Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
1 2 3 4 5 6 7 9 10 11 12 13 14 15
A PRELIMINARIES/TEMPORARY WORKS
GENERAL
MOBILIZATION AND DEMOBILIZATION
1 Mobilization of the construction by constructing temporaty L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 1.00 500,000.00 0.00 - 100.00%
acomodation for labours and site staff with required suitable facilities
and keeping the same in good hygenic condition for entire project
SITE OFFICE
completion time.ESTABLISHMENT
Demolition of the same and cleaning the site after
2 Providing
completionand of Maintaining Site Office
the construction of two
activities allRooms having
complete. [Note: 50% Per
total Area 16.00 25,000.00 400,000.00 16.00 400,000.00 16.00 400,000.00 0.00 - 100.00%
20 sq.m shall
payment for thebe use
made ofafter
Client and Consultant
completion includingand
of mobilization office chair, Month
remaining
Table, Lockable
50% after file cabinet,
completion of worksStationery Items (Ink, Paper, Pen, Pencils
as per contract]
PROJECT INFORMATION
etc.), 1 Computer and 1 PrinterBOARD
with all necessary set up. all complete
3 Providing and Fixing
as per instruction of ProjectThe
of engineer. Information board
Specification ofwith approved
computer shallText
not nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
in
be appropriate location
less than (19.5" led including all required
monitor with Core i5,fixing accessories500
7th Generation, as per
gb
drawing all complete.
Hdd, 8gb ddr 4 ram), Printer should function at least of Printing,
SAFETY SIGN BOARD
Scanning and Photocopy of A4 size documents. Providing and
4 Providing
Maintaining andallFixing
aboveof items
Safety onSignRental
BoardBasis
with approved
for entireText and nos.
project 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
Sinage
completionincluding
time. required fixing accessories as per drawing all
complete.
BARRICADING WORKS
5 Barricading between the School Academic area and Construction area R.m 130.00 2,000.00 260,000.00 130.00 260,000.00 130.00 260,000.00 0.00 - 100.00%
with 1.8 m high CGI Sheet fixed to Bamboo support frame all
complete as per instruction of Engineer.
BARRICADING WORKS
6 Barricading between the School Academic area and Construction area Sq.m 174.95 2,000.00 349,900.00 151.00 302,000.00 151.00 302,000.00 0.00 - 86.31%
with 1.8 m high CGI Sheet fixed to Bamboo support frame all
complete as per instruction of Engineer.
SAFETY MATERIALS & SITE SAFETY
7 Providing and Maintaining Construction Safety Measures in L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
Construction Site with proper Safety measures to person and work area
(Helmet, Shoes, First Aid Kit, Clothing, Glove, Guard Rail for edge
RELOCATING
protection, SafetyOF Net,EXISTING
Safety rope,TLCFall Protection etc.) as required by
8 Relocating
the Contractof ClauseExisting
GCC 24 Temporary Learningdivision
and Specification Centre 1 (TLC),
"GENERAL from sq.m 89.90 3,000.00 269,700.00 89.90 269,700.00 89.90 269,700.00 0.00 - 100.00%
construction
REQUIREMENT site to other place
CLAUSE 8(C)".byTheDemolition
number of andSafety
usingMaterials
existing
materials obtained from demolition of TLC to the
Personal Protecting Equipments (PPE) shall be minimum but not place decided by
LAB TEST(WATER TEST)
SMC.
limited to 40 sets. Payment shall be made in Prorata Basis for entire
9 Testing
durationand Providing Lab Test Report for Quality of Water in Water Job
of project. 1.00 7,500.00 7,500.00 0.00 - 0.00 - 0.00 - 0.00%
Stream (Up and Down streem) located near by Construction site before
Starting and after completion of construction work. This Test has to be
done to mark the affect of construction work in water stream.
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
TEMPORARY TOILET
10 Construction of temporary toilet with CGI Sheet fixed to Bamboo nos. 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 0.00 - 100.00%
support frame and all necesary items including Septic pit, Pipeline,
Toilet Pan etc. for entire project completion time all complete as per
ROAD REPAIR
Instruction AND MAINTENANCE
of Engineer. Rate shall include all Material cost with fixing,
11 Providing
construction andcharges
Maintaining the roads as &
and demolition necessary
cleaningto ofavoidthe blockage
same afterby km 12.00 50,000.00 600,000.00 12.00 600,000.00 12.00 600,000.00 0.00 - 100.00%
Landslides and Rockfall
completion of the construction for regular transport
activities of construction materials
all complete.
and site inspection during overall construction period. Rate shall
include all Material cost with demolition charges, cleaning, fixing &
B construction
CIVIL WORKS charges of the same after completion of the construction
- BUILDING
activities all complete.
1 EARTHWORKS
SITE CLEARANCE & MOBILIZATION:
1.1 Clearing and grubbing the site for construction by removing 150mm sq.m 925.01 100.00 92,501.00 943.09 94,309.37 34.56 3,456.25 908.53 90,853.12 101.95%
thick top soil including bushes, small trees, leveling of undulated
ground,
EARTHWORK shorting and stacking/storing selected
IN EXCAVATION : top soil for reuse in
1.2 landscaping works, disposing
Excavation in foundationsunsuitable materials
in all type from
of soils forsite, etc., all
foundation, cu.m 381.55 400.00 152,620.00 380.38 152,151.43 45.27 18,107.32 335.11 134,044.11 99.69%
complete footing,
trenches, as per drawings,
pits etc. tospecifications
the requiredand depthinstructions
including of the
dewatering
Engineer.
EARTH
by manualBACK FILLING
or mechanical : etc. as per specifications with all
means
1.3 Back cu.m 236.67 300.00 71,001.00 284.96 85,487.54 0.00 - 284.96 85,487.54 120.40%
contractor�s own machinery andfilling in foundation
equipment's, providing andcrossing
sides of of
foundation
track, with approved
shoring, strutting, soil
timberingobtained from the excavation
and buttressing at site and
with appropriate
1.4 BOULDER
stacked atand orSOLING
siteall brought : outside
from in layer not exceeding 15
materials
Providing and such
laying measures
uncoursed necessary
hand packedto retain
Dry in position
Rubble thecm
Stone sides
soling
1.4 thick
of the (compacted
foundation thickness)
pit and including
including transportation
refilling thespecial of soil,
excavated spreading
material with cu.m 119.02 6,000.00 714,120.00 119.01 714,067.20 63.35 380,094.60 55.66 333,972.60 99.99%
in
in foundation, under
requiredramming, floor
line and level, plinth
sprinklingwith out
water, any
ramming, dressing of stone
watering,
including filling leveling
interstices the site
with and
suitable disposing
quarry offcompacting
waste the with
mechanical
1.5 SAND rammers,
FILLING
surplus/unusable earthtesting,
:to outsideetc.,the
allconstruction per drawing, all or
complete as premises, or stone chips
quarry sand,
specification watering,
and instructions compacting
of thepit. using appropriate etc.
Engineer. mechanical
1.5 Providing
complete as
compaction and filling
per
means sand
drawings,
with allin soak
specifications
contractors all complete
and
materials, as per of
instructions
handling, drawings,
the
placing etc. cu.m 7.40 600.00 4,440.00 7.84 4,704.00 - 7.84 4,704.00 105.95%
specifications
Engineer.
all complete as andperinstruction
drawings, of the Engineer. and instruction of the
specifications
Engineer. The complete item including all lead & lift.
2 CONCRETE WORK
2.1 P.C.C
2.1.1 cu.m 15.38 14,000.00 215,320.00 16.19 226,650.81 0.09 1,256.06 16.10 225,394.75 105.26%
P.C.C (1:3:6)
Providing and laying machine mixed Plain Cement Concrete of
P.C.C
nominal(1:2:4)
mix 1:3:6 WORKS (1 cement : 3 sand : 6 coarse aggregate ) for leveling
2.1.2 course in foundations Providing
and under andfloor
laying of machine
building,mixed
etc. inPlain Cement
all level with cu.m 41.00 16,000.00 656,000.00 41.68 666,900.00 4.39 70,203.60 37.29 596,696.40 101.66%
Concrete
broken stone of nominal
aggregate mix of1:2:4 (1 cement
size not more than : 2 sand
25 mm : 4 of
coarse aggregate )
approved
P.C.C.
for FORcourse
leveling R.C.C. in WORKS : and under floor of building, etc. in
foundations
2.2 quality including formwork wherever necessary, dewatering, batching, cu.m 291.47 20,000.00 5,829,400.00 292.71 5,854,131.50 274.83 5,496,671.31 17.87 357,460.19 100.42%
Providing
all andbroken
laying stone
level transporting,
with in position machine
aggregate of sizemixed and machine
not more than 25allvibrated
mm of
mixing, placing, compacting, curing, including lead
cement
approved concrete
quality of mix
including 1:1.5:3 (1 cement:1.5 sand: 3 coarse
SILICA
and CEMENT
lift, etc. all complete asformwork
ADMIXTURE per drawings, wherever necessary,
specifications anddewatering,
2.3 aggregate)
batching, M20
mixing, grade for reinforced cement concrete work using kg 2914.70 300.00 874,410.00 2927.07 878,119.73 2748.34 824,500.70 178.73 53,619.03 100.42%
Providing
the instructions of transporting,
and mixing Silica Cement
the Engineer. placing, compacting,
Admixture of incuring,
structuralincluding
approved
all lead and
concrete atcement
the with
lift,rate
etc. 20
ofall2.50% mmby
complete graded
as per
weight machine
drawings,
of crushed
the cement stone
specifications
for aggregate
promotingand
of
theapproved
STEEL
workability, quality
REINFORCEMENT
instructions of the
improving in Engineer.
various
strength, locations
achieving andwaterproofing
heights including properties,
2.4 transportation
Providing
bleeding and of
prevention, concrete
fixing etc. to siteCement
in position
Silica of placing,
Fe steelcompaction,
500 Admixture reinforcement
shall befinished
the to
of various
product Mt. 46.66 130,000.00 6,065,800.00 48.52 6,308,049.98 44.85 5,830,341.27 3.67 477,708.71 103.99%
required
of Silica line
diameter Japan and
confirmingor level,to protection
superior relevant ISand
and shall code curing,
meet inthe etc. all
R.C.C. complete
works
requirements as as per
including
drawings,
straightening,
mentioned specifications
cutting, bending,
in specification and the instructions
binding and
of materials of the
withWorkmanship, Engineer,
20 SWG annealed butwire –
Division
FORM WORKS
2.5 excluding
for tying the
4: Concrete the cost ofArticle
reinforcement
Works, centering,
2.4 shuttering,
bars at and reinforcement,
each junctions (binding wireall
shall sq.m 2136.07 800.00 1,708,856.00 2118.09 1,694,470.16 1947.63 1,558,101.98 170.46 136,368.18 99.16%
Supplying and laying centering, shuttering of various pattern
complete
not be as per drawings,
measured separately) specifications
including all and
wasteinstructions
and cut of the
pieces,
formworks with 19/12 mm thick water proof ply wood & steel
Engineer. for adequate numbers of spacers, chairs, providing and
provision
adjustable props for all kinds of RCC works for foundations, columns,
3 placing
BRICK cement
shear walls,MASONRY
beams,mortar (1:1)
WORKS
slab, cover blocks
staircase, to keep
lintel, sill, the bars
pergola, in intended
including nails,
position atscaffolding,
propping all levels allstaging,
complete as per drawings,
supporting specifications
and bracing in proper andlines
3.1 BRICK
instructionsMASONRY
of thethe WORKS
Engineer. ( 1 :
(Authorized4 c/s )ONE
lapbrown SIDE
length self FAIRFACE
and adhesive
for the bar cu.m 96.21 20,000.00 1,924,200.00
and level, sealing joints with heavy duty tape,
7.2.3 CLEAR
length exceeding
SILICON 10 WATER-REPELENT
meter in length shall be
COATING
aligning to line and levels including Ties, PVC Spacer, Providing measured for the payment, sq.m
8.1.1 except
openings/
POINTING to column).
cutouts/
WORKpockets, IN BRICK applying
MASONARYDe-shuttering chemical, De- sqm
shuttering
BOQ Total asofapproved
items 3.1., by the
7.2.3 Engineer
& 8.1.1:etc., complete at all levels as
per drawing, specifications and instructions of the Engineer.
