DATA CENTER LIFE CYCLE
• Move • Scope
• De-commission • Business requirements
• Removal/Restore • Budget to build
• Hand over (return) • Feasibility of project
• Project team
DATA CENTER • Select vendors
• Select equipment
LIFE CYCLE • Freeze design
EN50600
Telecommunications Industry Association
ISO/IEC 22237
§ UTI
§ Oracle
§ IBM
§ HP
§ APC–Schneider
§ Etc
STANDARDS & GUIDELINE
Standards for sub-components
§ Electrical
§ Earthing
§ Raised Floors
§ Networks
§ Fire Protection
etc
Pusat Data Vs Bilik Server
Overview of rating levels
Rated-1 ; Basic
Single path for power and cooling distribution, no redundant
components
UPTIME 99.99%
RATED/TIER 3
UPTIME 99.98%
RATED/TIER 2
UPTIME 99.75%
RATED/TIER 1
UPTIME 99.67%
AVAILABILITY
A few definitions; N + X
‘N’ Component redundancy levels
N+1 Implementations
‘2N’ redundancy options
R AT E D / T I E R 1 ( B A S I C )
PDU IT Load
PAC
UPS OUTPUT
MSB UPS
N
SWITCHGEAR
G
TNB SOURCE
N = Need GENSET
R AT E D / T I E R 2 ( R E D U N D A N T C O M P O N E N T )
PDU IT Load
PAC 1 PAC 2
UPS OUTPUT
UPS 1
UPS 2
MSB
SWITCHGEAR
N + 1 G
TNB SOURCE
N = Need GENSET
R AT E D / T I E R 3 ( C O N C U R R E N T M A I N TA I N A B L E )
ACTIVE STANDBY
UPS 1
UPS 1
UPS 2
UPS 2
ATS
MSB MSB
SWITCHGEAR SWITCHGEAR
2(N + 1)
G G
N = Need TNB SOURCE 1
GENSET GENSET
TNB SOURCE 2
R AT E D / T I E R 4 ( FA U LT TO L E R A N C E )
ACTIVE ACTIVE
UPS 1
UPS 1
UPS 2
UPS 2
ATS
MSB MSB
SWITCHGEAR SWITCHGEAR
2(N + 1)
G G
N = Need TNB SOURCE 1
GENSET GENSET
TNB SOURCE 2
RATED / TIER
Rated / Tier yang sesuai untuk agensi ?
bergantung kepada :
a) Cost of Downtime
b) Risk Tolerance Level
c) Budget
SOAL JAWAB
TERIMA KASIH
Rujukan :