1-Fixing GPS pillars

2-Road center line • Pavement edges • Outer shoulder


edges • Toe lines of fills and cuts • Longitudinal and
transverse drains/ ditches • Bridge locations and Details •
River Channel locations along with river cross-sections All
man-made and natural topographical features  • Water
sources, Ponds etc.  
3- Culverts with their type and number • Electric and
telephone lines • Huts, Buildings, fences, stairs, hand
pumps, bore wells, wells • All Buildings with suitable
codes depending upon its classification like residential,
commercial, educational, health Center, industrial,
religious etc. • Oil and gas pipe lines • All trees with girth
greater than 0.3 meter.
4- At locations, where existing alignment cross other
roads, the survey was extended to 100 to 200 m on
either side of the road center to allow for the geometric
improvements. Cross sections at every 50 m interval in
flat terrain and at lesser interval on undulating terrain or
horizontal curves.
5- Past inventory and condition survey reports of existing
bridges, sub-surface and geo-technical data, hydraulic
data, as-built drawings, etc. • Inventory of existing
bridges / structures • Visual condition survey of existing
bridges / structures Details of Bridges with photographs
are presented in Annexure 4.1. Detailed Bridge inventory
and Condition Survey.
6-  IRC: SP: 35- 1990.
7- Road & Culvert Inventory
8- Hydrology & Drainage