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
6C(S)-A, 2-LaLiEC and Tc(S)
Brick Masonry Works (1:4 c/s) cu.m 18,000.00
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00
Exterior Weather Coat Paint sq.m
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 105.78 18,000.00 1,904,040.00 209.08 3,763,428.40 175.00 3,150,060.21 34.08 613,368.20 197.65%
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 79.2 1,500.00 118,800.00 89.27 133,909.80 61.24 91,866.00 28.03 42,043.80 112.72%
3.4 HONEY COMB BRICK WORKS (1:3 c/s) sq.m 4.52 9,000.00 40,680.00 5.87 52,861.95 1.59 14,341.95 4.28 38,520.00 129.95%
4 DOORS & WINDOWS WORKS
4.1 METAL FRAME(4.1.1 DOOR FRAME)
4.1
Providing and fixing in position in required line and level pressed r.m 162 1,100.00 178,200.00 161.84 178,024.00 153.54 168,894.00 8.30 9,130.00 99.90%
(folded) Steel door and window frame of size shown in drawings
WINDOW FRAME
4.1.2 manufacture from galvanized iron sheet of 1.20 mm thick including r.m 493.83 1,100.00 543,213.00 479.40 527,340.00 425.40 467,940.00 54.00 59,400.00 97.08%
METAL
4.2 hinges, jamb, SHUTTER
lock jamb, head, base ties of 1.2 mm pressed GI welded
on rigidly fixed
WINDOW SHUTTERtogether by mechanical means, adjustable lugs with
split end tailfabrication
4.2.1 Providing, to each jamb and including
installation steel butt hinges
in position 35 mm 2.5 mm thickthick glazed with sq.m 101.91 7,500.00 764,325.00 83.84 628,800.00 44.44 333,300.00 39.40 295,500.00 82.27%
mortar guards, reinforcing
window and ventilator shutter to door made hardware,
with 1.2mm strike-plate,
thick galvanized shock iron
absorbers
FLUSH folded in required size and shape including glazing with 5 mm per
as
DOOR required, SHUTTER factory Zinc
(32MM) Rich Primer etc., all complete as
4.3.1 sheet
drawings, sq.m 61.98 8,000.00 495,840.00 55.39 443,120.00 49.57 396,560.00 5.82 46,560.00 89.37%
thick clearspecification
Providing & fixing
float glass 32mmwithandthick instruction
glazing solidbeads, of washer
core the
flush Engineer.
door
and shutters,
special glazing in single
4.1.1UPVC
leaf
4.4
putty,orDOORdouble
required DOORFRAME
leaf
numbers as perand detailed
sizes drawing.
hardwareThe likeflush
hinges, doors shall be
tower-bolts,
factory made solid core blockpriming board shutters bonded with Primer
phenol of
4.4.1 4.4.1
handles, SHUTTER/FRAME
formaldehyde
eye-hook, applying coat with Zinc Rich sq.m 14.28 9,000.00 128,520.00 13.53 121,770.00 - 13.53 121,770.00 94.75%
approved make,
Providing and resin. etc.,The
fixing to
all doorlipping
complete frames shall
as 24 bemm
per of teakwood
drawings,
thick factory all-round
specificationmade PVC the
and
flush door
instruction
door with
shutterofmade a minimum
of styles and rails of UPVC hollow section ofC.P.
the Engineer. thickness of 12mm. The following size
fittings
59 shall
x 24 mm and
WINDOW be
GRILL used: (a) - 2-150 mm Handles
wall thickness 2 mm � 0.2 mm with inbuilt edging in each leaf; (b) Tower-
4.5 Providing,
boltboth
on – 300 sides.mm
MSThe long
solid at
styles
barstopandof1 required
inrails
eachmotredleaf
sizeand and200
and at bottom
jointed
fixing theincorners
inatposition eachmild leaf;
by sq.m 69.07 2,500.00 172,675.00 91.18 227,950.00 62.84 157,100.00 28.34 70,850.00 132.01%
( c ) 1grille
means
steel no. 300
made mm
of galvanized/plastic
with long C.P.brackets
required Aldrops
MS flats, with
of size Godrej
strips,75 bars made
x 220 mm padlock;
fabricated having (d)
wall
as per
COLLAPSIBLE
125 mm heavy GATE
dutyposition
GIstainless
But Hinges 3screws.
nos. infasteners
eachstyles
leaf.including
(rate shall
4.6 drawings,
thickness
Supplying 1.0
fixingmm
andinand fixing in using
position steelapproved
local make The collapsible of the gate shutter
2ofcoat sq.m 15.10 10,000.00 151,000.00 15.10 151,000.00 15.10 151,000.00 0.00 - 100.00%
include
reinforced
of enamel allandrequired
by inserting
Zincmake door
Rich hardware).
galvanized
Primer base tube of size
coat, etc., 20allx20 mmdouble
complete andas1 mm
approved
5. FLOORING size and WORKS properly fabricated with vertical
� 0.1 mm
detailed
5.1 channels wall
in20drawing,
x 10 thickness.
x 2mm The
specification
atCONCETE
100mm lockand rail
centers made andofbraced
instructions 'H'
ofsection,
thewith a UPVC
Engineer.
M.S. flat sq.m 977.10 900.00 879,390.00 981.29 883,160.78 853.78 768,404.93 127.51 114,755.85 100.43%
HARDENED
hollow CEMENT andFLOOR
diagonalsection 20 of sizewith
x 5mm,
Providing,
100top
laying
x 24 and
into
mm bottom
required
2rails
line,
mm� of Tand
level ironpattern
40 x 40 40xmm 6mm
0.2
NEAT mm wall
CEMENT thickness SKIRTINGfixed the shutter styles by means of a
5.2 with
thick 38mm
IPS floor
plastic/galvanized
Providing,
dia finish
laying
steel pulleys
iniron with
'U'
required
complete
cement
cleats.
line, concrete
The
level
with of
shutter
and
bolts
mixnuts
frame
pattern 1:2:4
shall
40
locking
mm (1
be cement
filled
thick :2
with
IPS r.m 446.74 100.00 44,674.00 458.50 45,850.00 446.46 44,646.00 12.04 1,204.00 102.63%
arrangements
sand :finish steppers
4multichambered
crushed stone handles including
aggregate 12 mm applying
and down agrade)
priming coat of
UPVC
floor
Zinc Rich
TERRAZZO with
Primer cement
CAST-INcarriage single
concrete
hoisting
SITU
panelofall
DADO
ofcomplete
mix required
1:2:4 size
(1as perhaving
cement :laid
2 overin all
sand
specification : 4and
alternate
thicknessstone
5.3 Providing
crushed panel
of the
20 mmor providing
and 112mm glass �and dividing
0.1downmm wall strips and
thickness. finished with
The panel sq.m 92.43 1,500.00 138,645.00 89.87 134,803.50 89.95 134,922.00 -0.08 - 118.50 97.23%
direction
approved and aggregate
of
floor Engineer.
laying
hardener mmmm
25 (Dreitop thick terrazzo grade) laid indado
cast-in-situ alternateup topanel the
filled vertically
or providing Glass anddividing
tie bar two FH
atstrips andof
places equivalent
by inserting
finished withfloor hardener)
horizontally
approved floor 6
height
applied
ROOFING/ shown
as(Dreitop in drawing with
perTERRACING
manufacturer's marble
instructions
WORKS chips rubbed
including and
mixing polishedlaying toin
6 mm galvanized
hardener rodFH and of fastened
equivalent with nutshardener)
floor and washers, applied complete
as per as
granolithic
required finish
slope, underfinishing
intrigal layer of 19 usingmmappropriate
thick cement power concrete 1:2:4 (1
trowelling
per manufacturer's
manufacturer's
METAL specification
instructions including and instruction
mixing10laying of Engineer.
in required slope,
6.1 cement
equipment, : 2WORKS
sand
etc. all
(TRUSS)
: 4 complete
crushed stone
as per aggregate
drawing, mm and
specification down and grade) k.g 8175.99 220.00 1,798,717.80 9257.95 2,036,749.25 8964.22 1,972,128.69 293.73 64,620.56 113.23%
(Plasopan
intrigal or
finishing Sintex) using Rate shall include the cost of door hardware.
Providing
base and topof
instructions
and fixing
layer
the of 6 mm thick with required color marble chipsetc.
Engineer.
appropriate
tubular roof power
trusses trowelling
with rafters, equipment,
purlins, wind of all
complete
ties,
CGI fromas1 per
sizesbrackets
SHEET mm drawing,
etc., tomade
ROOFING 4 mmwith specification
nominalrequired and
sizegradelaidinstructions
mild
in steelmarble
cement of theand
tubes Engineer.
powdermild
6.2 Providing
- do 3:1
steel
mix -sections
as (3 above,
& ofbut
fixing
cement for
required 100
: precoated
1 marble mm
sizes, high skirting.
including
galvanized
powder mixironhoisting,profile
: 7 marble fixing in by
Terracota
chips) position
colour
volume sq.m 555.99 2,000.00 1,111,980.00 560.17 1,120,334.00 354.67 709,334.00 205.50 411,000.00 100.75%
with
sheets MS
including (size,bed
cementplates,
shape and shoe
slurry, pitch angles,
required anchor
of corrugation
pigment, bolts etc., and
as approved
grinding, concrete
by Engineer)
polishing, buffing
CGI
grouting, SHEET ROOFING
concreting nut bolts,RIDGE fabrication, fixing and treated with two
6.3 0.52 mm +/- 5%
and applying sealertotal coat,coated etc.,thickness
all complete (TCT), as perBase Material Thickness
drawing, r.m 53.6 1,200.00 64,320.00 53.75 64,500.00 35.85 43,020.00 17.90 21,480.00 100.28%
Providing
coats
(BMT) of & laying
anticorrosive
of 0.50 mm, prefinished
paints
Zinc coating all plain
complete (colouras permatching
drawings, to roofing
specification and instruction of the120gsmEngineer. as per IS: 277 , 5-7 microns
sheet)
GI FACIA
epoxy CGI
specifications
primer Sheet
(EAVES) Ridge
andboth
on instructions
sideCoverof the of sheet
of 0.52Engineer.
the mm +/- 5%
and polyester Rate totaltopcoated
shall include
coat 15-18
6.4 thickness
Providing,
preparingSheet
microns. (TCT),
fabrication
shop Base to
drawings,
should Material
have required
obtaining Thickness
protective size and
Engineer's
guard (BMT)
shape
filmorand of25
Client's
of 0.50
fixing mm (Coating
in position
approval,
microns Kg 429.07 250.00 107,267.50 457.96 114,489.53 257.20 64,300.78 200.75 50,188.75 106.73%
and
1.2 Primer
mm thick as
supplying,tofabricating,
minimum above)
GI folded
avoid scratches over ridge
plates
delivering of with
size all
shown
whileattransportation required
in fixing
drawing
site, hoisting and should accessories
including
fixing in be the
like
CEMENT
cost self
fixing
position,
supplied tapping
singlescrew,
BOARD
brackets,
temporary
in FALSE
flats,clips,
staging,
length upscrews, clamps,
CEILING
preparation
to washer
painting
6 meter orofaswith etc.all
surface,
desiredenamel complete
applying
by with Zinc
Engineer. on The Rich
6.5 Primer,
building
Primer
sheet shall floors
required
of one asscaffolding
coat
be fixed perbefore
usingdesign,
Providing andtodrawing,
self and
work
one
drilling fixing
coat specifications
at/self
anyattapping
after all height
height,
erection etc.,instructions
6 mmallof
including
screws thick
complete
size of the
two(5.5x as sq.m 489.36 1,500.00 734,040.00 513.13 769,701.00 503.39 755,083.50 9.75 14,617.50 104.86%
Engineer.
Cement
per
coats
55mm)design,
ofwithBoard
synthetic
EPDMfalse
drawing, ceiling,
enamel specifications
seal paint
etc., including
allofcomplete
approved providing
instructions upmaketoof and
anyand fixing
thepitch inof
Engineer.
color etc. frame
all
horizontal/
7.
workPLASTERING/
complete
vertical made of
perspecial
orascurved drawing, WALL
surfaces sections FINISHING
power the
specification
excluding pressed
and WORKS
cost from
instruction MSof
of purlins, sheet
the Engineer.
rafters and
7.1 CEMENT
Galvanized
trusses withPLASTER
and including zinc cutting
coating WORKSand
to sizeconsisting
and shape angle hangerrequired.
wherever of
7.1.1 7.1.1 ON
25x25x0.55 INNER
of requiredWALL (1:6)
length at 1250mm c/c fixed to purlins with nut sq.m 1217.81 600.00 730,686.00 1267.38 760,425.02 1068.86 641,317.73 198.51 119,107.29 104.07%
ansProviding
bolts andand otherapplying
end of at angleall levels
hangerand shape
being 20 mm
fixed withthick nut and cementbolts
plaster
to GI main in building
channelinside 45x18x0.6 in specified
running cement
at the mortar
rate of 900mm in two layers c/c toas 6
to 8 mm
which thick section
ceiling final coat 0.55mmwith 1:6 thick (1 cement
bottom :6 wedgefine sand)
of 45mm cement withmortar
7.1.2
over
tapered ON
the 12CEILING
flangesto 14of mm26mm (1:4)
thick each1:6 (1
having cement clips : 6
of coarse
2.3mm sand)
at under
613mm coat in
with
7.1.2 12.5.mm, thick cement and sand plaster work of mix 1:4 (1 cement &4 sq.m 491.59 500.00 245,795.00 615.40 307,698.50 479.17 239,583.75 136.23 68,114.75 125.19%
all surface
ceiling sectionat alland height including
perimeter mixing
channels of mortar,
0.5mm laying thick 25mm in perfect highline,
sand)
7.1.3
level and
having in
ON concrete
OUTER
plumb
flanges ofandsurface,
20mmWALL
finishing ceiling
and(1:6): surface
in regular
30mm long,and at all
theeven heightsurface
perimeter including
of including mixing
ceiling fixed all
mortar, laying in perfect line, level and plumb and finishing in regular
7.1.3.1 7.1.3.1
necessary
and even
EXTERNAL
to wall/partition single with
surface including
PLASTER
or multi-stage
the help ofscaffolding,
all
raw plugs at
necessary single
making
450mm
or
grooves
c/c with
multi-stage
and finished sq.m 453.57 600.00 272,142.00 822.28 493,365.53 558.65 335,190.00 263.63 158,175.53 181.29%
Providing
recesses,
25mm long and
throating, applying
drive alldusting, at
screws dripping, all levels
@ 230mmwetting, and shape
interval,curing, 20
jointing mm thick
protection, cement
and fixing to
scaffolding,
plaster
providing
in required providing
in building
chicken
pattern, exterior
wire and
finishedmesh fixing
inwithat the200
specified mm cement
junction
recommended wide 24
of mortar gauge
concrete
filler, with
and
making GI1:6 Chicken
(1
masonry
openings
wire
7.1.3.2
7.1.3.2 cement
etc.,
for mesh
all
light do
:6 at junction
as
fine
complete
fittings,above
sand)as per
access inofall
for R.C.C.
