Professional Documents
Culture Documents
Here AM1 is the amount of steelin ton supplied from A port to M1 industry.
Objective Function:
Minimize Cost
=100*(60AM1+70AM2+100AM3+60AM4+90BM1+50BM2+70BM3+60BM4+90CM1+80
CM2+40CM3+60CM4)
Here 60AM1 is the ton of steel from Port to Mill M1 travelling a distance of 60 Km and
transportation charge of Rs 100 per ton per km
Subject to Constraint:
AM1+AM2+AM3+AM4=2000
BM1+BM2+BM3+BM4=3800
CM1+CM2+CM3+CM4=1600