5 5
500 200 500 500 200

75
5 5
SECTION C-C SECTION D-D 70 70
SECTION D-D

C 4 4 C D D D D
6 6
5 5

150
4

150
330 170 80 300 120 70 70
500 500
7 235 120 145 DETAIL-5 (2EA)
7

500
DETAIL-4
DETAIL-4
8 8

340 DN15
CABLE TRAY
LATER FROM NaOH DOSING PUMP TO
NEUTRALIZATION POND A A 05-11-20 ISSUED FOR INFORMATION IWN

5 5 REV DATE DESCRIPTION DSGN CHKD APPD

9 DN100 FROM LAMELLA CLARIFIER DN15 9


TO WATER EFFLUENT 20 2 48 2 33 60
100 805 215 445

FROM HCL DOSING PUMP TO

105 90 105
DN15 NEUTRALIZATION POND A

50
300
FROM COAGULANT DOSING PUMP TO
COAGULATION TANK
1565

1 271 58 171 14843 172 7264


4
1561
1120

10
4 105 90 105 500 200 500 10

DN15 3 300
FROM COAGULANT AID DOSING PUMP 3 TITLE:
TO FLOCCULATION TANK 2 2
DN40 SECTION A-A SECTION B-B
FROM INSTRUMENT AIR TO
11
DEHYDRATOR/FILTERPRESS 2 2 SCALE DRAWING NUMBER SHEET NO.REV. NO.
11

1 DN50 B B
1A A 1 : 100 CB2-V-LDL-52-60006 3/3 A
FROM AIR MIXING BLOWER TO DETAIL-3

50
ORDER WBS Doc. CODE

PS-14 (1 EA) NEUTRALIZATION POND A/B ITEM


Project DWG. No.
-
REV.
4

Look West DN25 300 200 170 230 100 TEAM CODE - -

FROM SERVICE WATER TO 105 90 105 DRAWN Title

SUCTION PIPE OF DEHYDRATOR PUMP 300 500 200 500 CHECKED


FABRICATION SHOP DRAWING
12
APPROVED (MAIN PIPE RACK)
12 AND DEHYDRATOR/FILTERPRESS DATE Scale DWG NO. REV. Sheet No.
DETAIL-1 DETAIL-2 1 DEPARTMENT
1 : 100 A 1/1

ENGINEERING & CONSTRUCTION