Band surface
drawing
panel, and
Plaster
cutoutsat masonry,
allmade
, specificationheight withmaking
including
andframe grooves
mixing
instruction
of andthe
of
perimeter rm. 484.65 100.00 48,465.00
recesses,
mortar,
channelslaying
Engineer. throating,
[Rate
suitably inshall dusting,
perfect
fixed also line,
all dripping,
include level
complete and
for wetting,
plumb
asproviding
per drawingcuring,
anddrips and protection,
finishing
band, in regular
moulds,
specification etc.
INTERNAL PALSTER ON WALL (1:4)WITH CEMENT
all
and complete
even
groove, chicken
direction asofper
surface wire
the drawing
includingmesh all
Engineer at, specification
necessary
junction
but excluding ofsingle
RCCand
the instruction.
or
and
costmulti-stage
masonry,
of [Rate
painting. etc.,shallto
PUNNING
7.1.4 also include for providing drips band, moulds, groove, chicken wire sq.m 36.14 700.00 25,298.00 35.65 24,955.00 37.08 25,959.36 -1.43 - 1,004.36 98.64%
scaffolding,
complete the
12.5.mm, making
thick works
cement grooves
at any and plaster
andheights].
sand recesses, work throating,
of mix dusting,
1:4 (1 cement dripping, &4
mesh at junction
wetting, curing, of RCC and
protection, masonry,chicken
providing etc., to wire completemesh the
at works at
the
sand) and 3 mm thick cement punning over plaster for water
any
7.2 junctionheights.
PAINTING of WORKS
concrete and masonry etc., all complete as per drawing , 0.00 0.00
tank,Septic tank,Man hole e.t.c on concrete surface, ceiling surface and
specification
wall surface atand allinstruction
height including of the mixing
Engineer. [Ratelaying
mortar, shall also include
in perfect
for providing
line, level anddrips plumb band,and moulds,
finishinggroove, in regular chicken
and even wire surface
mesh at
junction ofallRCC
including and masonry,
necessary single oretc., to complete
multi-stage the worksproviding
scaffolding, at any ,
Prepared by contractorheights.
making grooves and Checkedrecesses, bythroating,
Consultant, dusting,
DSC dripping, wetting, Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
curing, protection, etc. all complete as per drawing , specification and
instruction. [Rate shall also include for providing drips band, moulds,
groove, etc., to complete the works at any heights.
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
DISTEMPER PAINT
7.2.1 Providing and applying two or more coats sq.m 2167.88 200.00 433,576.00 2395.91 479,182.60 1806.98 361,395.98 588.93 117,786.62 110.52%
of washable distemper paint of approved manufacturer and shade over
aEXTERIOR
coat of alkaliWEATHERresistant cement COAT primer of approved manufacturer as
PAINT
7.2.2 per manufacturer'sProviding specifications to the surface
and applying two orofmorewall,coats
ceiling, beams
of first sq.m 491.67 350.00 172,084.50 822.28 287,798.00 434.61 152,112.17 387.67 135,685.83 167.24%
columns,
quality canopies,
hundred staircase,
percent acryliclobbies
paint ofetc., all complete
approved shadeasand perpattern
drawings,to
specifications
ENAMEL
the exterior PAINT andof
walls instruction.
buildings The etc., rates shall shall
The rates include for scraping,
include for
7.2.4 washing the
scrapping surface with
, washing water,
Providing
the surface surface
with and preparation,
applying
water, applyingby scaffolding
spray/brush
a coat of approvedetc.,
two or sq.m 475.91 400.00 190,364.00 527.49 210,995.40 454.80 181,921.30 72.69 29,074.10 110.84%
all
morecomplete
qualitycoats
water ofasbase
perquality
1st the manufacturer's
cement synthetic recommendations
enamel
primer, surface paint of approved
preparation, and as etc.,
scaffolding
8 MISCELLANEOUS
approved
manufacturer by the Engineer.
all complete as(Asian, per theBerger or equivalent)
manufacturer's over woodenand
recommendations or metal
as
CEMENT
surface
approved in by BOARD
required WALL
shade
the Engineer. at any height, shape, including surface
8.2 Supplying,
preparation, fabrication,
fillers/putty, fixing of cement
scaffolding, protection board
etc.inallposition
complete foras per sq.m 37.4 6,500.00 243,100.00 46.61 302,965.00 27.90 181,350.00 18.71 121,615.00 124.63%
internal
drawings, and external made
specifications andwith 9mm thickThe
instructions. cement board
finished (Shera
surface or
shall
Siam Cement
give even
RAILING and Board
uniform
Providing, orfabrication
equivalent)asfrom
surface. both sides
per design fixed to
drawings and75mm X
8.3 0.6mm thick C-stud fixed to U-Track with spacing
installation in position Mild Steel railing in staircase, verandah and 300mm o/c of kg. 1657.4 220.00 364,628.00 1682.17 370,077.90 1448.49 318,668.50 233.68 51,409.40 101.49%
horizontal
other areasframe,
including central coretofilled
cutting with shape
required cement mortar
and size, with
welding PE joints,
granules
installation
PUMP SHED having
of basecombined densityofapproximately
anchor plates appropriate size 900with
kg/m3, including
required
8.4 sealing joints
numbers
Supply, with fiber
of expansion
fabrication, tapes
bolts ofand
installation ofjoint
required sealing
2mx1.5m compound,
size, providing
and 1m high fillingsize
required
pump screw
shed nos. 1 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 0.00 - 100.00%
heads with
bends,
made as per50x50x6
finishingmanufacturer's
weldMS joints installation
to produce
Angle guidelines,
smooth
frame , covered sealing
surface,
outside perimeter
applying
and one
roof with
gaps
CGI with
coat of
sheet, silicon
Metal locakablesealant,
Primer and etc.,
door,two all complete
or morepad
including coats as per drawing,
of enamel
lock, base PCC paint of required
(1:2:4) 75mm
specifications
shade,
all etc., all
complete asandperinstructions
complete
design, per of
as drawing, theand
Engineer.
drawings, Rate shall
specifications
instructions and
of the include the
instruction
Engineer.
C ELECTRICAL
cost of metal WORKS
framing, joint and screw head sealing, required additional
of the Engineer.
A. strengthening
Common Installation member for the wall length exceeding 3 meter in length
1.1 or around
Stand door40
Alone and
A window
DP MCB opening, sealing perimeter with silicon
with Enclosure no. 2.00 12,000.00 24,000.00 2.00 24,000.00 2.00 24,000.00 0.00 - 100.00%
sealant. Total finished wall thickness 93 mm.
1.2 Stand
8.2.1 FORAlone 6 A DP MCB with Enclosure
PARTITION no. 2.00 8,500.00 17,000.00 2.00 17,000.00 2.00 17,000.00 0.00 - 100.00%
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper conductor
2.1 rm 100.00 1,400.00 140,000.00 100.00 140,000.00 100.00 140,000.00 0.00 - 100.00%
wires
2 Nos 2.5 Sq.mm + 1 No 1.5 Sq.mm mutistranded copper conductor
2.2 rm 95.00 250.00 23,750.00 96.00 24,000.00 96.00 24,000.00 0.00 - 101.05%
wires
B School Blocks
1 DISTRIBUTION BOARDS
1.1 DB (DB-1) nos. 1.00 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 0.00 - 100.00%
1.2 DB (DB-1) nos. 1.00 45,000.00 45,000.00 1.00 45,000.00 1.00 45,000.00 0.00 - 100.00%
1.3 DB (DB-2) & DB (DB-3) nos. 2.00 22,000.00 44,000.00 2.00 44,000.00 2.00 44,000.00 0.00 - 100.00%
1.4 DB (DB-2) nos. 1.00 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 0.00 - 100.00%
1.5 6A DP MCB with Enclosure nos. 2.00 8,500.00 17,000.00 2.00 17,000.00 2.00 17,000.00 0.00 - 100.00%
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded
2.1 r.m. 15.00 600.00 9,000.00 16.00 9,600.00 15.00 9,000.00 1.00 600.00 106.67%
Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 r.m. 10.00 500.00 5,000.00 10.00 5,000.00 10.00 5,000.00 0.00 - 100.00%
Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 r.m. 30.00 250.00 7,500.00 27.00 6,750.00 30.00 7,500.00 -3.00 - 750.00 90.00%
Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point pts. 90.00 700.00 63,000.00 90.00 63,000.00 90.00 63,000.00 0.00 - 100.00%
3.2 Two Way Light Point pts. 3.00 900.00 2,700.00 3.00 2,700.00 3.00 2,700.00 0.00 - 100.00%
3.3 Ceiling Fan Point pts. 4.00 900.00 3,600.00 4.00 3,600.00 4.00 3,600.00 0.00 - 100.00%
4 6A Universal Pin Light Power Socket Wiring pts. 77.00 900.00 69,300.00 77.00 69,300.00 77.00 69,300.00 0.00 - 100.00%
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket nos. 77.00 700.00 53,900.00 77.00 53,900.00 77.00 53,900.00 0.00 - 100.00%
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan nos. 4.00 6,000.00 24,000.00 4.00 24,000.00 4.00 24,000.00 0.00 - 100.00%
7 Light Fixtures/Luminaires & Accessories
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
7.1 24 W LED Surface Mounted Square type nos. 6.00 4,500.00 27,000.00 6.00 27,000.00 6.00 27,000.00 0.00 - 100.00%
7.2 24 W LED Recessed Mounted Square type nos. 6.00 4,500.00 27,000.00 6.00 27,000.00 6.00 27,000.00 0.00 - 100.00%
7.3 18 W LED Surface Mounted Square type nos. 20.00 2,700.00 54,000.00 20.00 54,000.00 20.00 54,000.00 0.00 - 100.00%
7.4 18 W LED Recessed Mounted Square type nos. 12.00 2,700.00 32,400.00 12.00 32,400.00 12.00 32,400.00 0.00 - 100.00%
7.5 12 W LED Surface Mounted Circular type nos. 16.00 2,400.00 38,400.00 16.00 38,400.00 16.00 38,400.00 0.00 - 100.00%
7.6 12 W LED Recessed Mounted Circular type nos. 13.00 2,400.00 31,200.00 13.00 31,200.00 13.00 31,200.00 0.00 - 100.00%
7.7 LED Wall Light nos. 4.00 1,800.00 7,200.00 4.00 7,200.00 4.00 7,200.00 0.00 - 100.00%
7.8 9 W LED Surface Mounted Cylindrical type nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 0.00 - 100.00%
7.9 6 W LED Recessed Circular type nos. 6.00 1,800.00 10,800.00 6.00 10,800.00 6.00 10,800.00 0.00 - 100.00%
7.10 7 W LED T5 Slim Mirror Light nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 0.00 - 100.00%
8 Pull Box
Junction Box At External Post Top Light nos. 6.00 700.00 4,200.00 6.00 4,200.00 6.00 4,200.00 0.00 - 100.00%
9 External Post Top Light Pole nos. 6.00 7,500.00 45,000.00 6.00 45,000.00 6.00 45,000.00 0.00 - 100.00%
10 Post Top External Light Fixtures nos. 6.00 9,800.00 58,800.00 6.00 58,800.00 6.00 58,800.00 0.00 - 100.00%
11 Earthing & Lighting Protection
11.1 Chemical Earthing nos. 6.00 45,000.00 270,000.00 6.00 270,000.00 6.00 270,000.00 0.00 - 100.00%
11.2 Earthing Bar nos. 6.00 22,000.00 132,000.00 6.00 132,000.00 6.00 132,000.00 0.00 - 100.00%
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip Mtr. 130.00 300.00 39,000.00 114.00 34,200.00 97.00 29,100.00 17.00 5,100.00 87.69%
