Note :

SINGLE LINE DIAGRAM MCCB1 : From P. MDP


PANEL MSB NEW & PANEL SDP-UPS MCCB2 : To P. DB UTILITY
MCCB3 : To P.MSB Lt.3
MCCB4 : To PAC Vertiv 2
P.MSB NEW P.SDP-UPS MCCB5 : To PAC Climaveneta
From MCCB6 : To PACV ertiv 1
Panel MDP MCCB7 : INCOMING UPS1
R MCCB8 : To UPS1
S MCCB9 : Bypass Maintenance
T MCCB10 : Outgoing UPS1
N MCCB11 : To P.PDU A
MCCB12 : To P.PDU B
MCCB1 MCCB7
Lampu Indikator Panel
FROM MDP 160A
Power Meter INCOMING UPS 1 Note :
400A
MCCB4 MCCB5 MCCB6 PAC Vertiv 1 dekat pintu masuk
R SURGE 100A 100A 100A PAC Vertive 2 dekat Rak Net
S PROTECTOR To PAC 1 To PAC 2 TO PAC 3 Lampu Indikator Panel SDP-UPS
T
N
3P Cable
Power Meter P.SDP-UPS

MCCB8 MCCB9
MCCB2 MCCB3 100A 100A
100A 160A UPS 1 TO UPS 1 Bypass Maintenance
TO DB- TO MSB (LEGRAND)
UTILITY Lt.3

R S T N R S T N

MCCB10
100A
Out UPS 1

MCCB11 MCCB12
100A 100A
Project :
SINGLE LINE DIAGRAM
To P. PDU A To P. PDU B Drawing name :

PANEL MSB NEW & PANEL SDP-UPS

Vendor :
PT.PARIRAYA DINAMIKA

Drawing date : 18 Oktober 2020