Professional Documents
Culture Documents
It contains
Isolation Transformer
Controlled Bridge Rectifier
Capacitor filter smoothing
Thyristor Charger Controller
Common Distribution Board
o Controller Interlocked input contactors
o Control Section
o Busbar Voltage Monitoring
o Outgoing MCB Distribution – 2 Bus Bars with a bus coupler
All alarm conditions are self cancelling when the alarm condition is cleared. But for High Voltage case,
alarm shall be reset manually.
Basic Construction
System has a Isolation Transformer then to a Thyristor Bidge. Thyristors are controlled by adjusting their
phase angle conduction from 1 phase compact controller. Output chokes and capacitors are there to
provide necessary smoothed output.
Supply to Charge controller is via TR2 providing 15V AC supply. Switch mode power supply is use to
convert 5V and 24V voltages required for other controlling.
Current limit measurements are taken from the shunt SH1 also used for ammeter.
Lamp Test will only work in manual mode and once entered to the manual mode, operation indicators
will light up. When manual key switch to position 1, system healthy and Lamp test Buttons will light up.
In auto mode, in normal operation bus coupler will be closed.
Details of PCBs:
Inside Charger:
Current Controlling also done through a Balance Whestone Bridge in here. Current control is the
balanced adjustment of this bridge.
Current Limit 1 – R6 Potentiometer
Current Limit 2 – R14 Potentiometer
PCB3 – Multiple Alarm Unit – Monitor all other alarms and provide timing functions for delayed
alarm initiation. This has 5V and 24V supply requirement. D45 Green LED indicates that 24V
supply is healthy and D44 Green LED indicates 5V supply is healthy.
If JP10 is not linked, boost charging cannot be done. Boost Time is set on JP 7. Default value in
2hours.
This units provide below alarm conditions.
o Mains Fail
o Charger Fail
o High Volts – Triggering Threshold can be adjusted by potentiometer R27
o Low Volts – Triggering Threshold can be adjusted by potentiometer R28
o This facilitate 5 other additional alarm conditions
PCB4 – Switch Mode Power Supply – 30W – should be for control operation. Creates 5V and 24V
supply. A green LED D7 is on when the power supply is operating
PCB5 – Front Panel Board
PCB6 – Charger Output Digital Meter
PCB7A + PBC7B – Controlled Bridge Rectifier
PCB8 – Earth Fault Alarm – Monitors earth leakage and feeds any alarm signal in to mother
board / alarm board via the Aux 3 and Aux 4 inputs
PCB9 – Relay Output Module – provides volts free contacts for external indication and is fed
directly from the Mother Board / Alarm Board
Module has 8 channels, each channel has an input line, an output relay with LED indicator, a
delay enabled link and a software timer which operates in minutes. Depend on the state of
input line, output line state will be changed. Output line can be programmed to be active or
inactive or active after a specific time.
PCB10 – AC and DC Filter Card
Operation of Charger:
Operation of Distribution Cubical:
Basic Connections:
Charger Connections