12.3.2 12 SWG Cu wire Mtr. 30.00 200.00 6,000.00 28.00 5,600.00 28.50 5,700.00 -0.50 - 100.00 93.33%
13 Earth Test link nos. 2.00 1,500.00 3,000.00 2.00 3,000.00 2.00 3,000.00 0.00 - 100.00%
C Solar PV System
1 Solar PV Panel nos. 8.00 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 0.00 - 100.00%
2 Tubular Deep Cycle Battery nos. 4.00 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 0.00 - 100.00%
3 Hybrid Inverter nos. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
D Fire Extinguisher
a ABC Stored Pressure 5.0kg size nos. 3.00 8,000.00 24,000.00 3.00 24,000.00 3.00 24,000.00 0.00 - 100.00%
D SANITARY WORKS
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm r.m 140.00 1,600.00 224,000.00 142.00 227,200.00 142.00 227,200.00 0.00 - 101.43%
20mm r.m 22.00 700.00 15,400.00 23.00 16,100.00 23.00 16,100.00 0.00 - 104.55%
15mm r.m 8.00 500.00 4,000.00 7.00 3,500.00 7.00 3,500.00 0.00 - 87.50%
c CPVC Ball Valve
40 mm nos. 4.00 2,000.00 8,000.00 4.00 8,000.00 4.00 8,000.00 0.00 - 100.00%
25 mm nos. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 0.00 - 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 0.00 - 100.00%
f 2000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
2 Sewer, Rain and Waste Water Installation
110 mm r.m 59.00 1,400.00 82,600.00 61.00 85,400.00 61.00 85,400.00 0.00 - 103.39%
75mm r.m 49.00 1,200.00 58,800.00 50.00 60,000.00 50.00 60,000.00 0.00 - 102.04%
50mm r.m 22.00 350.00 7,700.00 21.00 7,350.00 21.00 7,350.00 0.00 - 95.45%
B School Blocks
1 Sanitary Installation
a Lab Sink set 5.00 30,000.00 150,000.00 5.00 150,000.00 5.00 150,000.00 0.00 - 100.00%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
2 Sanitary Installation
a Water Closet Set set 2.00 34,000.00 68,000.00 2.00 68,000.00 2.00 68,000.00 0.00 - 100.00%
b Orissa Pan set 4.00 3,100.00 12,400.00 4.00 12,400.00 4.00 12,400.00 0.00 - 100.00%
c Hand Wash Basin set 2.00 8,000.00 16,000.00 2.00 16,000.00 2.00 16,000.00 0.00 - 100.00%
d Ladies Urinal set 2.00 110,000.00 220,000.00 2.00 220,000.00 2.00 220,000.00 0.00 - 100.00%
e Self Closing Bib Cock nos. 12.00 4,000.00 48,000.00 12.00 48,000.00 12.00 48,000.00 0.00 - 100.00%
f CP Spreader in Urinal set 4.00 2,500.00 10,000.00 4.00 10,000.00 4.00 10,000.00 0.00 - 100.00%
g Toilet Paper Holder nos. 2.00 2,600.00 5,200.00 2.00 5,200.00 2.00 5,200.00 0.00 - 100.00%
h Commode Spray nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 0.00 - 100.00%
i PVC Multi Floor Trap nos. 10.00 600.00 6,000.00 10.00 6,000.00 10.00 6,000.00 0.00 - 100.00%
j Waste Coupling and PVC Bottle Trap nos. 4.00 1,500.00 6,000.00 4.00 6,000.00 4.00 6,000.00 0.00 - 100.00%
k 40mm SS Grab Bar-Side nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 2.00 9,000.00 0.00 - 100.00%
l 40mm SS Grab Bar-Rear nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 2.00 9,000.00 0.00 - 100.00%
m CP Foldable Hinge nos. 4.00 5,500.00 22,000.00 4.00 22,000.00 4.00 22,000.00 0.00 - 100.00%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Quantity Update of work till now Previous Bill Currently Accomplished Work Percentage
S.N. Description of Work Unit Rate (NRs) Amount (NRs) Remarks
in BOQ Progress
Quantity Total Amount Quantity Total Amount Quantity Total Amount
2.5 FORMWORKS sq.m 54.93 800.00 43,944.00 54.67 43,738.00 54.67 43,738.00 0.00 - 99.53%
3 PLASTERING/WALL FINISHING WORKS
INTERNAL PLASTER ON WALL (1:4) WITH CEMENT PUNNING
3.1.1 sq.m 33.66 700.00 23,562.00 33.66 23,565.25 33.66 23,565.25 0.00 - 100.01%
4 WATERPROOFING WORKS sq.m 33.66 550.00 18,513.00 33.66 18,515.55 33.66 18,515.55 0.00 - 100.01%
F Furniture Works lot 1 4,000,000.00 4,000,000.00 1.00 4,000,000.00 1.00 4,000,000.00 0.00 - 100.00%
Total 42,800,969.34 37,511,382.50 5,289,586.84
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Block : 2-LaLiEC, 3-6C(S), Tc(S)
School Name : Shree Chandrodays S.S
Location : Shreenathkot, Gorkha
Abstract of Cost
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount Remarks
BOQ 2LaliEC 3-6C(S) Tc(S) Water Tank Quantity
No. Development
A PRELIMINARIES/TEMPORARY WORKS
GENERAL -
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 16.00 25,000.00 16.00 400,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 130.00 2,000.00 130.00 260,000.00
6 BARRICADING WORKS Sq.m 174.95 2,000.00 151.00 302,000.00
7 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
8 RELOCATING OF EXISTING TLC sq.m 89.90 3,000.00 89.90 269,700.00
9 LAB TEST(WATER TEST) Job 1.00 7,500.00 - -
10 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
11 ROAD REPAIR AND MAINTENANCE km 12.00 50,000.00 12.00 600,000.00
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 105.78 18,000.00 89.26 72.19 47.63 209.08 3,763,428.40
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 79.2 1,500.00 49.15 11.04 29.08 89.27 133,909.80
3.4 HONEY COMB BRICK WORKS (1:3 c/s) sq.m 4.52 9,000.00 4.28 1.59 5.87 52,861.95
4 DOORS & WINDOWS WORKS
4.1 METAL FRAME(4.1.1 DOOR FRAME)
4.1 4.1.1 DOOR FRAME r.m 162 1,100.00 71.90 161.84 178,024.00
89.94
4.1.2 WINDOW FRAME r.m 493.83 1,100.00 255.60 223.80 479.40 527,340.00
4.2 METAL SHUTTER
4.2.1 WINDOW SHUTTER sq.m 101.91 7,500.00 44.63 39.21 83.84 628,800.00
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 61.98 8,000.00 24.36 31.03 55.39 443,120.00
4.4 UPVC DOOR
4.4.1 4.4.1 SHUTTER/FRAME sq.m 14.28 9,000.00 13.53 121,770.00
13.53
4.5 WINDOW GRILL sq.m 69.07 2,500.00 45.18 39.77 6.23 91.18 227,950.00
4.6 COLLAPSIBLE GATE sq.m 15.10 10,000.00 7.55 7.55 15.10 151,000.00
5 FLOORING WORKS
5.1 HARDENED CEMENT CONCETE FLOOR sq.m 977.10 900.00 452.25 433.94 95.10 981.29 883,160.78
5.2 NEAT CEMENT SKIRTING r.m 446.74 100.00 205.90 228.46 24.14 458.50 45,850.00
5.3 TERRAZZO CAST-IN SITU DADO sq.m 92.43 1,500.00 22.60 2.40 64.87 89.87 134,803.50
6 ROOFING/ TERRACING WORKS
6.1 METAL WORKS (TRUSS) k.g 8175.99 220.00 4712.85 3545.29 999.81 9,257.95 2,036,749.25
6.2 CGI SHEET ROOFING sq.m 555.99 2,000.00 295.74 205.50 58.93 560.17 1,120,334.00
6.3 CGI SHEET ROOFING RIDGE r.m 53.6 1,200.00 23.75 17.90 12.10 53.75 64,500.00
6.4 GI FACIA (EAVES) Kg 429.07 250.00 170.52 143.91 143.52 457.96 114,489.53
6.5 CEMENT BOARD FALSE CEILING sq.m 489.36 1,500.00 289.83 174.90 48.40 513.13 769,701.00
7. PLASTERING/ WALL FINISHING WORKS
7.1.1 7.1 CEMENT PLASTER WORKS sq.m 1217.81 600.00 599.03 534.33 134.02 1,267.38 760,425.02
7.1.1 ON INNER WALL (1:6)
7.1.2 7.1.2 ON CEILING (1:4) sq.m 491.59 500.00 291.97 288.40 35.03 615.40 307,698.50
7.1.3 ON OUTER WALL (1:6):
7.1.3.1 7.1.3.1 EXTERNAL PLASTER sq.m 453.57 600.00 343.47 372.47 106.34 822.28 493,365.53
7.1.3.2 7.1.3.2 do as above for Band Plaster rm. 484.65 100.00
7.1.4 INTERNAL PALSTER ON WALL (1:4)WITH CEMENT PUNNING sq.m 36.14 700.00 35.65 35.65 24,955.00
7.2 PAINTING WORKS
C ELECTRICAL WORKS
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure no. 2.00 12,000.00 1.00 1.00 2.00 24,000.00
1.2 Stand Alone 6 A DP MCB with Enclosure no. 2.00 8,500.00 2.00 2.00 17,000.00
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper conductor
2.1 rm 100.00 1,400.00 50.00 50.00 100.00 140,000.00
wires
2 Nos 2.5 Sq.mm + 1 No 1.5 Sq.mm mutistranded copper conductor
2.2 rm 95.00 250.00 51.00 45.00 96.00 24,000.00
wires
B School Blocks
1 DISTRIBUTION BOARDS
1.1 DB (DB-1) nos. 1.00 30,000.00 1.00 1.00 30,000.00
1.2 DB (DB-1) nos. 1.00 45,000.00 1.00 1.00 45,000.00
1.3 DB (DB-2) & DB (DB-3) nos. 2.00 22,000.00 1.00 1.00 2.00 44,000.00
1.4 DB (DB-2) nos. 1.00 32,000.00 1.00 1.00 32,000.00
1.5 6A DP MCB with Enclosure nos. 2.00 8,500.00 2.00 2.00 17,000.00
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded
2.1 r.m. 15.00 600.00 8.00 8.00 16.00 9,600.00
Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 r.m. 10.00 500.00 5.00 5.00 10.00 5,000.00
Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 r.m. 30.00 250.00 14.00 13.00 27.00 6,750.00
Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point pts. 90.00 700.00 35.00 44.00 11.00 90.00 63,000.00
3.2 Two Way Light Point pts. 3.00 900.00 1.00 2.00 3.00 2,700.00
3.3 Ceiling Fan Point pts. 4.00 900.00 2.00 2.00 4.00 3,600.00
4 6A Universal Pin Light Power Socket Wiring pts. 77.00 900.00 49.00 28.00 77.00 69,300.00
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket nos. 77.00 700.00 49.00 28.00 77.00 53,900.00
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan nos. 4.00 6,000.00 4.00 4.00 24,000.00
7 Light Fixtures/Luminaires & Accessories
D SANITARY WORKS
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm r.m 140.00 1,600.00 142.00 142.00 227,200.00
20mm r.m 22.00 700.00 23.00 23.00 16,100.00
15mm r.m 8.00 500.00 7.00 7.00 3,500.00
c CPVC Ball Valve 0.00
40 mm nos. 4.00 2,000.00 4.00 4.00 8,000.00
25 mm nos. 2.00 900.00 2.00 2.00 1,800.00
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 1.00 1.00 4,500.00
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 1.00 1.00 12,500.00
f 2000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 1.00 1.00 34,000.00
2 Sewer, Rain and Waste Water Installation 0.00
110 mm r.m 59.00 1,400.00 61.00 61.00 85,400.00
5 Barricading Works 1 45 45 Rm
Breadth Height
S.No Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance and Mobilization 1 21.95 13.95 306.20
Total 306.20 Sq.m
Building Floors
Classroom
Class Room 2 5.75 5.75 0.20 13.23
Corridor 2 5.75 2.25 0.20 5.18
1 3.25 2.25 0.20 1.46
Below Staircase 1 3.25 5.75 0.20 3.74
Below ramp
For Slope 1 6.82 1.18 0.20 1.61
For Front wall 3-AB 1 6.50 0.45 0.10 0.29
For Side wall -3B 1 1.33 0.45 0.10 0.06
Total 45.99 Cu.m
2 Concrete Works
2.1 PCC
2.1.1 PCC work (1:3:6)
For Footing
Grid 1
Footing (F2) 2 2.20 2.20 0.10 0.97
Footing (F3) 2 2.50 2.50 0.10 1.25
Grid 2
Footing (F3) 2 2.50 2.50 0.10 1.25
Footing (F4) 2 2.80 2.80 0.10 1.57
Grid 3
Footing (F1) 4 1.50 1.50 0.10 0.90
First Floor
For column 12 0.45 0.45 3.00 7.29
F.F Staircase
Landing beam 1 3.05 0.25 0.38 0.29
Landing 2 1 3.2 1.85 0.15 0.89
First flight
Waist Slab 1 3.35 1.5 0.15 0.75
Riser 9 Area 0.02 1.50 0.30
Second Flight
Waist Slab 1 3.40 1.50 0.15 0.77
Riser 10 Area 0.02 1.50 0.34
Second Floor Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.53 6.69
Grid A-B-C_D 4 7.60 0.30 0.53 4.79
Secondary Beam
Grid A1-C1 2 7.90 0.25 0.43 1.68
Grid 1a 2 5.45 0.25 0.43 1.16
Grid 1b 1 3.20 0.25 0.43 0.34
S.F. Slab
Class room 8 2.73 2.73 0.13 7.43
Corridoor 4 2.73 2.20 0.13 3.00
1 3.20 2.20 0.13 0.88
Slab between beam 1b & 2B-2C 1 0.49 3.20 0.13 0.20
Staircase top slab 1 0.39 3.20 0.15 0.18
Lintel Bands, First floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Second Floor
For column 12 0.45 0.45 2.60 6.32
Second Floor Truss Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.40 5.09
Grid A-B-C-D 4 7.60 0.30 0.40 3.65
Lintel Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 14.15 0.23 0.13 0.41
Sill Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
Vetical Band 4.00 2.48 0.25 0.08 0.19
3 Brick works
3.2 Brick Masonary Works (1:4 c/s)
Foundation upto plinth
Grid 1,2,3 3 14.15 0.23 0.38 3.66
Grid A,B,C,D,E 4 7.60 0.23 0.38 2.62
Ground floor
Along grid A,B,C,D/(1-2) 4 5.55 0.23 2.33 11.87
Along grid 1 1 11.10 0.23 2.33 5.94
1 3.05 0.23 2.02 1.42
Along grid 2 1 10.80 0.23 2.33 5.78
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80
Below Staircase 1 4.50 3.20 14.40
Staircase Tread 18 0.3 1.50 8.10
Riser 20 0.15 1.50 4.50
Staircase landing 1 1.80 3.20 5.76
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Store Below Landing 1.00 2.50 1.25 3.11
2.00 0.31 1.25 0.78
2.00 0.69 1.44 1.98
2.00 1.44 1.63 4.69
Pedestal 4.00 1.25 0.25 1.25
4.00 0.50 0.25 0.50
Column
Grid 2A,2D 2.00 0.35 0.68 0.47
Grid 2B,2C 2.00 0.98 0.68 1.32
First Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Column
Grid 2A,2D 2.00 0.45 2.91 2.62
Grid 2B,2C 2.00 1.08 2.91 6.26
Deductions
W1 -8 1.10 1.13 -4.95
V1 -8 1.10 0.53 -2.31
W2 -1 1.50 1.00 -0.75
D1 -4 1.10 2.48 -5.45
Second Floor
Classroom 2.00 23.15 3.00 138.90
Staircase 1.00 14.67 3.00 44.01
Column
Grid 2A,2D 2.00 0.45 3.00 2.70
Grid 2B,2C 2.00 1.08 3.00 6.45
Deductions
W1 -8 1.10 1.13 -4.95
W2 -1 1.50 1.00 -0.75
V2 -8 1.10 0.65 -2.86
D2 -4 1.10 2.60 -5.72
Secondary Beam
Along Grid A1-C1 2 7.65 0.60 9.18
Along Grid 1a 2 5.70 0.60 6.84
Along Grid 1b 1 3.20 0.60 1.92
Below staircase
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Second floor
Truss Beam
Classroom 4 4 5.55 0.40 8.88
Classroom 5 4 5.55 0.40 8.88
Corridor; Along grid 2 , ( A-B) and (C-D) 2 5.55 0.40 4.44
Corridor; Along grid 2 , ( B-C) 1 3.05 1.10 3.36
Corridor; Along grid 3 , ( A-B), (B-C) and (C-
D) 1 14.15 0.70 9.91
Corridor; Along grid A, B, C and D; (2-3) 4 2.20 1.10 9.68
Total 288.40 sq.m
Truss Level
Main Beam(300 x 400)
Along grid 1 1.00 14.15 0.40 5.66
Along grid 3 1.00 14.15 0.40 5.66
Along grid A and D 2.00 7.60 0.40 6.08
Column Plaster
Upto Plinth Level
Along grid 1
Grid 1A,1D 2.00 1.10 0.45 0.99
Grid 1B,1C 2.00 0.65 0.45 0.59
Along grid 2
Grid 2A,2D 2.00 0.55 0.45 0.50
Along grid 3
Along grid 3A 1.00 0.08 0.38 0.03
1.00 0.45 0.40 0.18
Grid 3B 1.00 0.08 0.15 0.01
Grid 3C 1.00 0.60 0.15 0.09
Grid 3D 1.00 1.05 0.15 0.16
Upto Sill Level
Along grid 1
Grid 1A,1D 2.00 0.90 0.68 1.22
Grid 1B,1C 2.00 0.45 0.68 0.61
Along grid 2
Grid 2A,2D 2.00 0.55 0.68 0.74
Ground Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C 2.00 1.20 2.88 6.90
2.00 0.60 3.00 3.60
First Floor
Along grid 1
Grid 1A,1D 2.00 1.10 2.33 5.12
Grid 1B,1C 2.00 0.65 2.33 3.02
Along grid 2
Grid 2A,2D 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3D 2.00 1.05 3.00 6.30
Outer Steps
Grid 2A,2D 2.00 1.03 0.45 0.92
Grid 3A 1.00 0.93 0.45 0.42
Steps Edge 3.00 0.60 0.45 0.81
For Ramp
8 MISCELLANOUS
8.2 Cement Board
Partition
Above Side Walls 1.00 9.73 1.58 15.38
Total 15.39 sq.m
8.3 Railing
Total
Staircase Railing Kg/m Total
No. Length (m) Length
Horizontal ISNB 40 M 1 18.40 18.40 3.61 66.42
Vertical 38 mm Square Pipe 14 0.86 12.04 3.14 37.81
Horizontal 25mm Square Pipe 4 17.35 69.40 0.85 58.99
Balcony Railing
Site
S. No. Description G.F F.F S.F Quantity Unit Remarks
Development
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1.00 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 50.00 r.m
copper conductor wires
A Foundation
Longitudional Bar
a. F1
1 1400 1 12 150 4 20 1600 128 0.889 113.78
0 0
0 0
b. F2
1 2100 1 12 150 2 30 2300 138 0.889 122.67
0 0
0 0
c. F3
1 2400 1 12 150 4 34 2600 353.6 0.889 314.31
0 0
0 0
1 2700 1
d. F4 12 150 2 38 2900 220.4 0.889 195.91
0 0
0 0
B Foundation Beam 300*250
8850
a 3-12Ø Top Bar Along Grid A, B, C & D 2 2 12 4 3 9710 116.52 0.889 103.57
5 5
0 180 180 0
b 3-12Ø Bottom Bar Along Grid A, B, C & D 4 8850 4 12 4 3 9710 116.52 0.889 103.57
3 3
0 0
15850
c. 2-12Ø Top End Bars Along Grid 1,2&3 2 2 12 3 2 16710 100.26 0.889 89.12
5 5
0 520
180 520
180 0
15850
e 1-12Ø Top Mid Bar Along Grid 1,2&3 2 2 12 3 1 16710 50.13 0.889 44.56
5 5
0 520
180 520
180 0
g 2-12Ø Bottom Ends Bar Along Grid 1,2&3 7 12 3 2 16710 100.26 0.889 89.12
15850 7
2 2
0 0
h Lapping on Bottom Ends Bar 720 12 3 2 720 4.32 0.889 3.84
i 1-12Ø Bottom Mid Bar Along Grid 1,2&3 7 7 12 3 1 16710 50.13 0.889 44.56
2 15850
2
0 0
j Lapping on Bottom Mid Bar 720 12 3 2 720 4.32 0.889 3.84
200
80
l Entire Beam Length 250 8 100/150 1 673 1060 713.38 0.395 281.83
15850
a 2-16Ø Top Ends Bar Along Grid 1, 2 & 3 7 16 3 2 17290 103.74 1.580 163.94
7
2 2
0 0
b Laping
960 16 3 4 960 11.52 1.580 18.21
15850
c 2-16Ø Top Mid Bar Along Grid 1, 2 & 3 16 3 1 17290 51.87 1.580 81.97
7 7
2 2
0 0
d. Laping 960 16 3 1 960 2.88 1.580 4.55
1 1
e 2-20Ø Bottom Ends Bar Along Grid 1, 2 & 3
0 15850 0 20 3 2 17850 107.10 2.469 264.45
0 0
0 0
f Laping 1200 20 3 2 1200 7.20 2.469 17.78
1 1
g 2-20Ø Bottom Mid Bar Along Grid 1, 2 & 3 0 15850 0 20 3 2 17850 107.10 2.469 264.45
0 0
0 0
1500+70Ø
i 2-20Ø Extra Bar Along Grid 1 & 2 at Grid A 20 2 2 2900 11.60 2.469 28.64
Grid A
6950
j 2-20Ø Extra Bar Along Grid 1 & 2 at Grid B & C 20 2 2 6950 27.80 2.469 68.64
k 2-20Ø Extra Bar Along Grid 1 & 2 at Grid D 25 2 2 3450 13.80 3.858 53.24
Grid D
1700+70Ø
1500+70Ø
l 2-16Ø Extra Bar Along Grid 3 at Grid A 16 1 2 2620 5.24 1.580 8.28
Grid A
3050
m 2-16Ø Extra Bar Along Grid 3 at Grid B 16 1 2 3050 6.10 1.580 9.64
3050
n 2-16Ø Extra Bar Along Grid 3 at Grid C 16 1 2 3050 6.10 1.580 9.64
1500+70Ø
o 2-20Ø Extra Bar Along Grid 3 at Grid D 16 2 2 2620 10.48 1.580 16.56
Grid D
q Laping
960 16 3 2 960 5.76 1.580 9.10
8850
r 3-16Ø Top Bar Along Grid A, B, C & D 16 4 3 10290 123.48 1.580 195.13
7 7
2 2
0 0
1 1
s 4-20Ø Bottom Bar Along Grid A, B, C & D
0 0 20 4 4 10850 173.60 2.469 428.64
8850 0
0
0 0
4200+70Ø
t 2-20Ø Extra Bar Along Grid A, B, C & D at Grid 2 & 3 25 4 2 5950 47.60 3.858 183.64
1700+70Ø
u 2-20Ø Extra Bar Along Grid A, B, C & D at Grid 1 25 4 2 3450 27.60 3.858 106.48
250
12
0
x Grid 1, 2 & 3 475 12 100 3 143 1690 725.01 0.889 644.45
250
12
0
y Grid A, B, C & D 475 12 100 4 77 1690 520.52 0.889 462.69
Longitudional Bar upto ground floor height 6-20Ø for 1( A D ), 2 (A) & 3(A 3283
a 20 7 6 4107 172.494 2.469 425.91
B C D)
100 724
Longitudional Bar upto first floor height 6-20Ø for Grid 1( A D ), 2 (A) &
3283
b 20 7 6 7107 298.494 2.469 737.02
3( A B C D)
100 724
3283
c Longitudional Bar upto ground floor height 6-25Ø for 1( B C ) 25 2 6 4407 52.884 3.858 204.03
100 1024
6283
d Longitudional Bar upto first floor height 6-25Ø for Grid 1( B C ) 25 2 6 7407 88.884 3.858 342.92
100 1024
3283
e Longitudional Bar upto ground floor height 2-20Ø for Grid 2( B C D ) 20 3 2 4107 24.642 2.469 60.85
100 724
3283
f Longitudional Bar upto ground floor height 4-25Ø for Grid 2(B C D) 25 3 4 4407 52.884 3.858 204.03
100 1024
6283
g Longitudional Bar upto first floor height 6-20Ø for Grid 2(B C D) 20 3 6 7107 127.926 2.469 315.87
m
100 724
h Stirrups for Column upto Floor Height 0.00
370
80
370
i 8 100 12 8 1640 157.44 0.395 62.20
460
140
80
370
j 8 100 12 8 1180 113.28 0.395 44.75
460
370
80
k 8 100 12 8 1180 113.28 0.395 44.75
140
370 460
80
370
n 8 100 12 8 1640 157.44 0.395 62.20
460
460
370
80
p 8 100 12 8 1180 113.28 0.395 44.75
140
15850
7 7
a Top Main Bar(3-16Ø) 16 3 3 17290 155.61 1.580 245.90
2 2
0 0
b Lapping 960 16 3 6 960 17.28 1.580 27.31
7445 8405
g Torsion Bar (2-16Ø) 16 3 2 16810 100.86 1.580 159.38
960
Extra Bar at Grid 1 & 2
1 1900
h Extra Bar at Grid A (2-20Ø) 0 20 2 2 2900 11.6 2.469 28.64
0
0
6950
i Extra Bar at Grid B & C (2-20Ø) 20 2 2 6950 27.8 2.469 68.64
2100 1
j Extra Bar at Grid D (2-20Ø) 25 2 2 3450 13.8 3.858 53.24
3
5
Extra Bar at Grid 3 0
7 1900
k Extra Bar at Grid A (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
3050
l Extra Bar at Grid B & C (2-16Ø) 16 2 2 3050 12.2 1.580 19.28
1900 7
m Extra Bar at Grid D (2-16Ø) 2 16 2 2 2620 10.48 1.580 16.56
0
2 Along Grid A, B, C & D
8850
7 7
a Top Main Bar(3-16Ø) 16 4 3 10290 123.48 1.580 195.13
2 2
0 0
2100 1
d Extra Bar at Grid 1 (2-25Ø) 25 4 2 3450 27.6 3.858 106.48
3
5
0
1 4600
e Extra Bar at Grid 2 & 3 (2-25Ø) 25 4 2 5950 47.6 3.858 183.64
3
5
0
10
0
4
7
f Stirrups for Main Beam-Long Grid 10 125 1 381 1650 628.65 0.617 388.06
5
250
1
0
0 4
7
g Stirrups for Main Beam-Short Grid 10 125 1 284 1650 468.6 0.617 289.26
5
250
F Secondary Beam (300*425)
1 Along Grid A1 & C1
8870
a Top Main Bar (3-16Ø)
7 7 16 2 3 10290 61.74 1.580 97.57
1 1
0 0
6250
3
c Top Main Bar (3-16Ø)
7 3 16 2 3 7000 42 1.580 66.37
5 7
5
3750
3
e Top Main Bar (3-16Ø)
7 3 16 1 3 4500 13.5 1.580 21.33
5 7
5
3 3
f Bottom Main Bar (4-12Ø) 12 1 4 4500 18 0.889 16.00
7 3750 7
5 5
80
3
7
g Stirrups for Secondary Beam-Short Grid 8 125 1 142 1410 200.22 0.395 79.10
5
250
80
3
h Stirrups for Secondary Beam-Long Grid
7 8 125 1 125 1410 176.25 0.395 69.63
5
250
960
G STAIRCASE
200
50
1150
b 12 1 12 2910 34.92 0.889 31.04
1410
300
c Distribution Bar- Top & Bottom 1460 10 150 1 14 1460 20.44 0.617 12.62
d First Flight- Top & Bottom Bar 1460 10 150 1 55 1460 80.3 0.617 49.57
5
0
g Extra Bar 5 1 12 1 11 2100 23.1 0.889 20.54
0 1000 0
0
0
1840
850
h 220 12 1 12 2960 35.52 0.889 31.58
50
1000
1000 50
i 12 1 11 2100 23.1 0.889 20.54
50
900 3400
j Second Flight-Longitudional Bar 12 125 1 12 7320 87.84 0.889 78.08
450 2270
300
50 1150
k 2000 12 1 12 3420 41.04 0.889 36.48
220
5
l Extra Bar 0 12 1 11 2100 23.1 0.889 20.54
1000
5
1000 0
5
0
410 480
q Nosing Ties 8 4 6 1630 39.12 0.395 15.46
480 260
300 480
410 480
s 8 3 6 1520 27.36 0.395 10.81
480 150
300 480
480
80 1375 500
a Along Short Span-Between Grid A-B & C-D
2000 80 8 300 1 40 9985 399.4 0.395 157.79
575 500
8 8
b 8 300 1 36 9985 359.46 0.395 142.01
0 8750 0
500
2000
c Btween Grid B & C 80 8 8 300 1 11 4535 49.885 0.395 19.71
1875 0
500
d
8 8 8 300 1 11 4535 49.885 0.395 19.71
0 3875 0
575
575 1500
e 80 8 300 1 35 7560 264.6 0.395 104.53
2375 2375
8
0
575 575
f 8 8 8 300 1 35 7560 264.6 0.395 104.53
0 6250 0
575 575
8 8
g Grid A-D, 1b-3 0 8 300 1 9 17540 157.86 0.395 62.37
480 4405 0
11345
575
2125 1500 1500
80
1625 1625
h 1750 8 300 1 9 17540 157.86 0.395 62.37
575
2230 1500 2125 8
0
j
2050 8 150 1 94 2050 192.7 0.395 76.13
2250
k 8 150 1 18 2250 40.5 0.395 16.00
2130
l 8 150 1 11 2130 23.43 0.395 9.26
370
80
370
a Stirrups for First Floor 8 100 12 25 1640 492 0.395 194.37
460
140
80
370
b 8 100 12 25 1180 354 0.395 139.85
460
80
c 140 8 100 12 25 1180 354 0.395 139.85
370
370
80
460
Submitted by: Checked by: Verified by:
Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)
460
140
80
370
e 8 100 12 26 1180 368.16 0.395 145.45
460
80
f 140 8 100 12 26 1180 368.16 0.395 145.45
370
K Second Floor Beam (300*525)-Main Beam 0.00
1 Along Grid 1, 2 & 3 0.00
1 1200 1
c Bottom Bars - Ends (2-20Ø) 7275 8575 20 3 2 19050 114.3 2.469 282.22
0 0
0 0
0 0
7 7
d Bottom Bars- Mid (2-16Ø) 2 3250 960 960 2 16 3 2 19210 115.26 1.580 182.14
0 0
10700 1900
7445 8405
e Torsion Bars (2-16Ø) 16 3 2 16810 100.86 1.580 159.38
960
Extra Bar at Grid 1 & 2 0.00
1 1900
f Extra Bar at Grid A (2-20Ø) 0 20 2 2 2900 11.6 2.469 28.64
0
0
6950
g Extra Bar at Grid B & C (2-20Ø) 20 2 2 6950 27.8 2.469 68.64
1900 1
h Extra Bar at Grid D (2-20Ø) 20 2 2 2900 11.6 2.469 28.64
0
0
Extra Bar at Grid 3 0 0.00
7 1900
i Extra Bar at Grid A (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
3050
Submitted by: Checked by: Verified by:
Sharma-AM J/V Consultant Engineer DLPIU Engineer
Spacing c/c Length/pc. Total Length Weight Per Total Weight
SN Description Shape Size (mm) Structure Nos Rebar Nos Remarks
(mm) (mm) (m) Meter (Kg) (Kg)
3050
j Extra Bar at Grid B & C (2-16Ø) 16 2 2 3050 12.2 1.580 19.28
1900 7
k Extra Bar at Grid D (2-16Ø) 2 16 1 2 2620 5.24 1.580 8.28
0
2 Along Grid A, B, C & D 0.00
8850
7 7
a Top Main Bar(3-16Ø) 16 4 3 10290 123.48 1.580 195.13
2 2
0 0
2010 1
e Extra Bar at Grid 1 (2-20Ø) 20 4 2 3010 24.08 2.469 59.46
0
0
0
7 4510
f Extra Bar at Grid 2 & 3 (2-16Ø) 16 4 2 5230 41.84 1.580 66.12
2
0
80
4
7
g Stirrups for Beam-Along Grid 1 & 2 5 10 100 2 81 1610 260.82 0.617 161.00
250
80
4
7
h " 5 10 150 2 41 1610 132.02 0.617 81.49
250
80
4
7
i Stirrups for Beam-Along Grid 3 5 10 100 1 82 1610 132.02 0.617 81.49
250
80
4
7
j Stirrups for Short Grid A, B, C & D 10 100 4 55 1610 354.2 0.617 218.64
5
250
80
4
7
k " 10 150 4 17 1610 109.48 0.617 67.58
5
250
8730
a Top Main Bars (3-16Ø)
8 8 16 2 3 10440 62.64 1.580 98.99
5 5
5 5
6230
8
a Top Main Bar (3-16Ø)
5 8 16 2 3 7940 47.64 1.580 75.28
5 5
5
3730
8
a Top Main Bar (3-16Ø)
5 8 12 1 3 5440 16.32 0.889 14.51
5 5
5
8 8
b Bottom Main Bar (4-12Ø) 12 1 4 5440 21.76 0.889 19.34
5 3730 5
5 5
80
3
7
c Stirrups for Secondary Beam-Along A1 & C1 8 100 2 55 1410 155.1 0.395 61.28
5
250
80
3
7
d " 8 150 2 17 1410 47.94 0.395 18.94
5
250
80
3
7
e Stirrups for Secondary Beam-Along Grid 1a 8 100 1 60 1410 84.6 0.395 33.42
5
250
80
3
7
f " 8 150 1 17 1410 23.97 0.395 9.47
5
250
80
3
7
g Stirrups for Secondary Beam-Along Grid 1b 8 100 1 18 1410 25.38 0.395 10.03
5
250
80
3
7
h " 8 150 1 10 1410 14.1 0.395 5.57
5
250
960
960
M STAIRCASE 0.00
200
50
1150
b 12 1 12 2910 34.92 0.889 31.04
1410
300
c Distribution Bar- Top & Bottom 1460 10 150 1 14 1460 20.44 0.617 12.62
d First Flight- Top & Bottom Bar 1460 10 150 1 55 1460 80.3 0.617 49.57
5
0
g Extra Bar 5 1 12 1 11 2100 23.1 0.889 20.53
0 1000 0
0
0
1840
850
h 220 12 1 12 2960 35.52 0.889 31.57
50
1000
1000 50
i 12 1 11 2100 23.1 0.889 20.53
50
900 3400
j Second Flight-Longitudional Bar 12 125 1 12 7320 87.84 0.889 78.08
450 2270
300
50 1150
k 2000 12 1 12 3420 41.04 0.889 36.48
220
5
l Extra Bar 0 12 1 11 2100 23.1 0.889 20.53
1000
5
1000 0
5
0
410 480
q Nosing Ties 8 4 6 1630 39.12 0.395 15.46
480 260
300 480
410 480
s 8 3 6 1520 27.36 0.395 10.81
480 150
300 480
480
575
1500
80 1500
2375
a Along Short Span-Between Grid A-B & C-D 8 300 1 40 9985 399.4 0.395 157.79
1375 500
2000 80
575 500
b
8 8 8 300 1 36 9985 359.46 0.395 142.01
0 8750 0
500 1875
c Grid 1(b)-3 & B & C 80 8 300 1 11 4535 49.885 0.395 19.71
2000 8
0
500
d
8 8 8 300 1 11 4535 49.885 0.395 19.71
0 3875 0
575
575 1500
e 80 8 300 1 35 7560 264.6 0.395 104.53
2375 2375
8
0
575 575
f 8 8 8 300 1 35 7560 264.6 0.395 104.53
0 6250 0
575 575
8 8
g Grid A-D, 1b-3 0 8 300 1 9 17540 157.86 0.395 62.37
480 4405 0
11345
575
2125 1500 1500
80
1625 1625
h 1750 8 300 1 9 17540 157.86 0.395 62.37
575
2230 1500 2125 8
0
i Negative Bar 0.00
2050 50
j Along 1a 50 8 300 1 40 2150 86 0.395 33.98
k Along Grid 2 (A-B) & 2(C-D) 50 1950 50 8 300 2 20 2050 82 0.395 32.40
50 2050 50
l Along Grid 2 (B-C) 8 300 1 12 2150 25.8 0.395 10.19
50 2050
m Along Grid A1 & C1 50 8 300 2 28 2150 120.4 0.395 47.57
50 2250
n Along B & C 50 8 300 2 8 2350 37.6 0.395 14.86
7445 8405
7 7
b Top Bars - Mid (1-16Ø) 2 16 3 1 18250 54.75 1.580 86.52
960 2
0 0
3 960 3
c Bottom Bars - Ends (2-16Ø) 7275 8575 16 3 2 17450 104.7 1.580 165.45
2 2
0 0
3 3
d Bottom Bars- Mid (2-12Ø) 2 1925 720 960 2 12 3 2 18170 109.02 0.889 96.91
0 0
12000 1925
2 Along Grid A, B, C & D 0.00
8850
7 7
a Top Main Bar(3-16Ø) 16 4 3 10290 123.48 1.580 195.13
2 2
0 0
3 3
c Bottom Bar (2-12Ø) 12 4 2 9550 76.4 0.889 67.91
5 8850 5
0 0
80
3
d Stirrups for Main Beam-Along Short Grid (Grid A, B, C & D)
5 8 100 4 55 1650 363 0.395 143.41
0
250
80
3
e "
5 8 150 4 17 1650 112.2 0.395 44.33
0
250
8
0
3
5
f Stirrups for Main Beam-Along Long Grid (1, 2 & 3) 8 100 3 142 1650 702.9 0.395 277.69 14150.000
0
250
3 Lapping at Column Bars 0.00
6000
1200
760
4253
960
760
1253
c SF-Along Grid 1 (A & D) 16 2 6 2973 35.676 1.580 56.38
960
6000
1500
6000
1200
1040
4253
1200
1040
1253
1200
6000
1200
1040
4253
1200
480
1253
720
6000
1500
6000
1200
1040
4253
1200
1040
1253
1200
6000
1200
1040
4253
1200
480
1253
720
6000
1200
760
4253
s FF-Along Grid 3 - B, C & D 16 3 6 5973 107.514 1.580 169.90
960
480
1253
t SF-Along Grid 3 - B, C & D 12 3 6 2453 44.154 0.889 39.25
720
Q Sill Band
1 Ground Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600
2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600
2800 75
375
375
c Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75
4150 75
825
825
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
825
1250
375
Ties
65 65
f Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61
190
65 65
g Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79
190
65 65
h Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07
190
65 65
i Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
50 50
j Store Room Wall 8 150 1 20 170 3.4 0.40 1.35
70
2 First Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600
2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600
2800 75
375
375
c Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75
4150 75
825
825
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
e Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61
190
65 65
f Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79
190
65 65
g Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07
190
65 65
h Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
3 Second Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D 10 2 2 7150 28.6 0.62 17.66
75
75 600 600
2800 75
375
375
b Grid 2/A-B , Grid 2/C-D 10 2 2 3700 14.8 0.62 9.14
75
75
4150 75
825
825
c Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
d Grid 1/A-B , Grid 1/C-D 8 150 2 38 320 24.32 0.40 9.61
190
65 65
e Grid 2/A-B , Grid 2/C-D 8 150 2 24 320 15.36 0.40 6.07
190
65 65
f Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
R Lintel Band
1 Ground Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
4150 75
825
825
b Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
c Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22
190
65 65
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
2 First Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
4150 75
825
825
b Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
c Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22
190
65 65
d Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
3 Second Floor
Longitudinal Bars
4150 75
825
825
a Grid 1/A-B , Grid 1/C-D,Grid 2/A-B & Grid 2/C-D 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
2950 75
200
200
b Grid 1/B-C 10 1 2 4700 9.4 0.62 5.81
75
75 600 600
4150 75
825
825
c Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 10 4 2 7150 57.2 0.62 35.31
75
75 600 600
Ties
65 65
d Grid 1/A-B , Grid 1/C-D,Grid 2/A-B , Grid 2/C-D 8 150 4 38 320 48.64 0.40 19.22
190
65 65
e Grid 1/B-C 8 150 1 22 320 7.04 0.40 2.79
190
65 65
f Grid A/1-2 , Grid B/1-2 , Grid C/1-2 & Grid D/1-2 8 150 4 38 320 48.64 0.40 19.22
190
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance for Bldg 1 27.50 14.50 398.75
Soak pit 1 3.14 Area 3.14
Total 401.89 sq.m
Below ramp
For Slope 1 6.82 1.18 0.20 1.61
For Front wall 3-AB 1 6.50 0.45 0.10 0.29
For Side wall -3B 1 1.33 0.45 0.10 0.06
Building Floor
Grid AB,BC,DE/1-2 3 5.70 6.70 0.20 22.91
Staircase 1 6.70 3.20 0.20 4.29
Corridor 3 5.70 2.20 0.20 7.52
1 3.20 2.20 0.20 1.41
Inside of soak Pit 1 3.77 0.23 0.20 0.17
Total 53.76 cu.m
2 CONCRETE WORKS
2.1 P.C.C
2.1.1 P.C.C.(1:3:6) Works
F1 7 1.50 1.50 0.10 1.58
F2 4 1.70 1.70 0.10 1.16
F3 3 2.00 2.00 0.10 1.20
F4 1 2.20 2.20 0.10 0.48
Below Foundation Beam
Along grid 1 1 18.10 0.35 0.05 0.32
Along grid 2 1 18.10 0.35 0.05 0.32
Along grid 3 1 18.10 0.35 0.05 0.32
Along grid A,C and E 3 7.80 0.35 0.05 0.41
Along grid B & D 2 7.80 0.35 0.05 0.27
Total 6.05 cu.m
Beam
Footing beam(250x300)
Along grid 1,2,3 3 19.70 0.25 0.30 4.43
Along grid A,B,C,D,E 5 8.60 0.25 0.30 3.23
Tie beam(300 x 525)
Along grid 1,2,3 3 19.70 0.30 0.53 9.31
Along grid A,B,C,D,E 5 8.60 0.30 0.53 6.77
First floor level
Main beam(300x525)
Along grid 1,2,3 3 19.70 0.30 0.40 7.09
Along grid A,B,C,D,E 5 8.60 0.30 0.40 5.16 300
Secondary beam(250x425)
Along 1a 1 17.10 0.25 0.30 1.28
Along A1,B1,D1 3 8.65 0.25 0.30 1.95
Along 1b 1 3.20 0.25 0.30 0.24
Truss level
Main beam(300x400)
Along grid 1,2,3 3 19.70 0.30 0.40 7.09
Along grid A,B,C,D,E 5 8.60 0.30 0.40 5.16
Column
Column below Plinth level 15 0.45 0.45 1.20 3.65
Ground floor plan
Total columns(450x450) 15 0.45 0.45 3.00 9.11
First floor plan
Total columns(450x450) 15 0.45 0.45 3.00 9.11
Slab
First floor level 1 21.80 9.80 0.125 26.71
Deduction
Staircase Void -1 3.20 4.50 0.13 -1.80
Staircase
Bottom 1 2.29 1.50 0.15 0.51
Landing 1 3.20 1.50 0.15 0.72
Waist Slab 1 6.76 1.50 0.15 1.52
Steps 10 0.15 0.30 1.50 2.25
Landing Beam 1 3.05 0.25 0.38 1.16
Lintel Bands
Ground floor plan
Along grid 1 1 16.65 0.23 0.08 0.29
Sill Bands
Ground floor level
Along grid 1 1 19.70 0.23 0.08 0.34
Along grid 2 1 12.25 0.23 0.08 0.21
Along grid A,E 2 6.55 0.23 0.08 0.23
Along grid C,D 2 6.55 0.23 0.08 0.23
Between BC & 1-2 1 2.05 0.23 0.08 0.04
1 4.70 0.13 0.08 0.04
Below staircase 1 3.90 0.13 0.08 0.04
Vertical Band
Ground Floor 5 2.48 0.23 0.08 0.21
First Floor 4 2.60 0.23 0.08 0.18
Pedestal
Base Block 8 0.50 0.25 0.25 0.25
Bench
Bench Top Slab 1 2.40 0.50 0.08 0.09
Soak Pit
RCC slab 1 2.84 Area 0.15 0.43
Total 127.78 cu.m
2.5 Formworks
Foundation
Isolated footing
Column
Column below Plinth level 15 1.80 1.20 32.40
Ground floor plan
Total columns(450x450) 15 1.80 3.00 81.00
First floor plan
Total columns(450x450) 15 1.80 3.00 81.00
Slab
Base area 1 21.80 9.80 213.64
Staircase
Bottom 1 2.29 0.15 0.34
Waist Slab 1 6.76 1.80 12.18
Landing 1 1.50 1.50 2.25
1 1.95 0.20 0.39
1 1.94 1.50 2.90
Steps 20 0.30 0.15 0.90
Riser 20 1.50 0.15 4.50
Landing Beam 1 3.05 0.86 2.62
Lintel Bands
Ground floor plan
Along grid 1 1 16.65 0.25 4.16
Along grid 2 1 16.65 0.25 4.16
Along grid A,C,D,E 4 6.55 0.25 6.55
Between BC & 1-2 1 2.05 0.25 0.51
1 4.70 0.25 1.18
Sill Bands
Ground floor level
Along grid 1 1 19.70 0.15 2.96
Along grid 2 1 16.65 0.15 2.50
Along grid A,E 2 6.55 0.15 1.97
Along grid C,D 2 6.55 0.15 1.97
Between BC & 1-2 1 2.05 0.15 0.31
1 4.70 0.15 0.71
Below staircase 1 3.90 0.15 0.59
Deduction of door
D1 -4 1.10 0.15 -0.66
D2 -1 1.00 0.15 -0.15
Deduction of door
D1 -4 1.10 0.15 -0.66
D2 -1 1.00 0.15 -0.15
Pedestal
Base Block 8 1.25 0.25 2.50
Bench
Bench Top Slab 2 5.80 0.125 1.45
Bottom 2 1.90 0.25 0.95
3 BRICK WORKS
3.2 Full Brick (230 mm) Works (1:4c/s)
Brick Masonry Work Below Plinth Beam
Along grid 1,2,3 3 19.70 0.23 0.38 5.10
Along grid A,B,C,D & E 5 8.60 0.23 0.38 3.71
Ground floor
Along grid 1 1 16.65 0.23 2.33 8.90
For Ramp
Grid 3AB 1 1.40 0.22 0.30
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Deduction
D2 -8 1.10 -8.80
D3 -2 1.00 -2.00
Total 205.90 r.m
6 ROOFING/TERRACING WORKS
6.1 Metal Works
A Truss 1 4,712.85
Total 4,712.85 Kg
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground floor plan
Laboratory 1 32.35 Perimeter 2.91 94.14
Store 1 17.70 Perimeter 2.91 51.51
ECD 1 25.05 Perimeter 2.91 72.90
Staircase 1 17.75 3.00 53.25
For Strore Below Landing 1 3.53 1.25 4.39
2 0.70 1.44 2.01
1 2.88 1.60 4.60
Pedestal 5 1.25 0.25 1.56
5 0.50 0.25 0.63
Column
Grid 2A,2C,2D,2E 4 0.35 0.68 0.95
Grid 2B 1 0.45 0.68 0.30
Staircase
Waist slab 1 6.76 1.50 10.15
Landing 1 1.47 1.50 2.20
1 1.80 0.20 0.36
Ground Floor
Along grid 1
Grid 1A,1E 2.00 1.10 2.33 5.12
Grid 1B,1C,1D 3.00 0.65 2.33 4.53
Along grid 2
Grid 2A,2E 2.00 0.65 2.33 3.02
Along grid 3
Grid 3A,3E 2.00 1.05 3.00 6.30
First Floor
Along grid 1
Grid 1A,1E 2.00 1.10 3.00 6.60
Grid 1B,1C,1D 3.00 0.65 3.00 5.85
Along grid 2
Grid 2A,2E 2.00 0.65 3.00 3.90
Along grid 3
Grid 3A,3E 2.00 1.05 3.00 6.30
2.00 0.75 2.88 4.31
Grid 3B,3C,3D 3.00 1.20 2.88 10.35
3.00 0.60 3.00 5.40
8 MISCELLANEOUS
8.2 Cement Board Wall
8.2.1 For partition
Gable Walls 4.00 7.26 Area 29.04
Total 29.04 sq.m
8.3 Railing
Staircase Railing
Horizontal ISNB 40M 1 8.43 8.43 3.56 30.01
Vertical 38mm Square Pipe 2 0.989 1.98 2.82 5.58
Vertical 38mm Square Pipe 6 0.969 5.81 2.82 16.40
Horizontal 25mm Square Pipe 4 8.34 33.37 0.85 28.37
Balcony Railing
First Floor
Horizontal ISNB 40M 1 23.80 23.80 3.56 84.73
Horizontal ISNB 32M 2 23.80 47.60 3.10 147.56
Vertical ISNB 32M 19 1.02 19.38 3.10 60.08
Inclined ISNB 32M 19 0.134 2.55 3.10 7.89
Vertical 25mm Square Pipe 163 0.82 133.66 0.85 113.61
Pedestal
ISNB 40M Pedestal Bars 8 1.91 15.28 3.56 54.40
8 1.49 11.92 3.56 42.44
16 0.40 6.40 3.56 22.78
1.40
Bars (Y - direction) 12 150 0.89 5.00 10 1.60 82.67 73.48
0.10
2.10
Footing (2 Nos): 2200*2200mm, Bars
12 150 0.89 2.00 15 2.30 69.00 61.33
(X direction) 0.10
2.10
Bars (Y - direction) 12 150 0.89 2.00 15 2.30 69.00 61.33
0.10
2.30
Footing (3 Nos): 2400*2400mm, Bars
12 150 0.89 3.00 16 2.50 122.50 108.89
(X direction) 0.10
2.30
Bars (Y - direction) 12 150 0.89 3.00 16 2.50 122.50 108.89
0.10
2.40
Footing (1 Nos): 2500*2500mm, Bars
12 150 0.89 1.00 17 2.60 44.20 39.29
(X direction) 0.10
2.40
Bars (Y - direction) 12 150 0.89 1.00 17 2.60 44.20 39.29
0.10
2.70
Footing (1 Nos): 2800*2800mm, Bars
12 150 0.89 1.00 19 2.90 55.10 48.98
(X direction) 0.10
2.70
Bars (Y - direction) 12 150 0.89 1.00 19 2.90 55.10 48.98
0.10
2.90
Footing (2 Nos): 3000*3000mm, Bars
12 150 0.89 2.00 20 3.10 126.07 112.06
(X direction) 0.10
2.90
Bars (Y - direction) 12 150 0.89 2.00 20 3.10 126.07 112.06
0.10
3.00
Footing (1 Nos): 3100*3100mm, Bars
12 150 0.89 1.00 21 3.20 67.20 59.73
(X direction) 0.10
3.00
Bars (Y - direction) 12 150 0.89 1.00 21 3.20 67.20 59.73
0.10
0.20 0.08
100 &
Stirrups (for 250*300) 8 0.395 3 171 0.81 416.56 164.54
150
0.15
0.20 0.08
100 &
Stirrups (for 250*300) 8 0.395 5 75 0.81 304.50 120.28
150
0.15
Columns(450*450) upto plinth level
0.37 0.08
Stirrups for 15 columns 8 100 0.395 15.00 14 1.59 334.32 132.06
0.37
0.08
0.14
8 100 0.395 15.00 17 1.13 288.66 114.02
0.37
4 Plinth Tie Beams, 300*525mm
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3
Extra Bars above Grid B-B 0.45+1.7*2 25 3.86 3 2 3.85 23.10 89.05
Extra Bars above Grid C-C, D-D 1.05+0.45+1.7 25 3.86 3 4 3.20 38.40 148.03
0.475 0.1`2
Stirrups (for 300*525) 12 100&150 0.89 3 201 1.64 990.13 879.23
0.25
Main Bars (Short side beams); Along Grid A,B,C,D,E 0.00 0.00
0.475 0.12
G.F. Columns
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
FFL
GFL
0.37 0.08
100 &
Stirrups for 15 columns 8 0.40 15 29 1.59 686.55 271.23
0.37 150
0.08
0.14 100 &
4 8 0.40 15 52 1.13 874.47 345.47
150
0.37
Main Beams at F.F. Level
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3
21.5+0.45-2(0.07)
Bottom (T/O) 1.0 20 2.47 3 4 25.25 303.00 748.15
Extra Bars above Grid B-B 0.45+1.7*2 25 3.86 3 2 3.85 23.10 89.12
Extra Bars above Grid C-C, D-D 1.05+0.45+1.7 25 3.86 3 4 3.20 38.40 148.15
0.475 0.12
100 &
Stirrups (for 300*525) 10 0.62 3 232 1.64 1142.83 705.45
150
0.25
0.47 0.12
100 &
Stirrups (for 300*525) 10 0.62 5 78 1.58 616.20 382.04
150
0.25
Secondary Beam -
0.4 3.8-2(0.05)
16 1.58 1 3 5.44 16.32 25.79
0.4 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 1.30 35.37 13.97
150
0.20 27
0.4
16 1.58 1 3 14.90 44.70 70.64
11.7+.3*2-.05*2+.96
0.375 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 147 1.30 191.39 75.61
150
0.20
0.4
5.7+.5
16 1.58 1 3 7.94 23.82 37.64
0.375 0.10
100 &
Stirrups (for 425*250) 8 0.40 1 49 1.30 63.80 25.20
150
0.20
960 960
Hunge bar(at secondary beam
420 16 1.58 2 16 3.01 96.32 152.21
intersection) 420
250
First floor slab (First floor level) - -
Along Y-axis - -
600
GRID 1-3: between A-C 75 8 300 0.40 1 37 10.96 409.17 161.65
9800-40
450 600
75 8 300 0.40 1 37 11.12 415.15 164.01
9800-40
450
GRID 2-3: between C-D 75 8 300 0.40 1 12 5.49 63.99 25.28
4925-40
450
75 8 300 0.40 1 12 5.57 64.93 25.65
4925-40
450 600
GRID 1-3: between D-E 75 8 300 0.40 1 19 10.96 210.07 82.99
9800-40
600
75 8 300 0.40 1 19 11.12 213.13 84.20
9800-40
525
75 75 8 300 0.40 1 15 14.18 218.61 86.36
12300-40
525
GRID A-E: between 1a-3 75 75 8 300 0.40 1 16 23.44 365.27 144.31
21800-40
525
75 75 8 300 0.40 1 16 23.92 372.75 147.26
21800-40
525
GRID D-E: between 1-1a 75 75 8 300 0.40 3 15 7.46 345.03 136.31
6300-40
525
75 75 8 300 0.40 3 15 7.54 348.73 137.77
6300-40
1200
First Flight 12 125 0.89 1 13 3.80 49.34 43.85
2260
335
1450
3354 270
12 125 0.89 1 13 8.20 106.65 94.80
2700
430
1000
12 125 0.89 1 13 2.00 26.00 23.11
1000
1000
1000 12 125 0.89 1 13 2.00 26.00 23.11
1870
780 180 12 125 0.89 1 13 2.83 36.79 32.70
855
75
Second Flight 3354 12 125 0.89 1 13 8.05 104.64 93.01
2315
145
2260
240 780 12 125 0.89 1 13 3.28 42.64 37.90
2035
330 1000
12 125 0.89 1 13 3.37 43.75 38.88
1000
1880 12 125 0.89 1 13 4.68 60.84 54.08
180
1000
12 125 0.89 1 13 2.00 26.00 23.11
1000
450
Nosing ties 122 8 300 0.40 1 120 2.20 264.00 104.30
150
Second Flight distribution bar 75 1475 10 150 0.62 1 56 1.63 91.00 56.17
75
F.F. Columns
SFL
FFL
SFL
FFL
SFL
FFL
SFL
3000
16 1.58 5 2 3.60 35.95 56.81
FFL
SFL
FFL
SFL
FFL
SFL
FFL
SFL
FFL
SFL
FFL
0.37 0.08
100 &
Stirrups for 15 columns 8 0.40 15 29 1.59 692.52 273.59
150
0.37
0.08
0.14 100 &
8 0.40 15 52 1.13 882.96 348.82
150
0.37
Main Beams at Truss Level
Main Bars (Long side beams); Along Grid 1-1, 2-2, 3-3
0.72
Top (T/O) 21.5+0.45-2(0.05) 16 1.58 3 3 24.41 219.69 347.16
21.5+0.45-2(0.07)
0.42 12 0.889 3 2 23.57 141.42 125.71
0.35 0.12
100 &
Stirrups (for 300*400) 8 0.395 3 232 1.39 968.83 382.75
150
0.25
Main Bars (Short side beams); Along Grid A,B,C,D,E 0.00 0.00
0.42
9.5+0.45-2(0.05) 12 0.889 5 2 10.73 107.30 95.38
0.35 0.12
100 &
Stirrups (for 300*525) 8 0.395 5 79 1.39 549.84 217.22
150
0.25
G.F Sill band
600 600
At grid 1 10 0.62 3 2 7.29 43.74 27.00
5550
600 600
10 0.62 1 2 4.55 9.10 5.62
3050
600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
8 150 0.40 2 33 0.26 17.25 6.81
600 600
10 0.62 1 2 4.61 9.22 5.69
5550
8 150 0.40 1 25 0.26 6.59 2.60
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
Lintel Band
600 600
At grid 1 10 0.62 3 2 7.05 42.30 26.11
5550
8 150 0.40 3 38 0.26 29.64 11.71
600 600
10 0.62 1 2 4.55 9.10 5.62
3050
600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
8 150 0.40 2 31 0.26 15.95 6.30
600 600
10 0.62 1 2 4.85 9.70 5.99
5550
8 150 0.40 1 0.26 6.59 2.60
25
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
600 600
10 0.62 1 2 4.85 9.70 5.99
5550
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
8 150 0.40 4 45 0.26 46.45 18.35
600 600
10 0.62 1 2 4.55 9.10 5.62
3050
600 600
At grid 2 10 0.62 2 2 5.95 23.80 14.69
5550
600 600
10 0.62 1 2 4.85 9.70 5.99
5550
600 600
At grid A,C,D,E 10 0.62 4 2 8.05 64.40 39.75
6550
2-LaLiEC Total
S. No. Description Unit Remarks
GF FF Total Quantity
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1.00 1.00 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 50.00 r.m
copper conductor wires
B School Blocks
1 DISTRIBUTION BOARDS 1.00 1.00 2.00 2.00 nos.
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4
2.1 8.00 r.m
Sq mm Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5
2.2 5.00 r.m
Sq mm Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No
2.3 14.00 r.m
1.5 Sq mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 18.00 17.00 35.00 35.00 pts.
3.2 Two Way Light Point 1.00 1.00 1.00 pts.
3.3 Ceiling Fan Point 2.00 2.00 2.00 pts.
4 6A Universal Pin Light Power Socket Wiring 17.00 32.00 49.00 49.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 17.00 32.00 49.00 49.00 nos.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan nos.
6 Wall Fan 1.00 1.00 1.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.1 24 W LED Surface Mounted Square type 6.00 6.00 6.00 nos.
7.2 24 W LED Recessed Mounted Square type 6.00 6.00 6.00 nos.
7.3 18 W LED Surface Mounted Square type 4.00 4.00 4.00 nos.
7.4 18 W LED Recessed Mounted Square type 4.00 4.00 4.00 nos.
7.5 12 W LED Surface Mounted Cylindrical type 7.00 7.00 7.00 nos.
7.6 12 W LED Recessed Mounted Circular type 8.00 8.00 8.00 nos.
7.7 LED Wall Light 1.00 1.00 1.00 nos.
8 Pull Box nos.
Junction Box At External Post Top Light 3.00 no.
9 External Post Top Light Pole 3.00 3.00 no.
10 Post Top External Light Fixtures 3.00 3.00 no.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3.00 3.00 no.
11.2 Earthing Bar 3.00 3.00 no.
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 61.00 r.m
12.3.2 12 SWG Cu wire 16.00 r.m
13 Earth Test link 1.00 nos.
C Solar PV System
1 Solar PV Panel 8.00 nos.
2 Tubular Deep Cycle Battery 4.00 4.00 4.00 nos.
3 Hybrid Inverter 1.00 1.00 1.00 nos.
D Fire Extinguisher
a ABC Stored Pressure 5.0kg size 1 2 3.00 3.00 nos.
2 Concrete Works
2.1 PCC
2.1.1 PCC work (1:3:6)
For Footing
F1 9 1.00 1.00 0.10 0.90
For Lower Tie Beam
Grid 1 and Grid 3 2 9.40 0.45 0.05 0.42
Grid 2 2 4.70 0.35 0.05 0.16
Between grid 2 and 3 2 4.45 0.45 0.05 0.20
Along grid A-12,B-12 & C-12 3 3.20 0.45 0.05 0.22
Along grid A-23 & C-23 2 2.20 0.35 0.05 0.08
Along grid B-23 1 2.20 0.45 0.05 0.05
Septic Tank 1 0.83 1.45 0.08 0.09
Sewer Manhole (Rectangular)
Bottom 4 1.00 1.00 0.10 0.40
PCC Benching 4 0.07 Area 1.00 0.30
Total 2.82 cum
Sand Filling
Periphery of Soak pit 1 1.88 Area 1.55 2.92
Total 2.93 cu.m
3 Brickworks
5 FLOORING WORKS
5.1 Hard Concrete Flooring (40mm) With Neat Cement Punning
Toilet Floors 2 4.75 3.25 30.88
Corridor Floors 2 4.75 1.27 12.07
Outside Staircase 2 1.20 1.05 2.52
Ramp
Slanted Portion 1 5.45 1.03 5.59
Horizontal Portion 1 1.20 1.03 1.23
Drain 1 11.45 1.48 16.95
Along the terrace 2 4.75 2.25 21.38
Water Trough 2 0.60 3.75 4.50
Total 95.10 sq.m
6 ROOFING/TERRACING WORKS
6.1 Metal Works
Truss 1 999.81
Total 999.81 kgs
8 Miscellaneous
8.2 Cement Board Wall
For Partition
Gabel wall 2 1.09 Area 2.17
Total 2.18 sq.m
16mm dia rod Anchor bolt 24 0.45 10.800 r.m. 1.58 17.07
16mm dia nut nut 24 24.000 no. 0.03 0.75
10mm thick plate Top chord cleat 30 0.2 0.09 0.01 0.005 cu.m. 7,850.00 42.39
10mm thick plate Purlin Cleat 60 0.2 0.09 0.01 0.011 cu.m. 7,850.00 84.78
10mm dia nut bolt (50mm) nut bolt 60 60.000 no. 0.05 2.91
10mm thick plate Runner plate 16 0.175 0.07 0.01 0.002 cu.m. 7,850.00 15.39
10mm thick plate Runner box 32 0.175 0.07 0.01 0.004 cu.m. 7,850.00 30.77
10mm thick plate 32 0.08 0.07 0.01 0.002 cu.m. 7,850.00 14.07
16mm dia nut bolt (50mm) Runner box 32 32.000 no. 0.13 4.30
0.9
1 F1 Footing: Main bars 12 150 0.888 7 1.06 6.59
0.08
0.9
Distribution bars 12 150 0.888 7 1.06 6.59
0.08
0.22 0.08
100 &
Stirrups 8 0.395 30 1.04 12.32 110.92 Total height
150
0.22 for Stirrups= 3.25
0.15 0.08 & Ht. for 150 1.65
100 & spacing=
8 0.395 30 0.76 9.01 81.05
150
0.15
0.08 3 Nos. in
U shaped Stirrups & ties (total) 8 each 0.395 9 1.20 4.27 38.39
0.22
member
for One Column = 61.93
for Nine Columns = 557.40
3 Foundation Beams, 250*250
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 203 0.76 61.04 61.04 5 Stretches
150
0.15
0.15 0.08
8 150 0.395 32 0.76 9.71 9.71 1 Stretch (Section 2)
0.15
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 48 0.76 14.41 14.41
150
0.15
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 28 0.76 8.46 16.91
150
0.15
0.40 0.08
100 &
Stirrups (for 250*501) 8 0.395 20 1.26 9.87 19.74
150
0.15
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 203 1.06 85.14 85.14 5 Stretches
150
0.20
0.25 0.08
8 150 0.395 32 1.06 13.54 13.54 1 Stretch (Section 2)
0.20
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 48 1.06 20.10 20.10
150
0.20
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 28 1.06 11.79 23.59
150
0.20
Main Beams:
5 Long Beams: 250*450
10.0+0.3-2(0.06)
0.4+0.48 16 1.580 2 12.90 40.76 122.29 1 Lap
0.88
Top Bars 10.0+0.3-2(0.06) 16 1.580 3 12.90 61.15 183.44 1 Lap
0.40 0.08
100 &
Stirrups (for 250*450) 8 0.395 244 1.36 131.08 131.08 6 Stretches
150
0.20
Short side beams:
6.0+0.3-2(0.06)
Bottom Bars 0.4+0.2 12 0.888 4 7.38 26.21 78.64 3 beams
0.6
Top Bars 6.0+0.3-2(0.062) 12 0.888 3 7.38 19.66 58.98
0.40 0.08
Stirrups (for 250*450) 8 100 0.395 23 1.36 12.36 37.07
0.20
0.35 0.08
100 &
Stirrups (for 250*400) 8 0.395 28 1.26 14.02 42.06
150
0.20
0.86
6 SLAB: Short Span 0.11 2.71 10 150 0.617 65 4.65 186.49 186.49 65
1.48
Long Span 10.21 10 300 0.617 9 13.95 77.46 77.46 1 Lapping 9
0.09
1.48
1 Lapping, & Cranked
10.21 10 300 0.617 9 14.17 78.69 78.69
0.09 over middle beam
3.25
Top Extra (Negative) Bar 8 300 0.395 9 3.25 11.55 11.55
10.21
Distribution Bar, Long Span 8 150 0.395 10 10.21 41.40 41.40
2.71
Distribution Bar, Short Span 8 150 0.395 41 2.71 43.53 43.53
short span
4400
200
slab
Along Y axis
1915
110 8 1 34 9.03 306.85 0.40 121.21 Main Bar
7000
Total
S. No. Description Tc(S) Unit Remarks
Quantity
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 2 2.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS
1.5 6A DP MCB with Enclosure 2.00 2.00 nos.
3 General Service Light Point Wiring 0.00
3.1 One Way Light Point 11 11.00 pts.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan 0.00
6.2 225mm dia M/D exhaust Fan 4 4.00 nos.
7 Light Fixtures/Luminaires & Accessories 0.00
7.6 LED Wall Light 2 2.00 nos.
7.7 9 W LED Surface Mounted Cylindrical type 2 2.00 nos.
7.8 6 W LED Recessed Circular type 6 6.00 nos.
7.9 7 W LED T5 Slim Mirror Light 2 2.00 nos.
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance
Column 2 0.90 0.90 1.62
Concrete Pavement
Infront of 3-6C(S) 1 10.00 3.00 30.00
6.70 2.30 15.41
6.00 1.50 9.00
Infront of 2-LaLi 1 7.00 1.50 10.50
16.00 3.00 48.00
6.00 1.50 9.00
Infront of Toilet 1 15.00 1.50 22.50
Side of Toilet 2 6.00 1.90 22.80
In Betn Two Bldgs 1 12.00 2.50 30.00
At Gate 1 4.00 2.50 10.00
Total 208.83 sq.m
B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
Total 0.99 cu.m
8 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos
Building: 2-LaLiEC
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 ECD Student Desk (6 Seater) D-03 3 nos.
4 Soft Board F-01 1 nos.
5 Book Shelf F-02 3 nos.
6 Teacher's Table T-01 3 nos.
7 Teacher's Chair C-01 3 nos.
8 White Board F-03 3 nos.
Library
6 Student Bench G6-12 (3 Seater) B-02C 14 nos.
4 Library Table T-02 7 nos.
5 Library Shelf F-04 5 nos.
Computer nos.
7 Computer Table T-04 12 nos.
8 Computer Shelf C-02 24 nos.
9 White Board with Stand F-05 1 nos.
Laboratory
10 Equipment Shelf F-07 3 nos.
11 Lab Stool F-08 31 nos.
Miscellaneous
12 Equipment Cabinet F-09 4 nos.
13 Cusions F-16 18 nos.
14 Carpet 27.43 sq.m
Total 135 nos.
2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 20 3.62 289.6 0.62 179.552
3.02 3.02
0.3 0.3
3.27 3.27
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 32 3.14 401.92 0.62 249.19 3.045
0.05 0.05